Loading...
HomeMy WebLinkAboutResolution - 082461P - Street Improvements - Kerr Paving Co - GWO 10285 Hodges Park Recreation Center - 08_24_1961 -� P 0 RESOLUTION let RES OLUT ION ACCEPTING 1MMOVEMENTS ON PORTIONS OF ALLEYS, STREETS, AND/OR * AVENUES AS LISTED BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE OF ASSESSMENTS LEVIED. WHEREAS, the City of Lubbock heretofore passed various street improve- ment ordinance and resolutions and entered into contract with Kerr Paving Company, Inc. (G.W.O. 10285) for the making and construction of street and/or alley improvements on portions of numerous alleys, streets and/or avenues in said City including among others the following: The North-South Parking Lot at Hodges Park Recreation Center from its inter- section with a line 73 feet South of the South Property Line of 40th Street to its intersection with a line 423 feet South of the South Property Line of 40th Street, known and designated As Sub-Unit Number 1 of Unit Number_2058. The East-West Parking Lot at Hodges Park Recreation Center from its intersec- tion with the West Paving Line of the existing North-South Parking Lot to its intersection with the East Lip Line of College Avenue, known and designated as Sub-Unit Number 2 of Unit Number 2058. AND WHEREAS, the improvements upon the said portions of the abovemen- tioned alleys, streets and/or Avenues, have been inspected and found to have been constructed in accordance with terms of said contract G.W.O. 10285. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS: I. That the improvements on said portions of the abovementioned alleys, streets, and/or avenues be and the same are hereby accepted, and the City Engineer be and he is hereby authorized to direct payment of the City's portion of the cost. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 24TH DAY OF AUGUST 1961. David C. Casey, Mayor ATTEST: lc Laverkia Lowe, City S cretary APPROVE D : John T. Hickerson, City Engineer �^ APPROVED: '� Fred O. Senter, Jr., City toraey a CITY OF LUBBOCK a. �CK. TEXAS August 24, 1961 Honorable Mayor and City Commission Lubbock, Texas Gentlemen: I have examined the paving improvements constructed by Kerr Paving Company, Inc., paving contractor, under their contract dated June 8, 1961, designated as G.W.O. 10285 and find the improvements on the North-South and East-detest parking lots at Hodges Park Recreation Center as listed on the final estimate sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said streets and/or avenues, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due them by the City of Lubbock. Yours very truly, John T. Nickerson City Engineer 1 l ry COINS OLIDATE D FINAL ESTIMATE G.W.O. 10285 Accepted August 24, 1961 QU@iP IMES S.Y. S.Y. L.F.4�x4" Unit & S.Y. L.F. Re-sur- Valley $. _C. Sid Location Paving C..&_G facing Gutter Walk Sub-Unit 2058.1 N.S. Parking Lot for Hodges Park 716.53 385.00 Recreation Building 2085-2 E.W. Parking Lot Hodges Park 1641.25 672.00 14.33 13.19 416.00 Recreation Building TOTALS 2357,78 1057.00 14.33 13.19 416.00 COST DISTRIBUTION Unit &, Contract City to Sub-Unit Cost Contractor NOW 2058-1 1508.56 1508.56 2058-2 3909.98 3909.98 TOTALS 5418.54 5418.54 PLUS 25,000.00 due as provided in contract G.W.O. 10285 upon completion of base and curb and gutter units 2056-and 2057 (Slide Road from 42nd St. to 50th Sta and patch over storm sewer). TOTAL DUE FROM CITY $ 30,418.54 COST ESTIMATE 2357.78 S.Y. Paving @ 1.38 $ 3,253.74 1057.00 L.F. Curb & Gutter @ 1.35 1,426.95 14,33 S.Y. Resurfacing @ .90 12.90 13.19 S.Y. Valley Gutter @ 4.50 59.36 416.00 4ix4" R.C.Sidevalk @ 1,60 665,60 CONTRACT COST $ 5418.54 { T CCOSOLIIIATED FIN&L ESTMTE G.W.O. 10285 Accepted August 24, 1961 QUANTITIES S.Y. S.Y. L.F.4Tx4" Unit & S.Y. L.F. Re-sur- Valley R. C. Side Sub-Unit Location Paving C & G facing Gutter walk 2058-1 N.S. Parking Lot for Hodges Park 716.53 385.00 Recreation Building 20r2 E.W. Parking Lot Hodges Park 1641.25 672.00 14.33 13.19 416.00 Recreation Building TOTALS 2357,78 1057.00 14.33 13.19 416.00 COST DISTRIBUTION Unit & Contract City to Sub-Unit Cost Contractor NOW 2058-1 1508.56 1508.56 2058-2 3909.98 3909.98 TOTALS $5418.54 $5418.54 (For Units 2058 - 1 & 2) PLUS From G.W.O. 10285 $ 16,119.88 *due as provided in contract G.W.O. 10285 From Escrow 8,880.12 upon completion of base and curb and gutter $ 25,000.00 unit 2056 and 2057 (Slide Road from 42nd St $ 25,000.00* to 50th St. and patch over storm sewer), TOTAL DUE FRO[i CITY $ 30,418.54 COST ESTIraTATE 2357.78 S.Y. Paving @ 1.38 $ 3,253.7Z 1057.00 L.F. Curb & Gutter @ 1.35 1,4260'95 14.33 S.Y. Resurfacing @ .90 12.90 13.19 S.Y. Valley Gutter @ 4.5o 59.36 416.00 41 x 4" R. C. Sidewalk.@ 1.60 665.60 CONTEACT COST $ 5,418.54 r •