HomeMy WebLinkAboutResolution - 4153 - Contract - Allen Teinert Construction - Investigative Identification Office, MSB - 05_27_1993Resolution No.4153
May 27, 1993
Item #9
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock a Contract by and
between the City of Lubbock and Allen Teinert Construction Comany for the
remodeling of the Investigative Identification Office at Muncipal Square,
attached herewith, which shall be spread upon the minutes of the Council and
as spread upon the minutes of this Council shall constitute and be a part of
this Resolution as if fully copied herein in detail.
Passed by the City Council this
ATTEST:
.,n
etty .'3o ns n, City Secretary
APPROVED AS TO CONTENT:
Victor Kilmant Purchasing Manager
APPROVED AS TO FORM:
A--
DoWald G. Vandiver, First As§iistai
City Attorney
DGV:js/TEINERT.RES
D1-Agenda/May 20, 1993
4/53
CITY OF LUBBOCK
SPECIFICATIONS FOR
INVESTIGATIVE IDENTIFICATIO(
OFFICE REMODEL
BID # 12536
Copy
',fl 6��p 6y »
CITY OF LUBBOCK
Lubbock, Texas
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock a Contract by and
between the City of Lubbock and Allen Teinert Construction Comany for the
remodeling of the Investigative Identification Office at Muncipal Square,
attached herewith, which shall be spread upon the minutes of the Council and
as spread upon the minutes of this Council shall constitute and be a part of
this Resolution as if fully copied herein in detail.
Passed by the City Council this day of 1993.
ATTEST:
Betty M. Johnson, City Secretary
APPROVED AS TO CONTENT:
Victor Kil anL Purchasing Manager
1
APPROVED AS TO FORM:
Dolfald G. Vandiver, First Assis
City Attorney
DGV:je/TEIMMT.RES
DI-Agenda/May 20, 1993
F
r-
i
Office of
Purchasing
City of Lubbock
P.O. Box 2000
Lubbock. Texas 79457
606-767-2167
MAILED TO VENDOR: APRIL 23, 1993
CLOSE DATE: APRIL 28, 1993 AT 2 P.M.
BID #125361 INVESTIGATIVE IDENTIFICATION OFFICE REMODEL
ADDENDUM # 1
The following items take precedence over drawings and
specifications for the above named project. Where any item
called for in the bid documents is supplemented here, the
original requirements, not affected by this addendum, shall
remain in effect.
1. Remove existing HVAC supply grille and related duct work.
Patch and seal (so that no air leakage is detected)
supply line where branch and main duct system intersect.
2. Roof penetrations for refrigerant lines and electrical shall
be located directly above the renovated room. All roof work
shall be performed by Lydick as not to void the warranty of
equipment shall match existing roof pitch pans..
3. Owner shall supply all patch carpet. Contractor shall be
responsible for the proper installation of such carpeting.
4. Lay in ceiling shall be similar to existing located in the
hall way. However, new ceiling tiles shall have vinyl
backing 'as mentioned in the specifications.
5. Light fixtures shall be similar to those used in the hallway
which have return air capabilities.
r, 6. Window shall be double pane with lockable device. Glass
shall match existing glass. Dimension shall not exceed 4110"
X 316" and shall include frame and all trim. Window shall
have a shelf the width of the window and a depth of.
f' approximately 1211 on either side of the window. Shelf shall
i
be composed of 3/4" compressed plywood with a "Formica type"
finish. Finish shall be an off white color. Shelf shall
be properly installed to prevent warping or sagging of the
shelf. Window height shall be as per Owner's
representative.
All requests for additional information or clarification
concerning this RFQ should be submitted in writing and directed
to:
Dolores Chavarria
Buyer
City of Lubbock
P.O. Box 2000
Lubbock, Texas 79457
Questions may be faxed to: (806) 767-2164
Thank you,
Dolores Chavarria
Buyer
PLEASE RETURN ONE COPY WITH YOUR BID
CITY OF LUBBOCK
SPECIFICATIONS
for
TITLES INVESTIGATIVE IDENTIFICATION
OFFICE REMODEL
ADDRESS: MUNICIPAL SQUARE BUILDING, ROOM #207, 916 TEXAS AVENUE, LUBBOCK, TEXAS
BID NUMBER: 12536
PROJECT NUMBER: 1111-541101-5731
CONTRACT PREPARED BY: PURCHASING DEPARTMENT
1
I^
NDEx
PAGE
1. NOTICE TO BIDDERS..........................................................................................5
2. GENERAL INSTRUCTIONS TO BIDDERS ............................................. .............................7
3. BID PROPOSAL - BID FOR LUMP SUM CONTRACTS....................................................... .........15
r
�., 6. PAYMENT BOND..............................................................................................21
5. PERFORMANCE BOND..........................................................................................25
6. CERTIFICATE OF INSURANCE.................................................................................29
7. CONTRACT..................................................................................................33
' 8. GENERAL CONDITIONS OF THE AGREEMENT......................................................................37
r
9. CURRENT WAGE DETERMINATIONS...............................................................................55
r. 10. SPECIFICATIONS............................................................................................57
11. SPECIAL CONDITIONS........................................................................................59
12. NOTICE OF ACCEPTANCE......................................................................................61
t
3
NOTICE TO BIDDERS
5
NOTICE TO BIDDERS
BID # 12536
Sealed bids addressed to Dolores Chavarria, Buyer, City of Lubbock, Texas, will be received at the
office of the Purchasing Manager, Municipal Bldg., 1625 13th St., Room L-04, Lubbock, Texas, 79401, until
2:00 o'clock p.m. on the 28th day of April. 1993, or as changed by the issuance of formal addenda to all
planholders, to furnish all labor and materials and perform all work for the construction of the following
described project:
INVESTIGATIVE IDENTIFICATION OFFICE REMODEL
MUNICIPAL SOIIARE BUILDING
After the expiration of the time and date above first written, said sealed proposals will be opened
by the Buyer at his office and publicly read aloud.
It is the sole responsibility of the bidder to insure that his bid is actually in the office of
Purchasing Manager for the City of Lubbock, prior to the expiration of the date above first written.
The City of Lubbock will consider the bids on the 13th day of May. 1993. at Municipal Bldg.,
Lubbock, Texas, or as soon thereafter as may be reasonably convenient, subject to the right to reject any or
all bids and waive any formalities. The successful bidder will be required to furnish a performance bond
and payment bond in accordance with Article 5160, Vernon's Ann. Civil St., in the amount of 100% of the
total contract price in the event that said contract price exceeds f25,000.00. Said statutory bonds should
be issued by a company carrying a current J= Rating of JJ or superior, as the rating of the bond company is
a factor that will be considered in determination of the best responsible bidder. If the contract price
does not exceed $25,000.00 the said statutory bonds will not be required.
Bidders are required, whether or not a payment or performance bond is required, to submit a
cashier's or certified check issued by a bank satisfactory to the City of Lubbock, or a proposal bond from a
reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less
then 5% of the total amount of the bid submitted as a guarantee that bidder will enter into a contract and
execute all necessary bonds (if required) within 10 days after notice of award of the contract to him.
It shall be each bidders sole responsibility to inspect the site of the work and to inform himself
regarding all local conditions under which the work is to be done. It shall be understood and agreed that
all such factors have been thoroughly investigated and considered in the preparation of the bid submitted.
The plays, specifications, proposal forms and contract documents may be examined at the office of
the Purchasing Manager for the City of, Lubbock, Texas.
Attention of each bidder is particularly called to the schedule of general prevailing rate of per
diem wages included in the contract documents on file in the office of the Purchasing Manager of the City of
Lubbock, which document is specifically referred to in this notice to bidders. Each bidder's attention is
further directed to provision of Article 5159a, Vernon's Ann. Civil St., and the requirements contained
therein concerning the above wage scale and payment by the contractor of the prevailing rates of wages as
heretofore established by owner in said wage scale.
The City of Lubbock hereby notifies all bidders that in regard to any contract entered into pursuant
to this advertisement, minority and women business enterprises will be afforded equal opportunities to
submit bids in response to this invitation and will not be discriminated against on the grounds of race,
color, sex, disability, or national origin in consideration for an award.
There will be a pre -bid conference on 22th day of April, 1993. at 11:00 otclock a.m., Conference
Room, 206, Municipal Square Building, 916 Texas Ave., Lubbock, Tx. 79401
The City of Lubbock does not discriminate against persons with disabilities. City of Lubbock pre -
bid meetings and bid openings are available to all persons regardless of disability. If you would like bid
Information made available in a more accessible format or if you require assistance, please contact the
Purchasing Department at (806) 767-2167 (Monday -Friday, 8:00 - 5:00 p.m.) or 1625 13th Street Roan L-04 at
teast 48 hours in advance of the meeting.
CITY OF LUBBOCK
Dolores Chavarria�
BUYER
ADVERTISEMENT FOR BIDS
BID / 12536
Sealed bids addressed to Dolores Chavarris, Buyer, Purchasing Department,, City of Lubbock, Texas,
will be received at the Purchasing Office, Municipal Building, 1625 13th Street, Room L-04, Lubbock, Texas,
79401 until 2:00 o'clock Pon. on the 28th day of April. 1993. or as changed by the issuance of formal
addenda to all planholders, to furnish all labor and materials and perform all work for the construction of
the following described project:
INVESTIGATIVE IDENTIFICATION OFFICE REMODEL
MUNICIPAL BCUARE BUILDING
After the expiration of the time and date above first written, said sealed proposals will be opened
by the Buyer at his office and publicly read aloud.
The plans, specifications, proposal forms and contract documents may be examined at the office of
the Purchasing Manager for the City of Lubboek, Texas.
Attention of each bidder is particularly called to the Schedule of General Prevailing Rate of Per
Diem Wages included in the contract documents on file in the office of the Purchasing Manager of the City of
Lubbock, Texas. Each bidder's attention is further directed to the provisions of Article 5159a, Vernon's
Am. Civil St., and the requirements contained therein concerning such wage scales and payment by the
contractor of the prevailing rates of wages as heretofore established by the City of Lubbock.
The City of Lubbock hereby notifies all bidders that in regard to any contract entered ,into pursuant
to this advertisement, minority and women business enterprises will be afforded equal opportunities to
sutM t bids in response to this invitation and will not be discriminated against on the grounds of race,
color, sex, disability, or national origin in consideration for an award.
There will be a prebid conference on 22th day of April. 1993, at 11:00 o'clock a.m., Conference
Room, 206, Municipal Square Building, 916 Texas Ave., Lubbock, TX.79401
The City of Lubbock does not discriminate against persons with disabilities. City of Lubbock pre -
bid meetings and bid openings are available to all persons regardless of disability. If you would like bid
information made available in a more accessible format or if you require assistance, please contact the
Purchasing Department at (M) 767.2167 (Monday -Friday, 8:00 - 5:00 p.m.) or 1625 13th Street, Room L-04 at
least 48 hours in advance of the meeting.
