HomeMy WebLinkAboutResolution - 4793 - CO #6 To Contract #4 - BRB Contractors - SEWRP Improvements - 04_13_1995Resolution No. 4793 April 13, 1995 Item #12 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute for and on behalf of the City of Lubbock Change Order No. 6, for Southeast Water Reclamation Plant Improvements Contract No. 4, to add lump sum for modification of effluent pumps EP-804 and 805 to increase the performance capacity of the pumps, attached herewith, by and between the City of Lubbock and BRB Contractors, and any associated documents, which Change Order shall be spread upon the minutes of the Council and as spread upon the minutes of this Council shall constitute and be a part of this Resolution as if fully copied herein in detail. Passed by the City Council this 13 th ATTEST: Betty . Johnso , City Secretary APPROVED AS TO CONTENT: Terry Ellerbrook, Managing Director of Water Utilities APPROVED AS TO FORM: Ueftld G. Va City Attorney dp: ccdocs/co-water.res March 29, 1995 LUBBOCK, TEXAS SOUTHEAST WATER RECLAMATION PLANT IMPROVEMENTS CONTRACT 4 - WATER RECLAMATION PLANTS 2 & 3, LABORATORY IMPROVEMENTS AND DEMOLITION OF PLANT 1 CHANGE ORDER NO. 6 SCOPE. This Change Order No. 6 covers the following change to the Contract Documents: Add lump sum for modification of effluent pumps EP-804 and 805 to increase the performance capacity of the pumps. REASONS FOR CHANGE: A lump sum add is included for modification of effluent pumps EP-804 and 805, along with associated motors and variable speed drives, to increase the performance capacity of the pumping units. The performance capacities of EP-804 and 805 require modification to allow pumping of effluent water to Southwestern Public Service (SPS) at a higher flow rate than anticipated at the time of design. In addition to the higher flow rates, the length of discharge piping to SPS was considerably longer than information at the time of design indicated. The increased flow rate and longer discharge pipeline necessitates the increase in performance characteristics of the pumping units. SPS has a contract with the City which pays the City for the effluent water that SPS receives. The increased flow rate required by SPS will result in a substantial increase in revenues received from SPS. Attached to this Change Order is a copy of Black & Veatch letters CP-15 and CP-15A, along with a cost breakdown from BRB Contractor-s Inc. for the work performed. BASIS FOR CHANGE: Modify effluent pumps EP-804 and 805, including motors and variable speed drives, to increase performance characteristics of the pumps for a lump sum cost of $84,599.68. (LUBBOCK, TEXAS ) (17578.440 ) (CHANGE ORDER NO. 6) C06-1 CHANGE TO CONTRACT PRICE. Original Contract Price Current Contract Price adjusted by previous Change Orders Contract Price due to this Change Order will be increased by New Contract Price including this and previous Change Orders To date percent of original Contract Price $10,185,000.00 $10,203,981.30 $ 84,599.68 $10,288,580.98 1.02% CHANGE TO CONTRACT TIME. The Contract Time for this contract remains unchanged. AGREED to this 13th day of BRB CON S, INC. gy v n , ti' Title Pro 16 c. ATTEST: &tt,- a Betty fohnson, Ci Secretary APPROVED TO ORM: L& D Vandiver, first Assistant City Attorney (LUBBOCK, TEXAS ) (17578.440 ) (CHANGE ORDER NO. 6) APPROVED AS TO CONTENT: L erry Ellerbroo , Managing Director of Water Utilities C06-2 BLACK & VEATCH 5728 LBJ Freewcy, Suite 300, Doiios, Texas 75240, (214) 770-1500, Fox (214) 770-1549 Lubbock, Texas Southeast Water Reclamation Plant Improvements and Expansion Contract 