HomeMy WebLinkAboutResolution - 092459K - Street Improvements - West Texas Construction Co - GWO 2200 43Rd Street - 09_24_1959 RESOLUTIM OgZqr)q j<
RESOLUTION ACCEPTING IMPROVEYMTS ON PORTIONS OF ALLEYS, STREETS,
AND/OR AVENUES AS LISTED Mal AND ORDERING THE ISSUANCE CF CERTIFICATES IN
EVIDENCE OF ASSESSMENTS LEVIED. .
WHEREAS, the City of Lubbock heretofore passed various street
improvement ordinances and resolutions and- entered into contract with
West Texas Construction, Inc. ;,G.W.O. 2200 for the makin& and construction
of street improvements on portions of numerous streets and/or avenues in
said City including among others the following:
43rd Street from its intersection with a line 2 feet West of the West
Property Line of Nashville Avenue to its intersection with the East Property
Line of Orlando Avenues known and designated as Sub-Unit 16 of Unit 1918.
Leave Out Number 6, 14, 15, 16, 17, 18, 20, 23, 26, 28, 39, 42, and 48.
AND WHEREAS, the improvements upon the said portions of the above-
mentioned streets and or avenues, have been inspected and found to have
been constructed in accordance with terms of -said contract G. J.O. 2200.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
I.
That the improvements on said portions of the abovementioned
streets, and/or avenues be and the same are hereby accepted, and the City
Engineer be and he is hereby authorized to direct payment of the City's
portion of the cost.
II.
That the Mayor and City Secretary be, and they are hereby instructed
to execute and deliver certificates in evidence of the assessments levied
against the parcels of property abutting upon the said portions of the
streets andr avenues listed above and aginst the owners of such property
in accordance with law and in the manner provided in said contract, and the
proceedings with reference to said improvements and assessments where such
assessments were levied.
III.
This resolution shall take effect and be in force from and after
its passage.
t .
()qtqSq it
PASSED AND APPROVED THIS 24TH DAY OF SEFTEXBER 190
L nni.s Baker, Mayor
ATTEST:
Lave a Lowe., City ecretary
APPROVED:
*h� T. Nickerson, Citygineer
aughn It. Wilson, City Attorney
CITY OF LUBBOCK N414—j-
'�►
TEXAS
September 24, 1959
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by
West Texas Construction, Inc., paving contractor under their contract
dated May 120 1958, designated as G.W.O. 2200 and find the improvements
on 43rd Street and Leave Out Numbers 6, 14, 15, 16, 17, 18, 20, 23, 26,
28, 39, 42, and 48 as listed on the final estimate and assessment sheet
to have been completed in accordance with the plans and spdcifications
and reco�numend that you accept the improvements on said streets and/or
avenues, authorizing payment to the contractor the amount shown on the
attached consolidated final estimate sheet as due them by the City of
Lubbock and issue assignable certificates against property owners for
the respective amounts shown on the attached final assessment sheets
as being due against them and their respective properties.
Yours very truly.,
ohn T. Hickerson
City Engineer
CONSOLMILTED FIMLL EST", UR
GWO 2200
Accepted September 24,1959
1.A,r
UANTITIES
unit & S.Y. L.F.
Sub-Unit Location Paving C & G
1918-16 43rd St. from 2' W. of W.P.L. of Nashville 1742.00 1206.00
Ave. to the E.P.L. of Orlando Ave.
Total Quan. 1-A 1742.00 1206.00
I.B. QMWITIES SPECIAL UNIT PRICES LA&VEOEITS
L.O. 6 Ave. U from 902 Ave. U to 906 Ave. U 127.5 127.50
L.O. 14 Ave. K from 422 Ave. K to 424 Ave.K 52.0 52.00
L.O. 15 5th Street from 1401*5th St. to 1409-5th St. 152.78 125.00
L.O. 16 5th Street from 1202-5th St. to 1206-5th St. 125.50 I27.00
L.O. 17 Ave. 0 from 511 Ave. 0 to 513 Ave. 0 65.17 51.00
L.O. 18 Ave. M from 502 Ave.M to 508 Ave. M 122.22 100.00
L.O. 20 Ave. K from 514 Ave. K to 520 Ave. K 98.22 104.00
L.O. -23 6th Street W.G.L. of Ave.K to S.P.L. of 466.00 125.00
alley W. of Ave. K ENS":Only)
L.O. 26 Ave. C from 606 Ave. C to 608 Ave. C 59.50 51.00
L.O. 28 Ave. K from 817 Ave. K to 819 Ave. K 57.00 48.50
L.O. 39 Ave. D from 1718 Ave. D to 1720 Ave. D 58.89 53.00
L.O. 42 18th St. from 412-18th St. to 420 18th St. 147.00 124.50
L.D. 48 Canton Ave. from 2908 Canton Ave. to 242.40 274.00
2912 Canton Ave.
Total Quantities 1-B 1774.18 1362.50 Leave-out areas
r
CONSOLIDATED FIR&L ESTMATE
tO 2200
ACCEPTED SEPTSNBER 24,1959
COST ESTI, ME 2-A.
