HomeMy WebLinkAboutResolution - 082356B - Alley Improvements - Frank Hodges, Concrete Contractor - Hankins Addition - 08_23_1956 osessbo
RESOLUTION
RESOLUTION ACCEPTING DT-ROVEM7TS ON PORTIONS OF STREETS, AND/OR AVENUES
AS LISTED BELOW.
WHEREAS, the City of Lubbock passed a resolution on February 28, 1956,
authorizing the construction by Frank Hodges, concrete contractor, of alley
improvements in said city, specifically the following:
The South 282 feet of the North-South alley in Block 2, located between Avenue
Y and College Avenue from 16th Street to 19th Street, and in Hankins Addition.
This improvement is known and designated as Unit No. A-304.
AND WHEREAS, the improvements, upon the said portions of the above-
mentioned alley, have been inspected and found to have been constructed accord-
ine to the approved plans and specifications.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
I.
That the improvements', on said portions of the abovementioned alley,
be and the sane are hereby accepted, and the City Engineer be and is hereby
authorized to direct payment of the City's portion of cost, t,506.17.
II,
This resolution shall take effect and be in force after its passage.
PASSED AND IP PROVED THIS 23rd day of August, 1956.
ATT S. S. Forrest, Jr., Mayor'
ES :_;
A
Li #nia Lowe, City SecreUry
APPROVED:
�
hn T. Hickerson,, City Engineer
AP OVED:
Vaughn . Wilson., City Attorney
- I$
��. CITY OF LUBBOCK
5
lei
4PK
TEXAS
August 23, 1956
h
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
I have examined the paving improvements constructed by Frank Hodgea,
concrete contractor, as authorized by a resolution, which was passed
and approved on February 28, 1956, and find the alley improvement,
known and designated as Unit No. A-301+, as listed on the attached
final estimate sheet, to have been completed in accordance with plans
and specifications and recommend that you accept improvements on said
alley, paying the contractor the amount shown on the attached consoli-
dated estimate sheet as due him by the City of Lubbock.
Very tr *yours
'fj,) A/6.dz 4
hn T. Hickerson Jo2 n
JBS:wm City Engineer
CONSOLIDATED FINAL ESTIVATE
QUANTITIES
Unit No. Location Sly. S.Y,
Cone. Pay. Subgr. Prep.
A-304 South 282 ft. of N-8 alley, 523.27 523.27
Blk. 2, Hankins Add.
COST ESTTKffE
523.27 S. Y. Cone. alley Pay. + Subgr. Prep. 6 4.55207/8.Y. = $2,381.96
5% Engr, 119..10
Total Cost $2,501.06
COST DISTRIBUTION
Unit No. Total P.O. Total City City to Contract Credit
Cost Cost Cost Contr. Cost Engr.Dept.
A-304 $2001.06 el,875.79 $625.27 $5o6.17 $2,381.96 1,A19.10