HomeMy WebLinkAboutResolution - 081254I - Paving Improvements - Kerr & Middleton - 39Th St, From Louisville To Memphis Ave - 08_12_1954 f c�1 RFsoiUriou
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS, IND/OR AVENUES AS
(LISTED BELOW.
WHEREAS, the City of Lubbock passed resolutions on April 7.8, June 10, June
24 and July 8, 1954, authorizing the construction of street impruvements in portions
of various streets in said City including among others the following:
391th Street from its intersection with the East Property Line of Louisville Avenue
to its intersection with a line 6t East of the East Property Line of Memphis Avenue,
known and designated as Unit Number 1592.
39th Street from its intersection with the East Property Line of Hartford Avenue
to its intersection with,a line 92 East of the East Property Line of Indiana Avenue,
known and designated as Unit Number 1609.
52nd Street from its intersection with the West Property Line of Avenue D to its
intersection with the East Property Line of Avenue G, known and designated as Unit
Number 1616.
Avenue G from its intersection with the South Property Line of 50th Street to its
intersection with the South Property Line of 56th Street and 55th Street from its
intersection with the West Property Line of Avenue D to its intersection with the
East Property Line of Avenue G, known and designated as Unit Number 1624.
AND WHEREAS, the improvements upon the said portions of the abovementioned
streets have been inspected and found to have been constructed according to the
approved plans and specifications.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
I.
That the improvements on said portions of the abovementioned streets be,
and the same are hereby accepted and the City Engineer be and is hereby authorized
to direct the payment of the Cityts share on the due date as shown on the attached
consolidated sheet.
II.
This resolution shall take effect and be in force after its passage.
PASSED AND APPROVED THIS 12TH DAY OF AU UST 1954.
Y .f
ATTEST= Murrell R.,� pp,
Lavenia Xowe, City S retary
APYF�VED:
-G`—�-
W. B. Holmes, City Engineer
AIJPROVED: '
iy
Vaughn E. Wilson, City Attorney
CONTRACTORS AFFIDAVIT ON
n COMPLETION OF RESOLUTION PAVING
STATE OF TEXAS §
COUNTY OF LUBBOCK
Before me, a Notary Public in and for Lubbock County, Texas, on this dap
personally appeared James C. Kerr , who being by me duly sworn,
upon oath says:
I, James C. Kerr of Kerr & Middleton , do represent to the
City of Lubbock and solemnly swear hatI contracted with the owners of the property
abutting 39th Scree. from_ �i � t _JtZphia Aver . for constructing
paving improvements in accordance with city a plans and specifications on
said portion of 3�h Street which work, designated as
Unit 1a2 , was duly app:--owed and authorized 'oy resolution of the City Commission
passed the 8th day of Atrril 19_$1L, and that the work has been
completed according to the plans and specifications pertaining to the project and
that all labor, material, supplies and other cost including equipment, rental and
hire, and all expense items incurred in connection with said project have been paid
in filly that all liens and rights to fire ]Liens against any part of said project
or the moneys, bonds, or warrants due the Corr�-.ractor, have been satisfied by payment
to the claimant, his authorized agent or attorney, and Pal'. release of all recorded
liens or claims have been secured by settlement and duly filed of record with the
County Clerk of Lubbock County,
I further represent and affirm that all Federal, State and Municipal
laws were substantially complied with by me in doing and carrying out the fob
Fs d project herein referred to and that I paid applicable scale of wages, and
this affidavit is made to secure acceptance of these improvements by the City
Commission and therefore cause the first payment of the property owner portion of
the cost as set forth in the property owner contracts to become due and payable
within ten drays of such acceptanep and this affidavit is also made to secure
payment, of the City°s portion due the contractor upon the date of city payment as
set forth in the resolution of authorization.
Witness my hand this_3rd_day of Bu�usit�l954
HER R IETON
B t
Attest g® _
SabscTibed and sworn to before me this the of August, 19.
