RESOLUTIM
RESOLUTION, ACCEPTDJG IITROVR 'ITS Q,, A PORTICE1 OF A ALLEY AS LISTED
BELM:
WHEFOEAS, the City of Lubbock passed a resolution on Aug« : 2,., 1960
authorizing the construction of Alley improvements by Kerr Paving Company on a
portion of the following Alley:
East'rdest Alley from the West Lip line of Boston Avenue to the
East Lip line of Canton Avenue and between 26th Street and 27th Street,
known and designated as Unit number A 331
ARID 14PEREAS, the improvements upon the said portion of the above—
mentioned Alley have been inspected and found to have been constructed acc—
ording to the approved plans and specifications.
T OnE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
I.
That the improvex--ients on said portion of the above mentioned Alley
be, and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the. payment of the City's share.
This resolution shall take effect and be in force after its passage.
PASSED A11D APPRCV ,D TEI IS 22 DAY OF Septemberl9LO
David C. Casey, Mayor
ATTEST
La v is Lowe, Citjf Secret ry
AP ROVED:
ohn T. Hickerson, City Engineer
APPROVED:
0r ed 0. Sent er Jr,, City!:,kttorney
- r CITY OF LUBBOCK
1 e)
CK.`�
TEXAS
September 22, 1960
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by
Kerr Paving Company, paving contractor, as authorized by a resol—
ution passed on August 25, 1960, and find the improvements on
East—West Alley between Boston and' Canton Avenues and between
26th and 27th Streets, as listed on the final estimate sheet to have
been completed in accordance with the plans and specifications and
recommend that you accept the improvements on said alley authorizing
payment to the contractor the amount shown on the attached consolidated
final estimate sheet as due him by the City of Lubbock.
Yours very truly
John T. Hickerson
City Engineer
4
I'
caYSOLIDATED F-MAL ESTIMATE
G.w.o.2465
Accepted September 22, 1960
QUXITITIFS
- S.F.
Unit & S.F. L.F. Alley
Sub-Unit Location Paving C & G Ret
A 331 D41 Alley from West lip line of B
Boston Ave. to the East lip line
of Canton Avenue between 26th & 3045,00 84.20 151.32
27th Streets.
Totals 3045.00 84.20 151.32
COST ESTI UTE
03045.00 S.F. Paving C Z0.53 v1,613.85
84.20 L.F. Curb & Gutter 0 . 1.59 133.88
151.32 S.F. Alley Return 0 0.53 80.20
CUTR4C'2 COST k1
C�, DISTRIe i;TIGP
Property City to
Unit & Contract D ner Contractor
Sub-Unit Cost Cost Now
A-331 1827.93 1359.85 468.08
TOTAL 1827.93 1359.85 46,8.07