Loading...
HomeMy WebLinkAboutResolution - 112459N - Street Improvements 26Th Street To Quinton Ave. - 11_24_1959 RESOLUTION RESOLUTION ACCEPTING 7MMOMENTS ON PCRTIONS OF STREETS AND AVENUES AS LISTED BELOW: WBEREAS, in conformance with the paving requirement provisions of City Ordinance 13.31, the subdivider of Zora Addition (Lots I through 10), made arrangements with Kerr Paving Company for the construction of paving improvements on certain streets- dedicated in said subdivision under the provisions of said ordinance prior to the recording of the subdivision plat of Zora Addition. (Lots I through 10) including the following streets: North 1/2 of 26th Street from its intersection with the South Property Line of Lot 9, Zara Addition to its intersection with a line 28 feet East of the West Property Line of Quinton Avenue, known and designated as Unit Number' Ns 789. We of Quinton Avenue from its intersection with a line 18 feet North of th 1�2:t for th Property .Line of 26th Street to its intersection with a line 2.5 feet North of the North Property Line of the alley North of 26th Street, known and designated as Unit Number NS 7920 AND WHOYAS, the construction of the above improvements on the above- mentioned streets was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City ordinance 1331. TIEREFCRE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on'said portions of the abovementioned streets be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost. 11. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THis 24TH Dk: ER, 1959. &TTEST: nni's Baker, Mayor Laveni/aLcseae, City Sedrela;ry;, AP D T. Hick*rsonj� ity Engineer A VE, Vaughn fi.:Wilson, City Attorney CONSOLMATRD FIX&L ESTIMATE z0RA ADDITION LOTS 1 - 10 Accepted November 24, 1959 uANT Tr lES Unit & S.Y. S.Y. Sub-Unit Location S.Y. L.F. Alley Resurfacing Paving C & G Ret. NS 789 N� 26th Street from SPL of Lot 60 850.21 471.67 12.89 Zora Addition on Raleigh Avenue to 28 feet East of WPL of Quinton Avenue NS 792 Wk Quinton Avenue from 18 feet N of 213.01 138.82 15.00 NPL of 26th Street to 2.5 feet N. of NPR, of alley N. of 26th Street TO' AL 1063.22 610.49 15.00 12.89 COST DISTRIBUTION unit & Contract Property Sub-Unit Cost Owner Cost NS 789 2188.05 2188.05 NS 792 652.29 652.29 TOTAL 2840.34 2840.34 COST ESTIMATE 1063.22 S.Y. Paving @ 1.70 1,807:48 610.49 L.P. Curb & Gutter @ 1.55 946.26 15.00 S.Y. Alley Return @ 5.00 75.00 12.89 S.Y. Resurfacing @ 0.90 11.60 CON MCT COST $ 2,840.34 14 0" 4 CITY OF LUBBOCK I7 0K. 4 TEXAS November 24, 1959 Honorable Mayor and City Commission Lubbock, Texas Gentlemen: I have examined the paving improvements constructed by Kerr Paving Company, paving contractor, under their contract with the subdividers of Zora Addition and find the improvements on the North 1/2 of 26th Street and the West 1/2 of Quinton Avenue as listed on the final estimate sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improve- ments on said streets and avenues, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due them by the City of Lubbock, Yours very truly, John T. Hickerson City Engineer