HomeMy WebLinkAboutResolution - 121059O - Paving Improvements. Slide Rd And 29Th St. - 12_10_1959 1 210 Q
RMOLUTIM . GEL-TINE IMIROVEIvMTS ON A PORTION, OF A STIU3T AS
LISTED BhICW;
W117MIMAS., the City of Lubbock passed a resolution on September 24,
1959 authorizing the construction of street improvements by Pioneer Pavers,
Inc. on a portion of the following streets:
A portion of the north Stub of the intersection of Slide Road axed 29th Street
which is a part of a Unit known and designated as Unit Number 11-IS 62?.
AND WHEM"S., the improvements upon the said portion of the above—
'mentioned street have boar, inspected and found to have been constructed
according to the approved plans and speGifications.
THMWORE, BE IT BESOLVzM ff THE CITY CF LUBBOCK, TEXAS.
1.
That the it oia said pori-ton of the abov,.J'Mentioned street
be., and the same are hereby accepted and the City Fag ineer be and he is
hereby authorized to direct the payment of the City's share.
I.I.
This resolution shall take effect ax�d be in force after its
passage.
PASSED AND APPROVED WIS IOTI-,' DAY UP Dtlecemboar,
Lenrd s 21aker,, hayor
ATTEST
-'—-
Lave ixSa LoWe, City Secretary
APPWVED
lin T. Hickerson,, City Lhgir6er
APP
V
"lop, h, Ir
Vauglm Wilson, City Attorney
IZIOSOCto
A CO'SOLIDATM FINAL ES`MVE
G-W-0. 2359
Accepted becembeer L, 1959
UkT%T T ITI'
S.Y.
Unit .Location Paving
NS 627 A part of Forth Stub of the 147.06
intersection of Slide Road
and 29th Street.
Total 3-47.06
COST ESTIM.TE
147.06 S.Y. Paving 1.40 205.88
CONTRACT COST 205.88
2ST DISTRIBUTION
City- to
Contract Contractor due
nit Cost November l 1960
NS 627 205.88 205.$8
L CITY OF LUBBOCK
TEXAS
December ib, 1959
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
S have examined the paving improvements constructed by
Pioneer Pavers, Inc., paving contractor, under their contract dated
March 25, 1959, designated as G. T.O. 2359 as authorized by a
resolution passed on, September 24, 1959 and find the improvements on
a part of the North Stub of the intersection of Slide Road and 29th
Street as listed on the final estimate sheet to have been completed
in accordance with the plans and specifications and recommend that
you accept the i#provements on said streets and/or avenues, authoriz—
ing payment to the contractor the amount shown on the attached
consolidated final estimate sheet as due them by the City of Lubbock
which will be due November 1, 1960.
Yours very truly,
John T. Hickerson
City Engineer