HomeMy WebLinkAboutResolution - 071361C - Street Improvements - J.R. Fanning - Guava Avenue - 07_13_1961 r �
t�\p RESOLUTION
RESOLUTION ACCEPTING DIPROVEHENTS ON PORTIONS OF AN AVENUE AS LISTED
BELOW:
WHEREAS, the City of Lubbock passed resolutions on June 23, 1960 and
September 22, 1960 authorizing the construction of street improvements by
J. R. Fanning on portions of the following street:
Guava Avenue from its intersection with a line 15 feet north of the north
property line of east Baylor Street (West Leg) to its intersection with a line
15 feet south of the south property line of east Bates Street (West Leg),
known and designated as Unit Number 2026.
Guava Avenue from its intersection with a line 15 feet south of the south
property line of east Bates Street (west leg) to its intersection with a line
3 feet south of the south property line of the alley south of east Bates Street
known and designated as Sub-Unit Number 2 of Unit Number 2036.
Guava Avenue from its intersection with a line 15 feet north of the north
property line of east Colgate Street to its intersection with a line' 15 feet
north of the north property line of east Baylor Street, known and designated
as Sub-Unit Number 1 of Unit Number 2036.
AND WHEREAS, the improvements upon the said portions of the above-
mentioned streets have been inspected and found to have been constructed
according to the approved plans and specifications.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS
I.
That the improvements on said portions of the abovementioned streets
be, and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the Cityls share and release escrow money.
II.
i
This resolution shall take effect and be in force after its passage.
PASSED AND APPROVED THIS 13TH DAY OF J Y, 1961.
Da vi C. Casey, May
ATTE
Lav nia Lowe, Cit Secretary
A OVED
ohn T. Nickerson, City Engineer
APPROVED:
Fred 0. Senter, Jr., Ci At ey
r '
CITY OF LUBBOCK
TEXAS
July 13, 1961
1�
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen: r
I have examined the paving improvements cons ted by
J. R. Fanning, paving contractor, as authorized by reltjons
passed on June 23, 1960 and September 22, 1960, and #the
improvements on Guava Avenue as listed on the final !mate
sheet to have been completed in accordance with the 's And
specifications and recommend that you accept the imfinents on
said streets and/or avenues, authorizing payment t contractor
the amount shown on the attached consolidated fina�te sheet
as due him by the City of Lubbock.
Yours very trr,
LI r
John T. Hick
City Engine,
10"
1� CONSOLIDATED FINAL ESTIMATE
GWO 2620
Accepted July 13, 1961
QUANTITIES
S.Y. S.Y. S.Y.
Unit & S.Y. L.F. Alley Valley Drainage
Sub-Unit Location PavingC & G Ret. Gutter Channel
2026 Guava Ave. from 151 N.of the N.P.L. 1957.87 470.54 8.33 52.54 7.78
of E. Baylor St. (E.Leg) to 15' S.
of the. S.P.L. of E.Bates St.(W.Leg)
2036-1 Guava Ave. from 15t N. of the N.P.L. 1562.27 600.54 16.67 39.60
of Colgate St. to 15' N.of the
N.P.L. of E. Baylor St.
2036-2 Guava Ave. from 151 S.of the S.P.L. 595.56 298.00 16.67
of E. Bates St. to 31 S.of the S.P.L.
of the alley S.of E. Bates St.
4115.70 1369.08 41.67 92.14 7.78
COST ESTIMATE
4115.70 S.Y. Paving @ 1.49 6132.39
1369.08 L.F. Curb & Gutter @ 1.49 2039.93
41.67 S.Y. Alley Return @ 5.00 208.35
92.14 S.Y. Valley Gutter @ 5.50 506.77
7.78 S.Y. Drainage Channel @ 5.50 42.79
CONTRACT COST 8930.23
POST DISTRIBUTION
Unit & Contract Property City to
Sub-Unit Cost Owner Cost Contractor
NOW
2026 3991.74 2198.15 1793.59
2036-1 3523.74 2346.83 1176.91
2036-2 1414.75 973.62 441.13
TOTAL $ 8930.23 5518.60 3411.63
Escrow to be released to the Developer
Cherry Point Addition Lots 1 - 20 $ 67.33
Cherry Point Addition Lots 21 - 40 613.76
Cherry Point Addition Lots 41 - 80 1157.53
Cherry Point Addition Lots 81 - 118 631.12
Cherry Point Addition Lots 178 - 235 1727.27
Cherry Point Addition Lots 236 - 275 1028.95
TOTAL $ 5225.96
µ CITY OF LUBBOCK
�4CK;�
TEXAS
July 13, 1961
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by
J. R. Fanning, paving contractor, as authorized by resolutions
passed on June 23, 1960 and September 22, 1960, and find the
improvements on Guava avenue as listed on the final estimate
sheet to have been completed in accordance with the plans and
specifications and recommend that you accept the improvements on
said streets and/or avenues, authorizing payment to the contractor
the amount shown on the attached consolidated final estimate sheet
as due him by the City of Lubbock.
Yours very truly,,
John T. Hickerson
City Engineer