HomeMy WebLinkAboutResolution - 062559D - Street Improvements - Kerr & Middleton Paving Co - GWO 2155 19Th Street - 06_25_1959 i
otp
RESOLUTION
(�;- RESOLUTION' ACCEPTIhG.IMPR0`Va, 1EKTS ON PORTIONS OF ALLEYS, STREb'TS,
AA'D/OR AVENUES AS LISTED BEI4W AP D ORDERING THE ISSUANCE C�' CERTIFICATES IN
EVID&ICE OF ASSESSMENTS LEVIED.
WHEREAS, the City of Lubbock heretofore passed various street
improvements ordinances and resolutions and entered into contract with
Kerr and }Middleton Paving Company G.W.O. 2155 for the making and construction
of street and/or alley improvements on portions of numerous alleys, streets
and/or avenues in said City including among others the following:
Part of the E-�_d_ alley 19th Street and 20th Street and from College Avenue to
Boston Avenue.
10 D WHEPEAS, the improvements upon the said portions of the above-
mentioned alleys, streets and/or avenues, have been inspected and found to
have been construdted in accordance with terms of said contract G.W.O. 2155.
THORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEAS:
I.
That the improvements on said portions of the abovementioned alleys,
streets, and/or avenues be and the same7.�are hereby accepted, and the City
Engineer be and he is hereby authorizea `to direct payment of the City's
!' portion of the cost.
II.
That the Mayor and City Secretary be, and they are hereby instructed
to execute and deliver certificates in evidence of the assessments levied
against the arcels of property abutting upon the said portions of the alleys
streets and or avenues listed -above and against the owners of such property in
accordance with law and in the manner provided in said contract, and the pro-
ceedings with reference to said improvements and assessments where such assess-
ments were levied.
III.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 2 TH BAY OF JUKE 190.
sqD ;
enni.s ,Baker, Mayor
ATTEST:
Lave a Lowe, CitycSecretary
APPROVED:
yo�bnT. Nickerson, City Engineer
AP Lac
:
Vaughn . Gils n, City Attorney
4
l
r'
CITY OF LUBBOCK
oCK
�
TEXAS
June 25, 1959
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by Kerr
and Middleton Paving Company, paving contractor, under their contract
dated January 23, 1959, designated as G.W.C. 2155 as authorized by a
resolution passed on April 2, 1959 and find the improvements on F-
Alley between 19th Street and 20th Street and from College Avenue to
480 feet Nest of College Avenue as listed on the final estimate and
assessment sheet to have been completed in accordance with the plans
and specifications and recommend that you accept the improvements on
said alley, authorizing payment to the contractor the =nount shown on
the attached consolidated final estimate sheet as due him by the City
of Lubbock and issue assignable certificates against property owners
for the respective amounts shown on the attached final assessment
sheets as being"due against them and their respective properties.
Yours very truly,
ohn T. Nickerson
City Engineer
B03:ba
CONSOLIDATED FINAL ESTI .L4°1yE
G.W.0. 215.,
Accepted June 25, 1959
QTJANTITIBS
S.Y.
Unit & Concrete
Sub-Unit Location Paying
Part of
A 315-2 E-W alley between 19th St. and 20th St. 534.94
College Avenue to 480 ft. West.
Totals 534.94
COST UISTFJBUTION
Property City to
Unit & Contract Owner Contractor
Sub-Unit Cost Cost NGW
Part of
A 315-2 2,805.44 1,438.42 � 1,236.28
COST ESTIMATE
534.94 S. Y. Paving (5" concrete) Q 65 00 & 2,674.70
CONTRACT COST 21 674.70
GWO 2155
Accepted June 25, 1959 P
'' =SFII�I+iL PAVING ASSESSMENT E-W ALLEY Sheet No. 1 of 2
','City, of Lubbock
Unit No. A 315-2
Width 10 .feet From E. 7641 between College & Boston and 19th and 20th St.
Paving
Owner Lots Block Addition No.Ft. Rate Cost Total Coal
(NORTH SIDE)
Nora Thompson Combs 10 5 Ellwood Place 50.00 1.25 62.50 62.50
Mrs. Jessie M. McDonald 9 and the West 12.5 feet of Lot 8 5 Ellwood Place 62.50 1.25 78.13 78.13
Wallace Bogart East 37 .5 feet of Lot 8 and the West 5 Ellwood Place 62.50 1.25 78.13 78.13
25 feet of Lot 7
Wallace Bogart East 25 feet of Lot 7 5 Ellwood Place 25.00 1.25 31.25 31.25
Wallace Bogart 6 5 Ellwood Place 50.00 1.25 62.50 62.50
Wallace Bogart 5 5 Ellwood Place 50.00 2.25 112.50 112.50
Wallace Bogart West 25 feet of Lot 4 5 Ellwood Place 25.00 2.25 56.25 56.25
Texas Technological College Foundation East 25 feet of Lot 4 5 Ellwood place 25.00 2.25 56.25 56.25
Texas Technological College Founation 3 5 Ellwood Place 50.00 2.25 112.50 112.50
Texas Technological College Foundation 2 5 Ellwood Place 50.00 2.25 112.50 112.50
Texas Technological College Foundation West 32.4 feet of the South 5 Ellwood place 32.40 2.25 72.90 72.90
127.58 feet of Lot 1
(SOUTH SIDE)
Frances Mae Lawson 15 5 Ellwood Place 50.00 1.25 62.50 62.50
J. Roy Wells 16 and the West 25 feet of Lot 17 5 Ellwood Place 75.00 1.25 93.75 93.75
W. L. Bradshaw 18 and the East 25 feet of Lot 17 5 Ellwood Place 75.00 1.25 93.75 93.75
-- --- W. F. Brown 19 and the West 25 feet of Lot 20 5 Ellwood Place 75.00 1.25 93.75 93.75
Sidney C. Parnell et ux Connye M. East 25 feet of Lot 20 and the 5 Ellwood Place 50.00 1.25 62.50 62.50
West 25 feet of Lot 21
King Anthony Barrier East 25 feet of Lot 21 and the West 37.5 feet 5 Ellwood Place 62.50 1.25 78.13 78.13
of Lot 22
GWO 2155
FINAL PAVING ASSESSMENT E-W ALLEY Accepted June 25, 1959 4&/tziro..City.of Lubbock 22of 2
Width 1U,feet From E. 764' between College & Boston, and 19th and 20th St. Unit No. A 315-2
Paving
Owner Lots Block Addition No-Ft. Rate Cost Total Coat
Urallee Barrier, et vir Paul 23 and the East 12.5 feet of Lot 5 Ellwood Place 62.5 1.25 78.13 $ 78.13
22
Urallee Barrier, et vir Paul West 32.4 feet of Lot 24 5 Ellwood Place 32.4 1.25 40.50 40.50
......._.. ..______
TOTAL PROPERTY OWNER COST $ 1,438.42
" CITYYIs SHARE 1,370.02
TOTAL SUB-UNIT COST $ 2,808.44