CITY OF LUBBOCK
Dolores Chavarria�i
BUYER f`�
GENERAL INSTRUCTIONS TO BIDDERS
VA
GENERAL INSTRUCTIONS TO BIDDERS
SCOPE OF WORK
The work to be done under the contract documents shall consist of the following:
To remodel office and related area which will accommodate the Detective Latent work station.
The contractor shall furnish all labor, superintendence, machinery, equipment and all materials necessary to
complete this project in accordance with contract documents.
TRACT DOCUMENTS
All work covered by this contract shall be done in accordance with contract documents described in the General
Conditions.
All bidders shall be thoroughly familiar with all of the requirements set forth on the contract documents for the
construction of this project and shall be responsible for the satisfactory completion of all work contemplated by
said contract documents.
PLANS FOR USE BY BIDDERS
It is the intent of the City of Lubbock that all parties with an interest in submitting a bid on the project covered
by the contract documents be given a reasonable opportunity to examine the documents and prepare a bid without
charge of forfeiture of deposit. The contract documents, may be examined without charge as noted in the Notice to
Bidders.
TIME AND ORDER FOR COMPLETION
The construction covered by the contract documents shall be fully completed within 45 (fourty five) calendar days
from the date specified In the Notice to Proceed issued by the City of Lubbock to the successful', bidder.
The Contractor will be permitted to prosecute the work in the order of his own choosing, provided, however, the City
reserves the right to require the Contractor to admit a progress schedule of the work contemplated by the contract
documents. In the event the City requires a progress schedule to be submitted, and it is determined by the City
that the progress of the work is not in accordance with the progress schedule so submitted, the jCity may direct the
Contractor to take such action as the City deems necessary to insure completion of the project within the time
specified.
PAYMENT
All payments die to Contractor shall be made in accordance with the provisions of the General Conditions of the
contract documents.
AFFIDAVITS OF BILLS PAID
The City of Lubbock reserves the right, prior to final acceptance of this project to require the Contractor to
execute an affidavit that all bills for labor, materials and incidentals incurred in the construction of the
improvements contemplated by the contract documents have been paid in full and that there are no claims pending, of
which the Contractor has been notified.
9
T. KATER1ALS AND WORKMANSHIP
The intent of these contract documents is that only materials and workmanship of the best quality and grade will be
furnished. The fact that the specifications may fail to be sufficiently complete in some detail will not relieve
the Contractor of full responsibility for providing materials of high quality and for protecting them adequately
until incorporated into the project. The presence or absence of a representative of the City on the site will not
relieve the Contractor of full responsibility of complying with this provision. The specifications for materials
and methods set forth in the contract documents provide minimum standards of quality which the Owner believes
necessary to procure a satisfactory project.
a. GUARANTEES
All equipment and materials incorporated in the project and all construction shall be guaranteed against defective
materials and workmanship. Prior to final acceptance, the Contractor shall furnish to the Owner, a written general
guarantee which shall provide that the Contractor shall remedy any defects in the work, and pay for any and all
damages of any nature whatsoever resulting in such defects, when such defects appear within ONE year from date of
final acceptance of the work as a result of defective materials or workmanship, at no cost to the Owner (City of
Lubbock).
9. PLANS FOR THE CONTRACTOR
The contractor will be furnished one set of plans and specifications, and related contract documents for his use
during construction. Plans and specifications for use during construction will only be furnished directly to the
Contractor. The Contractor shall then distribute copies of plans and specifications to suppliers, subcontractors or
others, as required for proper prosecution of the work contemplated by the Contractor.
10. PROTECTION OF THE WORK
The Contractor shall be responsible for the care, preservation, conservation, and protection of all materials,
supplies, machinery, equipment, tools, apparatus, accessories, facilities, and all means of construction, and any
and all parts of the work whether the Contractor has been paid, partially paid, or not paid for such work, until the
date the City issues its certificate of completion to Contractor. The City reserves the right, after the bids have
been opened and before the contract has been awarded, to require of a bidder the following information:
(a) The experience record of the bidder showing completed jobs of a similar nature to the one covered by the
proposed contract and all work in progress with bond amounts and percentage completed.
(b) A sworn statement of the current financial condition of the bidder.
(c) Equipment schedule.
1i. TEXAS STATE SALES TAX
This contract is issued by an organization which qualifies for exemption provisions pursuant to provisions of
Article 20.O4 of the Texas Limited Sales, Excise and use Tax Act.
The Contractor must obtain a limited sales, excise and use tax permit which shall enable him to buy the materials to
be incorporated into the work without paying the tax at the time of purchase.
10
�1
12.
13.
14.
15.
16.
PROTECTION OF SUBSURFACE LINES AND STRUCTURES
It shall be the Contractorts responsibility to prosecute the work contemplated by the contract (documents in such a
way as to exercise due care to locate and prevent damage to all underground pipelines, utility lines, conduits or
other underground structures which eight or could be damaged by Contractor during the construction of the project
contemplated by these contract documents. The City of Lubbock agrees that it will furnish Contractor the location
of all such underground lines and utilities of which it has knowledge. However, such fact shall not relieve the
Contractor of his responsibilities aforementioned. All such underground lines or structures cut or damaged by
Contractor during the prosecution of the work contemplated by this contract shall be repaired immediately by
Contractor to the satisfaction of the City of Lubbock, Texas, at Contractor's expense.
BARRICADES AND'SAFETT MEASURES
The contractor shall, at his own expense, furnish and erect such barricades, fences, lights and danger signals, and
shall take such other precautionary measures for the protection of persons, property and the work as may be
necessary. The Contractor will be held responsible for all damage to the work due to failure of barricades, signs,
and lights to protect it, and when damage is incurred, the damaged portion shall be immediately removed and replaced
by Contractor at his own cost and expense. The Contractor's responsibility for maintewnce of barricades, signs,
and lights shall not tease until the date of issuance to Contractor of City's certificate of acceptance of the
project.
EXPLOSIVES
The use of explosives will not be permitted unless written permission to do so is obtained by the Contractor from
the City. In all cases where written permission is obtained for the use of explosives, the Contractor shall assume
full responsibility for all damage which may occur as a direct or indirect result of the blasting. In addition, in
all cases where explosives are authorized to be used, the Contractor shall use utmost care so as not to endanger
Life or property and the Contractor shall further use only such methods as are currently utilized by persons, firms,
or corporations engaged in similar type of construction activity.
Explosive materials shall not be stored or kept at the construction site by the Contractor.
In all cases where explosives are to be used during the construction of the project contemplated by this contract,
It shall be the duty of the Contractor to notify each utility company having structures (above or below the ground)
in proximity to the site of the work of ContractorOs intention to use explosives, and such notice shall be given
sufficiently in advance to enable the carpanies to take such steps as they may deem necessary to protect their
property from injury. Such notice, however, shall not relieve the Contractor of responsibility for any damage
resulting from his blasting operations.
CONTRACTOR'S REPRESENTATIVE
The successful bidder shall be required to have a responsible local representative available at all times while the
work is in progress under this contract. The successful bidder shall be required to furnish the name, address and
telephone number where such local representative may be reached during the time that the work contemplated by this
contract is in progress.
INSURANCE
The Contractor shall not commence work under this contract until he has obtained all insurance as required in the
General Conditions of the contract documents, from an underwriter authorized to do business in the State of Texas
and satisfactory to the City. Proof of coverage shall be furnished to the City and written notice of cancellation
or any material change will be provided ten (10) days in advance of cancellation or change. ALL policies shall
contain an agreement on the part of the insurer waiving the right to subrogation.
The insurance certificates furnished shall name the City as an additional insured and shall further state that all
subcontractors are named as additional insureds, or in the alternative, shall be accompanied by a statement from the
Contractor to the effect that no work on this particulgriproject shall be subcontracted.
17. LABOR AND WORKING HOURS
Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages
included in these contract documents. The wage rate which must be paid on this project shall not be less than
specified in the schedule of general prevailing rates of per diem wages as above mentioned. The bidders' attention
is further directed to the requirements of Article 5159a, Vernon's Annotated Civil Statutes providing for the
payment of the wage schedules above mentioned and the bidder's obligations thereunder. The inclusion of the
schedule of general prevailing rate of per diem wages in these contract documents does not release the Contractor
from compliance with any wage law that may be applicable. Construction work under this contract requiring an
inspector will not be performed on weekends or holidays unless the following conditions exist:
(1) The project being constructed is essential to the City of Lubbock's ability to provide the necessary service
to its citizens.
(2) Delays in construction are due to factors outside the control of the Contractor. The Contractor is
approaching the penalty provisions of the contract and Contractor can show he has made a diligent effort to
complete the contract within the allotted time. .
Before construction work requiring an inspector is to be performed on weekends or holidays, the Contractor must
notify the Owner's Representative not less than three full working days prior to the weekend or holiday he desires
to do work and obtain written permission from the Owner's Representative to do such work. The final decision on
whether to allow construction work requiring an inspector on weekends or holidays will be made by the owner's
Representative.
In any event, if a condition should occur or arise at the site of this project or from the work being done under
this contract which is hazardous or dangerous to property or life, the Contractor shall immediately commence work,
regardless of the day of the week or the time of day, to correct or alleviate such condition so that it is no longer
dangerous to property or life.
18. PAYMENT OF EMPLOYEES AND FILING OF PAYROLLS
The contractor and each of his subcontractors shall pay each of his employees engaged in work on the project under
this contract in full (less mandatory legal deductions) in cash, or by check readily cashable without discount, not
less often than once each week. The Contractor and each of his subcontractors engaged at the site of the work shall
not later than the seventh day following the payment of wages, file with the Owner's Representative, or Engineer, a
certified, sworn, legible copy of such payroll. This shall contain the name of each employee, his classification,
the number of hours worked on each day, rate of pay, and net pay. The affidavit shall state that the copy is a true
and correct copy of such payroll, that no rebates or deductions (except as shown) have been made, or will in the
future be made from the wages paid as'shown thereon. The Contractor must classify employees according to one of the
classifications set forth in the schedule of general prevailing rate of per diem wages, which schedule is included
in the contract documents.
The Contractor shall forfeit as a penalty to the City of Lubbock on whose behalf this contract is made, ten dollars
for each laborer, workman, or mechanicemployed for each calendar day, or portion thereof, such laborer, workman or
mechanic is paid less than the wages assigned to his particular classification as set forth in the schedule of
general prevailing rate of per diem wages included in these contract documents.
19. PROVISIONS CONCERNING ESCALATOR CLAUSES
Poposals submitted containing any conditions which provide for changes in the stated bid price due to increases or
decreases in the cost of materials, labor or other items required for the project will be rejected and returned to
the bidder without being considered.
12
r
20.
PREPARATION FOR PROPOSAL
The bidder shell submit his proposal on forms furnished by the City. AIL blank spaces in the form shall be
correctly filled in and the bidder shall state the price both in words and numerals, for which he proposes to do the
work contemplated or furnish the materials required. Such prices shall be written in ink, distinctly and Legibly,
or typewritten. In case of discrepancy between the price written in words and the price written in figures, the
price written in words shall govern. If the proposal is submitted by an individuaL, his name must be signed by him
or his duly authorized agent. If a proposal is submitted by a firm, association, or partnership, the name and
address of each member must be given and the proposaL signed by a member of the firm, association or partnership, or
person duly authorized. If the proposal is submitted by a company or corporation, the company or corporate name and
business address must be given, and the proposal signed by an official or duly authorized agent. Powers of attorney
authorizing agents or others to sign proposals must be properly certified and must be in writing and submitted with
the proposal. The proposal shall be executed in ink.