_ o
o ary Public in and for
Lubbock County, Texas �p�
CONTRACTORuS AFFIDAVIT ON
COMPLFTION OF RESOLUTION PAVING
STATE OF TEXAS
COUNTY OF LUBBOCK ¢
Bsfore me, a Notary Public in and for Lubbock Countyp Texas, on this day
personally appeared James C. Kerr , who being by me duly sworn,
upon oath says;
I, James C. Kerr of KeiddZeton , do represent to the
City of Lubbock and solemnly swear that I contracted with the owners o£. the property
abutting 39th Street from Indiana to Hartford Avenue for constructing
paving improvements in accordance with city standard plans and specifications on
said portion of 39th StMgJ_ --, which work, designated as
Unit 1609 , was duly approved and authorized by resolution of the City Commission
passed thg loth day of m_�T }e 3�9 and that the work has been
completed according to the plans and specifications pertaining to the project and
that all labor, material, supplies and other cost including equipmentp rental and
hirep and all expense items incurred in connection with said project have been paid
in full; that all liens and rights to f:bc liens against any part of said project
or the moneysp bonds, or warrants due the Contractor, have been satisfied by payment
tc the claimant, his authorized agent or attorney, and full release of all recorded
liens or claims have been secured by settlement and duly filed of record with the
County Clerk of Lubbock County.
I further represent and affim that all Federal, State and Municipal
laws were substantially complied with by me in doing and carrying out the job
end project herein referred to and that I paid applicable scale of wages, and
this affidavit is made to secure acceptance of these improvements by the City
Commission and therefore cause the first payment of the property owner portion of
the cost as set forth in the property owner contracts to become due and payable
Within ten days of such accepta.cep and this affidavit is also made to secure
payment of the City's portion due the contractor upon the date of city payment as
set forth in the resolution of authorization.
Witness my hand thie_.=,3rdsday of Au&ust1 195b.
KERR & DLETON
Attest.
—
Subscribed and sworn to before me this the 3rd dayof August, 1954*
ary Public o n and for
-`- Lubbock County, Texas 01\t
- . 6812SUrT.
CONTRACTOR9S AFFIDAVIT ON
COMPLETION OF RESOLUTION PAVING
STATE OF TEXAS §
COUI TY OF LUBBOCK §
Before me, a Notary Public in and for Lubbock County, Texas., on this day
personally appeared James C. Kerr v , who being by me duly sworn,
upon oath says-
I, es C. Kerr ?3�c� �sf , do represent to the
City of Lubbock and solemnly swear that I contracted with the owners of the property
ebuttine S nd Strut from Avenue 0 tote Ave--;e�z for constructing
paving improvements in accordance with city standard plans and specifications on
said portion of 52nd Street __ , which work, designated as
Unit 1616 , was duly approved and authorized by resolution of the City Commission
passed the 2 th day of June. 19,�4_., and that the work has been
completed according to the plans and specifications pertaining to the project. and
that all labor, material, supplies and other cost including equipment, rental and
hire., and all expense items incurred in connection with said project ha°ae been paid
in folly that all liens and rights to fix :dens against any part of said project
or the moneys, bonds, or warrants due the Contractor., have been satisfied by payment
to the claimant, his authorized agent or attorney, and full release of all recorded
liens or claims have been secured by settlement and duly filed of record with the
County Clerk of Lubbock County.
I further represent and affirm that all Federal, State and Municipal
laws were substantially complied with by me in doing and carrying out the job
and project herein referred to and that I paid applicable scale of wages, and
this affidavit is made to secure acceptance of these improvements by the City
Commission and therefore cause the first payment of the property owner portion of
the cost as set forth in the property owner contracts to become due and payable
within ten days of such acceptance, and this affidavit is also made to secure
payment of the City7s portion due the contractor upon the date of city payment as
set forth in the resolution of authorizatieno
Witness mar hand this__3r4.,_day of
S'RR & MIDDLETON
B t Q
Attests — 6,17
'-Subl9cribed and sworn to before me this the rd day of Atuust, 19546
0
c
otary, Public in and for ,r1N
Lubbock County, Texas 10
CONTRACTORS AFFIDAVIT ON
COMPLETION OF RESOLUTION PAVING
STATE OF TEXAS §
COUNTY OF LUBBOCK
Before me, a Notary Public in and for Lubbock County, Texas, on this day
personally appeared James C. Kerr - 4 , who being by me duly sworn,
upon oath says°
I, James C. Kerr of Kerr & ri3ddleton , do represent to the
City of Lubbock and solemnly swear° that I contracted with the owners of the property
abutting°55th Street &Ave• a. from AIM.. D. h 3, _ for constructing
paving improvements in accordance with city standard plans and specifications on
said portion of � th Streettaand Avenue G --, which work, designated as
Unit 6 , was duly approved and authorized by resolution of the City Commission
passed the 8th day of July1 19�,, and that the work has beers
sompleted according to the plans and specifications pertaining to the project and
that all labor, material, supplies and ether cost including equipment, rental and
hire, and all expense items incurred in connection with said project have been paid
in full; that all liens and rights to fix liens against any part of said project
or the moneys, bonds, or warrants due the Contractor, have been satisfied by payment
to the claimant, his authorized agent or attorney, and full release of all recorded
liens or claims have been secured by settlement and duly filed of record with the
County Clerk of Lubbock County.