4 SRF Project 3104-004 BRB Contractors, Inc. Post Office Box 12107 Lubbock, Texas 79452 Subject: Attention: Mr. Ken Dedmon Project Manager Gentlemen: B&V Project 17578.440 B&V File G-4.02 (BU-800) July 23, 1994 Letter No. CP-15 Plant No. 4 Effluent Pumping Station Modifications The purpose of this letter is to document the work to be performed on a time and material payment basis at Plant No. 4 Effluent Pumping Station for pumps EP-804 and -805 and associated electrical items. Where more detailed information is required to further define the work, please contact our Resident Project Representative, Mr. Steve Keeling, for copies of the existing shop drawings or other related information. Please proceed with the following work. • Remove the 50 horsepower motors and replace with 75 horsepower motors bf identical construction. If acceptable to the manufacturer, return the motors for a credit. • Remove the pumps and install one additional pump bowl assembly on each pump. The pump column and shaft shall be shortened as required to maintain the original overall length of the unit. Please contact Mr. Chester Hopper of C&H Pumps (817) 268-4995. He is aware of the scope of work for this item. • Change the breakers for each pump from 3P-100 amp to 3P-150 amp. The breakers are located in MCC-800. Deliver the 3P-100 amp breakers to the Owner to serve as spare parts. Page 2 BRB Contractors, Inc. B&V Project 17578.440 Mr. Ken Dedmon July 23, 1994 • Refer to sheet E-18 of the drawings for Contract 2, circuit ME-6 for EP-804 and circuit ME-7 for EP-805. Please perform the following wiring and conduit changes for each pump: From the motor control center to the adjustable frequency drive, route a circuit with 3#1/0, 1#6G, in a new 1-1/2 inch conduit. The conduit may be routed overhead. Disconnect the existing circuit and remove the wiring. From the adjustable frequency drive to the motor, remove the existing wiring and install new wiring (3#1/0, 3-4/C#14, 4#12, #6G) inside the existing 2-inch conduit. We are currently reviewing possible modifications or replacement of the two adjustable frequency drives. Once we complete our review of this item, we will notify you of the scope of that portion of the work. If you have any comments or questions, please feel free to call me. Very my yours, B A K & VEATCH ert G. McCollum, P.E. Project Engineer cc: Mr. Henry P. Day Mr. Steve Keeling BLACK & VEATCH 5728 1BJ Freeway, Suite 300, Dallas, Texas 75240, (214) 770-1500, Fax- (214) 770-1549 Lubbock, Texas B&V Project 17578.440 Southeast Water Reclamation Plant B&V File G-4.02 (BU-800) Improvements and Expansion July 27, 1994 Contract 4 Letter No. CP-15A SRF Project 3104-004 BRB Contractors, Inc. Post Office Box 12107 Lubbock, Texas 79452 Subject: Revisions for Effluent Pumping Station at Plant 4 Attention: Mr. Ken Dedmon Project Manager Gentlemen: Reference is made to our letter dated July 22, 1994. In addition to the previous items mentioned, please replace the existing adjustable frequency drives (AFDs) for effluent pumping units EP-804 and EP-805. The new adjustable frequency drives shall be Eclipse Model 6230-8421 as manufactured by Emerson. Please contact Mr. John E. Stevenson with Emerson at (214) 783-1831. Return the existing adjustable frequency drives to the manufacturer for a credit. Please proceed with installation as soon feel free to contact Mr. Steve Keeling. the ordering of the required equipment and its as possible. If you have any questions, please our office or our Resident Project Representative, Very truly yours, BLACK & VEATCH L 4L4'0'i yo-L' Robert G. McCollum, P.E. Project Engineer jes:rgm cc: Mr. Henry Day Mr. Steve Keeling BRB CONTRACTORSIBC. TIME & MATERIAL COSTS R ECARSHEET lame di No.: 5t WA I tK KCtrLAMA 11UN PLAN I IMFKUVLMLN I S - 200009 - PLANT 3 EFFLUENT PUMPS 804 & 805 MODS. Labor.' Total labor charges from accounting printout of: Burden for labor @ 41 %: Materials: Total materials charges from accounting printout: Subcontract. Total pricing from electrical sub.: Equipment: Total equipment charges from daily hours forms: Other. Backpage estimate items covered @ lab.