Each proposal shall be enclosed in a sealed envelope, addressed as specified in the Notice to Bidders, and endorsed
on the outside of the envelope in the following roamer:
(a) Bidder's name
(b) Proposal for (description of the project).
Bid proposals may be withdrawn and resubmitted at any time prior to the time set for opening of the bids, but no
proposal may be withdrawn or altered thereafter.
BOUND COPY OF CONTRACT DOCUMENTS
Bidder understands and agrees that the contract to be executed by bidder shall be bound and include the following:
(a) Notice to Bidders.
(b) General Instructions to Bidders.
M Bidder's Proposal.
(d) Statutory Bond (if required).
(e) Contract Agreement.
(f) General Conditions.
(g) Special Conditions (if any).
(h) Specifications.
(i) Insurance Certificates.
(j) All other documents made available to bidder for his inspection in accordance with the Notice to Bidders.
If Plans and specifications are too bulky or cumbersome to be physically bound, they are to be considered
Incorporated by reference into the aforementioned contract documents.
13
ac
a
n
m
BID PROPOSAL
BID FOR LUMP SUM CONTRACTS
PLACE: MUNICIPAL SQUARE, ROOK 207, 916 TEXAS AVENUE, LUBBOCK, TEXAS
4-28-93
DATE
#12536
PROJECT NO.
Proposal of ALLEN TEINERT CONSTRUCTION CO., INC. (hereinafter called Bidder)
To the Honorable Mayor and City C(x-rcil City of Lubbock, Texas (hereinafter called Owner)
Gentlemen:
The Bidder, in compliance with your invitation for bids for the construction of a INVESTIGATIVE
IDENTIFICATION OFFICE REMODEL BID #12536
having carefully examined the plans, specifications, instructions to bidders, notice to bidders and all other re-
lated contract documents and the site of the proposed work, and being familiar with all of the conditions surround-
ing the construction of the proposed project including the availability of materials and labor, hereby proposes to
furnish all labor, materials, and supplies; and to construct the project in accordance with the plans, specifica-
tions and contract documents, within the time set forth therein and at the price stated below. The price to cover
all expenses incurred in performing the work required under the contract documents, of which this proposal is to be
a part, is.as follows:
MATERIALS: Four Thousand, Eight Hundred Thirty-two dollars ----- CS 41832.00 )
SERVICES: Five Thousand, Eight Hundred and Two dollars-------(S 5,802.00 y
TOTAL BID: Ten Thousand, Six Hundred Thirty-four dollars------(S 10,634.00 y
Amount shall be shown in both words and figures. In case of discrepancy, the amount shown in words shall govern.)
Bidder hereby agrees to commence the work on the above project on or before a date to be specified in a
written "Notice to Proceed" of the owner and to fully complete the project within 45 (Fourty five) consecutive cal-
endar days thereafter as stipulated in the specifications and other contract documents. Bidder hereby further
agrees to pay to Owner as liquidated damages the sum of $100.00 (One Hundred Dollars) for each consecutive calendar
day in excess of the time set forth hereinabove for completion of this project, all as more fully set forth in the
general conditions of the contract documents.
Bidder understands and agrees that this bid proposal shall be completed and submitted in accordance with in-
struction number 20 of the General Instructions to Bidders.
Bidder understands that the Owner reserves the right to reject any or all bids and to waive any formality in
the bidding.
The Bidder agrees that this bid shall be good and may not be withdrawn for a period of thirty (30) calendar
days after the scheduled closing time for receiving bids.
11
` The undersigned Bidder hereby declares that he has visited the site of the work and has carefully examined
the plans, specifications and contract documents pertaining to the work covered by this bid, end he further agrees
to commence work on or before the date specified in the written notice to proceed, and to substantially complete the
work on which he has bid; as provided in the contract documents.
Enclosed with this proposal is a Cashier's Check or Certified Check for FZVe Hundred Thirty —One &
20/100—Dollars (S 531.20 ) 76t{Kx iDi)6)tKKKKXKXXXXXXXXXXXXXxxxxxxxxx)PRt gam{ XXXXy_%k
which it is agreed shall be collected and retained by the owner as liquidated damages in the event the proposal is
accepted by the Owner and the undersigned fails to execute the necessary contract documents and the required bond
(if any) with the Owner within ten (10) days after the date of receipt of written notification of acceptance of said
proposal; otherwise, said check or bond shall be returned to the undersigned upon demand.
Bidder understands and agrees that the contract to be executed by Bidder shall be bound and include all con-
tract documents node available to him for his inspection in accordance with the Notice to Bidders.
ALLEN TEINERT CONSTRU TION CO.
Contractor^
BY: C •►
ALLEN E. TEINERT, President
(Seal if Bidder is a Corporation)
per" 12
I'
7
4
4
LIST OF SUBCONTRACTORS
y
Kinority Owned
Yes No
i•
A-1 SERVICE ELECTRIC
-. X
2.
HENLEY INTERIORS
X
r 3.
4
BOB TYSON GLASS
4.
LYDICK ROOFING
r
5.
ADAMS BROS. PAINTING
X
7 6.
JOE GONZALES CARPET INSTL.
X -
7.
Flo.
— —
r
20
No Text
PERFORMANCE BOND
26
CERTIFICATE OF INSURANCE
30
AfFhOlDDfYY) ISSUE DATE (MM/
♦
tal). -�-'CERTIFIC�ATE—..'O—F,�IN8U'RA INSURANCE 03-16-91
PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND
CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE
0 S
THIS
NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE
POLICIE
QUISENBERRY & ASSOCIATES INC POLICIES BELOW,
4601 66TH STREET SUITE B COMPANIES AFFORDING COVERAGE
LUBBOCK TX 79414-4898
INSURED
COMPAN
LETTERYA COMMERCIAL UNION INSURANCE COMPANY
.. ...........
........ ... LETTER COMPANY B TEXAS WORKERS COMPENSATION INS FUND
COMPANY
ALLEN TEINERT CONSTRUCTION CO LETTER
202 AVENUE Q ........... .. ... ............... ... ..........
LUBBOCK TX 79415 LCETTOMPANER Y n w
COMPANY E
LETTER
COVERAGES
nt:f
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
..........
7CO POLICY EFFECTIVE POLICY EXPIRATION
LTR TYPE OF INSURANCE POLICY NUMBER DATE (MMIDDIYY) : DATE (MMIDDIYY) LIMITS
GENERAL LIABILITY
GENERAL AGGREGATE
000.4 PpIl
A 'X
COMMERCIAL GENERAL LIABILITY
PRODUCTS COMP/OP AGG
P.O.0 , 0 0
CLAIMS MADE X OCCUR.
CRR106448
03-25-93
03-25-94PERSONAL &ADV. INJURY
Il
1,000,po(
OWNER'S & CONTRACTOR'S PROT.
EACH OCCURRENCE
1,000,00C
FIRE DAMAGE (Any one flr
50
MED. EXPENSE (Any one person) 111
-5,00
AUTOMOBILE LIABILITY
'ANY
1 COMBINED SINGLE
LIMIT
m
ts
1,000,00C
AUTO
A X
ALL OWNED AUTOS
FRAB46513
03-26-93
03-26-94 BODILY INJURY
X
SCHEDULED AUTOS
(Per person)
$
X
HIRED AUTOS
BODILY INJURY
X
NON -OWNED AUTOS
(Per accident)
GARAGE LIABILITY
PROPERTY DAMAGE
is
EXCESS LIABILITY
EACH OCCURRENCE
$
UMBRELLA FORM
AGGREGATE
:3
OTHER THAN UMBRELLA FORM
WORKER'S COMPENSATION
STATUTORY LIMITS
B
AND
TSF100367-01
03-26-93
EACH ENT
ACCIDENT
03-26-94
Is
500, 00 C
DISEASE —POLICY LIMIT
$
500
EMPLOYERS' LIABILITY
DISEASE —EACH EMPLOYEE
I
.,90C
sno-nnir
OTHER
DESCRIPTION OF OPERATIONSILOCATIONSIVENICLESISPECIAL ITEMS
CERTIFICATE HOLDER_:.
CITY OF LUBBOCK
P3 BOX 2000
LUBBOCK TX 79417
,ACORD25-S(7/90)
t--CANCELLATI N
0
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO
MAIL 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE
LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR
LIABILITY OF ANY KIND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES.
REPRESENTA
t kl%"c
tY
��* �''C�ACOR6' CDR - IObFi' 4901
ON
U
H
__.
r.
t CONTRACT
STATE OF TEXAS
COUNTY OF LUBBOCK
THIS AGREEMENT, made and entered into this by and between the City of Lubbock, County of Lubbock,
State of Texas, acting by and through David R. Langston, Mayor, thereunto authorized to do so, hereinafter referred to as
OWNER, and A_LLEN TEINERT CONSTRUCTION COMPANY. INCORPORATED. of the City of LUBBOCK, County of LUBBOCK and the State of
TEXAS, hereinafter termed CONTRACTOR.
f YITNESSETN: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed
l by the OWNER and under the conditions expressed in the bond bearing even date herewith (if any) the CONTRACTOR hereby agrees
with OWNER to commence and complete the construction of certain improvements described as follows:
BID #12536 - INVESTIGATIVE IDENTIFICATION OFFICE REMODEL -MUNICIPAL SQUARE BUILDING - IN THE AMOUNT OF $10,634.00.
and all extra work a in connection therewith, underthe terms as stated in the contract documents and at his (or their) own
proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance
and other accessories and services necessary to complete the said construction in accordance with the contract documents as
defined in the General Condition of Agreement.
The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have been
given to him and to substantially complete same within the time specified in the contract documents.
The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract in accordance with the
proposal submitted therefore, subject to additions and deductions, as provided in the contract documents and to make payment
on account thereof as provided therein.
IN WITNESS WHEREOF, the parties to these presents ha (eexecut ed this eemen n u7c
Lubbock County, Texas in the
year and day first above written.
ATTEST:
�I Se reta
k A Fi VED AS TOf
:
APPROVED AS T ORM:
ATTEST:
Corporate Secretary
r
CONTRACTOR
By:
TITLE: ff.-e.l.y._ -/A
COMPLETE ADDRESS:
2 c.
35
f
r
r�
I
r
t
r
GENERAL CONDITIONS OF THE AGREEMENT
r
r
38
GENERAL CONDITIONS OF THE AGREEMENT
i. OWNER
Whenever the word Owner, or the expression Party of the First Part, or First Party, are used in this contract, it
shall be understood as referring to the City of Lubbock, Texas.
