HomeMy WebLinkAboutResolution - 010958G - Street Improvements - Pioneer Pavers Inc - GWO 2103 Multiple Locations - 01_09_1958 }
RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR
AVENUES AS LISTED BELOW AND ORDERING THE ISSUANCE OF CERTIFICATES IN EVIDENCE
OF ASSESSMENTS LEVIED.
WHEREAS, the City of Lubbock heretofore passed various street
improvement ordinances and resolutions and entered into contract with Pioneer
Pavers, Inc. (G.W.O. 2103)' for the malting and construction of street improve-
ments on`portions of numerous streets and/or avenues in said City including
among others the following:
Avenue K from its intersectionlwith the South Property Line of 34th Street to
its intersection with a line 5 feet North of the North Property Line of 36th
Street, known and designated as Sub-Unit Number 1 of Unit Number 1889.
48th Street from its intersection with the West Property Line of Avenue % to
its intersection with the East Property Line of College Avenue, known and
designated as Sub-Unit Number 7 of Unit Number 1889.
50th Street from its intersection with the East Property Line of Boston Avenue
(North Leg) to its intersection with the East Property Line of College Avenue
(North Leg) , known and designated as Sub-Unit Number 5 of Unit Number 1893.
AND WHEREAS, the improvements upon the said portions of the above-
mentioned streets and/or avenues, have been inspected and found to have been
'- constructed in accordance with terms of said contract (G.W.O. 2103).,
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
L.
That the improvements on said portions of the abovementioned
streets, and/or avenues be and the same are hereby accepted, and the City
Engineer be and he is hereby authorized to direct payment of the City's portion
of the cost.
II.
That the Mayor and City Secretary be, and they are hereby instruct-
ed to execute and deliver certificates in evidence of the assessments levied
against the parcels of property abutting upon the said portions of the streets
and/or,evenges listed above and against the owners of such property in
accordance with law and in the manner provided in said contract, and the pro-
ceedings with reference to said improvements and assessments where such assess-
ments were levied.
III.
This resolution shall take effect and be in force from and after
its passage.
GS
PASSED AND APPROVED THIS 9TH MY OF JANUARY, 1958.
S. S. Forrest, Jr., Mayor j/
ATTES V
Lwi&nia Lowe, dity Secretary
APPROVED.-
T. Hickerson, City Engineer
AP D:
- . 4 //A
L ghn Viiffon, City Attorney
CONSOLIDATED FINAL ESTIMATE
t OIORSR §
lam' G.W.0. 210
s
Accepted January 9. 1958
QUANTITIES
S.Y. S.Y. L.F. S.Y.
Unit & Paving Paving C & G Alley Bet.
Sub-Unit Location lit, Hot-Mix lit' Hot Mix
1889-1 Ave. K; 34th St. to 36th St, 2,177.71 10201.26 20,00
1889-7 48th St.; Ave. X to College Ave, 2,149.70 1$260.12
1893-5 50th St.; Boston Ave. to College 1329429,19 2,580•72
Avenue
IIOTAIS 49327.41 -3,942.19 5,042.10 20.00
COST ESTIMATE
4,327.41 S.Y. Paving; lit' Hot-Mix 0 61.50/S.Y. 62491.12
13,942.19 S.Y. Paving; 1V Hot-Mix @ Sl-58/S.Y. 22,028.66
5,042.10 L.F. Curb & Gutter 61..50/L.F. 77,P563.15
20.00 S.Y. Alley Return ® $5.00/S.Y. 100.00
CONTRACT COST $36,182.93
COST DISTRIBUTION
Property City to
Unit & Contract Owner Contractor
Sub-Unit Cost Cost NOW
1889-1 5,168.46 6 4,197.50 $ 970.96
1889 7 5,114.73 5,387.71 272.98
1893-5 , 25,899.74 11,533.96 14,365.78
TOTALS $369182.93 6212119.17 $15,063.76