I further represent and affirm that all Federal, State and Municipal
Laws were substantially complied with by me in doing and carrying out the job
and project herein referred to and that. I paid applicable scale of wages, and
this affidavit is made to secure acceptance of these improvements by the City
Commission and therefore cause the first payment of the property owner portion of
the cost as set forth in the property owner contracts to become due and payable
within ten days of such acceptance, and this affidavit is also made to secure
payment of the City°s portion due the contractor upon the date of city payment as
set forth in the resolution of authorization.
Witness my hand this__ __day of Augustj 19 —
SERR & LETON
B s
Attests •.. .
Subscribed and sw.:rn to before me this the rd day of Aueust, 1951a.
Notary Public in and for
^ Lubbock County, Texas
i . .
0612S4
CONSOLIDATED EST L►dATE FOR UNITS 1592, 16090 1616 AND �•
1624 At7T o inw 8Y REsommis !ND AccEPTED 8--12-54
SU:fi2ARY OF QUAhTITIESt
S.Y. of S.Y. of L.F. of S.Y. of
Unit Z` cat'lon Tayiniz Euber, Curb & fitter Ala
1592 39th Street Louisville to Memphis 1972.40 2325.41 1270.84
1609 39th Street Indiana to Hartford 1998.91 2378.18 1275.40
1616 52nd Street Ave. G to Ave. D 2666.66 3083.32 1500,00
1624 55th Street I: Ave. G 54th St. to Ave, 34.93 5663.12 2868.24 11.67
Totals 11,472.90 13,450.23 6,914.48 31.67
COST ESTDIATEt
32,472.90 S.Y. Favenent 6 1,05 c 612,046.55
13,450.23 S.Y. Subgr. Prep. 4 0.18 2,421.04
6,914.48 L.F. Curb & Gutter 0 1.45 10,026.00
31.67 S.X. alley slab 0 3.2$ s 102.93
Contract cost 124,596.52
5% Engineerizi; 1,229.82
Total Est. Co.t W,826.34
DISTRIBUT LqN
Total City to pay Credit
,jait No. lotal_Cost P,O C" ost City CoEt Vnteactor Dec.15.1954 Ugr.Dent.
_1592 4548.92 4269.48 279.44 62.83 216.61
)09 4595.08 4277.19 317.89 99.08 218.81
i616 5806.49 5443.54 563.15 96,65 276,50
1624 10675.65 ,9817.9 0�6. 540.0 217.90
25,E26.34 230907.47 2,019.87 789.05 1,229.62
ginal Paving As"Bument Retol. to kM"Metl
City of Lubbook ?9th Street Posted April 8, 1954 Sheet No. l of 1
Width 30 rest From EPL Louisville Ave. to W E. of EPL Memphis Ave. Accepted August 12, 1954 Unit No. 1592