2. CONTRACTOR
l Whenever the word Contractor, or the expression Party of the Second Part, or Second Party, is used, it shall be
l understood to mean the person, persons, copartnership or corporation, to -wit: ALLEN TEINERT COSNTRUCTION COMPANY
who has agreed to perform the work embraced in this contract, or to his or their legal representative.
a.
3. OWNER'S REPRESENTATIVE
Whenever the word Owner's Representative or representative is used in this contract, it shall be understood as
referring to George Ewing, Assistant Chief of Police -Investigations, City of Lubbock, under whose supervision these
contract documents, including the plans and specifications, were prepared, and who will inspect constructions; or to
such other representative, supervisor, or inspector as may be authorized by said Owner to act in any particular
under this agreement. Engineers, supervisor or inspectors will act for the Owner under the direction of Owner's
Representative, but shall not directly supervise the Contractor or men acting in behalf of the Contractor.
4. CONTRACT DOCUMENTS
The contract documents shall consist of the Notice to Bidders, General Instructions to Bidders, Proposal, Signed
Agreement, Statutory Bonds (if required), General Conditions of the Agreement, Special Conditions of the Agreement
(if any), Specifications, Plans, Insurance Certificate, and all other documents made available to Bidder for his
inspection in accordance with the Notice to Bidders.
S. INTERPRETATION OF PHRASES
Whenever the words "Directed," "Permitted," "Designated," "Required," °Considered Necessary," "Prescribed," or words
of like import are used, it shall be understood that the direction, requirement, permission, order, designation or
prescription of the Owner's Representative is intended; and similarly, the words "Approved," "Acceptable,"
"Satisfactory," or words of like import shell mean approved by or acceptable or satisfactory to the Owner's
Representative.
Whenever in the Specifications or drawings accompanying this agreement, the terms of description of various
qualities relative to finish, workmanship, or other qualities of similar kind which cannot, from their nature, be
specifically and clearly described and specified, but are necessarily described in general terms, the fulfillment of
which must depend on individual judgment, then, in all such cases, any question of the fulfillment of said
specifications shall be decided by the Owner's Representative, and said work shall be done in accordance with his
interpretations of the meaning of the words, terms, or clauses defining the character of the work.
6. SUBCONTRACTOR
The term Subcontractor, as employed herein, includes only those having a direct contract with the Contractor for
performance of work on the project contemplated by these contract documents. Owner shall have no responsibility to
any Subcontractor employed by Contractor for performance of work on the project contemplated by these contract
documents, but said Subcontractors will look exclusively to Contractor for any payments due Subcontractor.
7. WRITTEN NOTICE
Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of
the firm or to an officer of the corporation for wham it is intended, or if delivered at or sent certified mail to
the last business address known to him who gives the MtJce.
G
P 8. WORK
k
Unless otherwise stipulated, the Contractor shall provide and pay for ell materials, supplies, machinery, equipment,
tools, superintendence, labor, insurance, and all water, light, power, fuel, transportation and all other facilities
necessary for the execution and completion of the work covered by the contract documents. Unless otherwise
specified, all materials shall be new and both workmanship and materials shall be of a good quality. The Contractor
shall, if required, furnish satisfactory evidence as to the kind and quality of materials. Materials or work
described in words which so applied have well known, technical or trade meaning shall be held to refer such
recognized standards.
All work shall be done and all materials furnished in strict conformity with the contract documents.
9. SUBSTANTIALLY COMPLETED
The term "Substantially Completed" is meant that the structure or project contemplated by the contract documents has
been made suitable for use or occupancy or the facility is in a condition to serve its intended purpose, but still
may require minor miscellaneous work and adjustment.
10. LAYOUT
Except as specifically provided herein, the Contractor shall be responsible for laying out all work and shall
accomplish this work in a manner acceptable to the Owner's Representative. The owner's Representative will check
the Contractor's layout of all major structures and any other layout work done by the Contractor at Contractor's
request, but this check does not relieve the Contractor of the responsibility of correctly locating all work in
accordance with the Plans and Specifications.
11. KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE
The Contractor shall be furnished with one copies of all Plans, Profiles and Specifications without expense to him
and he shall keep one copy of same consistently accessible on the job site.
12. RIGHT OF ENTRY
The Owner's Representative may make periodic visits to the site to observe the progress of quality of the executed
work and to determine, in general, if the work is proceeding in accordance with the contract documents. He will not
be required to make exhaustive or continuous onsite inspections to check the quality or quantity of the work, nor
will he be responsible for the construction means, methods, techniques, sequences or procedures, or the safety
precautions incident thereto. His efforts will be directed towards providing assurances for the Owner that the
a completed project will conform to the requirements of the contract documents, but he will not be responsible for the
Contractor's failure to perform the work in accordance with the Contract Documents. On the basis of his onsite
observations, he will keep the Owner informed of the progress of the work and will endeavor to guard the Owner
against defects and deficiencies in the work of the Contractor.
13. LINES AND GRADES
All lines and grades shall be furnished by the Owner's Representative whenever necessary for the commencement of the
work contemplated by these contract documents or the completion of the work contemplated by these contract
documents. Whenever necessary, Contractor shall suspend his work in order to permit Owner's Representative to
comply with this requirement, but such suspension will be as brief as practical and Contractor shall be allowed no
extra compensation therefore. The Contractor shall give the Owner's Representative ample notice of the time and
place where lines and grades will be needed. All stakes, marks, etc., shall be carefully preserved by the
Contractor, and in case of careless destruction or removal by him, his Subcontractors, or his employees, such
stakes, marks, etc., shall be replaced by the Owner's Representative at Contractor's expense.
39
k
17
l7 14. 06WERIS REPRESENTATIVE'S AUTHORITY AND DUTY
Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the Owner's
Representative shall review all work included herein. He has the authority to stop the work whenever such stoppage
may be necessary to insure the proper execution of the contract. In order to permit delays and disputes and to
discourage litigation, it is further agreed that the Owner's Representative shall, in all cases, determine the
amounts end quantities of the several kinds of work which are to be paid for under this contract. He shall
determine all questions in relstion to said work and the construction thereof, and shall, in all cases, decide every
question which may arise relstive to the execution of this contract on the part of said Contractor. The Owner's
Representatives's estimates end findings shall be conditions precedent to the right of the parties hereto to
arbitration or to any action on the contract, end to any rights of the Contractor to receive any money under this
contract; provided, however, that should owner's Representative render any decision or give any direction, which in
the opinion of either party hereto, is not in accordance with the meaning and intent of this contract, either party
may file with said Owner's Representative within 30 days his written objection to the decision or direction so
rendered, and by such action may reserve the right to submit the questions so raised to arbitration as hereinafter
provided. It is the intent of this Agreement that there shall be no delsy in the execution of the work, therefore,
written decisions or direction of the Owner's Representative as rendered shall be promptly carried out, and any
claim arising therefrom shall be thereafter adjusted to arbitration as hereinafter provided.
The Owner's Representative shall, within a reasonable time, render and deliver to both the owner, and the Contractor
a written decision on all claims of the parties hereto and on all questions which may arise relative to the
execution of the work or the interpretation of the contract, specifications and plans. Should the Owner's
Representative fail to make such decision within a reasonable time, on appeal to arbitration may be taken as if his
decision had been rendered against the party appealing.
15. SUPERINTENDENCE AND INSPECTION
It is agreed by the Contractor that the Owner's Representative shall be and is hereby authorized to appoint from
time to time such subordinate engineers, supervisors, or inspectors as the said Owner's Representative may deem
proper to inspect the materials furnished and the work done under this Agreement, and to see that said material is
furnished and said work is done in accordance with the specifications therefore. The Contractor shall furnish all
reasonable aid and assistance required by the subordinate engineers, supervisors or inspectors for the proper
inspection and examination of the work. The Contractor shall regard end obey the directions and instructions of any
subordinate engineers, supervisors or inspectors so appointed, when such directions and instructions are consistent
J with the obligations of this Agreement and accompanying plans and specifications provided, however, should the
Contractor object to any orders by any subordinate engineer, supervisor or inspector, the Contractor may within six
(6) days sake written appeal to the owner's Representative for his decision.
16. CONTRACTOR'S DUTY AND SUPERINTENDENCE
The Contractor shall give personal attention to the faithful prosecution and completion of this :contract and shall
keep on the work, during its progress, a competent superintendent end any necessary assistanu, AU satisfactory to
Owner's Representative. The superintendent shall represent the Contractor in his absence and sil directions given
to him shall be binding as if given to the Contractor. Adequate supervision by competent and reasonable
representatives of the Contractor is essential to the proper performance of the work and lack of such supervision
shall be grounds for suspending operations of the Contractor.
The work, from its conmencement to completion, shall be under the exclusive charge and control of the Contractor and
all risk in connection therewith shall be borne by the Contractor.
The Owner or owner's Representatives will not be responsible for the acts or omissions of the Contractor, or any
subcontractors, or any of his agents or employees, or any other persons performing any of the work.
F
F 42
17. CONTRACTOR'S UNDERSTANDING
It is understood and agreed that the Contractor has, by careful examination, satisfied himself as to the nature and
location of the work, the confirmation of the ground, the character. quality and quantity of materials to be
encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the work,
and the general and local conditions, and all other matters which in any way effect the work under this contract.
No verbal agreement or conversation with any officer, agent, or employee of the Owner, either before or after the
execution of this contract, shall effect or modify any of the terms or obligations herein contained.
18. CHARACTER OF WORKMEN
The Contractor agrees to employ only orderly and competent mien, skillful in the performance in the type of work
required under this contract, to do the work; and agrees that whenever the Owner's Representative shall inform him
in writing that any man or men on the work, are, in his opinion, incompetent, unfaithful, or disorderly, such man or
men shall be discharged from the work and shall not again be employed on the work without the Owner's
Representative's written consent.
19. CONSTRUCTION PLANT '
The Contractor shall provide all labor, tools, equipment, machinery and materials necessary in the prosecution and
completion of this contract where it is not otherwise specifically provided that Owner shall furnish same, and it is
also understood that owner shall not be held responsible for the care, preservation, conservation, or protection of
any materials, tools, equipment or machinery or any part of the work until it is finally completed and accepted.
The building of structures for the housing of men or equipment will be permitted only at such places as the Owner's
Representative shall direct, and the sanitary conditions of the grounds in or about such structure shall at all
times be maintained in a manner satisfactory to the Owner's Representative.
20. SANITATION
Necessary sanitary conveniences for the use of laborers on the work site, properly secluded from public observation,
shall be constructed and maintained by the Contractor in such manner and at such points as shall be approved by the
Owner's Representative and their use shall be strictly enforced.
21. OBSERVATION AND TESTING
The Owner or Owner's Representative shall have the right at all reasonable times to observe and test the work.
