Loading...
HomeMy WebLinkAboutResolution - 122055C - Paving Improvements - L.E. & B.F. Hodges - E-W Alley, Block 1, Crouch SD - 12_20_1955 a Z'� RESOLUTION RESOLUTION ACCEPTING DH:'fi.OVEIMTS ON PORTIONS OF STREETS, AND/OR AVENUES AS LISTED BELOW. WHEREAS, the City of Lubbock passed a resolution on November 10, 19559 authorizing the construction by L. E. Hodges & B. F. Hodges, Contractors, of alley- paving improvements in said city,- specifically the following: The West 11,.0 feet of the East-West alley in Block 1, Crouch Subdivision. This improvement is known and designated as Unit No. A 303 • AND WHEREAS, the improvements, upon the said portions of the above- mentioned alley, have been inspected and found to have been constructed according to the approved plans and specifications. TH=ORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS: I. That the improvements, on said portions of the abovementioned alley, be and the same are hereby accepted, and the City Engineer be and is hereby authorized to direct payment of the City's portion of cost, $227.93. This portion increased over the original estimate of $210.73 due to a change in alley paving specifications. II. This resolution shall take effect and be in force after its passage. PASSED AND APPROVED THIS 20th day of December, 1955. Murr ATTEST: QMIZ," f 1--&ZZ Lavenii Lowe, City Seerletary APPROVED: (jJ6hn T. Hickerson, City Engineer =. -6 2--tp�. � — Vaughn E. Wilson, City Attorney 6 CITY OF LUBBOCK 122055C o� z sae TEXAS December 20, 1955 Honorable Mayor and City Commission Lubbock, Texas Gentlemen: I have exmi.ned the paving improvements constructed by West Texas Construction, Inc., paving ,contractors. as authorized by a resolution, which was passed and approved on November 10, 1955, and find the alley improvement known and designated as Unit No. A 303, as listed on the attached final estimate sheet., to have been completed in accordance with plans and specifications and recommend that you accept improvements on said alley, paying the contractor the amount shown on the attached consolidated estimate sheet as due him by the City of Lubbock. Very truly yours, f � Jot��T. Hickerson City Engineer JHS.jb CONSOLIDATED FINAL ESTIMATE QUANTITIES S.Y. Subgr. Unit No. Location Conc.Pay. Prep. A--3O3 E-W alley, BIZ. 1 239.00 239.00 Crouch Subd. Totals 239.00 239.00 COST ESTITE 239 S.Y. Cone. Alley Pay. + Subgr. Prep @ 4.488 $1,072.62 + 5% Eng'• � :3 Total Coat 1,126.25 COST DISTRIBUTION `t... Total P.O. Total City City to Contract Cost Credit Unit No. Cost Cost Cost Contr. Engr.Dept. A-3O3 1,126.25 $844.69 281.56 ',t227.93 $lt072.62 53.63 g