1742.00 S.Y. Paving @ $1.775 $ 3,092.05
1206.00 L.F. Curb & Gutter @ $1.55 1 869.30
CONTRACT COST $ 4,961.35
E96T ESTIMATE 2-B.
1774.18 S.Y. Paving @ $1.90 $ 3,370.94
1362.50 L.F. Curb & Gutter @ $1.65 2,248.12
IEAVE-OUT CONTRACT COST $ 5,619.06
COST DISTRIBUTION 3 A.
Unit &.. Contract Property City to
Sub-Unit Cost Owner Cost Contractor
N
1918-16 $ 4,961.35 5,239.55 278.20)
Cost Distribution 3.B
Leaveouts 5,619.06 4,169.10 1,449.96
TOTAL $ 10,580.41 $ 9,408.65 $1,171.76
GWo 2200Ll
Accepted 9-24-59
FINAL PAVING ASSESSMENT 43RD STREET Sbmet No. 1 of 1
CITY OF LUBBOCK Sub-Unit No. 16 of
Width 30 Feet From EPL Orlando to 2' West of WPL of Nashville Avenue Unit 1918
Paving C&G @ $1.6275 Ft.
Owner Lots Block Addition No-Ft. Rate Cost Lin-Ft. Cost Total Cost
(SOUTH SIDE)
Tom E. Carver 1 3 Sunset Heights Add. 87.5 2.70270868 236.49 87.50 142.41 378.90
William E. Weatherby 2 3 Sunset Heights Add. 72.5 2.70270868 195.95 72.50 117.99 313.94
Wade L. Curry 3 3 Sunset Heights Add. 72.5 2.70270868 195.95 72.50 117.99 313.94
James E. West, et ux 4 3 Sunset Heights Add. 72.5 2.70270868 195.95 72.50 117.99 313.94
J. C. Paulk 5 3 Sunset Heights Add. 72.5 2.70270868 195.95 72.50 117.99 313.94
Andrew N. Cates 6 3 Sunset Heights Add. 72.5 2.70270868 195.95 72.50 117.99 31.3.94
Audrey B.Brown, et ux 7 3 Sunset Heights Add. 72.5 2.70270868 195.95 72.50 117.99 313.94
Joe Powers 8 3 Sunset Heights Add. 82.5 2.70270868 222.97 82.50 134.27 357.24
(NORTH SIDE)
W. E. Ward 9 1 Sunset Heights Add. 82.5 2.70270868 222.97 82.50 134.27 357.24
Ralph Mathis & Leonard Wilson 10 1 Sunset Heights Add. 72.5 2.70270868 195.95 72.50 117.99 313.94
Charley J. Ellis, et ux 11 1 Sunset Heights Add. 72.5 2.70270868 195.95 72.50 117.99 313.94
Herbert R. Hatchel, et ux 12 1 Sunset Heights Add. 72.5 2.70270868 1:95.95 72.50 117.99 313.94
L. T. Foster 13 1 Sunset Heights Add. 72.5 2.70270868 195.95 72.50 117.99 313.94
L. D. Cox 14 1 Sunset Heights Add. 72.5 2.70270868 195.95 72.50 117.99 313.94
Roxie Haverly Neely 15 1 Sunset Heights Add. 72.5 2.70270868 195.95 32.50 117.99 313.94
Clarence R. Horn 16 1 Sunset Heights Add. 87.5 2.70270868 236.49 87.50 142.41 378.�n.
TOTAL PROPERTY OMR COST $ 5239.'
CITY'S SHARE 3
TOTAL SUB-UNIT COST
GWO 2200
Accepted
FINAL PAVING ASSESSMENT AVENUE U Sheet No. 1 of 1
CITY OF LUBBOCK Unit No. L.O. 6
Width 8 Feet From 902 Avenue U to 906 Avenue U
Paving
owner Lots Block Addition No. Ft. Rate Cost C&G @ $1.7325 Ft. Total
Lin.Ft, ost oat
Bessie Mee Rodgers 1 58 Overton 127.5 0.8936471 113.94 127.50 220.89 334.83
..................................................................................
