HomeMy WebLinkAboutResolution - 4068 - Contract - Heritage Remediation Engineering - 30_ VCT Sanitary Sewer - 01_28_1993Resolution No. 4068
.January 28, 1993
Item No. 17
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock BE and is hereby authorized and
directed to execute for and on behalf of the City of Lubbock a Contract by and
between the City of Lubbock and Heritage Remediation Engineering for the
cleaning of a 30" VCT sanitary sewer located at 6th Street & Oak Avenue,
Lubbock, Texas, attached herewith, which shall be spread upon the minutes of
the Council and as spread upon the minutes of this Council shall constitute
and be a part of this Resolution as if fully copied herein in detail.
Passed by the City Council this
ATTEST:
S6Q-Q 0-8 �
Sally St I Abbe, A ting City
Secretary
APPROVED AS TO CONTENT:
� avlt.=•u�
Victor Kilrftn, Acting Purchasing
Manager
APPROVED AS TO FORM:
flalrold Willard;Assistant ty
Attorney
AW:js/EERITAGE.RES.
D2-Agenda/January 29, 2993
CITY OF LUBBOCK
SPECIFICATIONS
FOR
SANITARY SEWER CLEANING
- 30" VCT
BID # 12396
1
UwidiCi's
CITY OF LUBBOCK
Lubbock, Texas
1'
r
0
r
t
CITY OF LUBBOCK
SPECIFICATIONS
for
TITLE: SANITARY SEWER CLEANING
- 30" VCT
ADDRESS: 6TH i OAK AVENUE
BID NUMBER: 12396
PROJECT NUMBER: 2121-548000-6413
f'
CONTRACT PREPARED BY: Purchasing Department
E
7;
s
f
-1-
THIS PAGE LEFT BLANK INTENTIONALLY
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
INDEX
PAGE
NOTICETO BIDDERS..........................................................................................3
GENERALINSTRUCTIONS TO BIDDERS............................................................................5
BIDPROPOSAL - BID FOR UNIT PRICE CONTRACTS...............................................................10
PAYMENTBOND..............................................................................................14
PERFORMANCEBOND..........................................................................................17
CERTIFICATEOF INSURANCE..................................................................................20
CONTRACT...............................................................................................22
GENERALCONDITIONS OF THE AGREEMENT......................................................................24
CURRENTWAGE DETERMINATIONS...............................................................................42
SPECIFICATIONS............................................................................................43
SPECIALCONDITIONS.......................................................................................I"
NOTICEOF ACCEPTANCE......................................................................................45
-2-
No Text
NOTICE TO BIDDERS
-3-
THIS PAGE LEFT BLANK INTENTIONALLY
r"
r
i
NOTICE TO BIDDERS
810 B 12396
i
Sealed proposals addressed to Ron Shuffield, Buyer, City of Lubbock, Texas, will be received at the
office of the Purchasing Manager, Municipal Bldg., 1625 13th St., Room L-04, Lubbock, Texas, 79401, until
2:00 o'clock P.m. on the 14th day of January, 1993, or as changed by the issuance! of formal addenda to all
planholders, to furnish all labor and materials and perform all work for the construction of the following
described project:
SANITARY SEVER CLEANING - 300 VCT
After the expiration of the time and date above first written, said sealed proposals will be opened
by the Buyer at his office and publicly read aloud.
It is the sole responsibility of the bidder to insure that his bid is actually in the office of
f•" Purchasing Manager for the City of Lubbock, prior to the expiration of the date above first written.
t
i
The City of Lubbock will consider the bids on. the 28th day of January, 1993, at Municipal Bldg.,
r Lubbock, Texas, or as soon thereafter as may be reasonably convenient, subject to the right to reject any or
all bids and waive any formalities. The successful bidder will be required to furnish a performance bond
and payment bond in accordance with Article 5160, Vernon's Am. Civil St., in the amount of 100% of the
total contract price in the event that said contract price exceeds $25,000.00. Said statutory bonds should
C be issued by a company carrying a current Best Rating of Q or superior, as the rating of the bond company is
a factor that will be considered in determination of the lowest responsible bidder. If the contract price
does not exceed $25,000.00 the said statutory bonds will not be required.
Bidders are required, whether or not a payment or performance bond is required, to submit a
cashier's or certified check issued by -a bank satisfactory to the City of Lubbock, or a proposal bond from a
reliable surety company, payable without recourse to the order of the City of Lubbock in an amount not less
than 5% of the total amount of the bid submitted as a guarantee that bidder will enter into a contract and
execute all necessary bonds (if required) within 10 days after notice of award of the contract to him.
It shall be each bidders sole responsibility to inspect the site of the work and to inform himself
regarding all local conditions under which the work is to be done. It shall be understood and agreed that
all such factors have been thoroughly investigated and considered in the preparation of the bid submitted.
The plans, specifications, proposal forms and contract documents may be examined at the office of
the Purchasing Manager for the City of Lubbock, Texas.
r Attention of each bidder is particularly called to the schedule of general prevailing
pe y g p ng rate of per
diem wages included in the contract documents on file in the office of the Purchasing Manager of the City of
Lubbock, which document is specifically referred to in this notice to bidders. Each bidder's attention is
further directed to provision of Article 5159a, Vernon's Am. Civil St., and the requirements contained
therein concerning the above wage scale and payment by the contractor of the prevailing rates of wages as
heretofore established by owner in said wage scale.
The City of Lubbock hereby notifies all bidders that in regard to any contract entered into pursuant
to this advertisement, minority and women business enterprises will be afforded equal opportunities to
submit bids in response to this invitation and will not be discriminated against on the grounds of race,
color, sex, disability, or national origin in consideration for an award.
There will be a pre -bid conference on jth day of January, 1993, at 10:00 o'clock a.m., Personnel
Conference Room #108, Municipal Building, 1625 13th Street.
CITY OF LUBBOCK
SY: Ron Shuff
BUYER
ADVERTISEMENT FOR BIDS
BID r 12396
Sealed proposals addressed to Ron Shuffield, Buyer, City of Lubbock, Texas, will be received at the
office of the Purchasing Manager, Municipal Building, 1625 13th Street, Room L-04., Lubbock, Texas, 79401
until 2:00 o'clock a.m. on the 14th day of January, 1993, or as changed by the issuance of formal addenda to
all planholders, to furnish all labor and materials and perform all work for the construction of the
following described project:
SANITARY SEWER CLEANING - 30" VCT
After the expiration of the time and date above first written, said sealed proposals will be opened
by the Buyer at his office and publicly read aloud.
The plans, specifications, proposal forms and contract documents may be examined at the office of
the Purchasing Manager for the City of Lubbock, Texas.
Attention of each bidder is particularly called to the Schedule of General Prevailing Rate of Per
Diem Wages included in the contract documents on file in the office of the Purchasing Manager of the City of
Lubbock, Texas. Each bidder's attention is further directed to the provisions of Article 5159a, Vernon's
Am. Civil St., and the requirements contained therein concerning such wage scales and payment by the
contractor of the prevailing rates of wages as heretofore established by the City of Lubbock.
The City of Lubbock hereby notifies all bidders that in regard to any contract entered into pursuant
to this advertisement, minority and women business enterprises will be afforded equal opportunities to
submit bids in response to this invitation and will not be discriminated against on the grounds of race,
color, sex, disability, or national origin in consideration for an award.
There will be a prebid conference on 7th day of January. 1993, at 10:00 o1clock a.m., Personnel
Conference Room 108, Municipal Building, 1625 13th Street.
BY: R Shu ld
BUYER
THIS PAGE LEFT BLANK INTENTIONALLY
F
GENERAL INSTRUCTIONS TO BIDDERS
-4-
THIS PAGE LEFT BLANK INTENTIONALLY
P
GENERAL INSTRUCTIONS TO BIDDERS
1. SCOPE OF WORK
The work to be done under the contract documents shall consist of the following:
Cleaning of approximately 17,507 feet of 30" VCT sanitary sewer and removal of the sludge and debris from
the line and restore to full hydraulic capacity.
The contractor shall furnish all labor, superintendence, machinery, equipment and all materials necessary to
complete this project in accordance with contract documents.
2. CONTRACT DOCUMENTS
All work covered by this contract shall be done in accordance with contract documents described in the Gen-
eral Conditions.
All bidders shall be thoroughly familiar with all of the requirements set forth on the contract documents
for the construction of this project and shall be responsible for the satisfactory completion of all work
contemplated by said contract documents.
3. MANS FOR USE BY BIDDERS
It is the intent of the City of Lubbock that all parties with an interest in submitting a bid on the project
covered by the contract documents be given a reasonable opportunity to examine the documents and prepare a
bid without charge of forfeiture of deposit. The contract documents, may be examined without charge as
noted in the Notice to Bidders.
4. TIME AND ORDER FOR COMPLETION
The construction covered by the contract documents shall be fully completed within 90 (NINETY) calendar days
from the date specified in the Notice to Proceed issued by the City of Lubbock to the successful bidder.
The Contractor will be permitted to prosecute the work in the order of his own choosing, provided, however,
the City reserves the right to require the Contractor to submit a progress schedule of the work contemplated
by the contract documents. In the event the City requires a progress schedule to be submitted, and it is
determined by the City that the progress of the work is not in accordance with the progress schedule so sub-
mitted, the City may direct the Contractor to take such action as the City deems necessary to insure comple-
tion of the project within the time specified.
5. PAYMENT
All payments due to Contractor shall be made in accordance with the provisions of the General Conditions of
the contract documents.
6. AFFIDAVITS OF BILLS PAID
The City of Lubbock reserves the right, prior to final acceptance of this project to require the Contractor
to execute an affidavit that all bills for tabor, materials and incidentals incurred in the construction of
the improvements contemplated by the contract documents have been paid in full and that there are no claims
pending, of which the Contractor has been notified.
-5-
7. MATERIALS AND WORKMANSHIP
The intent of these contract documents is that only materials and workmanship of the best quality and grade
will be furnished. The fact that the specifications may fail to be sufficiently complete in some detail
will not relieve the Contractor of full responsibility for providing materials of high quality and for pro-
tecting them adequately until incorporated into the project. The presence or absence of a representative of
the City on the site will not relieve the Contractor of full responsibility of complying with this provi-
sion. The specifications for materials and methods set forth in the contract documents provide minimum
standards of quality which the Owner believes necessary to procure a satisfactory project. _
8. GUARANTEES
All equipment and materials incorporated in the project and all construction shall be guaranteed against de-
fective materials and workmanship. Prior to final acceptance, the Contractor shall furnish to the Owner, a
written general guarantee which shall provide that the Contractor shall remedy any defects in the work, and
pay for any and all damages of any nature whatsoever resulting in such defects, when such defects appear
within ONE year from date of final acceptance of the work as a result of defective materials or workmanship,
at no cost to the Owner (City of Lubbock).
9. PLANS FOR THE CONTRACTOR
The contractor will be furnished one set of plans and specifications, and related contract documents for his
use during construction. Plans and specifications for use during construction will only be furnished di-
rectly to the Contractor. The Contractor shall then distribute copies of plans and specifications to sup-
pliers, subcontractors or others, as required for proper prosecution of the work contemplated by the Con-
tractor.
10. PROTECTION OF THE WORK
The Contractor shall be responsible for the care, preservation, conservation, and protection of all materi-
als, supplies, machinery, equipment, tools, apparatus, accessories, facilities, and all means of construc-
tion, and any and all parts of the work whether the Contractor has been paid, partially paid, or not paid
for such work, until the date the City issues its certificate of completion to Contractor. The City re-
serves the right, after the bids have been opened and before the contract has been awarded, to require of a
bidder the following information:
(a) The experience record of the bidder showing completed Jobs of a similar nature to the one covered by
the proposed contract and all work in progress with bond amounts and percentage completed.
(b) A sworn statement of the current financial condition of the bidder.
(c) Equipment schedule.
11. TEXAS STATE SALES TAX
This contract is issued by an organization which qualifies for exemption provisions pursuant to provisions
of Article 20.04 of the Texas Limited Sales, Excise and Use Tax Act.
The Contractor must obtain a limited sales, excise and use tax permit which shall enable him to buy the ma-
terials to be incorporated into the work without paying the tax at the time of purchase.
.6-
12. PROTECTION OF SUBSURFACE LINES AND STRUCTURES
It shall be the Contractor's responsibility to prosecute the work contemplated by the contract documents in
such a way as to exercise due care to locate and prevent damage to all underground pipelines, utility lines,
conduits or other underground structures which might or could be damaged by Contractor during the construc-
tion of the project contemplated by these contract documents. The City of Lubbock agrees that it will fur-
nish Contractor the location of all such underground lines and utilities of which it has knowledge. How-
ever, such fact shall not relieve the Contractor of his responsibilities aforementioned. All such under-
ground lines or structures cut or damaged by Contractor during the prosecution of the work contemplated by
this contract shall be repaired immediately by Contractor to the satisfaction of the City of Lubbock, Texas,
at Contractor's expense.
13. BARRICADES AND SAFETY MEASURES
The contractor shall, at his own expense, furnish and erect such barricades, fences, lights and danger sig-
nals, and shall take such other precautionary measures for the protection of persons, property and the work
as may be necessary.
The Contractor will be held responsible for all damage to the work due to failure of barricades, signs, and
lights to protect it, and when damage is incurred, the damaged portion shall be immediately removed and re-
placed by Contractor at his own cost and expense. The Contractor's responsibility for maintenance of barri-
cades, signs, and lights shall not cease until the date of issuance to Contractor of City's certificate of
acceptance of the project.
14. EXPLOSIVES
r" The use of explosives will not be permitted unless written permission to do so is obtained by the Contractor
from the City. In all cases where written permission is obtained for the use of explosives, the Contractor
shall assume full responsibility for all damage which may occur as a direct or indirect result of the
blast-ing. In addition, in all cases where explosives are authorized to be used, the Contractor shall use utmost
care so as not to endanger life or property and the Contractor shall further use only such methods as are
currently utilized by persons, firms, or corporations engaged in similar type of construction activity.
Explosive materials shall not be stored or kept at the construction site by the Contractor.
In all cases where explosives are to be used during the construction of the project contemplated by this
contract, it shall be the duty of the Contractor to notify each utility company having structures (above or
below the ground) in proximity to the site of the work of Contractor's intention to use explosives, and such
notice shall be given sufficiently in advance to enable the companies to take such steps as they may deem
necessary to protect their property from injury. Such notice, however, shalt not relieve the Contractor of
responsibility for any damage resulting from his blasting operatics.
15. CONTRACTOR'S REPRESENTATIVE
The successful bidder shall be required to have a responsible local representative available at all times
white the work is in progress under this contract. The successful bidder shall be required to furnish the
name, address and telephone number where such local representative may be reached during the time that the
work contemplated by this contract is in progress.
16. INSURANCE
The Contractor shall not commence work under this contract until he has obtained all insurance as required
in the General Conditions of the contract documents, from an underwriter authorized to do business in the
r State of Texas and satisfactory to the City. Proof of coverage shall be furnished to the City and written
notice of cancellation or any material change will be provided ten (10) days in advance of cancellation or
change. All policies shall contain an agreement on the part of the insurer waiving the right to subroga-
tion.
The insurance certificates furnished shall name the City as an additional insured and shall further state
that all subcontractors are named as additional insureds, or in the alternative, shall be accompanied by a
statement from the Contractor to the effect that no work on this particular project shall be subcontracted.
