HomeMy WebLinkAboutResolution - 111055H - Paving Improvements - West Texas Contruction, Inc. - Dollie Mac Add #4 - 11_10_1955 i t a 00 111055+t u' RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS, AND/OR AVENUES AS LISTED BELOW. WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, and a resolution authorizing paving, passed on September 8th, 1955, the subdividers of the Dollie Mac Addition No. 4 made arrangements with West Texas Construction, Incorporated, Paving Contractor, for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said Ordinance and resolution prior to the recording of the subdivision plat of the Dollie Mac Addition No. 4, including the following streets and avenues: Avenues V from its intersection with the South Property Line of 47th Street to its intersection with a line 15 feet North of the North Property Line of 48th Street, known and designated as New Subdivision Unit Number 187. Avenue V from its intersection with a line 15 feet South of the South Property Line of 48th`-Street to its intersection with a line 2.5 feet South of the South Property Line of the Alley (West Leg) South of 48th Street, known and designated as New Subdivision Unit Number 187—A. 48th Street from its intersection with a line 15 feet East of the East Property Line of Avenue to its intersection with a line 15 feet East of the East Property mine of Avenue V, known and designated as New Subdivision Unit ' a Number 188. AR'D WHEREAS, the construction of the above improvements on the above— mentioned streets and avenues was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City Specifications and in accordance with the provisions of City Ordinance Number 1331 and a. resolution authorizing paving, passed on September 8th, 1955• NOW THEREFORE, BE IT RESOLVED BY THE CITY COMt4ISSION OF THE CITY OF LUBBOCK: I. That the improvements on said portions of the abovementioned streets and avenues,be, and the same are hereby accepted and the City Engineer be and is hereby authorized to direct the payment of the City's portion :of cost. II. This resolution shall take effect and be in force from and after its passage. AND IT IS SO ORDERED. Passed and approved this loth day of November, 1955• i PP, Mayor CITY OF LUBBOCK TEXAS November 10, 1955 Honorable Mayor and City Commission Lubbock, Texas Gentlemen: 1 have examined the paving improvements constructed �.. . by West Texas Construction, Incorporated, under their contract with the subdivider of the Dollie Mac Addition No. 4 in accordance with Ordinance No. 1331 and a resolution authorizing paving, passed on September 8th, 1955, and find that the improvements on the streets and/or avenues designated as New Subdivision Units 187, 187--A, and 188, as listed on the attached final estimate sheet to have been completed in accordance with plans and specifications on said streets and/or avenues and recommend the payment to the contractor the amount shown on the attached consolidated final estimate sheet as being due him from the City of Lubbock. Very truly yours, ohn T. Hickerson City Engineer 0 CONSOLIDATED FINAL ESTIMATE FOR DOLLIE XAC ADDITION NO. 4 UNITS N-S 187, N-S 187-A, AND N-S 188 ACCEPTED NOVEHER LOTH, 1955 G. W. 0. 1190 AIM RESOLUTION PAVING UANTITIES S.Y. S. Y. L. F. S.Y. Alley hit No. Location PLrjim Prep. C & G. Slab -S 187 Avenue, V; 47th Street to 48th Street 765.56 955.56 570.00• 31.67 '-S 187-A Avenue V; 48th Street to Alley South of 382.78 499.17 305.00 31.67 48th Street -S 188 48th Street; Avenue V to Avenue W 2,132.19 2,498.05 1,317.08 TOTALS 3,280.53 3,952.78 22192.08 63.34 COST ESTIMATE 3,280.53 S. Y. Paving @ $1.12 = 3,674.19 3,952.78 S. Y. Subgr. Prep. @ .20 = 7906'56 2.9192.08 L. F. Curb and Gutter @ 1.47 = 3,222.36 63.34 S. Y. Alley Slab @ $3.25 = 205.86 Contract Cost 72892.97 10% Engineering 789.30 TOTAL COST 8,682.27 COST DISTRIBUTION Developer to. City to Pay City to Pay Contract Credit nit No. Total Cost Pa Contractor Contractor from Escrow Cost r. De t 4 187 2,188.31 994.68 994.69 6 1,989.37 198.94 "S 187-A 1,187.81 539.92 539.91 1,079.83 107.98 -,S 188 5,306.15 280. 3.02 6l$2 . 8 8,682.27 6 1,534.60 280.75 6,077.62 7,892.97 4 789.30 i � � l• lily ATTEST: L Lavezlia Lowe, City Secretary APPROVED: hn T. Hickerson, City Engineer APPROVED: )d,, 1 aughn E. Wilson, City Attorney