Contractor shall make necessary arrangements and provide proper facilities and access for such observation and
testing at any location wherever work is in preparation or progress. Contractor shall ascertain the scope of any
observation which may be contemplated by Owner or Owner's Representative and shall give ample notice as to the time
each part of the work will be ready for such observation. Owner or Owner's Representative may reject any work found
to be defective or not in accordance with the contract documents, regardless of the stage of its completion or the
time or place of discovery of such errors and regardless of whether Owner's Observer has previously accepted the
work through oversight or otherwise. If any work should be covered without approval or consent of the Owner, it
must, if requested by Owner or Owner's Representative, be uncovered for examination at Contractor's expense. In the
event that any part of the work is being fabricated or manufactured at a location where it is not convenient for
Owner or Owner's Representative to make observations of such work or require testing of said work, then in such
event Owner or Owner's Representative may require Contractor to furnish owner or Owner's Representative vertificates
of inspection, testing or approval made by persons competent to perform such tasks at the location where that part
of the work is being manufactured or fabricated. All such tests will be in accordance with the methods prescribed
by the American Society for Testing and Materials or such other applicable organization as may be required by law or
the contract documents.
43
If any work which is required to be inspected, tested, or approved is covered up without Written approval or consent
of the Owner or Owner's Representative, it must, if requested by the owner or Owner"s Representative, be uncovered
for observation and testing at the Contractor"s expense. The cost of all such inspections, tests and approvals
shall be borne by the Contractor unless otherwise provided herein. Any work which fails to meet the requirements of
any such tests, inspections or approval, and any work which meets the requirements of any such tests or approval but
does not meet the requirements of the contract documents shall be considered defective. Such defective work shall
be corrected at the Contractor's expense.
Keither observations by the owner or Owner's Representative, nor inspections, tests, or approvals made by owner,
Owner#s Representative, or other persons authorized under this agreement to make such inspections, tests, or
approvals shall relieve the Contractor from his obligation to perform the work in accordance with the requirements
of the contract documents.
22. DEFECTS AND THEIR REMEDIES
It is further agreed that if the work or any part thereof, or any material brought on the site of the work for use
in the work or selected for the same, shall be deemed by the owner or Owners' Representative as 'unsuitable or not in
conformity with plans, specification and contract documents, the Contractor shall, after receipt of written notice
thereof from the Owner" s Representative, forthwith remove such material and rebuild or otherwise remedy such work so
that it shall be in full accordance with this contract. It is further agreed that any remedialaction contemplated
Il as hereinabove set forth shall be at Contractorts expense.
r23, CHANGES AND ALTERATIONS
The Contractor further agrees that the owner may make such changes and alterations as the Owner may see fit, in the
line, grade, form dimensions, plans or or materials for the work herein contemplated, or any part thereof, either
before or after the beginning of the construction, without affecting the validity of this contract and the
accompanying bond.
If such changes or alterations diminish the quantity of the work to be done, they shall not constitute the basis for
a claim for damages, or anticipated profits on the work that may be dispensed with. If they increase the amount of
work, and the increased work can fairly be classified under the specifications, such increase shall be paid
according to the quantity actually done and at the unit price established for such work under this contract;
r otherwise such additional work shall be paid for as provided under Extra York. In case the owner shall make such
changes or alterations as shall make useless any work already done or material already furnished or used in said
work, then the owner shall recompense the Contractor for any material or labor so used, and for, any actual loss
occasioned by such change, due to actual expenses incurred in preparation for the work as originally planned.
24. EXTRA WORK
The term "extra workm as used in this contract shall be understood to mean and include all work that may be required
by the Owner or Ownerts Representative to be done by the Contractor to accomplish any change, alteration or addition
to the work as shown on the plans and specifications or contract documents and not covered by Contractor's proposal,
rexcept as provided under Changes and Alterations herein.
f.
It is agreed that the Contractor shall perform all extra work under the direction of the Ownerts Representative when
�^ presented with a written work order signed by the Owner's Representative; subject, however, to the right of the
f Contractor to require written confirmation of such extra work order by the Owner., It is also agreed that the
f compensation to be paid to the Contractor for performing said extra work shall be determined by, the following
methods:
Method (A) - By agreed unit prices; or
Method (B) - By agreed lump sum; or
Method (C) - If neither Method (A) or Method (6) be agreed upon before the extra work is commenced, then
the Contractor shall be paid the actual field cost of the work, plus fifteen (15%) per
cent.
r 44
l
In the 'event said extra work be performed and paid for under Method (C), then the provisions of this paragraph shall
apply and the ■actual field cost" is hereby defined to include the cost of all workmen, such as foremen,
timekeepers, mechanics and laborers, materials, supplies, teams, trucks, rentals on machinery and equipment, for the
time actually employed or used on such extra work, plus actual transportation charges necessarily incurred, together
with all expenses incurred directly on account of such extra work, including Social Security, Old Age Benefits,
Maintenance Bonds, Public Liability and Property Damage and Workmen's Compensation and all other insurances as may
be required by law or ordinances or directed by the Owner or Owner's Representative, or by them agreed to. Owner's
Representative may direct the form in which accounts of the actual field cost shall be kept and records of these
accounts shall be made available to the Owner's Representative. The Owner's Representative nay also specify in
writing, before the work commences, the method of doing the work and the type and kind of machinery and equipment to
be used; otherwise, these matters shell be determined by the Contractor. Unless otherwise agreed upon, the prices
for the use of machinery and equipment shall be determined by using 100%, unless otherwise specified, of the latest
Schedule of Equipment and Ownership Expenses adopted by the Associated General Contractors of America. Where
practical, the terms and prices for the use of machinery and equipment shall be incorporated in the written extra
work order. The fifteen percent (15%) of the actual field cost to be paid to Contractor shall cover and compensate
him for his profit, overhead, general superintendence and field office expense, and all other elements of cost and
expense not embraced within the actual field cost as herein defined, save that where the Contractor's Camp or Field
Office must be maintained primarily on account of such Extra Work, then the cost to maintain and operate the same
shall be included in the ■actual field cost."
No claim for extra work of any kind will be allowed unless ordered in writing by Owner's Representative. In case
any orders or instructions appear to the Contractor to involve extra work for which he should receive compensation
or an adjustment in the construction time, he shall make written request to the Owner's Representative for a written
order authorizing such extra work. Should a difference of opinion arise as to what does or does not constitute
extra work or as to the payment therefore, and the Owner's Representative insists upon its performance, the
Contractor shall proceed with the work after making written request for written order and shall keep adequate and
accurate account of the actual field cost thereof, as provided under Method (Q . The Contractor will thereby
preserve the right to submit the matter of payment to arbitration as herein below provided.
25. DISCREPANCIES AND OMISSIONS
It is further agreed that it is the intent of this contract that all work described in the proposal, the
specifications, plans and other contract documents, is to be done for the prices quoted by the Contractor and that
such price shall include all appurtenances necessary to complete the work in accordance with the intent of these
contract documents as interpreted by Owner's Representative. If the Contractor finds any discrepancies or omissions
in these plans, specifications, or contract documents, he should notify the Owners' Representative and obtain a
clarification before the bids are received, and if no such request is received by the owner's Representative prior
to the opening of bids, then it shall be considered that the Contractor fully understands the work to be included
and has provided sufficient sums in his proposal to complete the work in accordance with these plans and
specifications. It is further understood that any request for clarification must be submitted no later than five
days prior to the opening of bids.
26. RIGHT OF OWNER TO MODIFY METHODS AND EQUIPMENT
If at any time the methods or equipment used by the Contractor are found to be inadequate to secure the quality of
work with the rate of progress required under this contract, the Owner or owner's Representative may order the
Contractor in writing to increase their safety or improve their character and efficiency and the Contractor shall
comply with such order.
If, at any time, the working force of the Contractor is fnadequate for securing the progress herein specified, the
Contractor shall, if so ordered in writing, increase his force or equipment, or both, to such an extent as to give
reasonable assurance of compliance with the schedule of progress.
45
I
27. PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC
rThe Contractor shall take out and procure a policy or policies of Workmen's Compensation Insurance with an insurance
t company licensed to transact business in the State of Texas, which policy shalt comply with the Workmen's
Compensation laws of the State of Texas. The Contractor shall at all times exercise reasonable precaution for the
safety of employees and others on or near the work and shalt comply with all applicable provisions of federal, state
and municipal taws and building and construction codes. All machinery and equipment and other physical hazards
shall be guarded in accordance with the ■Manual of Accident Prevention in Construction" of Associated General
Contractors of America, except where incompatible with federal, state or municipal laws or regulations. The
Contractor, his sureties and insurance carriers shall defend, indemnify and save harmless the owner and all of its
l officers, agents and employees from all suits, actions, or claims of any character whatsoever, brought for or on
account of any injuries or damages received or sustained by any person or persons or property, on account of any
r negligent act or fault of the Contractor or any subcontractor, their agents or employees,, in the execution and
supervision of said contract, and the project which is the subject matter of this contract, on account of the
failure of Contractor or any subcontractor to provide necessary barricades, warning lights, or signs and will be
required to pay any judgment with costs which may be obtained against the Owner or any of its officers, agents, or
employees including attorneys fees.
The safety precautions taken shall be the sole responsibility of the Contractor, in his sole discretion as an
Independent Contractor; inclusion of this paragraph in the Agreement, as well as any notice which may be given by
the Owners or the Owner's Representative concerning omissions under this paragraph as the work progresses, are
intended as reminders to the Contractor of his duty and shall not be construed as any assumption of duty to
supervise safety precautions by either the Contractor or any of his subcontractors.
l 28. CONTRACTOR'S INSURANCE
r The Contractor shall procure and carry at his sole cost and expense through the life of this contract, insurance
protection as hereinafter specified. Such insurance shall be carried with an insurance company authorized to
transact business in the State of Texas and shall cover all operations in connection with this contract, whether
performed by the Contractor or a subcontractor, or separate policies shall be provided covering the operation of
each subcontractor.
A. Comprehensive General Liability insurance
The contractor shall have Comprehensive General liability Insurance with limits of $300,000 Bodily Injury
and 5300,000 Property Damage per occurrence to includes
Premises and Operations
Explosion & Collapse Hazard
Underground Damage Hazard
Products & Completed Operations Hazard
Contractual Liability
Independent Contractors Coverage
Personal Injury (with exclusion rc" waived)
The City is to be named as an additional insured on this policy for this specific Job, and copy of the
endorsement doing so is to be attached to the Certificate of Insurance.
r
F 46
6. Owner's Protective or Contingent Public Liability Insurance and Property Damage Liability Insurance.
The Contractor shall obtain an owner's Protective or Contingent Public Liability insurance policy naming the
City of Lubbock as insured and the amount of such policy shall be as follows
For bodily injuries, including accidental death, $500,000 per occurrence, and $100,000 for Property Damage.
C. Comprehensive Automobile Liability Insurance
The Contractor shall have Comprehensive Automobile Liability Insurance with limits of not less than;
Bodily Injury $250/500,000
Property Damage t100,000
to include all owned and nonowned cars including: Employers Nonownership Liability Hired and Nonowned
Vehicles. The City is to be named as an additional insured on this policy for this specific job and copy of
the endorsement doing so is to be attached to the Certificate of Insurance.
D.` Builder's Risk Insurance
The Contractor shall obtain a Builder's Risk policy in the amount of (100% of potential loss)
naming the City of Lubbock as insured.
