HomeMy WebLinkAboutResolution - 102356A - Pavement Improvements - West Texas Construction Co - Caprock Addition - 10_23_1956 1�I
RESOLUTION
RESOLUTION ACCEPTING IDDIPROVENMTS ON PORTIONS OF STREETS, AND/OR
AVENUES AS LISTED BELOW.
WHERM, ist conformance with the paving requirement provisions of
City Ordinance 1331, the subdividers of the Caprock Addition, Lots' 748-783
made arrangements with West Texas Construction: Incorporated, Paving
Contractors, for the construction of paving improvements on certain streets
dedicated in said subdivision under the provisions of said Ordinance, prior to
the recording of the subdivision plat of the 'Caprock Addition Lots 748--783,
including the following streets and avenues:
College Avenue Access Road from its intersection with a line 15 ft,. South of
the South Property Line of 62nd Street to its intersection with South Property
Line of the Alley South of 62nd Street, known and designated as New Subdivision
Unit Number 240.
Canton Avenue from its intersection with a line 15 ft. South of the South
Property Line of 62nd Street to ,its intersection with the South Property Line
of the Alley South of 62nd Street, known and designated as New Subdivision
Unit Number 241.
Boston Avenue from its intersection wth a line 15 ft. South of the South
Property Line of 62nd Street to its intersection with the South Property Line
of the alley South of 62nd Street, known and designated as New Subdivision
�. Up-it Number 242.
AND WHEREAS, the construction of the above improvements on the above—
mentioned streets and avenues was performed under the supervision of the City
Engineer, and said improvements have been completed and have been inspected and
found to have been constructed in accordance with City Specifications and in
accordance with the provisions of City Ordinance Number 1331.
NOW THEREFORE, BE IT RESOLVED BY THE CITY C0114ISSION OF THE CITY OF
LUBBOCK:
I,
That the improvements on said portions of the abovementioned avenues
be, and the same are hereby accepted and the City Engineer be and is hereby
authorized to direct the payment of the City's portion, of cost.
II,
This resolution shall take effect and be in force from and after its
passage.
AND IT IS SO ORDERED.
Passed and approved this 23rd day of October, 1956.
`S. �S. Forrest, Jr., tag. or
ATTEST: 01
'
av nia Lowe, City4Secretary
PROVED:
T. Hickexson, City Engineer
JtLD:
aughn E. Wilson, City Attorney
428fim-
CITY OF LUBBOCK
o ILL
��ocx
TEXAS
October 23, 1956
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
I have exwained the paving improvements constructed by
West Texas Construction, Incorporated, Paving Contractors, under
their contract with the subdivider of Caproak Addition Lots 7.48--
783 in accordance with New Subdivision Ordinance No, 1331 and
find the improvements on the College Avenue Access Road designated
as New Subdivision Unit No. 240, Canton Avenue designated as New
Subdivision Unit No. 241, and Boston Avenue designated as New
Subdivision Unit No. 24.2, as listed on the attached final estimate
sheet to have been completed in accordance with plans and
specifications and recommend the payment to the contractor the
amount shown on the attached consolidated final estimate sheet as
being due him from the City of Lubbock.
Very truly yours,
'+�
ohn T. Hickerson
E :wm City Engineer
102 bA
CONSOLIDATED PENAL ESMAATE FOR CAPROCK
ADDITION LOTS 748-783
ACCEPTED 0CTOBM 23, 1956
QUANTITIES
N-S Paving Subg.Prep# MG Alley
Unit No., Location, Sly. S,Y., L„F* Return
S,Yj�
24D College Ave.Access Rd.-151 S.of 292.43 374r73 254.26 11,67
SPD 62ad St„to SPL alley S.of
62nd St.
241. Canton. Ave.-151 S.of SPL62nd 425.35 532,37 277.26 3,84D
St. to SPY, alley S.of 62nd St.
24.2 Boston Ave.-15t S. of SPL 62nd 505,10 607,40 272,26 26.67
St. to SPL Alley S.of 62nd. St.
To-als 1,222.88 1,514.50 803.78 68.34
COST
19222.88 S,Y. Paving (Scarf. & Base) 1.20 = 1t467.45
1,514.04 S,Y. Subg. Prep. 9 .23 = 348.34
803,78 L.F, Conc. Curb & Gutter 0 1.51 - 1t213,71
68.34 S.Y. Cone, Alley Return 0 4..20 = �0
Total Contract Cost 33316.53
10% Engineering 331.65*
Total Cost 3,648.18
COST DISTRIBUTION
Iv-.S Cityrs Cost for
Unit No Arad Coat Snbdividerr a -Cogt Ext a Wide
240 870.05 567.73 302.32
241 1,177.53 1,177,53 -0-
242 1 a 68 1 l 0
3)316,53 2,900.17 41.6.36
Engineering is the City's cost as well. as Extra Width on R.O.W. Streets.