17. LABOR AND WORKING HOURS
Attention of each bidder is particularly called to the schedule of general prevailing rate of per diem wages
Included in these contract documents. The wage rate which must be paid on this project shall not be less
than specified in the schedule of general prevailing rates of per diem wages as above mentioned. The
bidders' attention is further directed to the requirements of Article 5159a, Vernon's Annotated Civil
Statutes providing for the payment of the wage schedules above mentioned and the bidder's obligations there-
under. The inclusion of the schedule of general prevailing rate of per diem wages in these contract docu-
ments does not release the Contractor from compliance with any wage law that may be applicable. Construc-
tion work under this contract requiring an inspector will not be performed on weekends or holidays unless
the following conditions exist:
(1) The project being constructed is essential to the City of Lubbock's ability to provide the necessary
service to its citizens.
(2) Delays in construction are due to factors outside the control of the Contractor. The Contractor is
approaching the penalty provisions of the contract and Contractor can show he has made a diligent
effort to complete the contract within the allotted time.
Before construction work requiring an inspector is to be performed on weekends or holidays, the Contractor
must notify the Owner's Representative not less than three full working days prior to the weekend or holiday
he desires to do work and obtain written permission from the owner's Representative to do such work. The
final decision on whether'to allow construction work requiring an inspector on weekends or holidays will be
made by the owner's Representative.
In any event, if a condition should occur or arise at the site of this project or from the work being done
under this contract which is hazardous or dangerous to property or life, the Contractor shall immediately
commence work, regardless of the day of the week or the time of day, to correct or alleviate such condition
so that it is no longer dangerous to property or life.
18. PAYMENT OF EMPLOYEES AND FILING OF PAYROLLS
The contractor and each of his subcontractors shall pay each of his employees engaged in work on the project
under this contract in full (less mandatory legal deductions) in cash, or by check readily cashable without
discount, not less often than once each week. The Contractor and each of his subcontractors engaged at the
site of the work shall not later than the seventh day following the payment of wages, file with the owner's
Representative, or Engineer, a certified, sworn, legible copy of such payroll. This shall contain the name
of each employee, his classification, the number of hours worked on each day, rate of pay, and net pay. The
affidavit shall state that the copy is a true and correct copy of such payroll, that no rebates or deduc-
tions (except as shown) have been made, or will in the future be made from the wages paid as shown thereon.
The Contractor must classify employees according to one of the classifications set forth in the schedule of
general prevailing rate of per diem wages, which schedule is included in the contract documents.
-8-
The Contractor shall forfeit as a penalty to the City of Lubbock on whose behalf this contract is made, ten
dollars for each laborer, workman, or mechanic employed for each calendar day, or portion thereof, such
r" laborer, workman or mechanic is paid less than the wages assigned to his particular classification as set
forth in the schedule of general prevailing rate of per diem wages included in these contract documents.
19. PROVISIONS CONCERNING ESCALATOR CLAUSES
Proposals submitted containing any conditions which provide for changes in the stated bid price due to in-
creases or decreases in the cost of materials, labor or other items required for the project will be re-
jected and returned to the bidder without being considered.
20. PREPARATION FOR PROPOSAL
The bidder shall submit his proposal on forms furnished by the City. All blank spaces in the form shall be
correctly filled in and the bidder shall state the price both in words and numerals, for which he proposes
to do the work contemplated or furnish the materials required. Such prices shall be written in ink, dis-
tinctly and legibly, or typewritten. In case of discrepancy between the price written in words and the
price written in figures, the price written in words shall govern. If the proposal is submitted by an indi-
vidual, his name must be signed by him or his duly authorized agent. if a proposal is submitted by a firm,
~ association, or partnership, the name and address of each member must be given and the proposal signed by a
member of the firm, association or partnership, or person duly authorized. if the proposal is submitted by
a company or corporation, the company or corporate name and business address must be given, and the proposal
�+ signed by an official or duly authorized agent. Powers of attorney authorizing agents or others to sign
1[ proposals must be properly certified and must be in writing and submitted with the propose(. The proposal
shall be executed in ink.
Each proposal shall be enclosed in a sealed envelope, addressed as specified in the Notice to Bidders, and
endorsed on the outside of the envelope in the following manner:
(a) Bidderls name
(b) Proposal for (description of the project).
Bid proposals may be withdrawn and resubmitted at any time prior to the time set for opening of the bids,
but no proposal may be withdrawn or altered thereafter.
21. BOUND COPY OF CONTRACT DOCUMENTS
Bidder understands and agrees that the contract to be executed by bidder shall be bound and include the fol-
towing:
(a) Notice to Bidders.
(b) General Instructions to Bidders.
(c) Bidder's Proposal.
(d) Statutory Bond (if required).
(e) Contract Agreement.
(f) General Conditions.
(9) Special Conditions (if any).
(h) Specifications.
(i) Insurance Certificates.
(J) All other documents made available to bidder for his inspection in accordance with the Notice to
Bidders.
If Plans and Specifications are too bulky or cumbersome to be physically bound, they are to be considered
incorporated by reference into the aforementioned contract documents.
r
-9-
THIS PAGE LEFT BLANK INTENTIONALLY
r
a
i
Piloi
BID PROPOSAL
r
i
r
4
THIS PAGE LEFT BLANK INTENTIONALLY
BID PROPOSAL
BID FOR UNIT PRICE CONTRACTS
PLACE CITY OF TALBRO -K
DATE 14 .TAN 9 i
PROJECT NO. 1 2196
Proposal of HERITAGE REMEDIATION/ENGINEERING. INC. (hereinafter called Bidder)
To the Honorable Mayor and City Council City of Lubbock, Texas (hereinafter called owner)
Gentlemen:
The Bidder, in compliance with your invitation for bids for the construction of a G A N T T A R V q rwr.12
having carefully examined the plans, specifications, instructions to bidders, notice to bidders and all other re-
lated contract documents and the site of the proposed work, and being familiar with all of the conditions surround-
ing the location of the proposed project including the availability of materials and labor, hereby proposes to
furnish all labor, equipment, and other incidentals to perform the cleaning in accordance with the plans, specifica-
tions and contract documents, within the time set forth therein and at the price stated in the Bid Proposal.
The Bidder binds himself on acceptance of his proposal to execute a contract and any required bonds, according to
the accompanying forms, for performing and completing the said work within the time stated and for the prices stated
In the Bid Proposal.
Bidder hereby agrees to commence the work on the above project an or before a date to be specified in a written
"Notice to Proceed" of the Owner and to fully complete the project within 90 (NINETY) consecutive calendar days
thereafter as stipulated in the specifications and other contract documents. Bidder hereby further agrees to pay to
Owner as liquidated damages the sum of $100.00 (One Hundred dollars) for each consecutive calendar day in excess of
the time set forth hereinabove for completion of this project, all as more fully set forth in the general conditions
of the contract documents.
1,
Bidder understands and agrees that this bid proposal shall be completed and submitted in accordance with instructidn
number 20 of the General Instructions to Bidders.
Bidder understands that the Owner reserves the right to reject any or all bids and to waive any formality in the
bidding.
The Bidder agrees that this bid shall be good and may not be withdrawn for a period of thirty (30) calendar days
after the scheduled closing time for receiving bids.
The undersigned Bidder hereby declares that he has visited the site of the work and has carefully examined the
plans, spbcifications and contract documents pertaining to the work covered by this bid, and he further agrees to
commence work on or before the date specified in the written notice to proceed, and to substantially complete the
work on which he has bid; as provided in the contract documents.
f"
-11-
r
Enclosed with this proposal is a Cashierst Check or Certified Chest for Potters
(i) er a Proposal Bond in the aia of FIVE PERCENT Po1[art {i5 )• %hich
it is agreed shall be collected and retained by the owner as titiuidated tfawspes in the Brent the-proposat it
accepted by the Owwr mod the undersigned tails to execute the necettary contract documents wrd the required bond
(if any) with the Owwr within ten (10) days after the data of receipt of written notification of acceptance of said
r proposal; otherwise, said check *r bond Malt to returned to the undersigned upon demand.
I Bidder understand. and agrees that the contract to be executed by Bidder thatl be bmind and include Ott contract
111 dents aade available to his for his inspection in accordance with the Notice to Bidders.
Heritage Remediation/Engineeriig��
Contractor
Sri )�z�A
ame J. Malone
F
(Seat if Bidder is a Corporation)
ATTESTS
2!1, J�
Secretary
0
e
r
.)2.
J
CERTTFICATION
Lewis L. Davis, as Secretary of Heritage Remediation/Engineering, Inc.
("Corporation") hereby certifies that James J. Maloney is the Vice President of Business
Development of the Corporation and has authority to enter into and execute all documents
necessary to carry out the operations, including bidding and other related contract activities,
of the Corporation.
J
Lewis L. Davis, Secretary
Date
92TU741.16
;. 0
Am
pl"
LIST OF SUBCONTRACTORS
This form shall be coavieted and submitted with the Bidder's Proposal-
1. Coastal Contractors, Inc.
2.
3.
4.
5.
6.
7.
a.
9.
10.
Minority Owned
Yes No
- x
I
THIS PAGE LEFT BLANK INTENTIONALLY
BASE BID PROPOSAL
BID FOR UNIT PRICE CONTRACTS
Item Quantities Per Total
No. & Units Description of Item & Unit Prices Unit Amount
---------------------------------------------------------------------------------
1. 17,507 L.F. Furnishing all labor, equipment, and any
other incidentals necessary for cleaning
30" VCT sanitary sewer with the maximum
spacing of 1498 feet between manholes,
complete per linear foot;
SERVICES: Six Dollars & Seventy-five Ce"s $6.75 )$116,172
TOTAL BID (ITEM 1)
11
(S18,iz2- 9:t
THIS PAGE LEFT BLANK INTENTIONALLY
il
ALTERNATE BID NO. 1
BID FOR UNIT PRICE CONTRACTS
Item Quantities Per Total
No. & Units Description of Item & Unit Prices Unit Amount
---------------------------------------------------------------------------------
1. 17,507 L.F. Furnishing all labor, equipment, and any
other incidentals necessary for cleaning
30" VCT sanitary sewer with the maximum
spacing of 1498 feet between manholes,
complete per linear foot;
SERVICES:Six Dollars & Seventy-five Cents ($6.75 )$118.172,
2. 17,507 L.F. Furnishing all labor, equipment and any
other incidentals necessary for T.V.
inspection of the 30" VCT sanitary sewer
with the maximum spacing of 1498 feet
between manholes, complete per linear
foot;
SERVICES: One Dollar and Zero Cents ($1.00 )$17, 507.
TOTAL BID (Items 1 and 2)
0
THIS PAGE LEFT BLANK INTENTIONALLY
11
r-
SPACING AND DEPTHS FOR EXISTING MANHOLES
MANHOLE
STATION
GROUND
ELEVATION
DEPTH
PIPE
LENGTH
1
0+15
44.31
9.11
0
2
7+00
40.00
4.42
685
3
21+62
43.61
17.23
1462
4
34+01
45.30
8.55
1239
5
46+86
48.28
10.92
1285
6
54+49
43.42
5.75
763
7
60+61
43.72
5.71
612
8
68+93
55.13
16.78
832
9
76+14
54.08
15.35
721
10
88+45
49.07
10.35
1231
11
92+88
48.74
9.24
443
12
99+25
46.95
7.20
637
13
106+99
47.05
6.97
774
14
111+39
50.10
9.87
440
15�
122+05
58.36
17.66
1066
16
127+55
51.74
10.82
550
17
130+52
49.65
8.61
297
18
134+57
45.95
4.74
405
19
140+78
66.00
24.00
621
20
142+59
65.16
23.55
181
21
144+32
57.27
15.54
173
22
159+30
49.98
7.65
1498
23
163+70
54.50
10.50
440
24
168+75
65.19
22.38
505
25
174+87
52.10
8.93
612
Note: Please bid base bid proposal and alternative bid No. 1
with spacing of manholes as shown
THIS PAGE LEFT BLANK INTENTIONALLY
ALTERNATE 9ID NO. 2
BID FOR UNIT PRICE CONTRACTS
Item Quantities Per Total
No. & Units Description of Item & Unit Prices Unit Amount
---------------------------------------------------------------------------------
1. 17,507 L.F. Furnishing all labor, equipment, and any
other incidentals necessary for cleaning
30" VCT sanitary sewer with the maximum
spacing of 832 feet between manholes,
complete per linear foot;
TOTAL BID
SERVICES:.qix nallars & Seventy-five Cents ($ 6.75 )$118,172.
($ 118,172.25
NOTE: If this bid, Alternate Bid No. 2, is accepted the City of Lubbock will
install six (6) 5 ft. diameter manholes at the locations shown with a doub'
asterisk on the following page titled "Manhole Spacing and Depths for
Alternate Bids No. 2 and 3.
u
THIS PAGE LEFT BLANK INTENTIONALLY
ALTERNATE BID NO. 3
BID FOR UNIT PRICE CONTRACTS
Item Quantities Per Total
No. & Units Description of Item & Unit Prices Unit Amount
---------------------------------------------------------------------------------
1. 17,507 L.F. Furnishing all labor, equipment, and any
other incidentals necessary for cleaning
30" VCT sanitary sewer with the maximum
spacing of 832 feet between manholes,
complete per linear foot;
SERVICES:
2. 17,507 L.F.
SERVICES:
TOTAL BID
Furnishing all labor, equipment, and any
other incidentals necessary for o,,j*?mjM Tv'ing
30" VCT sanitary sewer with the maximum
spacing of 832 feet between manholes,
complete per linear foot;
NOTE: If this bid, Alternate Bid No. 3, is accepted the City of Lubbock will
install six (6) 5 ft. diameter manholes at the locations shown with a doubl
asterisk on the following page titled "Manhole Spacing and Depths for
Alternate Bids No. 2 and 3.
THIS PAGE LEFT BLANK INTENTIONALLY
MANHOLE SPACING AND DEPTHS FOR
ALTERNATE BIDS NO 2 AND 3
MANHOLE
STATION
GROUND
ELEVATION
DEPTH
PIPE
LENGTH
1
0+15
44.31
9.11
0.00
2
7+00
40.00
4.42
685.00
3
14+75 * *
38.00
4.00
775.00
4
21+62
43.61
17.23
687.00
5
28+15**
48.00
11.00
653.00
6
34+01
45.30
8.55
586.00
7
40+75 * *
46.00
9.00
674.00
8
46+86
48.28
10.92
611.00
9
54+49
43.42
5.75
763.00
10
60+61
43.72
5.71
612.00
11
68+93
55.13
16.78
832.00
12
76+14
54.08
15.35
721.00
13
82+50**
48.00
9.00
636.00
14
88+45
49.07
10.35
595.00
15
92+88
48.74
9.24
443.00
16
99+25
46.95
7.20
637.00
17
106+99
47.05
6.97
774.00
18
111+39
50.10
9.87
440.00
19
116+75**
57.00
11.00
536.00
20
122+05
58.36
17.66
530.00
21
127+55
51.74
10.82
550.00
22
130+52
49.65
8.61
297.00
23
134+57
45.95
4.74
405.00
24
140+78
66.00
24.00
621.00
25
142+59
65.16
23.55
181.00
26
144+32
57.27
15.54
173.00
27
151+80**
67.00
24.00
748.00
28
159+30
49.98
7.65
750.00
29
163+70
54.50
10.50
440.00
30
168+75
65.19
22.38
505.00
31
174+87
52.10
8.93
612.00
** manholes to be installed
Note: Please bid Alternate No. 2 and 3 with spacing
of manholes as shown.