Paving Curb at 1.45 ft*
Otm Dl AddItin ft. IPt Rate Ca P
toe. R. L. Mummg 9" 8 &1' Hill 71.25 2.07849 248.09 71.25 10J.31 251.40
Carl E. Solt' 10 8 " 76.25 " 158.49 76:25 116.56 269.05-
Robert. Koontss 11 e e 76.25 " 158.49 76.25 no.% 269m
T. 4. Phrgeson 12 8 " 76.25 " 15849 76925 110.56= 269.05 .
li._H. McNally 11 8 " 76.25 " 158.49 76.25 11b.5ti; 269.05
W. D. McNsLUy 3-4 8 " 76.25 " 158.49 76.25. 110.W 269.05
William E. Rumilten 15 8 " 76.25 " 158.49 76.25 lib,56 26905
William E. Hamilton 16 8 e 76.25 " 158.49 76:25 110.56 269.05
South Side
Oscar Pay 1 11 " 76.25 " 1;8.49 76.25 110.56 269 05
Oscar Ray 2 11 " 76.25 " 158.49 76.25 110.56 269.05
V. W. Yocum a 11 * 76'.25 " 158,49 76.25 110.56 269.05
Batter Long 4 it " 76.25 " 158:48 76.25 110.56 269.04
Hill Bawtt 5 11 " 76.25 " 15H.49 76.25 lla.36 269.05
Zebu C. Tucker 6 11 " 76`.25 " 158.48 76.25 110.56 269.04
T. S. Terrell 7 11 " 76.25 " 158.49 76.25 110.56 269.05
Charts E. Doughteryr 8 11 " 71.25 " 1483.09 71.25 103.31 251.40
Total P.O. Cost 4269.48
Cityle Share 2".44
Total Unit Coat 4548.92
t
0(basotr
Mal Paving Assessment Resol. to Kerr & Middleton
City of L bbook 39tb Street Passed dune 10, 1954 Sheet No. 1 of I
Width 30 rest From EL'L. Rartford Avenue to 91 E. of HPL, Indiana Avenue Accepted August 12, 1954 tbit tto. 1609
Paving Curb at 1.45 Ft.
Owner Lets $look Additive,, • A. Rate Cost Lin, IM, Cot Tot-.1 Cast
lgI th Side..
1 1 W.C. Snow 47 2.1686040 101.92 47 68.16 170.07
2 1 " 56 " 121." 516 81.20 202.64
3 1 " 128 " 277.58 128 185.60 463.18
4 1 " 60 " 230.19 60 87.00 217.12
5 1 " 60 " 130.12 60 87.00 217.12
6 1 " 60 n 130.12 60 87.00 217.12
7 1 " 60 " 130.12 60 $7.00 217 12
8 1 " 60 'A M.12 60 87,00 217.22
9 1 " 60 # 110.12 60 87.00 a7.12
Seentt�$ide
The math 127.50
of the Y. 2751 of
Blk. 12, Taabbook
View Addition 12 Lubbock Views% " 1291.64 MI 4 21-38.58
Toul P.O. Coat 427"'i.�ts
CitTts Share 317.89
Total Not. Cost 4593.t18
-- _ t
Final Paving Assessment 52nd street 4-Middleton
City of Lubbock Fran 10e 3. of RPL Avenme 0 to 100 W. of Wn Avenue D Rased Jane 24 1954 Sheet No. 1 of 1
Width 36 Feet Aecapted August 12, 1954 Unit 1616
Paving Curb & Outter at 1.45 Ft.
Oymer Lotp Mock d t F
North Bide
15 4 L9ndaleAcree 51 2.178893 111.12 51.0 73..95 185.07
16 4 " 54 117.66 5A, 78.30 195.96
17 4 " 34 117.66 54 78.30 195.96
18 4 " 54 117.66 54 78.30 195.96
19 4 " 54 117.66 54 78.30 195.96
20 4 " 54 117.66 54 78.30 195.96
21 4 " 54 117.66 54 78.30 195.96
22 4 " 54 117.66 54 78.30 196.96
23 4 " 54 117.66 54 78.30 195.96
24 4 " 54 117.66 54 78.30 195.96
25 4 " 54 117.66 54 78.30 195.96
26 4 " 54 217.66 54 78.30 195.96
27 4 " 54 3.17.66 54 78.30 195.96
28 4 " 51 51 73.95 185.07
South-Side
23 5 " 50 .: `. .'. 108.94 50. 72:50 181.44
22 5 " 53 115.48 53 76.85 192.33
21 5 " 53 115.49 53 76.85 19234
20 5 " 53 115.0 53 76.95 192.93
19 5 " 53 115.48 53 76.85 192.33
18 5 " 53 115.49 53 76.85 292.34
17 5 " 53 n5.48 53 ?16.85 112.33
16 5 " 53 115.48 53 76.85 192.33
15 5 " 53 115.49 53 76.85 192.34
14 5 " 53 115.48 53 76.85 192.33
13 5 " 53 115.48 53 76.85 192.33
12 5 " 53 115.48 53 76.85 192.33
11 5 " 53 115.48 53 76.85 192.33
10 5 " 53 115.48 53 76.85 192.33
9 5 " 11 23.97 11 15.95 3%92
TOW P.O. Cast 5443.34
City'a Share 363.15
Unit Coat 5806.49