Loading...
HomeMy WebLinkAboutResolution - 061054E - Pavement Improvements - City Engineer - 39Th Street - 06_10_1954 7 W RESOL 0I f -� WHEREAS, the City Commission has heretofore determined that the City would contribute the customary city portion of from ten (10) to forty ('40) per cent oft e Copy to cost of street paving improvements, as determined by side and front property, to b Alderson constructed in accordance with the standard City of Lubbock street plans and speei 6-17-34 fications as approved by the ,City Engineer, and the owners of property abutting 39th Street from Hartford Avenue to Indiana Avenue, have requested permission to have pavement improvements constructed on the aforementioned 39th Street., and the paving of said 39th Street is needed to provide access to the area during its construction period, and'the City Engineer has approved the plans and specificatio s for such improvements, and, WHEREAS, Dr., W. C. Snow and others, owners of the property abutting on the herein described street will contract separately with a competent contractor for the above street improvements, and said improvements will be constructed in accordance with the aborementioned plans and'specifications under the supervision of the City Engineer, and the said owners desire that the City contribute its customary share towards such paving, and, WHEREAS, the contract cost of the paving improvements will not exceed $4,344.76, the total cost not over 6.,562.00, and the City's share in connection therewith would not exceed $284.81, leaving the property owner's portion not to exceed $4,277.19, such costs being well within the current prices for paving obtained by competitive bidding, and that such payment to be made by the City is reasonable fair and just to the abutting property owners, the City and all other persons affected thereby, and that the sum of $284.81 will be duly budgeted in the 1954 - 1955 Budget, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF LUBBOCK: ,Section 1. THAT, ;the' City Engineer be and he is hereby authorized to appro e plans and specifications °for paving on the streets herein described, provided that such plans and specifications meet the usual requirements for paving on streets within the dorporate limits of the City of Lubbock; said streets being as follows, to-wit Unit No. 1609 39th Street from its intersection with the East..Property Line of Hartford Avenue to its intersection with a line- 91 cast of the .East Property Line of! Indiana Avenue. The City Engineer ;is further,authorized and directed to duly inspect said shaving construction on said 39th Street and to require strict compliance with the :and upon completion of said paving, and upon Approved plans and specifications final approval by the City Engineer and acceptance of such improvements by the City Commission, the City Engineer is authorized to pay the contractor in full and final payment of the City's share of the cost of the abovementioned improvements a sum not to exceed -$57.57 which is the City share $264.81 less $217o24 engineering , leaving the amount due the contractor from the property owners not to exceed $4,277.19. Section 2. This authority is conditioned that Dr. W. C. Snow and the other owners of abutting property and the contractor mill pay for all material and labor � . and costs incidental to such construction, indemnify the City of Lubbock against any costs, claims or damages of every nature pertaining thereto, and that the Contractor furnish the City Engineer with acceptable evidence that the contractor and his sub-contractors, if any, are adequately covered by public liability and property damage insurance policies, that the said Dr. W. C. Snow and other owners of abutting property will cause such paving to continue to be done according to 1 the approved plans and specifications, and that upon completion thereof and final f approval of the City Engineer, all improvements designated herein shall be a permanent part of igaid 39th Street and the property of the City of Lubbock, without any liability whatsoever, except for the payment of a sum t57.57 to the Contractor after December 15, 1954, On motion of Commissioner Thomas seconded by Commissioner ^ Carpenter the foregoing resolution was unanimously passed by the City Commission this 10 day of June 19 54 har. Murrell R ATTEST: Lf&ehia Lowe, CLty Secretary I, Dr. W. C. Snow, representing myself and the remaining owners of abutting property on the abovementioned streets, and Kerr and Middleton Contractor, do hereby accept and agree to fully abide by the foregoing provisions f r the considerations therein stated. Dr. W..C. now BY Kerr Middleton By Approved: W. B. Holkes,, City Engineer APPx0ved: V hn . Wi soh City Attorney