HomeMy WebLinkAboutResolution - 011454E - Adopt Cost Estimate - City Engineer - Paving Improvements, GWO 835 - 01_14_1954 4E
GWO 835
RESOLUTION
RESOLUTION APPROVING AND ADOPTING ESTIMATE OF THE COST OF IMPROVEMENTS, OF
AMOUNTS TO BE ASSESSED FOR' IMPROVEi%1ENTS IN THE NATURE OF GRADING, LAYING CURB AND
GUTTER AND PAVING PORTIONS OF CERTAIN STREETS, HIGHWAYS, AVENUES AND/OR ALLEYS IN
THE CITY OF LUBBOCK, TEXAS AND CERTAIN STREETS AND HIGHWAYS, AVENUES AND/OR ALLEYS
ALONG THE BOUNDARY OF SAID CITY, SAID IMPROVEMENTS BEING DESIGNATED AS GWO NO. 835,
FIXING THE TIME AND PLACE FOR A HEARING TO THE OWNERS OF ABUTTING PROPERTY, AND
OTHER PERSONS INTERESTED IN SAID PROPERTY AND DIRECTING THE CITY SECRETARY TO PUB—
LISH NOTICE ON BEHALF OF THE GOVERNING BODY OF THE CITY OF LUBBOCK, TEXAS.
WHEREAS, the Governing Body of the City of Lubbock has heretofore ordered that
portions of the streets, highways and/or avenues be improved by grading, installing
concrete curb and gutter and paving with caliche base and quadruple asphalt surface
and alleys with concrete paving together with incidentals and appurtenances and
arrangements therefore have been made and entered into by the City of Lubbock,
Texas with Kerr and Middleton, Contractor, and,
WHEREAS, the Governing Body of the City of Lubbock has caused the City
Engineer to prepare and file estimates of the cost of such improvements and esti—
mates of the amounts per front foot to be assessed against abutting property and
the owners thereof, and such estimates have been prepared and examined;
THEREFORE, BE IT RESOLVED BY THE CITY CONMIISSION OF THE CITY OF LUBBOCK, TEXAS
I.
Such estimates be and they are hereby adopted and approved.
II.
NOTICE
TO THE OWNERS OF PROPERTY ABUTTING UPON THE HEREINBELOW MENTIONED PORTIONS OF
STREETS, HIGHWAYS, AVENUES .AND/OR ALLEYS AND TO ALL OTHERS AFFECTED:
The Governing Body of the City of Lubbock has heretofore ordered that the
following portions of streets, highways, avenues and/or alleys in and along the
boundary of the said City of Lubbock, Texas, be improved by raising, grading and
filling and installing concrete curbs and gutters and paving with c aliche base and
quadruple asphalt surface and alleys with concrete paving and storm sewers and
drains where necessary on streets, highways, avenues and/or alleys, designated
below:
It is hereby found and determined that the cost of ;improvements on such por—
tions of said streets, avenues, highways and/or alleys with the amount or amounts
per front foot proposed to be assessed for such improvements against the abutting
p -)perty and the owners thereof, on the portions of said streets, avenues, highways
and/or alleys are as follows, to-wit:
42nd Street from its intersection with the East Property Line of Akron Avenue to
its intersection with the East Gutter Line of Boston Avenue, known and designated
as Unit Number 1572 the estimated cost of improvements is $5848.75; the estimated
amount per front foot to be assessed against the abutting property and owners
thereof f er curb and gutter is $1.45; the estimated amount per front foot to be
assessed against the abutting property and owners thereof for improvements exclu—
sive of curb and gutter is $2.1722049 for front abutting property.
�. Memphis Avenue from its intersection with the South Gutter Line of 22nd Street
to its intersection with the North Gutter Line of 22nd Place, known and designated
as Unit Number 1496; the estimated cost of improvements is 02,767.55; the es-
timated amount per front foot to be assessed against the abutting property and
owners thereof for curb and gutter is 1.45; the estimated amount per front foot
to be assessed against the abutting property and owners thereof for improvements
exclusive of curb and gutter is $2.477969 for front abutting property and
01.6519876 for side abutting property.