E. Excess or Umbrella Liability Insurance
The Contractor shall have Excess or umbrella Liability insurance in the amount of ($1,000,000
minimum) with coverage to correspond with Comprehensive General Liability and Comprehensive Automobile
Liability coverages.
The City is to be named as an additional insured on this policy for this specific job and copy of the
endorsement doing so is to be attached to the Certificate of Insurance.
F. Worker's Compensation and Employers Liability Insurance
As required by State statute covering all employees whether employed by the Contractor or any Subcontractor
on the Job with Employers Liability of at least $100,000 limit.
G. Proof of Coverage
Before work on this contract is commenced, each Contractor and subcontractor shall submit to the owner for
approval five Certificates of Insurance covering each insurance policy carried and offered as evidence of
compliance with the above insurance requirements, signed by an authorized representative of the insurance
company setting forth:
(1) The name and address of the insured.
(2) The location of the operations to which the insurance applies. _
(3) The name of the policy and type or types of insurance in force thereunder on the date borne by such
certificate.
(k) The expiration :date of the policy and the limit or limits of liability thereunder on the date borne
by such certificate.
(5) A provision that the policy may be canceled only by mailing written notice to the named insured at
the address shown in the bid specifications.
47
r
C '
(6) A provision that written notice shall be given to the City ten days prior to any change in or
cancellation of the policies shown on the certificate.
(7) The certificate or certificates shall be on the form (or identical copies thereof) contained in the
job specifications. No substitute of nor amendment thereto will be acceptable.
r
29. DISABLED EMPLOYEES
Contractors having more than 15 employees agree to comply with the Americans with Disabilities Act of 1990, and
agree not to discriminate against a qualified individual with a disability because of the disability of such
Individual in regard to job application procedures, the hiring, advancement, or discharge of employees, employee
compensation, job training, and other terms, conditions, and priviliges of employment.
r
30. PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS, LABORERS, MATERIALMEN, AND FURNISHERS OF MACHINERY, EQUIPMENT AND
PLIES
The Contractor agrees that he will indemnify and save the Owner harmless from all claims growing out of any demands
of subcontractors, laborers, workmen, mechanics, materialmen end furnishers of machinery and parts thereof,
equipment, power tools, all suppliers, including commissary, incurred in the furtherance of the performance of this
contract. When Owner so desires, the Contractor shall furnish satisfactory evidence that all obligations of the
nature hereinabove designated have been paid, discharged or waived.
If during the progress of the work, Contractor shell allow any indebtedness to accrue for work furnished by any of
those designated in the preceding paragraph and shall fail to pay and discharge any such indebtedness within five
(5) days after demand is made, then Owner may, during the period for which such indebtedness shall remain unpaid,
withhold from the unpaid portion of this contract, a sun equal to the amount of such unpaid indebtedness or may
apply the sun so withheld to discharge any such indebtedness.
Any and all communications between any party under this paragraph must be in writing.
r
31. PROTECTION AGAINST ROYALTIES OR PATENT 1MYENTION
The contractor shall pay all royalties and license fees, and shall provide for the use of any design, device,
I material or process covered by letters patent or copyright by suitable legal agreement with the ',Patentee or Owner
l thereof. The Contractor shall defend all suits or claims for infringement of any patent or copyrights and shall
indemnify and save the Owner harmless from any loss on account thereof, except that Owner shall defend all such
suits and claims and shall be responsible for all such loss when a particular design, device, material or process or
l the product of a particular manufacturer or manufacturers is specified or required in these contract documents by
Owner; provided, however, if choice of alternate design, device, material or process is allowed to the Contractor,
then Contractor shall indemnify and save Owner harmless from any loss on account thereof. if the material or
process specified or required by Owner is an infringement, the Contractor shall be responsible for such loss unless
he promptly gives written notice to the Owner of such infringement.
32. LADS AND ORDINANCES
The Contractor shall at all times observe and comply with all federal, state and local laws, ordinances and
regulations, which in any manner effect the contract or the work, and shell indemnify and save harmless the Owner
against any claims arising from the violation of any such laws, ordinances, and regulations, whether by the
Contractor or his employees. If the Contractor observes that the plans and specifications are at variance
therewith, he shall promptly notify the Owners' Representative in writing and any necessary changes shall be
I adjusted as provided in the contract for changes in the work. if the Contractor performs any work knowing it to be
! contrary to such laws, ordinances, rules and regulations, and without such notice to the OwnerFs Representative, he
shall bear all costs arising therefrom.
r
F 48
The Owner is a municipal corporation of the State of Texas and the law from which it derives its powers, insofar as
the same regulates the objects for which, or the manner in which, or the conditions under Which the Owner may enter
into contracts, shall be controlling, and shall be considered as part of this contract to the same effect as though
embodied herein.
33. ASSIGNMENT AND SUBLETTING
The Contractor further agrees that he will retain personal control and will give his personal attention to the
fulfillment of this contract. The Contractor further agrees that subletting of any portion or feature of the work,
or materials required in the performance of this contract, shall not relieve the Contractor from his full
obligation to the Owner, as provided by this contractual agreement.
34. TIME FOR COMPLETION AND LIQUIDATED DAMAGES
It is hereby understood and mutually agreed by and between the Contractor and the Owner, that the date of beginning
and time for completion as specified in the contract of work to be done hereunder are essential conditions of this
contract; and it is further mutually understood and agreed that the work embraced in this contract shall be
commenced on a date to be specified in the Notice to Proceed.
If the Contractor should neglect, fail, or refuse to complete the work within the time herein specified, or any
proper extension thereof granted by the Owner, then the Contractor does hereby agree as part of the consideration
for the awarding of this contract, the Owner may withhold permanently from Contractor's total compensation, the sum
of $100.00 tone Hundred Dollars) PER DAY, not as a penalty, but as liquidated damages for the breach of the contract
as herein set forth for each and every calendar day that the Contractor shall be in default after the time
stipulated for completing the work.
It is expressly understood and agreed, by and between Contractor and the Owner, that the time for the completion of
the work described herein is reasonable time for the completion of the same, taking into consideration the average
climatic change and conditions and usual industrial conditions prevailing in this locality.
The amount is fixed and agreed upon by and between the Contractor and the Owner because of the impracticability and
extreme difficulty in fixing and ascertaining actual damages the owner would in such event sustain, and the amount
is agreed to be damages the Owner would sustain and shall be retained by the Owner from current periodical estimates
for payments or from final payment.
It is further agreed and understood between the Contractor and Owner that time is of the essence of this contract.
35. TIME AND ORDER'OF COMPLETION
It is the meaning and intent of this contract, unless otherwise herein specifically provided, that the Contractor
shalt be allowed to prosecute his work at such time and sessions, in such order of precedence, and in such manner as
shall be most conductive to economy of construction; provided, however, that the order and time of prosecution shall
be such that the work shall be substantially completed as a whole and in part, in accordance with this contract, the
plans and specifications, and within the time of completion designated in the proposals; provided, also, that when
the Owner is having other work done, either by contract or by his own force, the Owner's Representative may direct
the time and manner of constructing work done under this contract so that conflicts will be avoided and the
construction of the various works being done for the owner shall be harmonized.
The Contractor shall submit, at such times as may reasonably be requested by the Ownerts Representative, schedules
which shalt show the order in which the Contractor proposes to carry on the work, with dates at which the Contractor
will start the several parts of the work and estimated dates of completion of the several parts.
49
h
36. EXTENSION OF TIME
The Contractor agrees that he has submitted his proposal in full recognition of the time required for the completion
of this project, taking into consideration the average climatic range and industrial conditions prevailing in this
Locality, and has considered the liquidated damage provisions of paragraph 33 hereinabove set forth and that he
P.M shall not be entitled to, nor will he request, an extension of time on this contract, except wh his work has been
delayed by an act or neglect of the Owner, Owner's Representative, employees of the Owner or otzr contractors
employed by the owner, or by changes ordered in the 'work, or by strike,,walkouts, acts of God or'Ithe public enemy,
fire or flood. The Contractor may apply in writing for an extension of time, submitting therewith all written
Justification as may be required by Owner's Representative for such an extension as requested by,Contractor. The
OwneN s Representative within ten (10) days after receipt of a written request for an extension of time by the
Contractor supported by all requested documentation shall then submit such written request to the City Council of
.� the City of Lubbock for their consideration. Should the Contractor disagree with the action of City Council on
granting an extension of time, such disagreement shall be settled by arbitration as hereinafter provided.
37. HINDRANCE AND DELAYS
In executing the contract agreement, the Contractor agrees that in undertaking to complete the work within the time
herein fixed, he has taken into consideration and made allowances for all hindrances and delays incident to such
work, whether growing out of delays in securing material or workmen or otherwise. No charge shall be made by the
Contractor for hindrance or delays from any cause during the progress of any part of the work embraced in this
contract except where the work is stopped by order of the Owner or OwneN s Representative for the Owner's
convenience, in which event, such expense as in the judgment of the Owner's Representative that is caused by such
stoppage shall be paid by Owner to Contractor.
38. QUANTITIES AND MEASUREMENTS
No extra or customary measurements of any kind will be allowed, but the actual measured or computed length, area,
solid contents, number and weight only shall be considered, unless otherwise specifically provided.
In the event this contract is let on a unit price basis, then Owner and Contractor agree that this contract,
including the specifications, plans and other contract documents are intended to show clearly all work to be done
and material to be furnished hereunder. Where the estimated quantities are shown for the various classes of work to
be done and material to be furnished under this contract, they are approximate and are to be used only as a basis
for estimating the probable cost of the work and for comparing their proposals offered for the work. It is
understood and agreed that the actual amount of work to be done and the materials to be furnished under this
contract may differ somewhat from these estimates, and that where the basis for payment under this contract is the
unit price method, payment shall be for the actual amount of work done and materials furnished on the project.
r 39. PROTECTION OF ADJOINING PROPERTY
The Contractor shall take proper means to protect the adjacent or adjoining property or properties in any way
encountered, which may be injured or seriously affected by any process of construction to be undertaken under this
agreement, from any damage or injury by reason of said process of construction; and he shall be Liable for any and
all claims for such damage on account of his failure to fully protect all adjacent property. The Contractor agrees
to indemnify, save and hold harmless the Owner against any claim or claims for damages due to any injury to any
adjacent or adjoining property, arising or growing out of the performance of this contract, but,such indemnity shall
not apply to any claim of any kind arising out of the existence or character of the work.
I�
7
7 50
40. PRICE FOR WORK
In consideration of the furnishing of ell necessary labor, equipment and material and the completion of all work by
the Contractor, and on the delivery of all materials embraced in this contract in full conformity with the
specifications and stipulations herein contained, the owner agrees to pay the Contractor the price set forth in the
proposal attached hereto, which has been made a part of this contract, and the Contractor hereby agrees to receive
such price in full for furnishing all materials and all labor required for the aforesaid work, also, for all
expenses incurred by him and for well and truly performing the same and the whole thereof in the manner and
according to this agreement, the attached specifications, plans, contract documents and requirements of owner's
Representative.
