RESOLUTION
�. RESOLUTIM ACCEPTING Ir7PR0Vr�riM TS CN PORTIONS OF STREETS AND/OR
AV31UES AS LISTED BELCW:
WHEREAS, in conformance with the paving requirement provisions of
City Ordinance 1331, the subdivider of Tanglewood Addition, made arrangements
with Pioneer Pavers, Inc. for the construction of paving improvements on
certain streets dedicated in said subdivision under the provisions of said
Ordinance prior to the recording of the subdivision plat of Tanglewood Addition
including the following streets:
Strip of Curb and Gutter and Re—surfacing parts of Toledo Avenue from a,line
2.5 feet South of Alley South of 23rd Street to 2.5 feet South of Alley
North of 21st Street, known and designated as NS Unit Number 513.
24th Street from its intersection with a line 219.63 feet ywest of the WPL of
Topeka Avenue to its intersection with the West Lip Line of Topeka Avenue,
known and designated as NS Unit Number 512.
Topeka Averlue from its intersection with a line 42.03 feet South of the SPL
of 24th Street;, to its intersection with a line 18 feet South of the SPL of 21st
Street, known and designated as NS Unit Number 511.
23rd Street from its intersedtion with a line 42.03 feet South of the SPL of
Topeka Avenue to its intersectiob with a line 21.4 feet East of the ikiPL of
Toledo Avenue, known and designated as NS Unit Number 510.
�^ 22nd Street from its intersection with a line 12 feet West of EPL of Topeka
Avenue to its intersection with a line 20.5 feet East of the WPL of Toledo
Avenue, known and designated as NS Unit Number 509.
21st Street from its intersection with a line 219.63 feet West of the WPL of
Topeka Avenue to its intersection with a line 26.5 feet East of the iJPL of
Toledo Avenue, known and designated as NS Unit Number 508.
AND WHEREAS, the construction of the above improvements on the above—
mentioned streets was performed under the supervision of the City Engineer
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in accordant
with the provisions of City Ordinance 1331,
TfMMCRE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned streets
be and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost.
II.
This resolution shall take effect and be in force from and after
its passage.
OS23 sq K
PASSED AND APPROVED THIS 27TH DAY OF AUGUST, 19 .
Lennis Bakery Mayor
ATT
enia Lowey ity Secretary
APPROVED:
'"I�0-
J hn T. Hickerson, City Engineer
APFR :� �'iotl�
Vaughn E. filson, City Attorney
M w CITY OF LuBBOCK
Off/K.
TEXAS
August 27, 1959
Honorable Mayor and City GD=Lission
Lubbock, Texas
Gentlemen:
I have examined the paving improvements construction by pioneer
Pavers, Inc., paving contractor, under their contract dated January 10, 19591
designated as G.W.O. 2331 and under their contract with the subdividers of
Tanglewood Addition and find the improvements on 24th Street, Topeka Avenue,
23rd Street, 22nd Street, and 21st Street as listed on the final estimate
sheet' to have been completed in accordance with the plans and specifications
and recommend that you accept the improvements on said streets and/or avenues,
authorizing payment to the contractor the amount shown on the attached
consolidated final estimate sheet as due them by the City of Lubbock.
Yours very truly,
yJohneT. Hickerson
City Engineer
Sheet 1 of 2
GMSOLIDATEB FINAL ESTIMATE
TAGLOOD ADDITION
Accepted ApRust 273 1959
UANTITIES
S.Y. S.Y. L.F.
S.Y. L.F. Alley Valley Spdcial
Unit Location Paying C & G het. Gutter Curb
KS 508 21st St. from 219.63 , W. of the 3,623.40 1,870.48 52.54
'dPL of Topeka Ave. to the center
Lane of Toledo Ave.
IDS 509 22nd St. from 12' N. of EPL of 2,529.53 11404.04 52.54
Topeka Ave. to centerline of
Toledo Ave.
KS 510 23rd St. from 42.031 S. of the 3,383.19 1,644.82 52.54
SPL of Topeka to centerline of
Toledo Ave.
WS 511 Topeka Ave. from 42.03s S. of 3,890.42 2,488.45 182.42 30.00
the SPL of 24th St. to 181 S.
of the SPL of 21st St.
NS 512 24th St. f rcm 219.631 W. of the 858.34 510.80 11.00
'L of Topeka to the W. Lip Lime
of Topeka Ave.
ITS 513 Toledo Ave. from Alley S. of 377.04 68.42
23rd 3t. to 151 K. of NPL of 21st
St.
TOTALS 14,284.88 8,295.63 261.84 157.62 30,00
COST ESTIMATE
141284.88 S.Y. Paving @ 1.40 19,998.83
82295•63 L.F. Curb & Gutter 0 $1.45 123028.66
261.84 S.Y. Alley Return @ $4.50 1,178.28
1557.62] S.Y. Valley Gutter @ 5.00 788.10
70.27 S.Y. Re-surfacing @ $2.00 140.58
30.00 L.F. Special Curb @ 42.90 87.00
CONTRACT COST 34,221.45
Sheet 2 of 2
CONSOLIDATED FINAL ESTIMATE OQ
TANGI&TOOD ADDITICN
Accepted August 27, 1959
COST DISTRIDUTICK
Property
Contraet Owner
Unit Cost Cast
NS 508 8;o47.65 8,047.65
NS 509 5,839.90 5,839.90
: S 510 71384.15 7,384..15
NS 511 9,962.73. 9,9b2.73
NS 512 1,991.84 1,991.84
N5 513 995.18 995-18
TOTALS 34,221.45 34,221.45