Loading...
HomeMy WebLinkAboutResolution - 012358I - Pavement Improvements - Pioneer Pavers Inc - Oakwood Addition - 01/23/1958 RESOLUTION P RESOLUTION ACCEPTING MROVEMENTS ON A PORTION OF A STREET AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331,' the subdivider of Oakwood Addition, wade arrangements with Pioneer Pavers, Inc. for the construction of paving improvements on a certain street dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of Oakwood Addition including the following street: College Avenue Access Road (East Side) from its intersection with a line 15 feet South of the South Property Line of 55th Street to its intersection with a line 15 feet North of the North Property Line of 56th Street, known and designated as New-Subdivision Unit Number 291. AND WHEREAS, the construction of the above improvements on the above-mentioned street was performed under the supervision of the City Engineer and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned street be and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the tity's portion of the cost. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 23RD DAY OF JANUARY, 1958. ATTEST: S. S. Forrest, Jr., Mayor �l1 Lave is Lowe, City Secretary APPROVED:. 0 T. $ickerson, City Engineer. D. AV Qaughn E Wilson, City Attorney . to 01�5� CONSOLIDATED FML ESTZIfA.TE GgW.0, 2177 ACCEPTED JANUARY 23, 1958 QUANTITIES unit Location S.Y. L.F. S.Y. Paving C & G Alley t. NS-291 College Access Rd. (E.Side); 55th 596.44 503.00 11.67 St. to 56th St. COST ESTMTE 596.44 S.Y. Paving @ $10'50/S.Y. $ 894.66 503.00 L.F. Curb & Gutter @ $1.50/L.F. 754.50 11.67 S.Y. Alley Return @ $5.00/S.Y. 58.35 Contract Cost $1,707.51 COST DISTRIBUTION unit Contract Property City to Cost Owner Contractor Cost NOW NS-291 $ 1,707.51 $ 1,097.50 $ 610.01 CITY OF LUBBOCK 01 #' � TEXAS January 23, 1958 Hoserable Mayor and City Coaamissivn Lubbock, Texas Gentlemen: I have examined the paving improvements constructed by Pioneer Pavers, Inc., paving contractor, under their contract with the subdividers of Oakwood Addition and find the improvements on College Avenue Access Road (East Side) as listed on the final estimate sheet to have been coaaapleted in accordance with the plans and specifications and recosa and that you accept the improvements on said streets and/or avenues, authorizing payment to the contractor the am ust shows on the attached coa►selidated final estimate sheet as due them by the City of Lubbock. Yours very trul X , obs T. Hickersou JHS:waa City Engineer