THIS PAGE LEFT BLANK INTENTIONALLY
7
PAYMENT BOND
-14-
THIS PAGE LEFT BLANK INTENTIONALLY
r
r A UNITED STATES FI
LABOR AND MATERIAL PAYMENT BOND
Approved by The American Institute of Architects
A. I. A. Document No. A-311 (February 1970 Edition)
COMPANY
ID CHECK
t5thl RATING
LICENSED IN TEXAS
DATEZ EZA" jBY Z.��,�"
KNOW ALL MEN BY THESE PRESENTS: BOND NUMBER ..........................................
That...... HERITAGE REMEDIATION/ENGINEERING, INC.... . ...............
625 HOWARD STREET, DEER PARK, TEXAS 77536 ..................................................................................... as Principal,
hereinafter called Principal, and UNITED STATES FIDELITY AND GUARANTY COMPANY, a corporation organized and existing under the laws
of the State of Maryland, Baltimore, Maryland as Surety, hereinafter called Surety, are held and firmly bound unto.. C I T 1i OF
LU.BBOCK.,..TEXAS..-:..I 625.13T.H. STREET, ..ROOM .L.-04,..L.UBBOCK,..TEXAS....79.40.1..................
as Ohl i ee, hereinafter called Owner, for the use and benefit of claimants as hereinbelow defined, in the amount of ... ONE. ANDR.ED. .
THIR. Y. FIYE. THOUSAND. SIX..HUNDRED„ STVENTY..NJN.E. AND,NO/1Q0 Dollars ($..IK,.679.,.QQ.....
for the payment whereof Principal and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents.
WHEREAS, Principal has by written agreement dated 19 , entered into a contract with Owner for
SANITARY SEWER CLEANING — 30" VCT BID # 12396
in accordance with drawings and specifications prepared by.......................................................................
(Here Insert full name, title and address)
......................................................................................... . which contract is by reference made a part
hereof, and is hereinafter referred to as the Contract.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if the Principal shall promptly make payment to all
claimants as hereinafter defined, for all labor and material used or reasonably required for use in the performance of the Contract, then this
obligation shall be void; otherwise it shall remain in full force and effect, subject, however, to the following conditions:
(1) A claimant is defined as one having a direct contract with the Principal or with a sub -contractor of the Principal for labor, material,
or both, used or reasonably required for use in the performance of the contract, labor and material being construed to include that
part of water, gas, power, light, heat, oil, gasoline, telephone service or rental of equipment directly applicable to the Contract.
(2) The above -named Principal and Surety hereby jointly and severally agree with the Owner that every claimant as herein defined, who
has not been paid in full before the expiration of a period of ninety (90) days after the date on which the last of such claimant's
work or labor was done or performed, or materials were furnished by such claimant, may sue on this bond for the use of such
�^ claimant, prosecute the suit to final judgment for such sum or sums as may be justly due claimant, and have execution thereon. The
(! Owner shall not be liable for the payment of any costs or expenses of any such suit.
(3) No suit or action shall be commenced hereunder by any claimant,
(a) Unless claimant, other than one having a direct contract with the Principal, shall have given written notice to any two of the
following: The Principal, the Owner, or the Surety above named, within ninety (90) days after such claimant did or performed the
7last of the work or labor, or furnished the last of the materials for which said claim is made, stating with substantial accuracy
the amount claimed and the name of the party to whom the materials were furnished, or for whom the work or labor was done or
performed. Such notice shall be served by mailing the same by registered mail or certified mail, postage prepaid, in an envelope
addressed to the Principal, Owner or Surety, at any place where an office is regularly maintained for the transaction of business,
or served in any manner in which legal process may be served in the state in which the aforesaid project is located, save that
''" such service need not be made by a public officer.
(b) After the expiration of one (1) year following the date on which Principal ceased work on said Contract, it being understood,
however, that if any limitation embodied in this bond is prohibited by any law controlling the construction hereof such limitation
shall be deemed to be amended so as to be equal to the minimum period of lynitation permitted by such. law.
(c) Other than in a state court of competent jurisdiction in and for the county or other political subdivision of the state in which the
project, or any part thereof, is situated, or in the United States District Court for the district in which the project, or any part
_4 thereof, is situated, and not elsewhere.
(4) The amount of this bond shall be reduced by and to the extent of any payment or payments made in good faith hereunder, inclusive
of the payment by Surety of mechanics liens which may be filed of record against said improvement, whether or not claim for the
PM amount of such lien be presented under and against this bond.
Signed and sealed this........ 23RD ..........................day of.... F.EBRUARY........ . , .................... 19..93
HERITAGE REMEDIATION/ENGINEERING, INC.
........ . y... ' ' '`,�.',� ►� ..... , ...... By....w'� G.. ..!Seat?
AnZHMAE ROBERTS P V E: PREHIDEN�rfncipal ,
ED AT ITY D U N OMPANY
w.
11,,hh
................... B........ r.. ... ...(Seal)
qd i "�"" ) RUTIGL 0 ATT4� NEY IN FACT
RANDO t R ante bond In favor of the Owner conditions on the full and faltfiful performance the contract
�- BY:
i.. t 4 i. ' i"i r it
Contract 211-A (2.70)
Certified Copy 0 130216.
GENERAL POWER OF ATTORNEY
L \pELlTY
NO. Ol 4311NP
�u
r
4 / i
KNOW ALL MEN BY THESE PRESENTS: •'••`•
That UNITED STATES FIDELITY AND GUARANTY COMPANY, a corporation organized and existing under the
Taws of the State of Maryland, and having its principal office at the City of Baltimore, in the State of Maryland, does hereby
r'
constitute and appoint :Nick J. Rutigliano and Timothy J. Taylor
i
of the City of Indianapolis , State of Indiana ,
its true and lawful attorney(s) '
for the following purposes, to wit:
rTo sign its name as surety to, and to execute, seal and acknowledge any and all bonds, and to respectively do and
perform any and all acts and things set forth in the resolution of the Bo-�of Directors of the said UNITED STATES
FIDELITY AND GUARANTY COMPANY, a certified copy of whic�ieteto annexed and made a part of this Power of
Attorney; and the said UNITED STATES FIDELITY AND GU COMPANY, through us, its Board of Directors,
hereby
ratifies and confirms all and whatsoever dctet said ck J. Rutigliano or the
said Timothy J. Taylor
may lawfully do in the premises by virtue �jti se presents.
In Witness Whereof, the said TED STATES FI AND GUAR PANY has caused this instrument
to be sealed with its corporate duty attested b e s g�r natures of its V' a ident and Assistant Secretary, this loth
day of July A.
Q lkhVD STATES FIDELITY AND GUARANTY COMPANY
taN� (signed) By .. l.Y�'l v. n«weAr.
(SEAL) (Signed) ............. ................... ..... .
Assistant S=mtuy
STATE OF MARYLAND ) ss:
BALTIMORE CITY )
On this loth day of July , A.D. 19 92 , before me personally came
W.J.D. Scmerville, Jr. Vice President of the UNITED STATES FIDELITY AND GUARANTY COMPANY
and Paul D. Sims , Assistant Secretary of said Company, with both of whom 1 am personally acquainted, who
being by me severally duly sworn, said, that they, the said W. J. D. Scmerville, Jr. and Paul D. Sims
were respectively the Vice President and the Assistant Secretary of the said UNTIED STATES FIDELITY AND GUARANTY
` COMPANY, the corporation described in and which executed the foregoing' Power of Attorney; that they each knew the
seal of said corporation; that the seal affixed to said Power of Attorney was such corporate seal, that it was so affixed by,
r order of the Board of Directors of said corporation, and that they signed their names thereto by like order as Vice President
and Assistant Secretary, respectively, of the Company.
My Commission expires the first day in August A.D. 19_9 .
(SEAL) RVeiQ Si
P ♦ ( geed)
NOTARY PUBLIC
r„ W NOTARY
PUBLIC
FS 9 (t?r91)
r Q�
COPY OF RESOLUTIONS
Authority for Appointment
That Whereas, it is necessary for the effectual transaction of business that this Company appoint agents and attorneys with
power and authority to act for it and in its name in States other than Maryland, and in the Territories of the United States and in
the Provinces and Territories of Canada;
Therefore, be it Resolved, that this Company do, and it hereby does, authorize and empower its President or either of its
Vice Presidents in conjunction with its Secretary or one of its Assistant Secretaries, under its corporate seal, to appoint any person
or persons as attorney or attorneys -in -fact, or agent or agents of said Company, in its name and as its act, to execute and deliver
any and all contracts guaranteeing the fidelity of persons holding positions of public or private trust, guaranteeing the performances
of contracts other than insurance policies and executing or guaranteeing bonds and undertakings, required or permitted in all
actions or proceedings, or by law allowed, and
Also, in its name and as its attorney or attorneys -in -fact, or agent or agents to execute and guarantee the conditions of any
and all bonds, recognizances, obligations, stipulations, undertakings or anything in the nature of either of the same, which are or,
may by law, municipal or otherwise, or by any Statute of the United States or of any State or Territory of the United States or
of the Provinces or Territories of Canada, or by the rules, regulations, orders, customs, practice or discretion of any board, body,
organization, office or officer, local, municipal or otherwise, be allowed, required or permitted to be executed, made, taken,
given, tendered, accepted, filed or recorded for the security or protection of, by or for any person or persons, corporation, body,
office, interest, municipality or other association or organization whatsoever, in any and all capacities whatsoever, conditioned
for the doing or not doing of anything or any conditions which may be provided for in any such bond, recognizance, obligation,
stipulation, or undertaking, or anything in the nature of either of the same.
I, Paul D. Sims , an Assistant Secretary of the UNITED STATES FIDELITY AND GUARANTY
COMPANY, do hereby certify that the foregoing is a full, true and correct copy of the original Power of Attorney given by. said
Company to Nick J. Rutigliano and Titnol_hy J. Taylor
of Indianapolis, Indiana , authorizing and empowering them to sign bonds as therein set forth, which
Power of Attorney has never been revoked and is still in full force and effect.
And I do further certify that said Power of Attorney was given in pursuance of a resolution adopted at a regular meeting of
the Board of Directors of said Company, duly called and held at the office of the Company in the City of Baltimore, on the 25th
day of November, 1981, at which meeting a quorum of the Board of Directors was present, and that the foregoing is a true and
correct copy of said resolution, and the whole thereof as recorded in the minutes of said meeting.
Facsimile, Typewritten or Mechanically Reproduced Signatures
RESOLVED, That the facsimile, typewritten or mechanically reproduced signature of any Officers and the seal of this
Company, whether heretofore or hereafter, wherever appearing upon a certified copy of any Power of Attorney issued by this
Company, shall be treated the same as a handwritten signature and affixed seal, such certification may be by the facsimile signature
of any Assistant Secretary of the Company.
This certified copy may be signed by facsimile, typewritten or mechanically reproduced signature under and by authority
of the above resolution adopted by the Board of Directors of UNITED STATES FIDELITY AND GUARANTY COMPANY at
a meeting duly called and held on the 26th day of March, 1991, at which meeting a quorum of the Board of Directors was present,
and that the foregoing is a true and correct copy of said resolution which continues in full force and effect.
In Testimony Whereof, I have hereunto set my hand and the seal of the UNITED STATES FIDELITY AND GUARANTY
COMPANY on FEBRUARY 23, 1993
Assistant Secretary
7
STATUTORY PAYMENT BOND PURSUANT TO ARTICLE 5160
OF THE REVISED CIVIL STATUTES OF TEXAS
AS AMENDED BY
ACTS OF THE 56TH LEGISLATURE, REGULAR SESSION,
1959
KNOW ALL MEN BY THESE PRESENTS, that (hereinafter called the Principal(s), as
E
Principal(s), and
(hereinafter called the Surety(s), as Surety(s), are held and firmly bound unto the City of Lubbock (hereinafter
called the Obligee), in the amount of Dollars (E ) lawful money of
the United States for the payment whereof, the said Principal and Surety bind themselves, and their heirs, adminis-
trators, executors, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the day of
, 19 , to
and said Principal under the law is required before commencing the work provided for in said contract to execute a
bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to the
same extent as if copied at length herein.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants
supplying labor and material to him or a sub -contractor in the prosecution of the work provided for in said con-
tract, then, this obligation shall be void; otherwise to remain in full force and effect;
PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Article 5160 of the Revised
Civil Statutes of Texas as amended by Acts of the 56th Legislature, Regular Session, 1959, and all liabilities on
this bond shall be determined in accordance with the provisions of said Article to the same extent as if it were
copied at length herein.
-15-
IN WITNESS WHEREOF, the said Principal (s) and Surety (s) have signed and sealed this instrument this
day of 19_
Surety
Principal
*By: —
(Title)
By:
(Title)
By:
(Title) —
By:
(Title) _
The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby des-
ignates an agent resident in Lubbock County to whom any requisite notices may be delivered and
on whom service of process may be had in matters arising out of such suretyship. —"
Surety
*By:
(Title)
Approved as to form:
City of Lubbock
By:
City Attorney
*Note: If signed by an officer of the Surety Company there must be on file a certified extract from the by-laws
showing that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have copy
of power of attorney for our files.
-16-
r
9 .
r
f.
f_
r.
r
r
f
PERFORMANCE BOND
r
k�
i
-1T-
THIS PAGE LEFT BLANK INTENTIONALLY
° -�
UNITED STATES FIDELI UARANTY COMPANY
896, BOND CHECK
BEST RATING
PERFORMANCE BOND LICENSED IN TEXAS
Approved by The American Institute of Architects DATEZ-A-141 BY
KNOW ALL MEN BY THESE PRESENTS:
HERITAGE REMEDIATION/ENGINEERING, INC.
hereinafter called Contractor, and UNITED STATES FIDELITY AND GUARANTY COMPANY, a corporation organized and existing under the laws
of the State of Maryland, Baltimore, Maryland, as Surety, hereinafter called Surety, are held end firm CITY OF
LUBBOCK, TEXAS - 1625 13TH STREET, ROOM L-04, LUBBOCK, TEXAS 79401
ONE HUNDRED THIRTY FIVE THOUSAND SIX HUNDRED
SEVENTY NINE AND NOPOO 135,679.00
for the payment whereof Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents.
SANITARY SEWER CLEANING 30" VCT BID 12396
in accordance with drawings and specifications prepared by ....................................
hich contract is by reference made a part
hereof, and is hereinafter referred to as the Contract.
NOW. THEREFORE, THE CONDITION OF THIS OBLIGATION is such that, if Contractor shall promptly and faithfully perform
said Contract, then this obligation shall be null and void; otherwise it shall remain in full force and effect.
The Surety hereby waives notice of any alteration, or extension of time made by the Owner.