41. PAYMENTS
No payments made or certificates given shall be considered as conclusive evidence of the performance of the
contract, either wholly or in part, nor shall any certificate or payment be considered as acceptance of defective
work. Contractor shall at any time requested during the progress of the work furnish the owner or owner's
Representative with a verifying certificate showing the Contractor's total outstanding indebtedness in connection
with the work. Before final payment is made, Contractor shall satisfy Owner, by affidavit or otherwise, that there
are no outstanding liens against Owner's premises by reason of any work under the contract. Acceptance by
Contractor of final payment of the contract price shall constitute a waiver of all claims against owner which have
not theretofore been timely filed as provided in this contract.
42. PARTIAL PAYMENTS
on or before the tenth day of each month, the Contractor shall submit to Owner's Representative an application for
partial payment. Owner's Representative shall review said application for partial payment and the progress of the
work made by the Contractor and if found to be in order shall prepare a certificate for partial payment showing as
completely as practical the total value of the work done by the Contractor up to and including the last day of the
preceding month; said statement shall also include the value of all sound materials delivered on site of the work
that are to be fabricated into the work.
The Owner shall then pay the Contractor on or before the fifteenth day of the current month the total amount of the
Owner's Representative's Certificate of Partial Payment, less 5% of the amount thereof, which 5% shall be retained
until final payment, and further, less all previous payments and all further sums that may be retained by Owner
under the terms of this agreement. It is understood, however, that in case the whole work be near to completion,
and this fact is certified to by Owner's Representative and some unexpected and some unusual delay occurs due to no
fault or negligence on the part of the Contractor, the Owner may upon written recommendation of Owner's
Representative pay a reasonable and equitable portion of the retained percentage due Contractor.
43. FINAL COMPLETION AND ACCEPTANCE
Within thirty-one (31) days after the Contractor has given the Owner's Representative written notice that the work
has been completed or substantially completed, the Owner's Representative and the Owner shall inspect the work and
within said time, if the work be found to be completed or substantially completed in accordance with the contract
documents, the Owner's Representative shall issue to the Owner and Contractor his certificate of completion, and
thereupon it shall be the duty of the Owner within thirty-one (31) days to issue a certificate of acceptance of the
work to the Contractor.
51
r
p
44. FINAL PAYMENT
1
r
i
d 45.
Upon the issuance of the certificate of completion, the Owners Representative shall proceed to make final
measurement and prepare a final statement of the value of all work performed and materials furnished under the terms
of the agreement, and shall certify same to the Owner, who shall pay to the Contractor on or before the 31st day
after the date of certificate of completion, the balance due Contractor under the terms of this agreement, provided
he has fully performed his contractualobligations under the terms of this contract; and said payment shall become
due in any event upon said performance by the Contractor. Neither the certificate of acceptance nor the final
payment, nor any provisions in the contract documents shall relieve the Contractor of the obligation for fulfillment
of any warranty which may be required in the special conditions (if any) of this contract or required in the
specifications made a part of this contract.
CORRECTION OF WORK BEFORE FINAL PAYMENT FOR WORK
Contractor shall promptly remove from Owners' premises all materials condemned by the Oaner's Representative on
account of failure to conform to the contract, whether actually Incorporated in the work or not,, and Contractor
shall at his own expense promptly replace such condemned materials with other materials conforming to the
requirements of the contract. Contractor shall also bear the expense of restoring all work of other contractors
damaged by any such removal or replacement. If Contractor does not remove and replace any such condemned work
within a reasonable time after a written notice by the Owner or the Owner's Representative, Owner may remove and
replace it at Contractors expense.
46. CORRECTION OF WORK AFTER FINAL PAYMENT
Neither the final payment nor certificate nor any provision in this contract shall relieve the Contractor of
responsibility for faulty materials or workmanship, and he shall remedy any defects due thereto and pay for any
damage to other work resulting therefrom, which shall appear within a period of one (1) year from the date of
substantial completion. The Owner or the Owners Representative shall give notice of observed defects with
reasonable promptness.
47, PAYMENT WITHHELD
The Owner may, on account of subsequently discovered evidence, withhold or nullify the whole or part of any
certificate to such extent as may be necessary to protect himself from loss on account of:
(a) Defective work not remedied.
(b) Claims filed or reasonable evidence indicating possible filing of claims.
(e) Failure of the Contractor to make payments promptly to subcontractors or for materials or labor.
(d) Damage to another contractor.
r When the above grounds are removed, or the Contractor provides a surety bond satisfactory to the Owner, which will
1 protect the Owner in the amount withheld, payment shall be made for amoints withheld because of them.
48. TIME OF FILING CLAIMS
It is further agreed by both parties hereto that all questions of dispute or adjustment presented by the Contractor
shall be in writing and filed with the Owner's Representative within fifteen (15) days after th Owner's
Representative has given any directions, order or instruction to which the Contractor desires t take exception.
The Owners' Representative shall reply to such written exceptions by the Contractor and render his final decision in
writing. In case the Contractor should appeal from the decision of the Owner's Representative, any demand for
arbitration shall be filed with the Owners Representative and the Owner in writing within ten �10) days after the
l date of delivery to Contractor of the final decision of the Owners Representative. It is further agreed that final
acceptance of the work by the Owner and the acceptance by the Contractor of the final payment shall be a bar to any
r. claim by either party, except where noted otherwise in?t a contract documents.
49. ARBITRATION
All questions of dispute under this agreement shall be submitted to arbitration at the request of either party to
the dispute. The parties may agree upon one arbitrator, otherwise, there shall be three; one named in writing by
each party and the third chosen by the two arbiters selected; or if the arbiters fail to select a third within ten
(10) days, he shall be chosen by the District Judge, 72nd Judicial District of Texas. Each arbiter shall be a
resident of the City of Lubbock. Should the party demanding arbitration fail to name an arbiter within ten (10)
days of the demand, his right to arbitrate shall lapse, and the decision of the Owner's Representative shall be
final and binding on him. Should the other party fail to choose.an arbiter within ten (10) days, the Owner's
Representative shall appoint such arbiter. Should either party refuse or neglect to supply the arbiters with any
papers or information demanded in writing, the arbiters are empowered by both parties to take Ex Parte Proceedings.
The arbiters shall act with promptness. The decision of any two shall be binding on both parties.to the contract,
unless either or both parties shall appeal within ten (10) days from date of the award by the arbiters, and it is
hereby agreed that each party shall have the right of appeal and all proceedings shall be according to and governed
by Arbitration Statutes of Texas, being Article 224, et seq., Vernon's Annotated Civil Statutes. THE DECISION OF
THE ARBITERS UPON ANY QUESTION SUBMITTED TO ARBITRATION UNDER THIS CONTRACT SHALL BE A CONDITION PRECEDENT TO ANY
RIGHT OF LEGAL ACTION.
The arbiters, if they deem the case demands it, are authorized to award the party whose contention is sustained,
such sums as they deem proper for the time, expense and trouble incident to the appeal, and if the appeal was taken
without reasonable cause, they may award damages for any delay occasioned thereby. The arbiters shall fix their own
compensation, unless otherwise provided by agreement, and shalt assess the costs and charges of the arbitration upon
either or both parties. The award of the arbiters must be made in writing and shall not be open to objection on
account of the form of proceedings or award.
50. ABANDONMENT BY CONTRACTOR
In case the Contractor should abandon and fail or refuse to resume work within ten (10) days after written
notification from the owner or the Owner's Representative, or if the Contractor fails to comply with the orders of
the Owner's Representative, when such orders are consistent with this contract, this Agreement, or the
Specifications hereto attached, then the Surety on the bond shall be notified in writing and directed to complete
the work and a copy of said notice shall be delivered to the Contractor.
After receiving said notice of abandonment, the Contractor shall not remove from the work any machinery, equipment,
tools, materials or supplies then on the job, but the same, together with any materials and equipment under the
contract for work, may be held for use on the work by the owner or the Surety of the Contractor, or another
contractor, in completion of the work; and the Contractor shall not receive any rental or credit therefore (except
when used in connection with Extra work, where credit shall be allowed as provided for under paragraph 24 of this
contract); it being understood that the use of such equipment and materials wilt ultimately reduce the cost to
complete the work and be reflected in the final settlement.
In case the Surety should fail to commence compliance with the notice for completion hereinbefore provided for
within ten (10) days after service of such notice, then the Owner may provide for completion of the work in either
of the following elective manners:
(a) The Owner may employ such force of men and use of machinery, equipment, tools, materials and supplies as
said Owner may deem necessary to complete the work and charge the expense of such labor, machinery,
equipment, tools, materials and supplies to said Contractor, and the expense so charged shall be deducted
and paid by the Owner out of such ;moneys as may be due, or that may thereafter at any time become due to the
Contractor under and by virtue of this Agreement. In case such expense is less than the sum which would
have been payable under this contract, if the same had been completed by the Contractor, then said
Contractor shall receive the difference. In case such expense is greater than the sum which would have been
payable under this contract, if the same had been completed by said Contractor, then the Contractor and/or
his Surety shall pay the amount of such excess to the Owner; or
53
s
(b) The Owner, under sealed bids, after notice published as required by low, at least twice in a newspaper
having a general circulation in the County of location of the work, may let the contract for the completion
.� of the work under substantially the same terms and conditions which are provided in this contract. In case
of any increase in cost to the Owner under the new contract as compared to what would have been the cost
under this contract, such increase shell be charged to the Contractor and the Surety shell be and remain
r" bound therefore. However, should the cost to complete any such new contract prove to be less than that
which would have been the cost to complete the work under this contract, the Contractor or his Surety shall
be credited therewith.
When the work shall have been substantially completed, the Contractor and his Surety shall be so notified and
certificates of completion and acceptance, as provided in paragraph 42 hereinabove set forth, shall be issued. A
complete itemized statement of the contract accounts, certified to by Owner's Representative as being correct shall
then be prepared and delivered to Contractor end his Surety, whereon the Contractor or his Surety, or the Owner as
the case may be, shall pay the balance due as reflected by said statement within 30 days after the date of
certificate of completion.
In the event the statement of accounts shows that the cost to complete the work is less than that which would have
been the cost to the Owner had the work been completed by the Contractor under the terms of this contract, or when
the Contractor and/or his Surety shall pay the balance shown to be due by them to the Owner, then all machinery,
equipment, tools, materials or supplies left on the site of the work shall be turned over to the Contractor ardor
his Surety. Should the cost to complete the work exceed the contract price, and the Contractor and/or his Surety
fail to pay the amount due the Owner within the time designated hereinabove, and there remains any machinery,
equipment, tools, materials or supplies on the site of the work, notice thereof, together with an itemized list of
such equipment and materials shall be veiled to the Contractor and his surety at the respective addresses designated
In this contract; provided, however, that actual written notice given in any manner will satisfy this condition.