Memphis Avenue from its intersection with the South Gutter Line of 22nd Place
to its intersection with the Center Line of 23rd Street, known and designated as
Unit Number 1497; the estimated cost of improvements is $2,961.75; the estimated
amount per front foot to be assessed against the abutting property and owners
thereof for curb and gutter is $1.45; the estimated amount per front foot to be
assessed against the abutting property and owners thereof for improvements ex-
clusive of curb and gutter is $2.675013 for front abutting property and
$1.7833509 for side abutting property.
Memphis Avenue from its intersection with the Center Line of 23rd Street to its
intersection with the North Gutter Line of 24th Street, known and designated as
Unit Number 1498; the estimated cost of improvements is $2924.61; the estimated
amount per front foot to be assessed against the abutting property and owners
thereof for curb and gutter is $1.45; the estimated amount per front foot to be
assessed against the abutting property and owners thereof for improvements
exclusive of curb and gutter is $2.83339 for 4ont abutting property and
$1.889302 for side abutting property.
Memphis Avenue from its intersection with the South Gutter Line of 24th Street
to its intersection with the North Gutter Line of 25th Street, known and desig-
nated as Unit Number 1499; the estimated cost of improvements is 022696,85; the
estimated amount per front foot to be assessed against the abutting property
and owners thereof for curb and gutter Is $1.45; the estimated amount per front
foot to be assessed against the abutting property and owners thereof for improve-
ments, exclusive of curb and gutter is $2.599009 for front abutting property and
$1.7326813 for side abutting property.
Memphis Avenue from its intersection with the South Gutter Line of 25th Street
to its intersection with the North Gutter Line of 26th Street, known and
designated as Unit Number 1500; the estimated cost of improvements is $2698.07;
the estimated amount per front foot to be assessed against the abutting property
and owners thereof for curb and gutter is $1.45; the estimated amount per front '
foot to be assessed against the abutting property and owners thereof for improve-
ments exclusive of curb and gutter is $2.680970 for front abutting property and
$1.787322 for side abutting property.
Baylor Street from its intersection with the East Property Line of College Avenue
to its intersection with the East Property Line of Waco Avenue, known and desig-
nated as Unit Number 1501; the estimated cost of improvements is $7,418.02; the
estimated amount per front foot to be assessed against the abutting property and
owners thereof for curb and gutter is $1.45; the estimated amount per front foot
to be assessed against the abutting property and owners thereof for improvements
- exclusive of curb and gutter is $2.4539158'for front abutting property.
22nd Place from its intersection with the West Property Line of Nashville Avenue
to its intersection with the West Property Line of Oxford Avenue, known and
designated as Unit Number 1502; the estimated cost of improvements is $4,765.76;
the estimated amount per front 'foot to be assessed against the abutting property
f and owners thereof for curb and gutter if $1.45; the estimated amount per front
foot to be assessed against the abutting property and owners thereof for improve-
9 {'
ments exclusive of curb and utter is $2.269316666 for front abutting property andl
1.5128853 for side abutting property.
24th Street from its intersection with the West Property Line of Memphis Avenue to
Its intersection with the West Property Line of Nashville Avenue, known and desig—
nated as Unit Number 1505; the estimated cost of improvements is $4,600.52; the
estimated amount per front foot to be assessed against the abutting property and
owners thereof for curb and gutter is $1.45; the estimated amount per front foot
to be assessed against the abutting property and owners thereof for improvements
exclusive of curb and gutter is $2.0749'714 for front abutting property and
$1.3833211 for side abutting property.
Emory Street from its intersection with the East Property Line of N. Indiana
Avenue to its intersection with the West Property Line of N. Elgin Avenue, known
and designated as Unit Number 1506; 'the estimated cost of improvements is
14,463.75; the estimated amount per front foot to be assessed against the abutti
property and owners thereof for curb and gutter is $1.45; the .estimated amount per
front foot to be assessed against the abutting property and owners thereof for
improvements exclusive of curb and gutter is $2.1000156 for front abutting propert
Marg. Access N. Side of 50th Street from its intersection with the Center Line of
Nashville Avenue to its intersection with the Center Line of Peoria Avenue, known
and designated as Unit Number 1507; the estimated cost of improvements is
7669.84; the estimated amount per front foot to be assessed against the abutting
property and owners thereof for curb and gutter is $1.45; the estimated amount per
front foot to be assessed against the abutting property and owners thereof for
improvements exclusive of curb is $1.792185 for front abutting property.