*18%: (small tools, misc. hardware items, safety, etc.) Subtotal: Subtotal of costs: OH/P Overhead & Profit @ 15%: Grand Total Grand Total of Summarized Costs: 01 /19/95 $1, 077.07 $441.60 $66,005.95 $5,480.85 $365.60 193.87 $73, 564.94 $11, 034.74 $84, 599.68 Comments: Removed, modified and replaced two vertical turbine pumps and adjustable freq. drives per B&V, with new wiring, etc. Signed: Q ,L-� B Bi Date.- 721117 � ,j 14 � -1 Signed: -RACTORS, INC. OWNER / ENG. REPRESENTATIVE Date: April 13, 1995 KDWMW 03/13/95 200009.WK4 Proj. -Name � No.: $E WATER RECLAMATION PLANT lMPR VEMENTS TX3LUB Description: 200009 - PLANT 3 EFFLUENT PUMPS 804 & 806 MODS. _iEQUIPMENT USED FORD P/U FC-269 $6.00 $12.00 $72.00 RAMMAX 1313 COMP 18 PE-0015 QB-0041 $41.00 $15.74 $0.00 $0.00 $0.00 $0.00 a0.00 IHC S-1700 EB-0040 $12.00 $2.00 $24.00 $0.00 L.B. LS108 GA-0023 $127.76 ILLER BIG 4 PORT. GEN. SB-0025 GEN. $13.66 $7.64 L.B. HC108 GA-0029 $130.78 $0.00 $269.60 OMEGA GA-0024 $67.40 $4.00 WATER PUMF GEN. $5.86 ORN6.6 H-0035 $171.20 _ 10.00 LASER GEN. $13.74 _ __ ___ $0.00 CASE 590 LA-106 $46.80 $0.00 TRENCH BOX GEN. $39.20 $0.00 MICH. L-90 KA-0024 $88.60 $0.00 $0.00 CAT 930 KA-0032 $64.00 $0.00 $0.00 NH L555 KB-0026 $27.80 $0.00 $0.00 RAYGO 320 PA-0008 $54.60 $0.00 Total EaulD. Charges a $365.60 02/0§/95 200009. WK4 /I ti I-), T. , 01 000 8R5 Contractors, Inc. DA I't 1 / 19/95 XJC052 DE FAIL JOB COST I.EDREk I I+IE 10. 1:,7 PAHE: 1 FROM 0/00/00 TO 99/99/9J Job /Sub- TX3LUB WASTEWATER fREAfMENT PLANT, LUHBOCK, iX Prjet Mngr Estimator Superinten 35 KEN DEDMON 125 DAVID VAN DYNE 78 SfEVE MARKS DATE G/L-SUR JRNO JRSQ SOURCE DESCRIPTION REFERENCE P/O # HRS/01Y IIM UNIT COST AMOUNT 200009 L MID EFF PUMPS EP-804/803 9/21/94 2100-100 PR00082 1675 PAY 092194 KENNETH D. 00112 01/0 00000000 3100 HR 16.6033 49.81 --9421,194 2�300-100---____-PR00082_-1676-PAY-092194-R 39-m140-80000000 5100 HR 1b-5000-- ---- _ -_ 8 ..50 9/21/94 2100-100 PR00082 1677 PAY 092194 JORGE G. C 00257 01/0 00000000 5.00 HR 16.5000 8-.50 9/21/94 2100-100 PR00082 1678 PAY 092194 JOSE SAMUE 04059 01/0 00000000 5.00 HR 10.8760 54.38 --W211 94. Pima -tom_--- FCi01308z-167-9-PAY ` -01121 VA000000 - - - 5.00 HN_ _.-S.7500--__ _.__ ._ 46.75__ 9/21/94 2700-100 PR00082 1717 PAY 092194 FICA EXPEN 00000000 24.12 9/21/94 2700-100 PR0008P 1750 PAY 092194 W/C EXPENS 00000000 26.94 -W36494-- 2700-100------. ...-Q100138 0401-GJ09-224 RJC BURDEN ---- .00000000 ---- -----51..0 -- 12/28/94 2100-100 PR00096 0759 PAY 122894 ROBERT COR 04100 01/0 00000000 20.50 HR 12.5000 256.25 1/10/95 2100-100 PR00101 0633 PAY 011095 MANUEL R C 03089 01/0 00000000 6.00 HR 9.0000 54.00 --_SL10/95---..:100=10Q-___ _.-kRQL0101-jaE::4 PAY 011095--ROBERT rnu M41OZ 01/13 0OW0000 4.00 Hk 12.500a._- -._ _ 50.013 1/10/95 2100-100 PR00101 0635 PAY 011095 ALEJANDRO 04357 01/0 00000000 12.00 HR 14.2400 170.88 1/10/95 2100-100 PRO0101 0636 PAY 011095 ROMAN TDRR 04478 01/0 00000000 22.00 Hk 8.0000 176.00 1/-10/95 2100=100 _-_.. PR00101 0637 PAY 011095 _7UAN HERNA-04657 01/0 00000000 8.0: F1R 6.5000 52.00 Cost Type TOTALS PlTc 95. Sc.! 1,077.07 Pay Item P 1 0 1,077.07 1 200009 M 000 .P4-EPS PUMPS-T3M___ I1/20/94 2200-100 PJ00s42 002F. CUN'TROL IL E57C. 00000000 12/28/94 2200-100 P.J00408 0057 C r H PI.IMP 29E 00000000 12/21/34 2200-108. _ GJ'0057c 0067 GJ17-::1 DELEMBER D 00000000 Cost Type fOfALS P10 F'Z,y 1+<r,: PfI", SUL Job P I D Job PTD 9J. J�' 95.50 1,1, 552.'3'� 53 . 