Whenever Contractor shall be, and declared by Owner to be in default under the Contract, the Owner having performed Owner's obligations
thereunder, the Surety may promptly remedy the default, or shall prompt y
(1) Complete the Contract in accordance with its terms and conditions, or
(2) Obtain a bid or bids for completing the Contract in accordance with its terms and conditions, and upon determination by Surety of the low-
est responsible bidder, or. if the Owner elects, upon determination by the Owner and the Surety jointly of the lowest responsible bidder,
arrange for a contract beiween such bidder and Owner, and make available as Work progresses (even though there should be a default or a
succession of defaults under the contract or contracts of completion arranged under this paragraph) sufficient funds to pay the cost of
completion less the balance of the contract price; but not exceeding, including other costs and damages for which the Surety may be liable
hereunder, the amount set forth in he paragraph hereof. The term "balance of the contract price," as used in this paragraph, shall
mean the total amount payable by Owner to Contractor under the Contract and any amendments thereto, less the amount properly paid by
Owner to Contractor.
Any suit under this bond must be instituted before the expiration of two (2) years from the date on which final payment under the
Contract falls due.
No right of action shall accrue on this bond to or for the use of any person or corporation other than the Omer named herein or
the heirs, executors, administrators or successors of the Owner.
RA D By/ .......... .............. (Seal)
FACT
I
9
.k
3
\ Certified copy N o 130217
GENERAL POWER OF ATTORNEY
�ot�"ar
NO. 104311
KNOW ALL MEN BY THESE PRESENTS:'•,,•`•
That UNTIED STATES FIDELITY AND GUARANTY COMPANY, a corporation organized and existing under the
laws of the State of Maryland, and having its principal office at the City of Baltimore, in the State of Maryland, does hereby
constitute and appoint Nick J. Rutigliano and Timothy J. Taylor
of the City of Indianapolis , State of Indiana , its true and lawful attorney(s) "
for the following purposes, to wit:
To sign its name as surety to, and to execute, seal and acknowledge any and all bonds, and to respectively do and
perform any and all acts and things set foith in the resolution of the Bo of Directors of the said UNITED STATES
FIDELITY AND GUARANTY COMPANY, a certified copy of whicwcohz
annexed and made a part of this Power of
Attorney; and the said UNITED STATES FIDELITY AND GU PANY, through us, its Board of Directors,
hereby ratifies and confirms all and whatsoever a he said Nick J. Rutigliano or the
said Timothy J. Taylor
may lawfully do in the premises by virtues resents.
In Witness Whereof, the sai�, STATES ND GUARA ANY has caused this instrument
to be sealed with its corpora at;"` my attesteWXnatures, of its V" %*dent and Assistant Secretary, this
day of July. , AD
loth
0S0� STATES FIDELITY AND GUARANTY COMPANY
® (Signed) By ....�3 . v. ,
ALam•
(SEAL) (Signed) .. .. ..
Acscvam
STATE OF MARYLAND ) ss:
BALTIMORE CITY )
On this 10th day of July , A.D. 19 92 , before me personally came-
W. J. D. 8w erville, Jr. Vice President of the UNITED STATES FIDELITY AND GUARANTY COMPANY
and Paul D. Sims , Assistant Secretary of said Company, with both of whom I am personally acquainted, who
being by me severally duly sworn, said, that they, the said W. J. D. Somerville, Jr. and Paul D. ` Sims
were respectively the Vice President and the Assistant Secretary of the said UNITED STATES FIDELITY AND GUARANTY
COMPANY, the corporation described in and which executed the foregoing Power of Attorney; than they each knew the
seal of said corporation; that the seal affixed to said Power of Attorney was such corporate seal, that it was so affixed by
order of the Board of Directors of said corporation, and that they signed their names thereto by like order as Vice President
and Assistant Secretary, respectively, of the Company.
My Commission expires the first day in August A. D. 19�h .
(SEAL) Q, RR
e'QI (Signed) ..
NOTARY PUBLIC c�
� NOTARY �
PUBLIC
COPY OF RESOLUTIONS
Authority for Appointment
That Whereas, it is necessary for the effectual transaction of business that this Company appoint agents and attorneys with
power and authority to act for it and in its name in States other than Maryland, and in the Territories of the United States and in
the Provinces and Territories of Canada;
Therefore, be it Resolved, that this Company do, and it hereby does, authorize and empower its President or either of its
Vice Presidents in conjunction with its Secretary or one of its Assistant Secretaries, under its corporate seal, to appoint any person
or persons as attorney or attorneys -in -fact, or agent or agents of said Company, in its name and as its act, to execute and deliver
any and all contracts guaranteeing the fidelity of persons holding positions of public or private trust, guaranteeing the performances
of contracts other than insurance policies and executing or guaranteeing bonds and undertakings, required or permitted in all
actions or proceedings, or by law allowed, and
Also, in its name and as its attorney or attorneys -in -fact, or agent or agents to execute and guarantee the conditions of any
and all bonds, recognizances, obligations, stipulations, undertakings or anything in the nature of either of the same, which are or
may by law, municipal or otherwise, or by any Statute of the United States or of any State or Territory of the United States or
of the Provinces or Territories of Canada, or by the rules, regulations, orders, customs, practice or discretion of any board, body,
organization, office or officer, local, municipal or otherwise, be allowed, required or permitted to be executed, made, taken,
given, tendered, accepted, filed or recorded for the security or protection of, by or for any person or persons, corporation, body,
office, interest, municipality or other association or organization whatsoever, in any and all capacities whatsoever, conditioned
for the doing or not doing of anything or any conditions which may be provided for in any such bond, recognizance, obligation,
stipulation, or undertaking, or anything in the nature of either of the same.
1, Paul D. Sims , an Assistant Secretary of the UNITED STATES FIDELITY AND GUARANTY
COMPANY, do hereby certify that the foregoing is a full, true and correct copy of the original Power of Attorney given by said
Company to ,Nick J. Rutigliano and Timothy J. Taylor.
of Indianapolis, Indiana , authorizing and empowering them to sign bonds as therein set forth, which
Power of Attorney has never been revoked and is still in full force and effect.
And I do further certify that said Power of Attorney was given in pursuance of a resolution adopted at a regular meeting of
the Board of Directors of said Company, duly called and held at the office of the Company in the City of Baltimore, on the 25th
day of November, 1981, at which meeting a quorum of the Board of Directors was present, and that the foregoing is a true and
correct copy of said resolution, and the whole thereof as recorded in the minutes of said meeting.
Facsimile, Typewritten or Mechanically Reproduced Signatures
RESOLVED, That the facsimile, typewritten or mechanically reproduced signature of any Officers and the seal of this
Company, whether heretofore or hereafter, wherever appearing upon a certified copy of any Power of Attorney issued by this
Company, shall be treated the same as a handwritten signature and affixed seal, such certification may be by the facsimile signature
of any Assistant Secretary of the Company.
This certified copy may be signed by facsimile, typewritten or mechanically reproduced signature under and by authority
of the above resolution adopted by the Board of Directors of UNITED STATES FIDELITY AND GUARANTY COMPANY at
a meeting duly called and held on the 26th day of March, 1991, at which meeting a quorum of the Board of Directors was present,
and that the foregoing is a true and correct copy of said resolution which continues in full force and effect.
In Testimony Whereof, I have hereunto set my hand and the seal of the UNITED STATES FIDELITY AND GUARANTY
COMPANY on
FEBRUARY 23, 1993
B Assistant Secretary
P
r6
r
i STATUTORY PERFORMANCE BOND PURSUANT TO ARTICLE 5160
OF THE REVISED CIVIL STATUTES OF TEXAS AS
AMENDED BY
ACTS OF THE 56TH LEGISLATURE, REGULAR SESSION 1959
KNOW ALL MEN BY THESE PRESENTS, that (hereinafter called the Principal(s), as Principal(s), and
4
L
t (hereinafter called the Surety(s), as Surety(s), are held and firmly bound unto the City of Lubbock (hereinafter
called the Obligee), in the amount of Dollars (S ) lawful money of the
�.. United States for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administra-
tors, executors, successors and assigns, jointly and severally, firmly by these presents.
c
WHEREAS, the Principal has entered into a certain written contract with the Obligee, dated the day of
19—, to
i
r
and said principal under the law is required before commencing the work provided for in said contract to execute a
bond in the amount of said contract which contract is hereby referred to and made a part hereof as fully and to the
same extent as if copied at length herein.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully per-
form the work in accordance with the plans, specifications and contract documents, then this obligation shall be
void; otherwise to remain in full force and effect.
PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Article 5160 of the Revised
Civil Statutes of Texas as amended by Acts of the 56th Legislature, regular session 1959, and all liabilities on
this bond shall be determined in accordance with the provisions of said article to the same extent as if it were
copied at length herein.
IN WITNESS WHEREOF, the said Principal (a) and Surety (a) have signed and sealed this instrument this _
day of , 19_
Surety
`By:_.
(Title)
r
p
Principal
By:
(Title)
By:
(Title)
By:
(Title)
The undersigned surety company represents that it is duly qualified to do business in Texas, and hereby
designates an agent resident in'Lubbock County to whom any requisite notices may be delivered and on
whom service of process may be had in matters arising out of such suretyship.
Surety
*By:
(Title)
Approved as to Form
City of Lubbock
By:
City Attorney
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws
showing that this person has authority to sign such obligation. If signed by an Attorney in Fact, we must have copy
of power of attorney for our files.
-19-
CERTIFICATE OF INSURANCE
-20-
THIS PAGE LEFT BLANK INTENTIONALLY
i
CERTIFICATE OF INSURANCE
�j HERITAGE REMEDIATION/ENGINEERING, INC.
l• To: CITY of LURSC z 625 Howard Street DATE: 01/12/93
Deer Park, TX 77536 Type of Sewer Cleaning
Lubbock. Texas Project: Bid # 12396
THIS IS TO CERTIFY THAT (Name and Address of Insured) is, at the date of this certificate, in-
sured by this Company with respect to the business operations hereinafter described, for the types of insurance and
in accordance with the provisions of the standard policies used by this Coapany, the further hereinafter described.
Exceptions to standard policy noted hereon.
TYPE OF INSURANCE
Policy No. Effact ive Expires Limits of Liability
! 1 uortmen:- NWA 0103553.........
08/01 /92 -- -• 08/01 /93 --• Empl Oyer' s L i ab i 1 ity
ComoenLsat i on $1 , 000 , 000
---------------------•--•-----------•-------••---•-------_.-.--•--•------------•------------------•--•--------.-----
Owner's Protec- TBD Contract Date COWS SINGLE LIMIT
tive or Contin- Per Occurrence S I .000 , 000
gent Liability AGGREGATE ft!!B6)C7CfCf1*me s 1,000,000
---------------------------------------------.---------------------•-------------------•--------------------------•-
Contractor's NGB1259117-04 06/01 /92 06/01 /93 WW %M SINGLE sLIMIT
Protective or Per Occurrence s ci _ fin_,__ o
Contingent AGGREGATEs 5.000.000
Liability
-------------------------------------------•--•----------------------------•-------COMBINED .SINGL.E.I Ti-----
Automobile NKA1258583-04 06/01 /92 06/01 /93 >Ps
[ f Peerr oOccurrence s 5,000,000
"=1bxAx 1"1Jd( s
....................................................................................................................
Cworehensive NGB1259117-04 06/01/92 06/01/93 COMBINED SINGLE LIMIT
General liability PER OCCURRENCE 5,000,000
---------------------•-----------•-----.-.---------------------•--------•------AFIG RI:GAT�--------
U reila Liability s
----------------------------------------------------------------------------------------------------------------
rThe foregoing Policies (do) Wi'dM cover sit subcontractors.
Locations Covered Policies are written on a blanket basis.
DESCRIPTIOW of Operations Covered Bid # 12396 (City of Lubbock)
The above policies either in the body thereof or by appropriate endorsement provide that they may not be A"q�kxx
canceled by the insurer in less than the legal time required after the insured has received written notice of such
06 MKMMir cancellation, or in case there is no legal requirement. in less than five days in advance of cancellation.
FIVE COPIES OF THIS CERTIFICATE
MUST BE SENT TO THE OYIIER.
PLANET INSURANCE COMPANY
(Name of I urer) r
TOB S SU�f AN AGE , INC.
Title PRESIDENT-
-21-
ki
y
THIS PAGE LEFT BLANK INTENTIONALLY
CONTRACT
STATE OF TEXAS
COUNTY OF LUBBOCK
THIS AGREEMENT, made and entered into this 14th day of January, 1993, by and between the City of Lubbock, County of
Lubbock, State of Texas, acting by and through David R. Langston, Mayor, thereunto authorized to do so, hereinafter referred
to as OWNER, and Dan Hawkins, Director of water Utilities of the City of LUBBOCK, County of LUBBOCK and the State of TEXAS,
hereinafter termed CONTRACTOR.
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed
by the OLMER and under the conditions expressed in the bond bearing even date herewith (if any) the CONTRACTOR hereby agrees
with OWNER to commence and complete the construction of certain improvements described as follows:
BID $ 12396 - SANITARY SEWER CLEANING - 30" VCT
and all extra work in connection therewith, under the terms as stated in the contract documents and at his (or their) own
proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence, labor, insurance
and other accessories and services necessary to complete the said construction in accordance with the contract documents as
defined in the General Condition of Agreement.
The CONTRACTOR hereby agrees to commence work within ten days after the date written notice to do so shall have been
given to him and to substantially complete same within the time specified in the contract documents.
The OWNER agrees to pay the CONTRACTOR in current funds for the performance of the contract in accordance with the
proposal submitted therefore, subject to additions and deductions, as provided in the contract documents and to make payment
on account thereof as provided therein.
IN WITNESS WHEREOF, the parties to these presents haveecuted thic'\agreement in Lubbock, Lubbock Canty, Texas in the
r
year and day first above written. \A
AT
dr
Corporate Secretary
CITY
MA
CONT CT
By:
�TL
J. to y
_
CCMPLETE ADDRESS:
Heritage Rellediation/Engineering
625 Howard Street
Deer Park, TX 77536
-23-
1
F.
GENERAL CONDITIONS OF THE AGREEMENT
-24-
THIS PAGE LEFT BLANK INTENTIONALLY
GENERAL CONDITIONS OF THE AGREEMENT
i�
j 1. OWNER
Whenever the word owner, or the expression Party of the First Part, or First Party, are used in this con-
tract, it shall be understood as referring to the City of Lubbock, Texas.
2. CONTRACTOR
Whenever the word Contractor, or the expression Party of the Second Part, or Second Party, is used, it shall
be understood to mean the person, persons, copartnership or corporation, to -wit: Heritage Remediatign/Eng.,
who has agreed to perform the work embraced in this contract, or to his or their legal representative. Inc.
3. OWNER'S REPRESENTATIVE
rWhenever the word Owner's Representative or representative is used in this contract, it shall be understood
( as referring to DAN A. HAWKINS, DIRECTOR OF WATER UTILITIES, City of Lubbock, under whose supervision these
contract documents, including the plans and specifications, were prepared, and who will inspect construc-
tions; or to such other representative, supervisor, or inspector as may be authorized by said Owner to act
in any particular under this agreement. Engineers, supervisor or inspectors will act for the Owner under
the direction of owner's Representative, but shall not directly supervise the Contractor or men acting in
._ behalf of the Contractor.
6. CONTRACT DOCUMENTS
The contract documents shall consist of the Notice to Bidders, General Instructions to Bidders, Proposal,
Signed Agreement, Statutory Bonds (if required), General Conditions of the Agreement, Special Conditions of
the Agreement (if any), Specifications, Plans, Insurance Certificate, and all other documents made available
to Bidder for his inspection in accordance with the Notice to Bidders.