Avenue R from its intersection with the. South Property Line of 34th Street to its
intersection with the North Property Line of 38th Street, known and designated as
Unit Number 1512; the estimated cost of improvements is $8659,09; the estimated
amount per front foot to be assessed againIst the abutting property and owners
thereof for curb and gutter is $1.45; the estimated amount per front foot to be
assessed against the abutting property and owners thereof for improvements exclusi e
of curb and gutter is $1.8222792 for front abutting property and $1.214852798 for
side abutting property.
Waco Avenue from its intersection with the Southwest Paving Line of Clovis Road
to its intersection with the South Property Line of Colgate Streets known and
designated as Unit Number 1513; the estimated cost of improvements is $1176,97;
the estimated amount per front foot to be assessed against the abutting property
and owners thereof for curb is $1.45; the estimated amount per front foot to be
assessed against the abutting property and owners thereof for improvements
exclusive of curb and gutter is $3,169997 for front abutting property.
37th Street from its intersection with the East Property Line of Knoxville Avenue
to its intersection with the East Property Line of Louisville Avenue, known and
designated as Unit Number 1516; the estimated cost of improvements is $4624.17;
the estimated amount per front foot to be assessed against the abutting property
and owners thereof for curb and gutter is $1.45; the estimated amount per front
foot to be assessed against the abutting pr perty and owners thereof for improve—
ments exclusive of curb and gutter is $2.10627049 for front abutting property.
51st Street from its intersection with the West Property Line of Avenue D to its
intersection with the East Property Line of Avenue G, known and designated as Unit
Number 1519; the estimated cost of improvements is $5160,75; the estimated amount
per front foot to be assessed against the abutting property and owners thereof for
curb and gutter is $1.45; the estimated amount per front foot to be assessed
against the abutting property and owners thereof for improvements exclusive of curb
and gutter is $1.791446 for front abutting property.
33rd Street from its intersection with the East Property Line of Salem Avenue to
its intersection with the East Property Line of Toledo Avenue, known and designated
as Unit Number 1520; the estimated cost of improvements is $3681.92; the estimated
amount per front foot to be assessed against the abutting property and owners
thereof for curb and gutter is $1.45; the estimated amount per front foot to be
assessed against the abutting property and owners thereof for improvements exclu—
sive of curb and gutter is $2.16125323 for front abutting property.
Salem Avenue from its intersection with the South Property Line of 33rd Street
(� to its intersection with the North Paving Line 6f`34th Street, known and designate
as Unit Number 1521; the estimated cost of improvements is $2144.88; the estimated
amount per front foot to be assessed against the abutting property and owners
thereof for curb and gutter is $1.45; the estimated amount per front foot to be
assessed against the abutting property and owners thereof for improvements exclu-
sive of curb and gutter is $2.7166458 for front abutting property and $1.8111063
for side abutting property.
Avenue J from its intersection with the North Property Line of 37th Street to its
intersection with the North Property Line of 38th Street known and designated as
Unit Number 1527; the estimated cost of improvements is 2444.94; the estimated
amount per front foot to be assessed against the abutting property and owners
thereof for curb and gutter is 1.45; the estimated amount per front foot to be
assessed against the abutting property and owners thereof for improvements exclu—
sive of curb and gutter is $2.6895339 for front abutting property and y1.793027598I
for side abutting property.
