RESOLUTION ACCEPTING MMOVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES
AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Caprock Addition made arrangements with West
Texas Construction, Inc. for the constructionof paving improvements on
certain streets dedicated in said subdivision under the provisions of said
Ordinance prior to the recording of the subdivision plat of Caprock Addition
including the following streets:
64th Street from its intersection with a line 16 feet West of the West Property
Line of Canton Avenue to its intersection with a line 15 feet West of the West
Property Line of College Avenue Access Road (North Leg) known and designated
as New Subdivision Unit Number 373.
65th Street from its intersection with a line 2.5 feet South of the South
Property Line of the alley South of 64th Street to its intersection with the
center line of 64th Street, known and designated as New Subdivision Unit
Number 374.
.Canton Avenue from its intersection with a line 2.5 feet South of the South
Property Line of the alley South of 63rd Street to its intersection with a
line 2.5 feet South of the South Property Line of the alley South of 64th
Street, known and designated as New Subdivision Unit Number 375.
Boston Avenue from its intersection with a line 2.5 feet South of the South
Property Line of the alley South of 63rd Street to its intersection with a line
15 feet North of the North Property Line of 64th Street, known and designated
as New Subdivision Unit Number 376.
College Avenue Access Road (West Side) from its intersection with a line 2.5
feet South of the South Property Line of the alley South of 63rd Street to its
intersection with a line 2.5 feet South of the South Property Line of the alley
South of '64th Street, known and designated as New Subdivision Unit Number 377.
AND WHEREAS, the construction of the above improvements on the above-
mentioned streets was performed under the supervision of the City Engineer, and
said improvements have been completed and have been inspected and found to
have been constructed in accordance with City specifications and in accordance
with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned streets be
and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the 'payment of the City's portion of the cost and to
release escrow money.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 31ST DAY OF DECEMBER 1958.
Vun:its Baker, Mayor
ATTEST:
Lavenfi Lowe, City ecretary
APPROVED:
' C
ohn T. Hickerson, City Engineer
tEaugghn
Wilgon, City Attorney
�1
CITY OF LUBBOCK
oCK.
TEXAS
December 31, 1958
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by
West Texas Construction, Inc. , paving contractor, under their
contract with the subdividers of Caprock Additions and find the
improvements on 64th and 65th Streets, Canton Avenue, Boston Avenue
and College Avenue Access Road (West Side) as listed on the final
estimate sheet to have been completed in accordance with thelpl.ans
and specifications and recommend that you accept the improvements
on said streets and/or avenues, authorizing payment to the contractor
the amount shown on the attached consolidated final estimate sheet
as due them by the City of Lubbock.
Yours very truly,
64ohn T. Hickerson
City Engineer
CONSOLIDATED FIMLL EST IN&TE
G.W.O. 2219
Accepted December 31, 1958
M4M IT IES
S.Y. S.Y. S.Y.
Unit Location S.Y. L.F. Alley Valley Cone.
Paving C&G Ret. Gutter Island
NS 373 64th St. from 160 W.of the W.P.I.. of 6537.85 3415.46
Canton Ave. to 15' W.of the WPL of
College Ave. Access Rd.(N.Leg)
NS 374 65th St. from 2.5' S.of the SPL of 450.17 252.31 34.63
the alley S. of 64th St. to the center
line of 64th St.
NS 375 Canton Ave. from 2.5' S. of the SPL of 761.81 466.52 30.00
the alley S. of 63rd St. to 2.5' S: of
the SPL of the alley S. of 64th St.
NS 376 Boston Ave. from 2.5' S. of the SPL of 399.55 189.26
the alley S. of 63rd St. to 15' N.of
the NPL of 64th St.
NS 377 College Ave.Access Rd.(West Side) from 1025.87 440.83 17.71 35.16 13.03
2.5' S. of the SPL of the alley S.of
63rd St. to 2.5' S. of the SPL of the
alley S. of 64th St.
Totals 9175.25 4764.38 82.34 35.16 13.03
COST ESTIMATE
9175.25 S.Y. Paving @ $1.54/S.Y. $14,129.88
4764.38 L.P. Curb & Gutter @ $1.49/L.F. 7,098.93
82.34 S.Y. Alley Return @ $4.50/S.Y. 370.53
35.16 S.Y. Valley Gutter @ $5.00,'S.Y: 175.80
13.03 S.Y. Conc.Island @ $5.001S.Y. 65.15
Contract Cost $ 21, 840.29
COST DISTRIBUTION
Unit Contract Property City to
Cost Owner Contractor
Cost NW
NS 373 15,157.32 15,157.32
NS 374 1,225:04 1,225.04
NS 375 2:003.30 2,003.30
NS 376 897.30 800.15 97.15
NS 377 2,557.33 1 532.30 1 025.03
Totals 21,840.29 20,718.11 1,122.18