5. INTERPRETATION OF PHRASES
Whenever the words "Directed," "Permitted," "Designated," "Required," "Considered Necessary," "Prescribed,"
or words of like import are used, it shall be understood that the direction, requirement, permission, order,
designation or prescription of the Owner's Representative is intended; and similarly, the words "Approved,"
"Acceptable," "Satisfactory," or words of like import shall mean approved by or acceptable or satisfactory
to the Owner's Representative.
Whenever in the Specifications or drawings accompanying this agreement, the terms of description of various
qualities relative to finish, workmanship, or other qualities of similar kind which cannot, from their na-
ture, be specifically and clearly described and specified, but are necessarily described in general terms,
the fulfillment of which must depend on individual Judgment, then, in all such cases, any question of the
fulfillment of said Specifications shall be decided by the Owner's Representative, and said work shall be
done in accordance with his interpretations of the meaning of the words, terms, or clauses defining the
character of the work.
6. SUBCONTRACTOR
r" The term Subcontractor, as employed herein, includes only those having a direct contract with the Contractor
for performance of work on the project contemplated by these contract documents. owner shall have no re-
sponsibR ity to any Subcontractor employed by Contractor for performance of work on the project contemplated
by these contract documents, but said Subcontractors will look exclusively to Contractor for any payments
due Subcontractor.
PM
i
.25-
7. WRITTEN NOTICE
Written notice shall be deemed to have been duly served if delivered in person to the individual or to a
member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent
certified mail to the last business address known to him who gives the notice.
8. WORK
Unless otherwise stipulated, the Contractor shall provide and pay for all materials, supplies, machinery,
equipment, tools, superintendence, labor, insurance, and all water, light, power, fuel, transportation and
all other facilities necessary for the execution and completion of the work covered by the contract docu-
ments. Unless otherwise specified, all materials shall be new and both workmanship and materials shall be
of a good quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and
quality of materials. Materials or work described in words which so applied have well known, technical or
trade meaning shall be held to refer such recognized standards.
All work shall be done and all materials furnished in strict conformity with the contract documents.
9. SUBSTANTIALLY COMPLETED
The term "Substantially Completed" is meant that the structure or project contemplated by the contract docu-
ments has been made suitable for use or occupancy or the facility is in a condition to serve its intended
purpose, but still may require minor miscellaneous work and adjustment.
10. LAYOUT
Except as specifically provided herein, the Contractor shall be responsible for laying out all work and
shall accomplish this work in a manner acceptable to the Owner's Representative. The Owner's Representative
will check the Contractor's layout of all major structures and any other layout work done by the Contractor
at Contractor's request, but this check does not relieve the Contractor of the responsibility of correctly
Locating all work in accordance with the Plans and Specifications.
11. KEEPING OF PLANS AND SPECIFICATIONS ACCESSIBLE
The Contractor shall be furnished with one copies of all Plans, Profiles and Specifications without expense
to him and he shall keep one copy of same consistently accessible on the job site.
12. RIGHT OF ENTRY
The owner's Representative may make periodic visits to the site to observe the progress of quality of the
executed work and to determine, in general, if the work is proceeding in accordance with the contract docu-
ments. He will not be required to make exhaustive or continuous on -site inspections to check the quality or
quantity of the work, nor will he be responsible for the construction means, methods, techniques, sequences
or procedures, or the safety precautions incident thereto. His efforts will be directed towards providing
assurances for the Owner that the completed project will conform to the requirements of the contract docu-
ments, but he will not be responsible for the Contractor's failure to perform the work in accordance with
the Contract Documents. On the basis of his on -site observations, he will keep the Owner informed of the
progress of the work and will endeavor to guard the Owner against defects and deficiencies in the work of
the Contractor.
-26-
r
{
' 13. LINES AND GRADES
PM
r
1
All lines and grades shall be furnished by the Owner's Representative whenever necessary for the commence-
ment of the work contemplated by these contract documents or the completion of the work contemplated by
these contract documents. Whenever necessary, Contractor shall suspend his work in order to permit owner's
Representative to comply with this requirement, but such suspension will be as brief as practical and Con-
tractor shall be allowed no extra compensation therefore. The Contractor shall give the Owner's Repre-
sentative ample notice of the time and place where lines and grades will be needed. All stakes, marks,
etc., shall be carefully preserved by the Contractor, and in case of careless destruction or removal by him,
his Subcontractors, or his employees, such stakes, marks, etc., shall be replaced by the owner's Representa-
tive at Contractor's expense.
14. OWNER'S REPRESENTATIVE'S AUTHORITY AND DUTY
Unless otherwise specified, it is mutually agreed between the parties to this Agreement that the Owner's
Representative shall review all work included herein. He has the authority to stop the work whenever such
stoppage may be necessary to insure the proper execution of the contract. In order to permit delays and
disputes and to discourage litigation, it is further agreed that the Owner's Representative shall, in all
cases, determine the amounts and quantities of the several kinds of work which are to be paid for under this
contract. He shall determine all questions in relation to said work and the construction thereof, and
shall, in all cases, decide every question which may arise relative to the execution of this contract on the
part of said Contractor. The Owner's Representative's estimates and findings shall be conditions precedent
to the right of the parties hereto to arbitration or to any action on the contract, and to any rights of the
Contractor to receive any money under this contract; provided, however, that should Owner's Representative
render any decision or give any direction, which in the opinion of either party hereto, is not in accordance
with the meaning and intent of this contract, either party may file with said Owner's Representative within
30 days his written objection to the decision or direction so rendered, and by such action may reserve the
right to submit the questions so raised to arbitration as hereinafter provided. It is the intent of this
Agreement that there shall be no delay in the execution of the work, therefore, written decisions or direc-
tion of the Owner's Representative as rendered shall be promptly carried out, and any claim arising there-
from shall be thereafter adjusted to arbitration as hereinafter provided.
The Owner's Representative shall, within a reasonable time, render and deliver to both the owner and the
Contractor a written decision on all claims of the parties hereto and on all questions which may arise rela-
tive to the execution of the work or the interpretation of the contract, specifications and plans. Should
the Owner's Representative fail to make such decision within a reasonable time, an appeal to arbitration may
be taken as if his decision had been rendered against the party appealing.
15. SUPERINTENDENCE AND INSPECTION
It is agreed by the Contractor that the Owner's Representative shall be and is hereby authorized to appoint
from time to time such subordinate engineers, supervisors, or inspectors as the said Owner's Representative
may deem proper to inspect the materials furnished and the work done under this Agreement, and to see that
said material is furnished and said work is done in accordance with the specifications therefore. The Con-
tractor shall furnish all reasonable aid and assistance required by the subordinate engineers, supervisors
or inspectors for the proper inspection and examination of the work. The Contractor shall regard and obey
the directions and instructions of any subordinate engineers, supervisors or inspectors so appointed, when
such directions and Instructions are consistent with the obligations of this Agreement and accompanying
plans and specifications provided, however, should the Contractor object to any orders by any subordinate
engineer, supervisor or inspector, the Contractor may within six (6) days make written appeal to the Owner's
Representative for his decision.
.27-
16. CONTRACTOR'S DUTY AND SUPERINTENDENCE
The Contractor shall give personal attention to the faithful prosecution and completion of this contract and
shall keep on the work, during its progress, a competent superintendent and any necessary assistants, all
satisfactory to Owner's Representative. The superintendent shall represent the Contractor in his absence
and all directions given to him shall be binding as if given to the Contractor. Adequate supervision by
competent and reasonable representatives of the Contractor is essential to the proper performance of the
work and lack of such supervision shall be grounds for suspending operations of the Contractor.
The work, from its commencement to completion, shall be under the exclusive charge and control of the Con-
tractor and all risk in connection therewith shall be borne by the Contractor.
The Owner or Owner's Representatives will not be responsible for the acts or omissions of the Contractor, or
any subcontractors, or any of his agents or employees, or any other persons performing any of the work.
17. CONTRACTOR'S UNDERSTANDING
It is understood and agreed that the Contractor has, by careful examination, satisfied himself as to the na-
ture and location of the work, the confirmation of the ground, the character, quality and quantity of mate-
rials to be encountered, the character of equipment and facilities needed preliminary to and during the
prosecution of the work, and the general and local conditions, and all other matters which in any way effect
the work under this contract. No verbal agreement or conversation with any officer, agent, or employee of
the owner, either before or after the execution of this contract, shall effect or modify any of the terms or
obligations herein contained.
18. CHARACTER OF WORKMEN
The Contractor agrees to employ only orderly and competent men, skillful in the performance in the type of
work required under this contract, to do the work; and agrees that whenever the Owner's Representative shall
inform him in writing that any man or men on the work, are, in his opinion, incompetent, unfaithful, or dis-
orderly, such man or men shall be discharged from the work and shall not again be employed on the work with-
out the Owner's Representative's written consent.
19. CONSTRUCTION PLANT
The Contractor shall provide all labor, tools, equipment, machinery and materials necessary in the prosecu-
tion and completion of this contract where it is not otherwise specifically provided that owner shall fur-
nish same, and it is also understood that Owner shall not be held responsible for the care, preservation,
conservation, or protection of any materials, tools, equipment or machinery or any part of the work until it
is finally completed and accepted.
The building of structures for the housing of men or equipment will be permitted only at such places as the
Owner's Representative shall direct, and the sanitary conditions of the grounds in or about such structure
shall at all times be maintained in a manner satisfactory to the Owner's Representative.
20. SANITATION
Necessary sanitary conveniences for the use of laborers on the work site, properly secluded from public ob-
servation, shall be constructed and maintained by the Contractor in such manner and at such points as shall
be approved by the owner's Representative and their use shall be strictly enforced.
.28-
r�
8
21. OBSERVATION AND TESTING
The owner or Owner's Representative shall have the right at all reasonable times to observe and test the
work. Contractor shall make necessary arrangements and provide proper facilities and access for such obser-
vation and testing at any location wherever work is in preparation or progress. Contractor shall ascertain
the scope of any observation which may be contemplated by Owner or Owner's Representative and shall give am-
ple notice as to the time each part of the work will be ready for such observation. Owner or Owner's Rep-
resentative may reject any work found to be defective or not in accordance with the contract documents, re-
gardless of the stage of its completion or the time or place of discovery of such errors and regardless of
whether owner's Observer has previously accepted the work through oversight or otherwise. If any work
should be covered without approval or consent of the Owner, it must, if requested by Owner or Owner's Repre-
sentative, be uncovered for examination at Contractor's expense. In the event that any part of the work is
being fabricated or manufactured at a location where it is not convenient for Owner or Owner's Representa-
tive to make observations of such work or require testing of said work, then in such event Owner or Owner's
Representative may require Contractor to furnish owner or owner's Representative certificates of inspection,
testing or approval made by persons competent to perform such tasks at the location where that part of the
work is being manufactured or fabricated. All such tests will be in accordance with the methods prescribed
by the American Society for Testing and Materials or such other applicable organization as may be required
by law or the contract documents.
If any work which is required to be inspected, tested, or approved is covered up without written approval or
consent of the Owner or Owner's Representative, it must, if requested by the Owner or Owner's Representa-
tive, be uncovered for observation and testing at the Contractor's expense. The cost of all such inspec-
tions, tests and approvals shall be borne by the Contractor unless otherwise provided herein. Any work
which fails to meet the requirements of any such tests, inspections or approval, and any work which meets
the requirements of any such tests or approval but does not meet the requirements of the contract documents
shall be considered defective. Such defective work shall be corrected at the Contractor's expense.
Neither observations by the Owner or Owner's Representative, nor inspections, tests, or approvals made by
Owner, Owner's Representative, or other persons authorized under this agreement to make such inspections,
tests, or approvals shall relieve the Contractor from his obligation to perform the work in accordance with
the requirements of the contract documents.
p 22. DEFECTS AND THEIR REMEDIES
It is further agreed that if the work or any part thereof, or any material brought on the site of the work
for use in the work or selected for the same, shall be deemed by the Owner or Owners' Representative as un-
suitable or not in conformity with plans, specification and contract documents, the Contractor shall, after
receipt of written notice thereof from the Owner's Representative, forthwith remove such material and re-
build or otherwise remedy such work so that it shall be in full accordance with this contract. It is fur-
ther agreed that any remedial action contemplated as hereinabove set forth shall be at Contractor's expense.
23. CHANGES AND ALTERATIONS
The Contractor further agrees that the Owner may make such changes and alterations as the Owner may see fit,
in the line, grade, form dimensions, plans or or materials for the work herein contemplated, or any part
thereof, either before or after the beginning of the construction, without affecting the validity of this
contract and the accompanying bond.
�... If such changes or alterations diminish the quantity of the work to be done, they shall not constitute the
basis for a claim for damages, or anticipated profits on the work that may be dispensed with. If they in-
crease the amount of work, and the increased work can fairly be classified under the specifications, such
increase shall be paid according to the quantity actually done and at the unit price established for such
work under this contract; otherwise such additional work shall be paid for as provided under Extra Work. In
-29-
case the Owner shall make such changes or alterations as shall make useless any work already done or mate-
rial already furnished or used in said work, then the Owner shall recompense the Contractor for any material
or labor so used, and for any actual loss occasioned by such change, due to actual expenses incurred in
preparation for the work as originally planned.
24. EXTRA WORK
The term "extra work" as used in this contract shall be understood to mean and include all work that may be
required by the Owner or Owner's Representative to be done by the Contractor to accomplish any change, al-
teration or addition to the work as shown on the plans and specifications or contract documents and not cov-
ered by Contractor's proposal, except as provided under Changes and Alterations herein.
It is agreed that the Contractor shall perform all extra work under the direction of the Owner's Representa-
tive when presented with a written work order signed by the Owner's Representative; subject, however, to the
right of the Contractor to require written confirmation of such extra work order by the Owner. It is also
agreed that the compensation to be paid to the Contractor for performing said extra work shall be determined
by the following methods:
Method (A) - By agreed unit prices; or
Method (B) - By agreed lump sum; or
Method (C) - if neither Method (A) or Method (B) be agreed upon before the extra work is com-
menced, then the Contractor shall be paid the actual field cost of the work, plus
fifteen (15%) per cent.
In the event said extra work be performed and paid for under Method (C), then the provisions of this para-
graph shall apply and the "actual field cost" is hereby defined to include the cost of all workmen, such as
foremen, timekeepers, mechanics and laborers, materials, supplies, teams, trucks, rentals on machinery and
equipment, for the time actually employed or used on such extra work, plus actual transportation charges
necessarily incurred, together with all expenses incurred directly on account of such extra work, including
Social Security, Old Age Benefits, Maintenance Bonds, Public Liability and Property Damage and Workmen's
Compensation and all other insurances as may be required by law or ordinances or directed by the Owner or
Owner's Representative, or by them agreed to. Owner's Representative may direct the form in which accounts
of the actual field cost shall be kept and records of these accounts shall be made available to the Owner's
Representative. The Owner's Representative may also specify in writing, before the work commences, the
method of doing the work and the type and kind of machinery and equipment to be used; otherwise, these mat-
ters shall be determined by the Contractor. Unless otherwise agreed upon, the prices for the use of machin-
ery and equipment shall be determined by using 100%, unless otherwise specified, of the latest Schedule of
Equipment,and Ownership Expenses adopted by the Associated General Contractors of America. Where practical,
the terms and prices for the use of machinery and equipment shall be incorporated in the written extra work
order. The fifteen percent (15%) of the actual field cost to be paid to Contractor shall cover and com-
pensate him for his profit, overhead, general superintendence and field office expense, and AL other ele-
ments of cost and expense not embraced within the actual field cost as herein defined, save that where the
Contractor's Camp or Field Office must be maintained primarily on account of such Extra Work, then the cost
to maintain and operate the same shall be included in the "actual field cost."