45th Street from its intersection with the East Property Line of Avenue T to its
intersection with the East Property Line of Avenue U, known.and designated as
Unit Number 1528; the estimated cost of improvements is 04590.20; hhe estimated
amount per front foot to be assessed against the abutting property and owners
thereof for curb and gutter is $1.45; the estimated amount per front foot to be
assessed against the abutting property and owners thereof for improvements
exclusive of curb and gutter is $2,09514403 for front abutting property.
th Street from its intersection with the East Property Line of Toledo Avenue to
its intersection with the East Property Line of Vicksburg Avenue, known and
designated as Unit Number 1536; the estimated cost of improvements is $12,087,69;
the estimated amount per front foot to be assessed against the abutting property
and owners thereof for curb and gutter is $1.45; the estimated amount per front
foot to be assessed against the abutting property and owners thereof for improve—
ments exclusive of curb and gutter is $2.459311226 for front abutting property.
Utica Avenue from its intersection with the South Property Line of 36th Street to
its intersection with the North Property Line of 38th Street, known and designated
as Unit Number 1537; the estimated cost of improvements is $5389.02; the estimated
amount per front foot to be assessed against the abutting property and owners
thereof for curb and gutter is $1.45; the estimated amount per front foot to be
assessed against the abutting pr perty and owners thereof for improvements exclu—
sive of curb and gutter is $2.6567535 for front abutting property and $1.7711777
for side abutting property.
36th Street from its intersection with the East Property Line of Memphis Avenue
to its intersection with the East Paving Line of Nashville Avenue, known and
designated as Unit Plumber 1541; the estimated cost of improvements is $4718.91;
S
L%Sl r:
the estimated amount per front foot to be assessed against the abutting property
and owners thereof for curb and gutter is $1.45; the estimated amount pdr front
foot to be assessed against the abutting property and owners thereof for improvemen
exclusive of curb and gutter is $2.20493388 for front abutting property.
37th Street from its intersection with the East Paving Line of Avenue A to its
intersection with the East Property Line of Avenue E, known and designated as Unit
Number 1545; the estimated cost of improvements is $11,341.18; the estimated
amount per front foot to be assessed against the abutting property and owners
thereof for curb and gutter is D1.45; , the estimated amount per front foot to be
assessed against the abutting property and owners thereof for improvements exclu—
sive of curb and gutter is $2.2632186 for front abutting property and $1.5088124
for side abutting property.
53rd Street and Avenue G from its intersection with the North Property Line of 54th
Street to its intersection with the West Property' Line of Avenue D, known and
designated as Unit Number 1546; the estimated cost of improvements is $8875.98;
the estimated amount per front foot to be assessed against the abutting property
and owners thereof for curb and gutter is $1.45; the estimated amount per front
foot to be assessed against the abutting property and owners thereof for improve—
ments exclusive of curb and gutter is $'1.97380529 for front abutting property and
$1.31587019 for side abutting property.
32nd Street from its intersection with the East Property Line of Salem Avenue to
its intersection with the East Property Line of Toledo Avenue, known and designated
as Unit Number 1548; the estimated cost of 'improvements is 03681.92; the estimated
amount per front foot to be assessed against the abutting property and owners
thereof for curb and gutter is $1.45; the estimated amount per front foot to be
�... assessed against the abutting property and owners thereof for improvements exclusiv
of curb and gutter is $2.16125523 for front abutting property.
Salem Avenue from its intersection with the South Property Line of 32nd Street to
its intersection with the North Property Line of 33rd Street, known and designated
as Unit Number 1549; the estimated cost of improvements is $2065.71; the estimated
amount per front foot to be assessed against the abutting property and owners
thereof for improvements exclusive of curb and gutter is $2.20281132 for front
abutting property and $1.4685482 for side abutting property.
45th Street from its intersection with the West Paving Line of Avenue $ to its
intersection with the East Paving Line of Avenue L. known and designated as Unit
Number 1550; the estimated cost of improvements is $9039.32; the estimated amount
per front foot to be assessed against the abutting property and owners thereof for
curb and gutter is $1.45; the estimated. amount per front foot to be assessed agains
the abutting property and owners thereof for improvements exclusive of curb and
gutter is $2.1421991 for front abutting property.
37th Street $-om its intersection with the East Property Line of Louisville
Avenue to its intersection with the East Property Line of Memphis Avenue, known
and designated as Unit Number 1551; the estimated cost of improvements is $4590.21;
the estimated amount per front foot to be assessed against the abutting property
and owners thereof for curb and gutter is $1.45; the estimated amount per front
foot to be assessed against the abutting property and owners thereof for improve—
ments exclusive of curb is $2.081221311 for front abutting property.
