HomeMy WebLinkAboutResolution - 082461P - Street Improvements - Kerr Paving Co - GWO 10285 Hodges Park Recreation Center - 08_24_1961 -�
P 0
RESOLUTION
let RES OLUT ION ACCEPTING 1MMOVEMENTS ON PORTIONS OF ALLEYS, STREETS, AND/OR
* AVENUES AS LISTED BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE
OF ASSESSMENTS LEVIED.
WHEREAS, the City of Lubbock heretofore passed various street improve-
ment ordinance and resolutions and entered into contract with Kerr Paving
Company, Inc. (G.W.O. 10285) for the making and construction of street and/or
alley improvements on portions of numerous alleys, streets and/or avenues in
said City including among others the following:
The North-South Parking Lot at Hodges Park Recreation Center from its inter-
section with a line 73 feet South of the South Property Line of 40th Street
to its intersection with a line 423 feet South of the South Property Line of
40th Street, known and designated As Sub-Unit Number 1 of Unit Number_2058.
The East-West Parking Lot at Hodges Park Recreation Center from its intersec-
tion with the West Paving Line of the existing North-South Parking Lot to its
intersection with the East Lip Line of College Avenue, known and designated
as Sub-Unit Number 2 of Unit Number 2058.
AND WHEREAS, the improvements upon the said portions of the abovemen-
tioned alleys, streets and/or Avenues, have been inspected and found to have
been constructed in accordance with terms of said contract G.W.O. 10285.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
I.
That the improvements on said portions of the abovementioned alleys,
streets, and/or avenues be and the same are hereby accepted, and the City
Engineer be and he is hereby authorized to direct payment of the City's portion
of the cost.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 24TH DAY OF AUGUST 1961.
David C. Casey, Mayor
ATTEST:
lc
Laverkia Lowe, City S cretary
APPROVE
D
:
John T. Hickerson, City Engineer
�^ APPROVED:
'� Fred O. Senter, Jr., City toraey
a
CITY OF LUBBOCK
a.
�CK.
TEXAS
August 24, 1961
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by Kerr
Paving Company, Inc., paving contractor, under their contract dated
June 8, 1961, designated as G.W.O. 10285 and find the improvements on
the North-South and East-detest parking lots at Hodges Park Recreation Center
as listed on the final estimate sheet to have been completed in accordance
with the plans and specifications and recommend that you accept the
improvements on said streets and/or avenues, authorizing payment to the
contractor the amount shown on the attached consolidated final estimate
sheet as due them by the City of Lubbock.
Yours very truly,
John T. Nickerson
City Engineer
1 l
ry
COINS OLIDATE D FINAL ESTIMATE
G.W.O. 10285
Accepted August 24, 1961
QU@iP IMES
S.Y. S.Y. L.F.4�x4"
Unit & S.Y. L.F. Re-sur- Valley $. _C. Sid
Location Paving C..&_G facing Gutter Walk
Sub-Unit
2058.1 N.S. Parking Lot for Hodges Park 716.53 385.00
Recreation Building
2085-2 E.W. Parking Lot Hodges Park 1641.25 672.00 14.33 13.19 416.00
Recreation Building
TOTALS 2357,78 1057.00 14.33 13.19 416.00
COST DISTRIBUTION
Unit &, Contract City to
Sub-Unit Cost Contractor
NOW
2058-1 1508.56 1508.56
2058-2 3909.98 3909.98
TOTALS 5418.54 5418.54
PLUS 25,000.00 due as provided in contract G.W.O. 10285
upon completion of base and curb and gutter
units 2056-and 2057 (Slide Road from 42nd
St. to 50th Sta and patch over storm sewer).
TOTAL DUE FROM CITY $ 30,418.54
COST ESTIMATE
2357.78 S.Y. Paving @ 1.38 $ 3,253.74
1057.00 L.F. Curb & Gutter @ 1.35 1,426.95
14,33 S.Y. Resurfacing @ .90 12.90
13.19 S.Y. Valley Gutter @ 4.50 59.36
416.00 4ix4" R.C.Sidevalk @ 1,60 665,60
CONTRACT COST $ 5418.54
{
T
CCOSOLIIIATED FIN&L ESTMTE
G.W.O. 10285
Accepted August 24, 1961
QUANTITIES
S.Y. S.Y. L.F.4Tx4"
Unit & S.Y. L.F. Re-sur- Valley R. C. Side
Sub-Unit Location Paving C & G facing Gutter walk
2058-1 N.S. Parking Lot for Hodges Park 716.53 385.00
Recreation Building
20r2 E.W. Parking Lot Hodges Park 1641.25 672.00 14.33 13.19 416.00
Recreation Building
TOTALS 2357,78 1057.00 14.33 13.19 416.00
COST DISTRIBUTION
Unit & Contract City to
Sub-Unit Cost Contractor
NOW
2058-1 1508.56 1508.56
2058-2 3909.98 3909.98
TOTALS $5418.54 $5418.54 (For Units 2058 - 1 & 2)
PLUS From G.W.O. 10285 $ 16,119.88 *due as provided in contract G.W.O. 10285
From Escrow 8,880.12 upon completion of base and curb and gutter
$ 25,000.00 unit 2056 and 2057 (Slide Road from 42nd St
$ 25,000.00* to 50th St. and patch over storm sewer),
TOTAL DUE FRO[i CITY $ 30,418.54
COST ESTIraTATE
2357.78 S.Y. Paving @ 1.38 $ 3,253.7Z
1057.00 L.F. Curb & Gutter @ 1.35 1,4260'95
14.33 S.Y. Resurfacing @ .90 12.90
13.19 S.Y. Valley Gutter @ 4.5o 59.36
416.00 41 x 4" R. C. Sidewalk.@ 1.60 665.60
CONTEACT COST $ 5,418.54
r •