TOTAL PROPERTY OWNER COST $ 334.83
CITY'S SHARE 140.42
TOTAL SUB-UNIT COST $ 475.25
(W0 2200
Accepted 9-24-59
FINAL PAVING ASSESSMENT AVENUE K Sheet No. 1 of 1
CITY OF LUBBOCK unit No. L.O. 14
Width 9 Feet From 422 Avenue K to 424 Avenue K
Paving C&G @ $1.7325 Total
Owner Lots Block Addition No.Ft. Rate Cost Lin.Ft. Cast Cost
...................................................................................
J. W. Chapman 13 & 14 5 Original Town 52.0 0.9975000 51.87 52.00 90.09 141.96
TOTAL PROPERTY OW1gER COST $ 141.96
CITY'S SHARE 51.87
TOTAL SUB-UNIT COST $ 193.83
GWO 2200
Accepted 9-24-59
FINAL PAVING ASSESSMENT 5TH STREET Sheet No. 1 of 1
CITY OF LUBBOCK
Width li Feet From 1401 5th Street to 1409 5th street Unit No. L.O. 15
Paving C&G C $1.7325 Total
Owner Lots Block Addition No.Ft. Rate Cost Lin.Ft. Cost Cost
Nell. Holcomb 20 19 Original Town 125 1.2192000 152.40 125.00 216.56 368.96
.............. ........
TOTAL PROPERTY OWNER COST $ 368.96
CITY isSHARE 152.40
TOTAL sUB-UNIT COST $ 521.36
GWO 2200
Accepted 9-24-59
FINAL PAVING ASSESSMENT 5TH STREET Sheet No. 1 of l
CITY OR LUBBOCK
Width 8.5 feet From 1202 5th Street to 1206 5th Street Unit No. L.O. 16
Paving CMG @ $1.7325 Total
Owner Lots Block Addition No.Ft. Rate Cost Lin-Ft. Cost Cost
J. W. Chapman 13 5 Original Town 125.0 1.0153600 126.92 125.00 216.56 343.48
TOTAL PROPERTY OWNER COST $ 343.48
CITY'S SHARE 126.92
TOTAL SUB-UNIT COST $ 470.40
GWO 2200
Accepted 9-24.-59
FINAL PAVING ASSESSMENT AVENUE 0 Sheet No. 1 of 1
CITY,OF,LUBBOCK
Width 11.5 Feet From 511 Avenue 0 to 513 Avenue 0 Unit No. L.O. 17
Paving C&G @ 41.7325
Owner Lots Block Addition No.Ft. Rate Cost Lin.Ft. Cost Total Cost
Eugene G. White 6 & 7 17 Original Town 51.0 1.2501923 63.76 51.00 88.36 152.12
TOTAL PROPERTY OMR COST $ 152.12
CITY'S SHARE 66.25
TOTAL SUB-UNIT COST $ 218.37
GWO 2200
Accepted 9-24-59
FINAL PAVING ASSESSMENT Avenue M Sheet No. 1 of 1
CITY:OF LUBBOCK
Width I1_Feet . From 502 Avenue M to 508 Avenue M Unit No. L.O. 18
Paving CMG @ $1.7325 Ft.
Owner Lots Block Addition No.Ft. Rate Cost Lin.Ft, Cost Total Cost
Neil Holcomb 17, 18, 19 4k 20 19 Original Town 100.0 1.1723077 117.23 100.00 173.25 290.48
..........................................................................................
TOTAL PROPERTY OWNER COST $ 290.48
CITY'S SHARE 126.60
TOTAL SUB-UNIT COST $ 417.08
GWO 2200
Accepted 9-24-59
FINb.L PAVING ASSESSMENT Avenue K Sheet No. 1 of I
CITY.OF LUBBOCK
Width 8.5 Feet From 514 Avenue K to 520 Avenue K Unit No. L.O. 20
Paving C&G @ $1.7325 Ft.
Owner Lots Block Addition, No.Ft. Rate Cost Lin.-ft. ost Total Cost
Ernest J. Ohnemas 11,12,13 & 14 21 Original T mn 104.0 0.9420192 97.97 104.00 180.18 278.15
......................................................................................