Avenue U from its intersection with the South Gutter Line of 39th Street to its
intersection with the North Gutter Line of 40th Street, known and designated as
Unit Number 1555; the estimated cost of improvements is $2202.43; the estimated
amount per front foot to be assessed against the abutting property and owners
Of 14A4E= 11
thereof for curb and gutter is $1.45; the estimated amount per front foot to be
assessed against the abutting property and owners thereof for improvements
exclusive of 'curb and gutter is $2.3320366 for front abutting property and
$1.554691065 for side abutting property.
Utica Avenue from its intersection with the South Property Line of 15th Street
to its intersection with the North Property Line of 19th Street, known and
designated as Unit Number 1556; the estimated cost of improvements is $13,812.51;
the estimated amount per front foot to be assessed against the abutting property
and owners thereof for curb and gutter is $1.45; the estimated amount per front
foot to be assessed against the abutting property and_owners thereof for improve—
ments exclusive of curb and gutter is �>2.980165 for front abutting property and
�1.98677697 for side abutting property.
Gary Avenue from its intersection with the South Property Line of 47th Street
to its intersection with the North Property Line of 50th Street, known and
designated as Unit Number 1559; the estimated cost of improvements is $8310.55; t e
estimated amount per front foot to be assessed against the abutting property and
owners thereof for curb and gutter is 01.45; the estimated amount per front foot
to be assessed against the abutting property and owners thereof for improvements
exclusive of curb and gutter is 03.4307000 for$ont abutting property and
$1.7856315 for side abutting property.
Louisville Avenue from its intersection with the South Property Line of 33rd
Street to its intersection with the North Paving Line of 34th Street, known and
designated as Unit Number 1561; the estimated cost of improvements is $2146.46;
the estimated amount per front foot to be assessed against the abutting property
and owners thereof for curb and gutter is �1.45; the estimated amount per front
�- foot to be assessed against the abutting property and owners thereof for improve—
ments exclusive of curb and gutter is $2.710229 for front abutting property and
$1.806828 for side abutting property.
39th Street from its intersection with the West Property Line of Avenue U to its
intersection with the West Property Line of Avenue V, known and designated as
Unit Number 1562; the estimated cost of improvements is $4745.73; the estimated
amount per front foot to be assessed against the abutting property and owners
thereof for curb and gutter is $1.45; the estimated amount per front foot to be
assessed against the abutting property and owners thereof for improvements
exclusive of curb and gutter is $2.4581321 for front abutting property and
$1.6387547 for side abutting property.
Avenue P from its intersection with the South Property Line of 34th Street to its
intersection with the South Property Line of 38th Street known and designated as
Unit Number 1563; the estimated cost of improvements is 410,096.82; the estimated
amount per front foot to be assessed against the abutting property and owners
thereof for curb and gutter is $1.45; the estimated amount per front foot to be
assessed against the abutting property and owners thereof for improvements
exclusive of curb and gutter is 03.1414339 for front abutting property and
02.09428927 for side abutting property.
Orlando Avenue from its intersection with the South Property Line of 17th Street
(East Leg) to its intersection with the North Property Line of 18th Street,
known and designated as Unit Number '1564; the estimated cost of improvements is
$2337.83; the estimated amount per front foot to be assessed against the abutting
property and owners thereof for curb and gutter is $1.45; the estimated amount
per front foot to be assessed against the abutting property and owners therefor
for improvements exclusive of curb and gutter is �2.653247 for front abutting
property and $1.7688313 for side abutting; property.
Orlando Avenue from its intersection with the South Property Line of 18th Street
,.� to its intersection with the North Property Line of 19th Street, known and
designated as Unit Number 1565; the estimated cost of improvements -is $3366.69;
! the estimated amount per front foot to be assessed against the abutting property
and owners thereof for curb and gutter is $1.45; the estimated amount per front
foot to be assessed 'against the abutting property and owners thereof for improve—
ments exclusive of curb and gutter is $2.9566385 for front abutting property and
11,9710923 for side abutting property.