No claim for extra work of any kind will be allowed unless ordered in writing by Owner's Representative. In
case any orders or instructions appear to the Contractor to involve extra work for which he should receive
compensation or an adjustment in the construction time, he shall make written request to the Owner's Repre-
sentative for a written order authorizing such extra work. Should a difference of opinion arise as to what
does or does not constitute extra work or as to the payment therefore, and the Owner's Representative in-
sists upon its performance, the Contractor shall proceed with the work after making written request for
written order and shall keep adequate and accurate account of the actual field cost thereof, as provided
-30-
6
s under Method (C). The Contractor will thereby preserve the right to submit the matter of payment to arbi-
tration as herein below provided.
i
4 25. DISCREPANCIES AND OMISSIONS
It is further agreed that it is the intent of this contract that all work described in the proposal, the
specifications, plans and other contract documents, is to be done for the prices quoted by the Contractor
and that such price shall include all appurtenances necessary to complete the work in accordance with the
intent of these contract documents as interpreted by Owner's Representative. If the Contractor finds any
discrepancies or omissions in these plans, specifications, or contract documents, he should notify the
Owners' Representative and obtain a clarification before the bids are received, and if no such request is
received by the Owner's Representative prior to the opening of bids, then it shall be considered that the
Contractor fully understands the work to be included and has provided sufficient sums in his proposal to
complete the work in accordance with these plans and specifications. It is further understood that any re-
quest for clarification must be submitted no later than five days prior to the opening of bids.
26. RIGHT OF OWNER TO MODIFY METHODS AND EQUIPMENT
if at any time the methods or equipment used by the Contractor are found to be inadequate to secure the
r quality of work with the rate of progress required under this contract, the Owner or Owner's Representative
may order the Contractor in writing to increase their safety or improve their character and efficiency and
the Contractor shall comply with such order.
If, at any time, the working force of the Contractor is inadequate for securing the progress herein speci-
fied, the Contractor shall, if so ordered in writing, increase his force or equipment, or both, to such an
extent as to give reasonable assurance of compliance with the schedule of progress.
27. PROTECTION AGAINST ACCIDENT TO EMPLOYEES AND THE PUBLIC
The Contractor shall take out and procure a policy or policies of Workmen's Compensation Insurance with an
insurance company licensed to transact business in the State of Texas, which policy shall comply with the
Workmen's Compensation laws of the State of Texas. The Contractor shall at all times exercise reasonable
precaution for the safety of employees and others on or near the work and shall comply with all applicable
provisions of federal, state and municipal laws and building and construction codes. All machinery and
equipment and other physical hazards shall be guarded in accordance with the "Manual of Accident Prevention
in Construction" of Associated General Contractors of America, except where incompatible with federal, state
or municipal laws or regulations. The Contractor, his sureties and insurance carriers shall defend, indem-
nify and save harmless the owner and all of its officers, agents and employees from all suits, actions, or
claims of any character whatsoever, brought for or on account of any injuries or damages received or sus-
tained by any person or persons or property, on account of any negligent act or fault of the Contractor or
any subcontractor, their agents or employees, in the execution and supervision of said contract, and the
project which is the subject matter of this contract, on account of the failure of Contractor or any subcon-
tractor to provide necessary barricades, warning lights, or signs and will be required to pay any judgment
with costs which may be obtained against the owner or any of its officers, agents, or employees including
attorney's fees.
The safety precautions taken shall be the sole responsibility of the Contractor, in his sole discretion as
an Independent Contractor; inclusion of this paragraph in the Agreement, as well as any notice which may be
given by the owners or the Owner's Representative concerning omissions under this paragraph as the work pro-
gresses, are intended as reminders to the Contractor of his duty and shall not be construed as any assump-
tion of duty to supervise safety precautions by either the Contractor or any of his subcontractors.
-31.
28. CONTRACTOR'S INSURANCE
The Contractor shall procure and carry at his sole cost and expense through the life of this contract, in-
surance protection as hereinafter specified. Such insurance shall be carried with an insurance company au-
thorized to transact business in the State of Texas and shall cover all operations in connection with this
contract,.whether performed by the Contractor or a subcontractor, or separate policies shall be provided
covering the operation of each subcontractor.
A. Comprehensive General Liability Insurance
The contractor shall have Comprehensive General Liability Insurance with limits of $300,000 Bodity
Injury and $300,000 Property Damage per occurrence to include:
Premises and Operations
Explosion & Collapse Hazard
Underground Damage Hazard
Products i Completed Operations Hazard .,
Contractual Liability
Independent Contractors Coverage
Personal Injury (with exclusion "c" waived) ^—
The City is to be named as an additional insured on this policy for this specific job, and copy of
the endorsement doing so is to be attached to the Certificate of Insurance.
B. Owner's Protective or Contingent Public Liability Insurance and Property Damage Liability Insurance.
The Contractor shall obtain an Owner's Protective or Contingent Public Liability insurance policy
naming the City of Lubbock as insured and the amount of such policy shall be as follows
For bodily injuries, including accidental death, $500,000 per occurrence, and $100,000 for Property
Damage.
C. Comprehensive Automobile Liability Insurance
The Contractor shall have Comprehensive Automobile Liability Insurance with limits of not less than;
Bodily Injury $250/500,000
Property Damage $100,000
to include all owned and non -owned cars including: Employers Non -ownership Liability Hired and Non -
owned Vehicles. The City is to be named as an additional insured on this policy for this specific
job and copy of the endorsement doing so is to be attached to the Certificate of insurance.
D. Builder's Risk insurance
The Contractor shall obtain a Builder's Risk policy in the amount of (100% of poten-
tial loss) naming the City of Lubbock as insured.
-32.
The Contractor shall have Excess or Umbrella Liability Insurance in the amount of
($1,000,000 minimum) with coverage to correspond with Comprehensive General Liability and Comprehen-
sive Automobile Liability coverages.
The City is to be named as an additional insured on this policy for this specific job and copy of
the endorsement doing so is to be attached to the Certificate of Insurance.
I F. Worker's Compensation and Employers Liability Insurance
l
As required by State statute covering all employees whether employed by the Contractor or any Sub-
contractor on the job with Employers Liability of at least $100,000 limit.
} G. Proof of Coverage
Before work on this contract is commenced, each Contractor and subcontractor shalt submit to the
owner for approval five Certificates of Insurance covering each insurance policy carried and
offered as evidence of compliance with the above insurance requirements, signed by an authorized
representative of the insurance company setting forth:
(1) The name and address of the insured.
(2) The location of the operations to which the insurance applies.
(3) The name of the policy and type or types of insurance in force thereunder on the date borne
by such certificate.
(4) The expiration date of the policy and the limit or limits of liability thereunder on the
date borne by such certificate.
(5) A provision that the policy may be canceled only by mailing written notice to the named in-
sured at the address shown in the bid specifications.
(6) A provision that written notice shall be given to the City ten days prior to any change in
or cancellation of the policies shown on the certificate.
(7) The certificate or certificates shall be on the form (or identical copies thereof) con-
tained in the job specifications. No substitute of nor amendment thereto will be accept-
able.
29. PROTECTION AGAINST CLAIMS OF SUBCONTRACTORS. LABORERS, MATERIALMEN, AND FURNISHERS OF MACHINERY. EQUIPMENT
AND SUPPLIES
The Contractor agrees that he will indemnify and save the owner harmless from all claims growing out of any
demands of subcontractors, laborers, workmen, mechanics, mmaterialmen and furnishers of machinery and parts
thereof, equipment, power tools, all suppliers, including commissary, incurred in the furtherance of the
performance of this contract. when owner so desires, the Contractor shall furnish satisfactory evidence
that all obligations of the nature hereinabove designated have been paid, discharged or waived.
If during the progress of the work, Contractor shall allow any indebtedness to accrue for work furnished by
any of those designated in the preceding paragraph and shall fail to pay and discharge any such indebtedness
within five (5) days after demand is made, then Owner may, during the period for which such indebtedness
r
I
t�
.33-
shall remain unpaid, withhold from the unpaid portion of this contract, a sum equal to the amount of such
unpaid indebtedness or may apply the sum so withheld to discharge any such indebtedness.
Any and all communications between any party under this paragraph must be in writing.
30. PROTECTION AGAINST ROYALTIES OR PATENT INVENTION
The contractor shall pay all royalties and license fees, and shall provide for the use of any design, de-
vice, material or process covered by letters patent or copyright by suitable legal agreement with the Paten-
tee or Owner thereof. The Contractor shall defend all suits or claims for infringement of any patent or
copyrights and shall indemnify and save the owner harmless from any loss on account thereof, except that
Owner shall defend all such suits and claims and shall be responsible for all such loss when a particular
design, device, material or process or the product of a particular manufacturer or manufacturers is speci-
fied or required in these contract documents by Owner; provided, however, if choice of alternate design, de-
vice, material or process is allowed to the Contractor, then Contractor shall indemnify and save owner harm-
less from any loss on account thereof. If the material or process specified or required by owner is an in-
fringement, the Contractor shall be responsible for such loss unless he promptly gives written notice to the
Owner of such infringement. ,
31. LAWS AND ORDINANCES
The Contractor shall at all times observe and comply with all federal, state and local laws, ordinances and
regulations, which in any manner effect the contract or the work, and shall indemnify and save harmless the
Owner against any claims arising from the violation of any such laws, ordinances, and regulations, whether
by the Contractor or his employees. if the Contractor observes that the plans and specifications are at
variance therewith, he shall promptly notify the Owners' Representative in writing and any necessary changes
shall be adjusted as provided in the contract for changes in the work. If the Contractor performs any work
knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to the
Owner's Representative, he shall bear all costs arising therefrom.
The Owner is a municipal corporation of the State of Texas and the law from which it derives its powers, in-
sofar as the same regulates the objects for which, or the manner in which, or the conditions under which the
Owner may enter into contracts, shall be controlling, and shall be considered as part of this contract to
the same effect as though embodied herein.
32. ASSIGNMENT AND SUBLETTING
The Contractor further agrees that he will retain personal control and will give his personal attention to
the fulfillment of this contract. The Contractor further agrees that subletting of any portion or feature
of the work, or materials required in the performance of this contract, shall not relieve the Contractor
from his full obligations to the Owner, as provided by this contractual agreement.
33. TIME FOR COMPLETION AND LIQUIDATED DAMAGES
it is hereby understood and mutually agreed by and between the Contractor and the Owner, that the date of
beginning and time for completion as specified in the contract of work to be done hereunder are essential
conditions of this contract; and it is further mutually understood and agreed that the work embraced in this
contract shall be commenced on a date to be specified in the Notice to Proceed.
If the Contractor should neglect, fail, or refuse to complete the work within the time herein specified, or
any proper extension thereof granted by the Owner, then the Contractor does hereby agree as part of the con-
sideration for the awarding of this contract, the owner may withhold permanently from Contractor's total
compensation, the sum of $100.00 (ONE HUNDRED DOLLARS) PER DAY, not as a penalty, but as liquidated damages
.34-
r
i
for the breach of the contract as herein set forth for each and every calendar day that the Contractor shall
be in default after the time stipulated for completing the work.
It is expressly understood and agreed, by and between Contractor and the Owner, that the time for the com-
pletion of the work described herein is reasonable time for the completion of the same, taking into consid-
eration the average climatic change and conditions and usual industrial conditions prevailing in this local-
ity.
The amount is fixed and agreed upon by and between the Contractor and the Owner because of the
impractica-bility and extreme difficulty in fixing and ascertaining actual damages the Owner would in such event sus-
tain, and the amount is agreed to be damages the Owner would sustain and shall be retained by the Owner from
current periodical estimates for payments or from final payment.
It is further agreed and understood between the Contractor and Owner that time is of the essence of this
contract.
36. TIME AND ORDER OF COMPLETION
It is the meaning and intent of this contract, unless otherwise herein specifically provided, that the Con-
tractor shall be allowed to prosecute his work at such time and sessions, in such order of precedence, and
in such manner as shall be most conductive to economy of construction; provided, however, that the order and
time of prosecution shall be such that the work shall be substantially completed as a whole and in part, in
r. accordance with this contact, the plans and specifications, and within the time of completion designated in
the proposals; provided, also, that when the Owner is having other work done, either by contract or by his
own force, the Owner's Representative may direct the time and manner of constructing work done under this
contract so that conflicts will be avoided and the construction of the various works being done for the
Owner shall be harmonized.
The Contractor shall submit, at such times as may reasonably be requested by the Owner's Representative,
r schedules which shall show the order in which the Contractor proposes to carry on the work, with dates at
which the Contractor will start the several parts of the work and estimated dates of completion of the sev-
eral parts.
35. EXTENSION OF TIME
The Contractor agrees that he has submitted his proposal in full recognition of the time required for the
completion of this project, taking into consideration the average climatic range and industrial conditions
prevailing in this locality, and has considered the liquidated damage provisions of paragraph 33 hereinabove
set forth and that he shall not be entitled to, nor will he request, an extension of time on this contract,
r, except when his work has been delayed by an act or neglect of the Owner, Owner's Representative, employees
of the Owner or other contractors employed by the owner, or by changes ordered in the work, or by strike,
walk -outs, acts of God or the public enemy, fire or flood. The Contractor may apply in writing for an ex-
r�
tension of time, submitting therewith all written justification as may be required by owner's Representative
for such an extension as requested by Contractor. The Owner's Representative within ten (10) days after re-
ceipt of a written request for an extension of time by the Contractor supported by all requested docu-
mentation shall then submit such written request to the City Council of the City of Lubbock for their con-
sideration. Should the Contractor disagree with the action of City Council on granting an extension of
i
time, such disagreement shall be settled by arbitration as hereinafter provided.
36. HINDRANCE AND DELAYS
In executing the contract agreement, the Contractor agrees that in undertaking to complete the work within
the time herein fixed, he has taken into consideration and made allowances for all hindrances and delays in-
cident to such work, whether growing out of delays in securing material or workmen or otherwise. No charge
-35-
shall be made by the Contractor for hindrance or delays from any cause during the progress of any part of
the work embraced in this contract except where the work is stopped by order of the Owner or Owner's
Representative for the Owner's convenience, in which event, such expense as in the judgment of the Owner's
Representative that is caused by such stoppage shall be paid by owner to Contractor.
37. QUANTITIES AND MEASUREMENTS
No extra or customary measurements of any kind will be allowed, but the actual measured or computed length,
area, solid contents, number and weight only shall be considered, unless otherwise specifically provided.
In the event this contract is let on a unit price basis, then Owner and Contractor agree that this contract,
including the specifications, plans and other contract documents are intended to show clearly all work to be
done and material to be furnished hereunder. Where the estimated quantities are shown for the various
classes of work to be done and material to be furnished under this contract, they are approximate and are to
be used only as a basis for estimating the probable cost of the work and for comparing their proposals of-
fered for the work. It is understood and agreed that the actual amount of work to be done and the materials
to be furnished under this contract may differ somewhat from these estimates, and that where the basis for
payment under this contract is the unit price method, payment shall be for the actual amount of work done
and materials furnished on the project.
