Loading...
HomeMy WebLinkAboutResolution - 102356A - Pavement Improvements - West Texas Construction Co - Caprock Addition - 10_23_1956 1�I RESOLUTION RESOLUTION ACCEPTING IDDIPROVENMTS ON PORTIONS OF STREETS, AND/OR AVENUES AS LISTED BELOW. WHERM, ist conformance with the paving requirement provisions of City Ordinance 1331, the subdividers of the Caprock Addition, Lots' 748-783 made arrangements with West Texas Construction: Incorporated, Paving Contractors, for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said Ordinance, prior to the recording of the subdivision plat of the 'Caprock Addition Lots 748--783, including the following streets and avenues: College Avenue Access Road from its intersection with a line 15 ft,. South of the South Property Line of 62nd Street to its intersection with South Property Line of the Alley South of 62nd Street, known and designated as New Subdivision Unit Number 240. Canton Avenue from its intersection with a line 15 ft. South of the South Property Line of 62nd Street to ,its intersection with the South Property Line of the Alley South of 62nd Street, known and designated as New Subdivision Unit Number 241. Boston Avenue from its intersection wth a line 15 ft. South of the South Property Line of 62nd Street to its intersection with the South Property Line of the alley South of 62nd Street, known and designated as New Subdivision �. Up-it Number 242. AND WHEREAS, the construction of the above improvements on the above— mentioned streets and avenues was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City Specifications and in accordance with the provisions of City Ordinance Number 1331. NOW THEREFORE, BE IT RESOLVED BY THE CITY C0114ISSION OF THE CITY OF LUBBOCK: I, That the improvements on said portions of the abovementioned avenues be, and the same are hereby accepted and the City Engineer be and is hereby authorized to direct the payment of the City's portion, of cost. II, This resolution shall take effect and be in force from and after its passage. AND IT IS SO ORDERED. Passed and approved this 23rd day of October, 1956. `S. �S. Forrest, Jr., tag. or ATTEST: 01 ' av nia Lowe, City4Secretary PROVED: T. Hickexson, City Engineer JtLD: aughn E. Wilson, City Attorney 428fim- CITY OF LUBBOCK o ILL ��ocx TEXAS October 23, 1956 Honorable Mayor and City Commission Lubbock, Texas Gentlemen: I have exwained the paving improvements constructed by West Texas Construction, Incorporated, Paving Contractors, under their contract with the subdivider of Caproak Addition Lots 7.48-- 783 in accordance with New Subdivision Ordinance No, 1331 and find the improvements on the College Avenue Access Road designated as New Subdivision Unit No. 240, Canton Avenue designated as New Subdivision Unit No. 241, and Boston Avenue designated as New Subdivision Unit No. 24.2, as listed on the attached final estimate sheet to have been completed in accordance with plans and specifications and recommend the payment to the contractor the amount shown on the attached consolidated final estimate sheet as being due him from the City of Lubbock. Very truly yours, '+� ohn T. Hickerson E :wm City Engineer 102 bA CONSOLIDATED PENAL ESMAATE FOR CAPROCK ADDITION LOTS 748-783 ACCEPTED 0CTOBM 23, 1956 QUANTITIES N-S Paving Subg.Prep# MG Alley Unit No., Location, Sly. S,Y., L„F* Return S,Yj� 24D College Ave.Access Rd.-151 S.of 292.43 374r73 254.26 11,67 SPD 62ad St„to SPL alley S.of 62nd St. 241. Canton. Ave.-151 S.of SPL62nd 425.35 532,37 277.26 3,84D St. to SPY, alley S.of 62nd St. 24.2 Boston Ave.-15t S. of SPL 62nd 505,10 607,40 272,26 26.67 St. to SPL Alley S.of 62nd. St. To-als 1,222.88 1,514.50 803.78 68.34 COST 19222.88 S,Y. Paving (Scarf. & Base) 1.20 = 1t467.45 1,514.04 S,Y. Subg. Prep. 9 .23 = 348.34 803,78 L.F, Conc. Curb & Gutter 0 1.51 - 1t213,71 68.34 S.Y. Cone, Alley Return 0 4..20 = �0 Total Contract Cost 33316.53 10% Engineering 331.65* Total Cost 3,648.18 COST DISTRIBUTION Iv-.S Cityrs Cost for Unit No Arad Coat Snbdividerr a -Cogt Ext a Wide 240 870.05 567.73 302.32 241 1,177.53 1,177,53 -0- 242 1 a 68 1 l 0 3)316,53 2,900.17 41.6.36 Engineering is the City's cost as well. as Extra Width on R.O.W. Streets.