18th Street from its intersection with the West Property Line of Orlando Avenue
to its intersection with the West Property Line of Norfork Avenue, known and
designated as Unit Number 1566; the estimated cost of improvements is $4830.26;
the estimated amount per front foot to be assessed against the abutting property
and owners thereof for curb and gutter is $1.45; the estimated amount per front
foot to be assessed against the abutting property and owners thereof for improve—
ments exclusive of curb and gutter is $2.3176916 for front abutting property.
35th Street from its intersection with the center line of Indiana Avenue to its
intersection with the East Property Line of Hartford Avenue, known and designated
as Unit Number 1567; the estimated cost of improvements is 4882.88; the estimated
amount per front foot to be assessed against the abutting property and owners
thereof for curb and gutter is 1.45; the estimated amount per front foot to be
assessed against the abutting property and owners thereof for improvements
exclusive of curb and gutter is $2.380184 for front abutting property.
36th Street from its intersection with the East Property Line of Knoxville Avenue
to its intersection with the East Property Line of Louisville Avenue, known and
designated as Unit Number 1568; the estimated cost of improvements is $4637.87;'
the estimated amount per front foot to be assessed against the abutting property
and owners thereof for curb and gutter is $1.45; the estimated amount per front
foot to be assessed against the abutting property and owners thereof for improve—
ments bxclusive of curb is $2.1126885 for front abutting property.
! Flint Avenue from its intersection with the South Property Line of 34th Street
to its intersection with the North Property Line of 35th Street, known and
designated as Unit Number 1569; the estimated cost of improvements is $2461.38;
the estimated amount per front foot to be assessed against the abutting property
and owners thereof for curb and gutter if 01.45; the estimated amount per front
foot to be assessed against the abutting property and owners thereof for improve—
ments exclusive of curb and gutter is $2.9715251 for front abutting property and
$1.45011278 for side tbutting property.
54th Street from its intersection with the East Paving Line of Avenue H to its
intersection with the west Property Line of 'venue D. known and designated as
Unit Number 1570; the estimated cost of improvements is $11,109.22; the estimated
amount per front foot to be assessed against the abutting property and owners ,
thereof for curb and gutter if $1.45; the estimated amount per front foot to be
assessed against the abutting property and owners thereof for improvements
exclusive of curb and gutter is $2.1678771 for front abutting property and
$1.4452586 for side abutting property.
Avenue L from its intersection with the South Paving Line of 30th Street to its
intersection with the South Property Line of 31st Street, known and designated as
Unit Number 1571—A; the estimated cost of improvements is $2951.31; the estimated
amount per front foot to be assessed against the abutting property and owners
thereof for curb and gutter is $1.45; the estimated amount per front foot to be
assessed against the abutting property and owners thereof for improvements
exclusive of curb and gutter is $3.04016524 for front abutting property and
1.43751678 for side abutting property.
0.
Avenue L from its intersection with the South Property Line of 31st Street to its
intersection with the South Property Line of 32nd ''treat, known and designated
as Unit Number 1571-B; the estimated cost of improvements is 2935.46; the
estimated amount per front foot to be assessed against the abutting property and
owners thereof for curb andgutter is $1.45; the estimated amount per front foot
to be assessed against the abutting property and owners thereof for improvements
exclusive of curb and gutter is $3.5425504 for front abutting property and
1.725085 for side abutting property.
Avenue L from its intersection with the South Property Line of 32nd Street to its
intersection with the North Property Line of 33rd Street, known and designated
as Unit Number 1571-C; the estimated cost of improvements is $2456.55; the
estimated amount per front foot to be assessed against the abutting property and
owners thereof for curb and gutter is $1.45; , the estimated amount per front foot
to be assessed against the abutting property and owners thereof for improvements
exclusive of curb and gutter is 12.75168807 for front abutting property and
1.3036452 for side abutting property.