38. PROTECTION OF ADJOINING PROPERTY
The Contractor shall take proper means to protect the adjacent or adjoining property or properties in any
way encountered, which may be injured or seriously affected by any process of construction to be undertaken
under this agreement, from any damage or injury by reason of said process of construction; and he shall be
liable for any and all claims for such damage on account of his failure to fully protect all adjacent
property. The Contractor agrees to indemnify, save and hold harmless the Owner against any claim or claims
for damages due to any injury to any adjacent or adjoining property, arising or growing out of the perfor-
mance of this contract, but such indemnity shall not apply to any claim of any kind arising out of the exis-
tence or character of the work.
39. PRICE FOR WORK
In consideration of the furnishing of all necessary labor, equipment and material and the completion of all
work by the Contractor, and on the delivery of all materials embraced in this contract in full conformity
with the specifications and stipulations herein contained, the owner agrees to pay the Contractor the price
set forth in the proposal attached hereto, which has been made a part of this contract, and the Contractor
hereby agrees to receive such price in full for furnishing all materials and all labor required for the
aforesaid work, also, for all expenses incurred by him and for well and truly performing the same and the
whole thereof in the manner and according to this agreement, the attached specifications, plans, contract
documents and requirements of owner's Representative.
40. PAYMENTS
No payments made or certificates given shall be considered as conclusive evidence of the performance of the
contract, either wholly or in part, nor shall any certificate or payment be considered as acceptance of de-
fective work. Contractor shall at any time requested during the progress of the work furnish the owner or
Owner's Representative with a verifying certificate showing the Contractor's total outstanding indebtedness
in connection with the work. Before final payment is made, Contractor shall satisfy Owner, by affidavit or
otherwise, that there are no outstanding liens against Owner's premises by reason of any work under the con-
tract. Acceptance by Contractor of final payment of the contract price shall constitute a waiver of all
claims against Owner which have not theretofore been timely filed as provided in this contract.
-36-
r
41. PARTIAL PAYMENTS
on or before the tenth day of each month, the Contractor shall submit to Owner's Representative an applica-
tion for partial payment. Owner's Representative shall review said application for partial payment and the
progress of the work made by the Contractor and if found to be in order shall prepare a certificate for par-
tial payment showing as completely as practical the total value of the work done by the Contractor up to and
including the last day of the preceding month; said statement shall also include the value of all sound ma-
terials delivered on site of the work that are to be fabricated into the work.
The Owner shall then pay the Contractor on or before the fifteenth day of the current month the total amount
of the Owner's Representative's Certificate of Partial Payment, less 5% of the amount thereof, which 5%
shall be retained until final payment, and further, less all previous payments and all further sums that may
be retained by Owner under the terms of this agreement. It is understood, however, that in case the whole
work be near to completion, and this fact is certified to by Owner's Representative and some unexpected and
some unusual delay occurs due to no fault or negligence on the part of the Contractor, the Owner may upon
written recommendation of Owner's Representative pay a reasonable and equitable portion of the retained per-
centage due Contractor.
42. FINAL COMPLETION AND ACCEPTANCE
Within thirty-one (31) days after the Contractor has given the Owner's Representative written notice that
the work has been completed or substantially completed, the Owner's Representative and the owner shall in-
spect the work and within said time, if the work be found to be completed or substantially completed in ac-
cordance with the contract documents, the Owner's Representative shall issue to the owner and Contractor his
certificate of completion, and thereupon it shall be the duty of the Owner within thirty-one (31) days to
issue a certificate of acceptance of the work to the Contractor.
43. FINAL PAYMENT
upon the issuance of the certificate of completion, the Owner's Representative shall proceed to make final
measurement and prepare a final statement of the value of all work performed and materials furnished under
the terms of the agreement, and shall certify same to the Owner, who shall pay to the Contractor on or be-
fore the 31st day after the date of certificate of completion, the balance due Contractor under the terms of
this agreement, provided he has fully performed his contractual obligations under the terms of this con-
tract; and said payment shall become due in any event upon said performance by the Contractor. Neither the
certificate of acceptance nor the final payment, nor any provisions in the contract documents shall relieve
the Contractor of the obligation for fulfillment of any warranty which may be required in the special condi-
tions (if any) of this contract or required in the specifications made a part of this contract.
44. CORRECTION OF WORK BEFORE FINAL PAYMENT FOR WORK
Contractor shall promptly remove from Owners' premises all materials condemned by the Owner's Representative
on account of failure to conform to the contract, whether actually incorporated in the work or not, and Con-
tractor shall at his own expense promptly replace such condemned materials with other materials conforming
to the requirements of the contract. Contractor shall also bear the expense of restoring all work of other
contractors damaged by any such removal or replacement. If Contractor does not remove and replace any such
condemned work within a reasonable time after a written notice by the Owner or the Owner's Representative,
Owner may remove and replace it at Contractor's expense.
45. CORRECTION OF WORK AFTER FINAL PAYMENT
Neither the final payment nor certificate nor any provision in this contract shall relieve the Contractor of
r�
responsibility for faulty materials or workmanship, and he shall remedy any defects due thereto and pay for
any damage to other work resulting therefrom, which shall appear within a period of one (1) year from the
r
-37-
date of substantial completion. The Owner or the Owner's Representative shall give notice of observed de-
fects with reasonable promptness.
46. PAYMENT WITHHELD•
The Owner may, on account of subsequently discovered evidence, withhold or nullify the whole or part of any
certificate to such extent as may be necessary to protect himself from loss on account of:
(a) ' Defective work not remedied.
(b) Claims filed or reasonable evidence indicating possible filing of claims.
(c) Failure of the Contractor to make payments promptly to subcontractors or for materials or labor.
(d) Damage to another contractor.
When the above grounds are removed, or the Contractor provides a surety bond satisfactory to the Owner,
which will protect the Owner in the amount withheld, payment shall be made for amounts withheld because of
them.
47. TIME OF FILING CLAIMS
it is further agreed by both parties hereto that all questions of dispute or adjustment presented by the
Contractor shall be in writing and filed with the Owner's Representative within fifteen (15) days after the
Owner's Representative has given any directions, order or instruction to which the Contractor desires to
take exception. The Owners' Representative shall reply to such written exceptions by the Contractor and
render his final decision in writing. In case the Contractor should appeal from the decision of the Owner's
Representative, any demand for arbitration shall be filed with the Owner's Representative and the owner in
writing within ten (10) days after the date of delivery to Contractor of the final decision of the Owner's
Representative. It is further agreed that final acceptance of the work by the Owner and the acceptance by
the Contractor of the final payment shall be a bar to any claim by either party, except where noted other-
wise in the contract documents.
48. ARBITRATION
All questions of dispute under this agreement shall be submitted to arbitration at the request of either
party to the dispute. The parties may agree upon one arbitrator, otherwise, there shall be three; one named
in writing by each party and the third chosen by the two arbiters selected; or if the arbiters fail to se-
lect a third within ten (10) days, he shall be chosen by the District Judge, 72nd Judicial District of
Texas. Each arbiter shall be a resident of the City of Lubbock. Should the party demanding arbitration
fail to name an arbiter within ten (10) days of the demand, his right to arbitrate shall lapse, and the de-
cision of the Owner's Representative shall be final and binding on him. Should the other party fail to
choose an arbiter within ten (10) days, the Owner's Representative shall appoint such arbiter. Should ei-
ther party refuse or neglect to supply the arbiters with any papers or information demanded in writing, the
arbiters are empowered by both parties to take Ex Parte Proceedings.
The arbiters shall act with promptness. The decision of any two shall be binding on both parties to the
contract, unless either or both parties shall appeal within ten (10) days from date of the award by the ar-
biters, and it is hereby agreed that each party shall have the right of appeal and all proceedings shall be
according to and governed by Arbitration Statutes of Texas, being Article 224, et seq., Vernon's Annotated
Civil Statutes. THE DECISION OF THE ARBITERS UPON ANY QUESTION SUBMITTED TO ARBITRATION UNDER THIS CONTRACT
SHALL BE A CONDITION PRECEDENT TO ANY RIGHT OF LEGAL ACTION.
-38-
The arbiters, if they deem the case demands it, are authorized to award the party whose contention is sus-
tained, such sums as they deem proper for the time, expense and trouble incident to the appeal, and if the
appeal was taken without reasonable cause, they may award damages for any delay occasioned thereby. The ar-
biters shall fix their own compensation, unless otherwise provided by agreement, and shall assess the costs
and charges of the arbitration upon either or both parties. The award of the arbiters must be made in writ-
ing and shall not be open to objection on account of the form of proceedings or award.
49. ABANDONMENT BY CONTRACTOR
In case the Contractor should abandon and fail or refuse to resume work within ten (10) days after written
notification from the Owner or the Owner's Representative, or if the Contractor fails to comply with the or-
ders of the Owner's Representative, when such orders are consistent with this contract, this Agreement, or
the Specifications hereto attached, then the Surety on the bond shall be notified in writing and directed to
complete the work and a copy of said notice shall be delivered to the Contractor.
After receiving said notice of abandonment, the Contractor shall not remove from the work any machinery,
equipment, tools, materials or supplies then on the job, but the same, together with any materials and
equipment under the contract for work, may be held for use on the work by the Owner or the Surety of the
Contractor, or another contractor, in completion of the work; and the Contractor shall not receive any
rental or credit therefore (except when used in connection with Extra Work, where credit shall be allowed as
provided for under paragraph 24 of this contract); it being understood that the use of such equipment and
materials will ultimately reduce the cost to complete the work and be reflected in the final settlement.
In case the Surety should fail to commence compliance with the notice for completion hereinbefore provided
for within ten (10) days after service of such notice, then the Owner may provide for completion of the work
in either of the following elective manners:
(a) The Owner may employ such force of men and use of machinery, equipment, tools, materials and sup-
plies as said Owner may deem necessary to complete the work and charge the expense of such labor,
^" machinery, equipment, tools, materials and supplies to said Contractor, and the expense so charged
shall be deducted and paid by the owner out of such moneys as may be due, or that may thereafter at
any time become due to the Contractor under and by virtue of this Agreement. In case such expense
r is less than the sum which would have been payable under this contract, if the same had been com-
pleted by the Contractor, then said Contractor shall receive the difference. In case such expense
is greater than the sum which would have been payable under this contract, if the same had been com-
pleted by said Contractor, then the Contractor and/or his Surety shall pay the amount of such excess
to the Owner; or
(b) The Owner, under sealed bids, after notice published as required by law, at least twice in a newspa-
per having a general circulation in the County of location of the work, may let the contract for the
completion of the work under substantially the same terms and conditions which are provided in this
contract. In case of any increase in cost to the Owner under the new contract as compared to what
would have been the cost under this contract, such increase shall be charged to the Contractor and
the Surety shall be and remain bound therefore. However, should the cost to complete any such new
contract prove to be less than that which would have been the cost to complete the work under this
contract, the Contractor or his Surety shall be credited therewith.
When the work shall have been substantially completed, the Contractor and his Surety shall be so notified
and certificates of completion and acceptance, as provided in paragraph 42 hereinabove set forth, shall be
r., issued. A complete itemized statement of the contract accounts, certified to by owner's Representative as
being correct shall then be prepared and delivered to Contractor and his Surety, whereon the Contractor or
his Surety, or the Owner as the case may be, shall pay the balance due as reflected by said statement within
r�
30 days after the date of certificate of completion.
r�
-39-
In the event the statement of accounts shows that the cost to complete the work is less than that which
would have been the cost to the Owner had the work been completed by the Contractor under the terms of this
contract, or when the Contractor and/or his Surety shall pay the balance shown to be due by them to the
Owner, then all machinery, equipment, tools, materials or supplies left on the site of the work shall be
turned over to the Contractor and/or his Surety. Should the cost to complete the work exceed the contract
price, and the Contractor and/or his Surety fail to pay the amount due the owner within the time designated
hereinabove, and there remains any machinery, equipment, tools, materials or supplies on the site of the
work, notice thereof, together with an itemized list of such equipment and materialsshall be mailed to the
Contractor and his Surety at the respective addresses designated in this contract; provided, however, that
actual written notice given in any manner will satisfy this condition. After mailing, or other giving of
such notice, such property shall be held at the risk of the Contractor and his Surety subject only to the
duty of the Owner to exercise ordinary care to protect such property. After fifteen (15) days from the date
of said notice the Owner may sell such machinery, equipment, tools, materials or supplies and apply the net
sum derived from such sale to the credit of the Contractor and his Surety. Such sale may be made at either
public or private sale, with or without notice, as the Owner may elect. The Owner shall release any machin-
ery, equipment, tools, materials, or supplies which remain on the *jobsite and belong to persons other than
the Contractor or his Surety, to their proper owners.
50. ABANDONMENT BY OWNER
In case the Owner shall fail to comply with the terms of this contract, and should fail or refuse to comply
with said terms within ten (10) days after written notification by the Contractor, then the Contractor may
suspend or wholly abandon the work, and may remove therefrom all machinery, tools, and equipment, and all
materials on the ground that have not been included in payments to the Contractor and have not been incorpo-
.rated into the work. Thereupon, the Owner's Representative shall make an estimate of the total amount
earned by the Contractor, which estimate shall include the value of all work actually completed by said Con-
tractor at the prices stated in the the attached proposal, the value of all partially completed work at a
fair and equitable price, and the amount of all Extra Work performed at the prices agreed upon, or provided
for by the terms of this contract, and a reasonable sum to cover the cost of any provisions made by the Con-
tractor to carry the whole work to completion, and which cannot be utilized. The Owner's Representative
shall then make a final statement of the balance due the Contractor by deducting from the above estimate all
previous payments by the Owner and all other sums that may be retained by the owner under the terms of this
Agreement, and shall certify same to the owner who shall pay to the Contractor on or before thirty (30) days
after the date of the notification by the Contractor the balance shown by said final statement as due the
Contractor, under the terms of this Agreement.
51. BONDS
The successful bidder shall be required to furnish a performance bond and payment bond in accordance with
Article 5160, Vernon's Annotated Civil Statutes in the amount of 100% of the total contract price, in the
event said contract price exceeds $25,000.00. If the contract price does not exceed $25,000.00, the statu-
tory bonds will not be required. All bonds, if required, shall be submitted on forms supplied by the Owner,
and executed by an approved Surety Company authorized to do business in the State of Texas. And it is fur-
ther agreed that this contract shall not be in effect until such bonds are so furnished.
52. SPECIAL CONDITIONS
In the event special conditions are contained herein as part of the contract documents and said special con-
ditions conflict with any of the general conditions contained in this contract, then in such event the
special conditions shall control.
-40-
PW
4
PM
53. LOSSES FROM NATURAL CAUSES
Unless otherwise specified herein, all loss or damage to the Contractor arising out of the nature of the
work to be done, or from the action of the elements, or from any unforeseen circumstance and the prosecution
of the same, or from unusual obstructions or difficulties which may be encountered in the prosecution of the
work, shall be sustained and borne by the Contractor at his own cost and expense.