TOTAL PROPERTY OWNER COST $ 278.15
CITY'S Smn 97.98
TOTAL SUB-UNIT COST $ 376.13
GWO 2200
Accepted 9-24-59
F IR&L PAVING ASSESSIIENT 6TH STREET Sheet No. l of l
CITY OF LUBBOCK
Width 51 Feet Frpm WGL of Avenue K to EPL of alley West of Avenue K Unit No. L,O. 23
Paving C&G @ $1.7325 Ft. Total
Owner Lots Block Addition No.Ft. Rate Cost Lin.Ft, Cost Cost
Ernest J. Ohnemus 11 21 Original Town 125.0 4.4251200 553.14 125.00 216.56 769.70
TOTAL PROPERTY OWNER COST $ 769.70
CITY'S SHARE 376.53
TOTAL SUB-UNIT COST $1,146.23
GW0 2200
Accepted 9-24-59
FINAL PAVING ASSESSMENT AVENUE C Sheet No. 1 of 1
CITY.OF LUBBOCK
Width 10.5 Feet From 606 Avenue C to 608 Avenue C Unit No. L.O. 26
Paving C&G @ $1.7325
Owner Lots Block Addition No.Ft. Rate Cost Lin-Ft. Cost Total Cost
J. D. Haddock 17 45 Original Town 26.0 1.1246154 29.24 26.00 45.04 $ 74.28
Elbert Haddock 18 45 Original Town 26.0 1.1246154 29.24 26.00 45.04 74.28
.........
TOTAL PROPERTY (EWER COST $ 148.56
CITY'S SHARE 58.50
TOTAL SUB-UNIT COST $ 207.06
GWO 2200
Accepted 9-24-59
FIN&L PAVING ASSESSMENT Avenue K Sheet No. 1 of 1
CITY OF LUBBOCK
Width 9.5 Feet. From 817 Avenue K to 819 Avenue K Unit No. L.O. 28
Paving C&G @ $1.7325
Owner Lots Block Addition No.Ft. Rate Cost Lin.Ft. Coat Total Cost
Estate of Lou Arnett 9 & 10 70 Original Town 48.5 1.0934615 53.03 48.50 84.03 $ 137.06
.................................................................................................
Jordan (deceased)
TOTAL PROPERTY OWNER COST $ 137.06
CITY'5 SHARE 60.68
TOTAL SUBUNIT COST $ 197.74
GWO 2200
Accepted 9-24-59
FINAL PAVING ASSESSMENT Avenue D Sheet No. 1 of 1
CITY OF LUBBOCK Unit No. L.U. 39
Width 10 feet From 1718 Avenue D to 1720 Avenue D
Paving C&G @ $1.7325 Ft. Total
Owner Lots Block Addition. NO-Ft. Rate Cost Lin.Ft. Cost Cost
J. A. Hodges East 112 of Lots 11 & 12 218 Original Town 52.0 1.1463462 59.61 52.00 90.09 1149.70
. ...... .. .
TOTAL PROPERTY OWNER COST $ 149.70
CTPY'S SHARE 59.61
TOTAL SUB-UNIT COST $ 209.31
GWO 2200
Accepted 9-24-59
FINAL PAVING ASSESSMENT 18th Street Sheet No. l of 1
CITY-OF LUBBOCK
Width 10.5 Feet From 412 18th Street to 420 18th Street Unit No. L.0. 42
Paving C&G @ $1.7325 Ft.
Owner Lots Block Addition No.Ft. Rate Cost Lin.Ft. . Cost Total Cast
1111a M. Wilkinson 10 219 Original T mn 124.5 1.1730400 146.04 124.50 215.70 361.74
TOTAL PROPERTY OWNER COST $ 361.74
CITY'S sH&RE 147.22
TOTAL BUB-UNIT COST $ 508.96
Gw0 2200
Accepted 9-24-59
FINAL PAVING ASSESSMENT Canton Avenue Sheet No. 1 of I
CITY OF LUBBOCK
Width 7.5 Feet From 2908 Canton. Ave. to 2912 Canton Ave. Unit No. L.O. 48
Paving C&G @ $1.7325 Ft. Total.
Owner Lots No.Ft. Rate Cost Lin.pt, post Cost
Clyde C. Sullivant Beginning at a point which is 965 feet South and 274.0 0.7943796 217.66 274.00 474.70 t692.36
300 feet East of the Northwest corner of the
Southeast 1/4 of Section 13, Block B, Lubbock
County, Texas;
Thence South 274 feet;
Thence West 100.0 feet;
Thence North 274 feet;
Thence East 100.0 feet to place of beginning
TOTAL PROPERTY OWNER COST $692.36
CITY=S SH&RE 265.93
TOTAL SUB-UNIT COST $958.29