Avenue L from its intersection with the North Property Line of 33rd Street to its
intersection with the North Gutter Line of 34th Street, known and designated as
Unit Number 1571-D; the estimated cost of improvements is $2814.68; the estimated
amount per front foot to be assessed against the abutting property and owners
thereof for curb and gutter is $1.45; the estimated amount per front foot to be
assessed against the abutting property and owners thereof for improvements
exclusive of curb and gutter is 3.4264288 for front abutting property and
$1.676017866 for side abutting property.
North—South alley Block 10 Overton Addition from its intersection with the
South Property Line of 13th Street to its intersection with the North Property
Line of 14th Street, known and designated as Unit Number A-302; the estimated
cost of improvements is $2277.91; the estimated amount per foot to be assessed
against the abutting property and owners thereof for improvements is
$3.7274909 for abutting property.
And arrangement for the making and construction of such improvements with
pavement of quadruple course asphalt surface treatment (Inverted Penetration Type)
and a Six (6) Inch compacted caliche base in streets, highways, avenues and/or
alleys and with pavement of Five (5) Inch concrete slab in alleys has been made
and entered into by the 'jity of Lubbock, Texas, and rolls or statements showing
the proposed amounts to be assessed against abutting property and the owners
thereof have been filed with the City, such rolls or statements showing other
matters and things, and have been approved and the "ity Commission of said City
has fixed a time and place for hearing to the owners of property abutting upon
said portions of streets, highways, avenues and/or alleys, and to all others
affected, at which hearing the amounts to be assessed against the respective
parcels of abutting land and the owners thereof for improvements in the units
upon which the particular parcels of property abut, the amounts of benefits to the
respective parcels o.� property by means of the improvements in the unit upon which
the,,.part, oular property abuts, the regularity of the proceedings with reference to
such improvements, the apportionment of the cost of such improvements, and other
matters and things will be determined, and after such hearings assessments will
by ordinance be made and levied, ,and such hearing will be had and held by and be—
fore the City Commission of the `'ity of Lubbock, Texas, in regular Dommission
meeting room in the pity Hall, in the City of Lubbock, Texas on the 28th day of
January, 1954, at 2:00 P.M. o1clock, The rolls or statements showing the proposed
amounts of such assessments are on file in the office of the City Secretary and
copies thereof are in the office of the City Engineer of the City of Lubbock and
open to inspection of any interested parties at any time, and of all said matters
I.
;,.., and things all such owners of property, as well as any and others in anywise
affected or interested, will take due notice.
By order of the "ity Commission of the Gity of Lubbock, this the 14th
day of January, 1954.
No notice other than that hereinabove provided for shall be necessary
but publication of such notice shall be due and sufficient notice to any and all
persons, firms, corporations and other parties.
�I That a hearing be given and held by and before the Governing Body of
the Cityof exas to all persons owning or claiming an property
Lubbock,, , P g g y P P Y
abutting any part or portion of said streets, highways, avenues and/or alleys
described in Section II, of this Resolution, as well as all owning or claiming
any interest in any such property. Such hearing shall be given and held on the
28th day of January, 1954, at 2:00 P.M. otclock on the first floor in the City
Hall, City of Lubbock, Texas and the City Secretary is hereby directed to give
notice of the time and place of such hearing, and of other matters and facts in
accordance with the terms and provisions of an Act passed at the first called
session of the 40th Legislature of the State of Texas and known as Chapter 106 of
the Acts of said Legislature which has been adopted as an amendment to and made a
part of the Charter of the City of Lubbock, Texas, and as amended by Chapter 281
Acts of the 52nd Regular Session of said Legislature. Such notice shall be by
advertisement inserted at least three times in g newspaper published in the City
^ of Lubbock, Texas; the first publication shall be made at least ten days before
the said hearing. Said notice shall comply with and be in accordance with the
terms and provisions of this resolution and said Act as amended.
PASSED AND APPROVED BY UNANIMOUS VOTE OF THE GOVERNING BODY OF THE CITY OF
LUBBOCK, TEXAS, THIS, THE 14TH DAY OF JANUARY, 1954.
ATTE Murrell . grip r °
L venia, Lowe, C ty Sec etary
j APPROVED.
W. B. Holmes, City Engineer
AlipPRO
I
j -rhug E. a n, City Attorney
i, ,