54. INDEPENDENT CONTRACTOR
Contractor is, and shall remain, an independent contractor with full, complete and exclusive power and au-
thority to direct, supervise, and control his own employees and to determine the method of the performance
of the work covered hereby. The fact that the Owner or Owner's Representative shall have the right to ob-
serve Contractor's work during his performance and to carry out the other prerogatives which are expressly
reserved to and vested in the Owner or Owner's Representative hereunder, is not intended to and shall not at
any time change or effect the status of the Contractor as an independent contractor with respect to either
the Owner or Owner's Representative or to the Contractor's own employees or to any other person, firm, or
rcorporation.
55. CLEANING UP
The Contractor shall at all times keep the premises free from accumulation of debris caused by the work, and
at the completion of the work he shall remove all such debris and also his tools, scaffolding, and surplus
C materials and shell leave the work room clean or its equivalent. The work shall be left in good order and
condition. In case of dispute owner may remove the debris and charge the cost to the Contractor.
7
-41.
THIS PAGE LEFT BLANK INTENTIONALLY
l
C
CURRENT WAGE DETERMINATIONS
t
i
f
f,
1
-42-
THIS PAGE LEFT BLANK INTENTIONALLY
Resolution2502
January 8, 1987
Agenda Item #18
DGV:da
WHEREAS, the City Council has heretofore established the general
prevailing rate of per diem wages for each craft or type of workmen or
:mechanics needed to execute public works contracts for the City of Lubbock
in accordance with the provisions of Vernon's Ann.Civ.St., Art. 5159a; and
WHEREAS, such wage rates were established by Resolution No. 719
enacted February 12, 1981, updated by Resolution No. 1590 enacted February
,
,;? 23 , 1984 ; and
WHEREAS, such rates need to be updated at the present time in order
to reflect the current prevailing rate of per diem wages; NOW THEREFORE:
4
BE IT RESOLVED BY
THE CITY COUNCIL OF THE CITY OF
LUBBOCK:
THAT the general
prevailing rate of per diem wages for public works
contracts shall be
as set forth in the following
named exhibits, which
exhibits shall be
attached hereto and made a part
hereof for all intents
�.-
:and purposes:
Exhibit A:
Building Construction Trades
Exhibit B:
Paving and Highway Construction
Trades
Exhibit C:
Electrical Trades
Exhibit D:
Overtime Rate
Exhibit E:
Weekend and Holiday Rate
:Such wage rates are hereby found and declared to be the general prevailing
rate of per diem wages in all localities where public works are undertaken
on behalf of the City of Lubbock and such wage rates shall be included in
F all public works contracts as provided by law.
;Passed by the City Council this 8th day of January , 1987.
Ranettd..Boyd, City Secretary
APPROVED T ONTENT:
Bi 1 P yne, Director of Building
Services
0 e- & z)
B.C..McMINN, MAYOR
APPROVED AS TO FORM:
Do ld G. Vandiver, First
Assistant City Attorney
EXHIBIT A
City of Lubbock
Building Construction Trades
Prevailing Rates
Craft
Acoustical Ceiling Installer
Air Conditioner Installer
Air Conditioner Installer -Helper
Bricklayer
Bricklayer -Helper
Carpenter
Carpenter -Helper
Cement Finisher
Drywall Hanger
Electrician
Electrician -Helper
Equipment Operator
Heavy
Light
Floor Installer
Glazier
Insulator, Piping/Boiler
Insulator -Helper
Iron Worker
Laborer, General
Mortar Mixer
Painter
Plumber
Plumber -Helper
Roofer
Roofer -Helper
Sheet Metal Worker
Sheet Metal Worker -Helper
Welder - Certified
Hourlv Rate
$11.60
8.35
5.50
10.50
5.00
11.00
5.50
7.35
8.70
10.50
5.25
8.00
5.70
8.00
7.50
9.50
5.00
7.30
4.75
5.60
8.75
9.25
6.00
7.65
4.75
8.75
5.50
8.00
EXHIBIT B
Paving and Highway Construction
Prevailing Wage Rates
Craft Hourlv Rate
Asphalt Heaterman
$5.25
Asphalt Shoveler
4.75
Concrete Finisher
7.35
Concrete Finisher -Helper
4.75
Electrician
10.50
Flagger *
4.75
Form Setter
6.50
Form Setter -Helper
5.50
Laborer, General
4.75
Laborer, Utility
5.80
Mechanic
6.50
Mechanic -Helper
6.00
POWER EQUIPMENT OPERATORS
Asphalt Paving Machine
6.00
Bulldozer
5.25
Concrete Paving Machinist
6.50
Front End Loader
5.85
Heavy Equipment Operator
6.40
Light Equipment Operator
6.40
Motor Grade Operator.
8.00
Roller
5.25
Scraper
5.25
Tractor
5.50
Truck Driver -
Light
5.25
Heavy
5.25
EXHIBIT C
Electric Construction Trades
Prevailing Wage Rates
Craft Hourly Rate
Power Line Foreman $11.00
Lineman Journeyman 10.45
Lineman Apprentice Series 8.90
Groundman Series 7.25
EXHIBIT 0
Prevailing Wage Rates
Overtime Rate
The rate for overtime (in excess of forty hours per week) is 1 1/2
times base rate.
EXHIBIT E
Prevailing Wage Rates
Weekend and Holiday Rate
The rate for weekend and holiday is 1 1/2 times base rate.
SPECIFICATIONS
-43-
THIS PAGE LEFT BLANK INTENTIONALLY
SANITARY SEWER CLEANING SPECIFICATIONS
SCOPE OF WORK
The contractor shall furnish all labor and materials and all other
incidentals necessary for cleaning approximately 17,507 feet of 30"
sanitary sewer. The contractor shall remove the sludge and debris from
the line and restore to full hydraulic capacity.
SUBMITTALS
The contractor shall submit a schedule of their proposed work as bid
including information on experience of firm and personnel assigned to
the cleaning work, also information on all equipment and the type of
process that will be used for cleaning. No cleaning shall commence
until these submittals have been approved and the successful bidder has
received a written Notice to Proceed from the City of Lubbock.
CLEANING
The sewers shall be cleaned by removing dirt, rock, sand, and other
materials from the sanitary sewer lines and manholes. The cleaning
process shall be accomplished while the sewer is flowing.
All necessary precautions are to be taken to protect.the sewer lines
from damage resulting from the cleaning process. Damage to the sewer or
flooding of private or public property as a direct result of the
cleaning method shall be the responsibility and liability of the
contractor.
REMOVAL OF DEBRIS
Materials generated by the cleaning operation shall be removed at the
upstream or downstream manhole of the section being cleaned. Suitable
traps or weirs shall be used to minimize the movement of solids to
adjacent sections of pipe.
Waste materials and debris resulting from pipeline cleaning operations
r shall be removed and conveyed by the contractor to a waste disposal site
I as directed by the Owner. The disposal site shall be made accessible
during the contractor's working hours. All fees and/or permits required
r, to dispose of the waste will be the responsibility of the owner. Under
no circumstances shall sewage or solids removed from sewer lines be
discharged or spilled onto the streets or into ditches, catch basins, or
r
storm drains.
r
Page 1
WATER
The waste water present in the sanitary sewer main may be utilized to
provide necessary fluid for the cleaning devices. The use of potable
water from the City water system for sewer cleaning will be made
available with proper backflow/back-siphonage protection. Potable water
shall be loaded from approved fire hydrants and shall be metered.
EQUIPMENT
The cleaning system shall utilize a device capable of dislodging, moving
and removing all sediments found in sewer lines without damaging the
structural integrity of the pipe or manholes.
The cleaning device shall have sufficient power or force to move the
debris, found in this sanitary sewer main, to the manhole for
extraction.
The cleaning method shall maintain normal sewer flows during the
cleaning process.
The method shall be capable of cleaning lengths of up to the maximum
manhole spacing without supplemental excavations.
Solids shall be removed by suction, pumping, or other mechanical means.
The contractor shall decant or separate the water before transporting
the solids.- Liquid decanted from the solids shall be returned to the
sewer.
Solids shall be removed from the jobsite daily.
The contractor shall keep the jobsite clean and sanitary.
The solids removed shall be transported to the sludge drying beds at the
Southeast Water Reclamation Plant.
The debris remaining in the sewer after cleaning shall not exceed 0.3 of
one inch.
BARRICADES AND SAFETY MEASURES
The Contractor shall, at his own expense, furnish and erect such
barricades, fences, lights, and danger signals, and shall take such
other precautionary measures for the protection of persons, property and
maintain traffic flow as may be necessary. All safety measures shall
meet the requirements of the Texas Manual on Uniform Traffic Control
Devices.
Page 2
SAFETY
The Contractor shall conduct his operations in strict accordance with
all applicable Federal, State and Local Safety Codes and Statutes, and
shall be fully responsible and obligated to maintain procedures for the
safety of the public as well as all work, personnel, and equipment
involved in the project.
PAYMENT
Exposing and opening the manholes on the sewers to be cleaned shall be
incidental to "Cleaning". Acceptance of sewer cleaning work shall be
made upon the successful completion of television inspection and shall
be to the satisfaction of the City. If the Television inspection shows
the cleaning to be unsatisfactory, the Contractor shall be required to
reclean the sewer line until the cleaning is satisfactory. All such
recleaning and reinspection shall be done by the Contractor at no
additional cost to City.
The unit price per linear foot bid for cleaning 17,507 feet of 30"
diameter sewer line shall be full compensation for all labor, water and
equipment required to clean the line as specified. This includes the
collection, removal, transportation, and disposal of all sand, debris
and liquid wastes to the Southeast Water Reclamation Plant. Any manhole
and/or frame and cover which is dismantled or damaged during the
cleaning process shall be repaired by the City of Lubbock at the City of
Lubbock's expense.
( Page 3
THIS PAGE LEFT BLANK INTENTIONALLY
r
TELEVISION INSPECTION SPECIFICATIONS
GENERAL
Inspection shall be performed by internal television with a closed circuit
" T.V. camera in the sewer line. The interior of the line shall be inspected to
determine the location of any part of the line that is not adequately cleaned
!� as specified.
The -television camera used for the inspection shall be one specifically
designed and constructed for such inspection. Lighting for the camera shall
be suitable to allow a clear picture of the entire periphery of the pipe. The
camera shall be operative in 100% humidity conditions. The camera, television
monitor, and other components of the video system shall produce a "color"
picture quality to the reasonable satisfaction of the City Authorized
Representative; and if unsatisfactory, the equipment shall be replaced with
r.
satisfactory quality producing equipment.
In no case will the television camera be pulled at a speed greater than 30
feet per minute. Manual winches, power winches, TV cable, and powered rewinds
or other devices that do not obstruct the camera view or interfere with proper
documentation of the sewer conditions shall be used to move the camera through
the sewer line. If, during the inspection operation, the television camera
will not pass through the entire line section, the Contractor shall set up his
equipment so that the inspection can be performed from the opposite manhole.
When manually operated winches are used to pull the television camera through
the line section, telephones or other suitable means of communication shall be
set up between the two manholes of the line section being inspected to insure
good communications between members of the crew.
r•
A videotape recording of each line section shall be made by the Contractor and
i this recording shall provide a complete "color" video and audio record of the
entire inspection. The TV unit shall have the capability of displaying on
r" video tape written information concerning the pipe inspected.
All visual observations shall be recorded by the Contractor on a "Television
�- Inspection Report". The Contractor shall electronically input and record the
data into the Contractor's FIMS system and deliver the data to the City.
MEASUREMENT
The measurement of the sewer line to be inspected by T.V. shall be from center
of manhole to center of manhole. No deductions will be made for the space
occupied by the manholes.
PAYMENT
All work performed and measured as provided will be paid for at the unit price
bid which shall be full compensation for television inspection as specified,
and for furnishing all labor tools, equipment and incidentals necessary to
complete the work.
THIS PAGE LEFT BLANK INTENTIONALLY
','' � ��°�.•��II II III � ..o
a1111V
NOEL
MARTIN
ELEM.
V
ern
1� waTT[N .. /
a0N
Rw M n
. rw
i�
LINE TO BE LEANED
VCT
CITY Ctmtrt NY
r[r0f tal
...Dt.. _ ST I
_.
1 !1 � ►
a
or b
I � ^•rrm ' � 11
I
sc41e 1" _ iso0
THIS PAGE LEFT BLANK INTENTIONALLY
City of Lubbock
P.O. Box 2000
Lubbock. Texas 79457
e06-767-2167
MAILED TO VENDOR: January 7, 1993
CLOSE: January 14, 1993 @ 2:00 P.M.
l BID #12396: SANITARY SEWER CLEANING - 30' YCT
ADDENDUM # 1
PLEASE MODIFY OR AMEND CONTRACT DOCUMENTS AS PER THE ENCLOSURES
CONTAINED HEREIN.
1. Please find enclosed a corrected Bid Proposal Form for
Alternate #3; item #2. Please return your bid for this
alternate on the new bid form.
2. At General Conditions; page 32; item 28-D. Please delete
the requirements for Builder's Risk Insurance.
THAN YOU,
Ron Shuffiel ,
BUYER
PLEASE RETURN ONE COPY WITH YOUR BID
Office of
Purchasing
ALTERNATE BID' -NO. 3
BID FOR UNIT PRICE CONTRACTS
Item Quantities Per Total
No. & Units Description of Item & Unit Prices Unit Amount
---------------------------------------------------------------------------------
1. 17,507 L.F. Furnishing all labor, equipment, and any
other incidentals necessary for cleaning
30" VCT sanitary sewer with the maximum
spacing of 832 feet between manholes,
complete per linear foot;
SERVICES: six Dollars & seventy-five Cents ($ 6.75 )$118.17
2. 17,507 L.F. Furnishing all labor, equipment, and any
other incidentals necessary for T.V.
inspection of the 30" VCT sanitary sewer
with the maximum spacing of 832 feet between
manholes, complete per linear foot;
TOTAL BID
SERVICES: one Dollar & zero cents ($ 1.00 )$17,507.00
($135.679.25 )
NOTE: If this bid, Alternate Bid No. 3, is accepted the City of Lubbock will
install six (6) 5 ft. diameter manholes at the locations shown with a double
asterisk on the following page titled "Manhole Spacing and Depths for
Alternate Bids No. 2 and 3.
7
SPECIAL CONDITIONS
r
THIS PAGE LEFT BLANK INTENTIONALLY
NOTICE OF ACCEPTANCE
TO:
The City of Lubbock, having considered the proposals submitted and opened on the 14 day of
Janiia 199_3, for work to be done and materials to be furnished in and for:
as set forth in detail in the Specifications, Plans, and Contract Documents for such work for the City of Lubbock;
it appearing that your proposal is fair, equitable and to the best interest of said City, please take notice that
said proposal was accepted by the City Council of the City of Lubbock on the 28th day of January 1993 at
the bid price contained therein, subject to the execution of and furnishing of ell contract documents, bonds, cer-
tificates of insurance, and ell other documents specified and required to be executed and furnished under the con-
tract documents. It will be necessary for you to execute and furnish to the City of Lubbock all such documents
within ten (10) days from your receipt of this Notice.
The five percent (5%) bid security, submitted with your proposal, will be returned upon the execution of
such contract documents and bonds within the above specified ten (10) day period. In the event you should fail to
execute and furnish such contract documents and bonds within the time limit specified, said bid security will be re-
tained by the City of Lubbock.
C
fis
CITY OF LUBBOCK
Owner's Representative
-45-
THIS PAGE LEFT BLANK INTENTIONALLY
0