After mailing, or other giving of such notice, such property shall be held at the risk of the Contractor and his
Surety subject only to the duty of the Owner to exercise ordinary care to protect such property. After fifteen (15)
days from the date of said notice the Owner may sell such machinery, equipment, tools, materials or supplies and
apply the net sum derived from such sale to the credit of the Contractor and his Surety. Such sale may be made at
either public or private sale, with or without notice, as the Owner may elect. The Owner shall release any
machinery, equipment, tools, materials, or supplies which remain on the *jobsite and belong to persons other then
the Contractor or his Surety, to their proper owners.
51. ABANDONMENT BY OWNER
In case the Owner shall fail to comply with the terms of this contract, and should fail or refuse to comply with
r said tens within ten (10) days after written notification by the Contractor, then the Contractor may suspend or
1 wholly abandon the work, and my remove therefrom all machinery, tools, and equipment, and sit materials on the
ground that have not been included in payments to the Contractor and have not been incorporatedInto the work.
Thereupon, the Owner's Representative shall make an estimate of the total amount earned by the Contractor, which
estimate shell include the value of all work actually completed by said Contractor st the prices stated in the the
III attached proposal, the value of all partially completed work at a fair and equitable price, and the amount of all
Extra Work performed at the prices agreed upon, or provided for by the terms of this contract, and a reasonable sum
to cover the cost of any provisions made by the Contractor to carry the whole work to completion, and which cannot
be utilized. The Owner's Representative shall then make a final statement of the balance due the Contractor by
deducting from the above estimate all previous payments by the Owner and all other sums, that may be retained by the
Owner under the terms of this Agreement, and shall certify same to the Owner who shall pay to the Contractor on or
before thirty (30) days after the date of the notification by the Contractor the balance shown by said final
statement as due the Contractor, under the terms of this Agreement.
r
54
52. BONDS
The successful bidder shall be required to furnish a performance bond and payment bond in accordance with Article
5160, Vernon's Annotated Civil Statutes in the amount of 100% of the total contract price, in the event said
contract price exceeds $25,000.00. If the contract price does not exceed $25,000.00,`the statutory bonds will not
be required. All bonds, if required, shall be submitted on forms supplied by the Owner, and executed by an approved
Surety Company authorized to do business in the State of Texas. And it is further agreed that this contract shall
not be in effect until such bonds are so furnished.
53. ESPECIAL CONDITIONS
In the event special conditions are contained herein as part of the contract documents and said special conditions
conflict with any of the general conditions contained in this contract, then in such event the special conditions
shall control.
54. LOSSES FROM NATURAL CAUSES
Unless otherwise specified herein, all loss or damage to the Contractor arising out of the nature of the work to be
done, or from the action of the elements, or from any unforeseen circumstance and the prosecution of the same, or
from uniusual obstructions or difficulties which may be encountered in the prosecution of the work, shall be
sustained and borne by the Contractor at his own cost and expense.
$5. INDEPENDENT CONTRACTOR
Contractor is, and shall remain, an independent contractor with full, complete and exclusive power and authority to
direct, supervise, and control his own employees and to determine the method of the performance of the work covered
hereby. The fact that the Owner or Owner's Representative shall have the right to observe Contractor's work during
his performance and to carry out the other prerogatives which are expressly reserved to and vested in the Owner or
Owner's Representative hereunder, is not intended to and shall not at any time change or effect the status of the
Contractor as an independent contractor with respect to either the Owner or Owner's Representative or to the
Contractor's own employees or to any other person, firm, or corporation.
$6. CLEANING UP
The Contractor shall at all times keep the premises free from accumulation of debris caused by the work, and at the
completion of the work he shall remove ell such debris and also his tools, scaffolding, and surplus materials and
shall leave the work room clean or its equivalent. The work &hall be left in good order and condition. In case of
dispute owner may remove the debris and charge the cost to the Contractor.
55
CURRENT WAGE DETERMINATIONS
56
Resolution 74,2502
January 8, 1987
Agenda Item #18
DGV:da
RESOLUTION
WHEREAS, the City Council has heretofore established the general -
prevailing rate of per diem wages for each craft or type of workmen or
mechanics needed to execute public works contracts for the City of Lubbock
Tin accordance with the provisions of Vernon's Ann.Civ.St., Art. 5159a; and
WHEREAS, such wage rates were established by Resolution No. 719
enacted February 12, 1981, updated by Resolution No. 1590 enacted February
23, 1984; and
WHEREAS, such rates need to be updated at the present time in order
to reflect the current prevailing rate of per diem wages; NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the general prevailing rate of per diem wages for public works
contracts shall be as set forth in the following named exhibits, which
exhibits shall be attached hereto and made a part hereof for all intents
and purposes:
Exhibit A: Building Construction Trades
' Exhibit B: Paving and Highway Construction Trades
Exhibit C: Electrical Trades
Exhibit D: Overtime Rate
Exhibit E: Weekend and Holiday Rate
l Such wage rates are hereby found and declared to be the 'general prevailing
rate of per diem wages in all localities where public works are undertaken
on behalf of the City of Lubbock and such wage rates shall be included in
all public works contracts as provided by law.
r Passed by the City Council this 8th day of January 1987.
l
G`
B.C. McMINN, MAYOR
Ranett#,-Boyd, City Secretary
=I-PXyne,Dfrector
: APPROVED AS TO FORM:
l f Building Do ld G. Vandiver, First
Services Assistant City Attorney
L
r
F
EXHIBIT A
- City'of Lubbock
Building Construction Trades
Prevailing Rates'
Craft
Hourly Rate
Acoustical Ceiling Installer
$11.60
Air Conditioner Installer
8.35
Air Conditioner Installer -Helper
5.50
Bricklayer
10.50
Bricklayer -Helper
5.00
Carpenter
'11.00
Carpenter -Helper
5.50
Cement finisher
7.35
Drywall Hanger
8.70
Electrician
10.50
Electrician -Helper
5.25
Equipment Operator -
Heavy
8.00
Light
5.70
Floor Installer
8.00
Glazier
7.50
Insulator, Piping/Boiler
9.50
Insulator -Helper
5.00
Iron.Worker.
7.30
Laborer, General
4.75
Mortar Mixer
5.60
Painter
8.75
Plumber
9.25
Plumber -Helper
6.00
Roofer
7.65
Roofer -Helper
4.75
- Sheet Metal Worker
8.75
Sheet Metal Worker -Helper
5.50
Welder - Certified
8.00
r ..
EXHIBIT B
Paving and Highway Construction
Prevailing Wage Rates
r ft
Asphalt Heaterman
Asphalt Shoveler
Concrete Finisher
Concrete Finisher -Helper
Electrician
Flagger
Form Setter
Form Setter -Helper
Laborer, General
Laborer, Utility
Mechanic
Mechanic -Helper
POWER EQUIPMENT OPERATORS
Asphalt Paving Machine
Bulldozer
Concrete Paving Machinist
Front End Loader
Heavy Equipment Operator
Light Equipment Operator
Motor Grade Operator.
Roller
Scraper
Tractor
Truck Driver -
Light
Heavy
Hourly Rate
$5.25
4.75
7.35
4.75
10.50
4.75
6.50
5.50
4.75
5.80
6.50
6.00
E.00
5.25
6.50
5.85
6.40
6.40
8.00
5.25
5.25
5.50
5.25
5.25
EXHIBIT C
Electric Construction Trades —
Prevailing Wage Rates
Craft Hourly Rate
Power Line Foreman $11:00
Lineman Journeyman 10.45
Lineman Apprentice Series 8.90
Groundman Series 7.25
EXHIBIT D
Prevailing Wage Rates
Overtime Rate
The rate for overtime (in excess of forty hours per week) is l 1/2
times base rate.
EXHIBIT E
Prevailing Wage Rates
Weekend and Holiday Rate
The rate for weekend and holiday is.l 1/2 times base rate.
to
H
3
Li
m
Le
co
r l�
SCOPE:
The contractor shall supply all material and labor for the remodel
of office and related area which will accommodate the Detective
Latent work station. The work shall be located on the second
floor, Room 207 of the Municipal Square, 916 Texas Avenue', Lubbock,
Texas. The work shall be divided into two areas (the main room and
the hallway) and shall include, but not limited to the following:
AN LLWAY
1. Remove designated partitioned walls.
2. Patch floor areas with matching carpet.
MAIN ROOM
1. Relocate door from West wall and place on East wall. Removed
II partitioned wall panel shall be installed where door was
removed. Reuse door and trim and patch carpet to match
existing.
2. Between new door location and North wall, install new 321IX60"
window with sliding horizontal glass.
3. Install new suspended acoustical ceiling, 2'X2' squares with
vinyl backing for moisture barrier.
4. Install three (3) new 21X41, 4-bulb fluorescent lighting
fixtures. Lights shall be locally operated. Provide new
dedicated electrical circuit for lights.
5. Install new dedicated circuits for receptacle outlets as
designated. Work station shall require five (5) new outlets.
6. Install new ceiling mounted, 2 ton package air conditioning
system complete with microprocessor controls, electric reheat,
humidification, dehumidification and air cooled operation to -
300 F (outdoor) ambient temperature. The following parameters
are required:
a. Power 120/60/1. Dedicated circuit
required.
b. Temperature 680-780 F. with a maximum of 30
variation per hour with ambient
(outdoor) temperature range from
-300 to 1150 F.
C. Humidity 50% -60% RH with a maximum of 5%
variation per hour.
d. Duration of use HVAC system designed to operate
24 hours per day, 365 days per
year.
7. The Latent work station will require the following Electrical:
j' a. Power 120/60/1. Dedicated circuits as
j required.
b. Wires Two wires, plus a third wire for
equipment ground. (ALUMINUM
wire is not acceptable).
Neutral wire must not be
connected to the building ground
except at the power source
F
(transformer, building service
entrance).
c. Maximum load 3.29 KVA.
8. Paint walls and trim with off white color to match paint in
Police Department Administration offices
9. Power shall come from panel in roof access room.
1
wl NPnr✓ C,.IRr6T
1
r
i
P,#T` '
2POT
L i:__ L- L--' L- L-_- L�.....: L.o._ L_-� Lr L— L--: L- L— L---� L_ L L� L—
SPECIAL CONDITIONS
r
r
r
r
r
�
60
r
TO:
NOTICE OF ACCEPTANCE
The City of Lubbock, having considered the proposals submitted and opened on the day of
199, for work to be done and materials to be furnished in and for:
i
as set forth in detail in the Specifications, Plans, and Contract Documents for such work for the City of Lubbock; it
appearing that your proposal is fair, equitable and to the best interest of said City, please take notice that said proposal
was accepted by the City Council of the City of Lubbock on the day of 1 199i at the bid price contained
therein, subject to the execution of and furnishing of all contract documents, bonds, certificates of insurance, and all
other documents specified and required to be executed and furnished under the contract documents. it will be necessary for
you to execute and furnish to the City of Lubbock all such documents within ten 1101 days from your re'celpt of this Notice.
The five percent (5%) bid security, submitted with your proposal, will be returned upon the execution of such
contract documents and bonds within the above specified ten (10) day period. In the event you should fail to execute and
furnish such contract documents and bonds within the time limit specified, said bid security will be retained by the City of
Lubbock.