HomeMy WebLinkAboutResolution - 082560B - Pavement Improvements - Kerr Paving Co - Zora Addition - 08_25_1960 RESOLUTION
t„>
y r RESOLUTION ACCEPTING' IMOMIENTS ON A PORTION OF A STREET AS LISTED
BELOW:
WHEREAS, in conformance with` the paving requirement provisions of City
Ordinance 1331, the subdivider of Zora Addition, made arrangements with Kerr
Paving Company for the construction of paving improvements on certain streets
dedicated in said subdivision under the provisions of said Ordinance prior to
the recording of the subdivision plat of Zora Addition including the following
street:
Brownfield Drive (concrete only) from its intersection with the West Property
Line of Lot 10, Zora Addition to its intersection with the East Property Line
of Lot 10, Zora Addition, known and designated as Part of New Subdivision
Unit Number 794.
AND WHEREAS, the construction of the above improvements on the above-
mentioned street was performed under the supervision of the City Erg ineer, and
said improvements have been completed and have been inspected and found to have
been constructed in accordance with City specifications and in accordance with
the provisions of City Ordinance 1331.
THEREFORE, BE TT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned street
be and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the Cityts portion of the cost.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 25TH DAY OF AUGUST, 1960.
A- L'O.Ar Z-0-
David C. Casey, i�,ayor
ATTES .
Lav6nia Lowe, C y Secretary
APPROVED:
(John T. Hickerson, City Engineer
APPROVED:
Fred 0. Senter, Jr., City torney
' RES OLUT ION
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR
AVENUES AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Indian Hills Addition made arrangements with
Hodges and Tierney Construction Co. for the construction of paving improve-
ments on certain streets dedicated in said subdivision under the provisions
of said Ordinance prior to the recording of the subdivision plat of Indian
Hills Addition including the following streets:
South 1/2 of 40th Street from its intersection with the East Lip Line of
Albany Avenue to its intersection with the Nest edge of Strip Paving on Slide
Road, known and designated as New Subdivision Unit Number 772.
North 1/2 of 40th Street from its intersection with the East Lip Line of
Albany Avenue to its intersection with the West edge of strip paving on Slide
Road, known and designated as New Subdivision Unit Number 773.
East 1/2 of Albany Avenue (concrete only) from its intersection with the center
line of 40th Street to its intersection with a line 2.5 feet South of the
South Property Line of the alley North of 40th Street, known and designated as
New Subdivision Unit Number 774.
East 1/2 of Albany Avenue (concrete only) from its intersection with the center
line of 40th Street to its intersection with a line 3 feet South of the South
�-- Property Line of the alley South of 41st Street, known and designated as
New Subdivision Unit Number 775-A.
41st Street from its intersection with the East Lip Line of Albany Avenue
to its intersection with the West edge of strip paving on Slide Road, known
and designated as New Subdivision Unit Number 776.
West 1/2 of Slide Road (concrete only) from its intersection with a line 2.5
feet South of the South Property Line of the alley North of 40th Street to
its intersection with a line 15 feet North of the North Property Line of 40th
Street, known and designated as New Subdivision Unit Number 779.
West 1/2 of Slide Road (concrete only) from its intersection with a line 15
feet South of the South Property Line of 40th Street to its intersection with
a line 15 feet North of the North Property Line of 41st Street, known and
designated as New Subdivision Unit Number 780,
West 1/2 of glide Road (concrete only) from its intersection with a line 15
feet South of the South Property Line of 41st Street to its intersection with
a line 3 feet South of the South Property Line of the alley South of 41st
Street, known and designated as New Subdivision Unit Number 781-A.
AND WHEREAS, the construction of the above improvements on the above-
mentioned streets was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in
accordance with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
�^ I.
That the improvements on said portions of the abovementioned streets
be and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost and to
release escrow money.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 11TH DAY OF AUGUST, 1960.
Lm/
David C. Casey, Mayor
ATTEST:
l!
Laveni Lowe, City Yiaetaari
APPROVED:
J hn T. Hickerson, City Engineer
APPROVED:
ram-
Fred 0. Senter,Jr., City, torney
CITY OF LUBBOCK
�QCK.
TEXAS
August 11, 1960
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by
Hodges & Tierney Construction Co., paving contractor, under
their contract with the subdividers of Indian Sills Addition
and find the improvements on 40th Street, 41st Street, Albany
Avenue and Slide Road as listed on the final estimate *sheet
to have been completed in accordance with the plans and specifica-
tions and recommend that you accept the improvements on said
streets and avenues.
Yours very `truly,
Kohn T. Hickerson
City Engineer
j
CONSOLIDATED FINAL ESTMTE
tR;
INDUN HILIS ADDITION
ACCEPTED AUGUST 11, 1960
QUANTITIES
Unit & S.Y. S.Y.
Sub-Unit Location S.Y. L.F. Alley Valley
Paving C & G Ret. Gutter
NS 772 Sk of 40th St, from E.Lip Line -of 2449.83 1274,54 17.38
Albany Ave. to W. edge of strip
paving in Slide Road
NS 773 NJ of 40th St. from E. Lip Line of 2467.21 1274.54
Albany Ave. to W. edge of strip
paving in Slide Road
NS 774 Ek Albany Ave.(concrete only) from 109.50
E 40th St. to 2.51 S. of SPL_of
alley N. of 40th St.
NS 775-A Ek Albany Ave.(concrete only) from 416,00 21.11
L 40th St. to 31 S. of SPL of-alley
S. of 41st St.
NS 776 41st St. from E. Lip Line of Albany 4881.88 2549.08 52.54
Ave. to W. edge of strip paving in
Slide Road
NS 779 Wk Slide Road (concrete only) from 109.50
2.5' S. of SPL_of alley N. of 40th
St. to 151 N. of NFL of 40th St.
NS 780 A Slide Road (concrete only) 271.00 15,00
from 15' S. of SPL of 40th St. to
151 N. of NPL of 41st St.
NS 781•A W of Slide Road (concrete only) 161.00 15.00
from 15' S. of SPL of 41st St. to 3'
S. of SPL of alley S. of 41st St.
TOTALS 9798.92 6165.16 51.11 69.92
COST ESTIMATE
9798.92 S.Y. Paving @ 10'40 $ 13,718.49
616516 L.F. Curb & Gutter @ 10'40 8,631.22
51.11 S.Y. Alley Return @ 4.50 230,00
69.92 S.Y. Valley Gutter @ 5.00 349.60
CONMACT COST $ 22,929.31
r^
4� .s
COST DISTRIBUTION
Property
Unit & Contract Owner
,gub-pnit Cost Cost
NS 772 53,301.02 5,301.02
NS 773 5,238.45 5,238.45
NS 774 153.30 153.30
NS 775-A 677.40 677.40
NS 776 10,666.04 108666.04
NS 779 153.30 153.30
NS 780 44690 446.90
NS 781-A 292.90 292,90
TOTAIS $ 22,929.31 22,929.31
i