446. 00 514.4E 65,491.49 491. 49 66, 568. 56 66,568.5E Q,1 000 BRB Contractors, Inc. DATE 1 / 19/95 DF I AIL JOB COST LF DGEk + it'll 10. c7 PAGE FROM 0/001eO TU 99/991."4:, Jnh /Sub- TX3LUB WASTEWATER fi?EAfMENT PLANT, LUBBOCK, TX Prjct Mngr Estimator Superinten 35 KEN DEDMON 125 DAVID VAN DYNE 78 ST'EVE MARKS DATE G/L-SUB JRNO JRSQ SOURCE OESi:RIPTION REFERENCE P/O # HRS/PfY Um UNIT COST AMOUNT Division PTU 95.50 66,568.56 i _ - -- - ---- -- -- - - — ''aspany - w 10 y5. 50 --- _ _ 66, 568. 56 ADJUSTMENT FOR CHANGES IN WORK comiscl A. Revision M: _ ,;lc: �J t3jj o_1� u1 cuT COS i3OA LrT ,&a W- Unit: ,_/ Of Change In Work: Pomp ,V - --- " ihcpsred; - _ Uc: Ct i�)I IUtT — Vnl'y -Ited' L. Unil t.+rbol l.ttbur M/l; Will ultra Sub It 5ubcoeuarr - 9 - RL-Ec _ RS a .50 -CO. c o _..WIL 1ry�1. �t .w•' s 8,50 3 +r1-. o o/y .. 3- [q}. } 5- 4 uo&r Ph.; o 1.� O O R S 1 2• 90 I a s 1 00 w 3- 9S- NEat ie $ RS 8-So- 9-f'.00 -- _ -f- _ pis - i�s ),2. So ) a S. oo- -. 9 s - Ic qR S jy,S0 8S. 0 0 -- S-- 95 - iFaCTR+c-,a a _j L - HAS 1AS0 19S.00 -- -- r)A0 LF .00 .L; b _... 3 l , da -- s ?s sellid-s/ �A —� 6• Is 3 o rn 33 , A 4L A - -- 545 S'o ; -11 l 1 t suhrr►laic -. -� ,G�6, oa i � 36o�s� ---^: SUBTOTAL LABOR rL MATERIAL LABOR BURDEN 31% SMALL TOOLS 18% SUBTOTAL 0 b p 15%. - --- BOND 2.51 i'n,PAT �g=�C %/ $ a. CR��LCs Proj. Name & NO.: SE WATER RECLAMATION PLANT IMPROVEMENTS - TX3LU Description: PLANT 4 T&M a EPS PUMPS 804 & 805 Labor Code 200009 Labor- Name -7 - ------ - -- dissif. -1 Rate I - R e- a--.- -1 -6'-T.] Code # Alex Garcia Foreman $14.28 1 S 200009 Robert Corona ;Manuel Constando $9.00 Ramon Torres lCarp. HIpr.! S6.60 Materials: (attach copies of tickets or invoices) Equipment # Hrs. Model Unit # Hm FORD PlU FC-269 RAMMAX I PE-0015 INC 3-1700 EB-0040 IGD COMP 1901 OB-0041 L.B. L8108 CA-0023 1!�LER SB-0025 B. H CIO—$ GA-00n PORT. GEN. GEN. OMEGA GA4024 WATER PUMP i GEN. 'KORNG."44 CASE 590 H-0035 LASER TRENCH BOX GEN. GEN. LA-106 MICH. L-90 . --��f./sia�- KA-0024 CAT 930 T 9 KA-0032 f NH L555 L55 KB-0026 R _ XGO 320 PA -MO (list equipment & hours used for this work) Comments* Lie r ar, Signed Date: Signed: BRB CONTRACTORS, INC. All Aw-, --- --Date: OWNER / ENG. REPRESENTATIVE 200009. W t<.- Proj. Name & No.: SE -WATER RECLAMATION PLANT IMPROVEMENTS - TX3LU Description: PLANT 4 T&M Q EPS PUMPS 804 & 805 Labor Code 200009 Labor: Name I Classif. I Rate -1O. T. Alex Garcia Foreman $1428 174 200009 Robert Corona Operator 512.50 :Manuel Constanclo q;qp._ H-1pr., $9.00 !Ramon Torres Carp. Hlpr. 58.00 A W"At z, materials. (attach copies of bckets or invoices) Equipment A46M Unit # Hrs. Mpd-el Unit # I FORD PlU FC-269 A RAMMAX PE-0015 i IHC S4700 ES-0040.. !I GD COMP ISO OB-0041 LB. L3108 GA-0023 *LLER BIG 401 SB-0025 LB. HC108 GA-0029 i PORT. GEN. GEN. OMEGA GA4024 WATER PUMP KORNG. 6U4: H-0035 LASER GEN.— CASE590 LA-106 TRENCH BOX GEN. MICH. L-90 KA-0024 CAT 930 KA-0032 NH L555 KS-0026 RAYGO 320 PA-0004 wI (list equoment 8 hours used for this work) Comments., Signed: AR &BC ON T—R �ACC -i OOR S. INC. Date. - Signed: Date: OWNER / ENG. REPRESENTATIVE 200009W-- Prol. Name & No.: ;5JEWATERRECLARATION PLANTIMPROVEMENTS - TX3LUB kescription: PLANT -4-T&M @_E-PS PUMPS 804 & 805 Labor Code 200009 Labor., i Name i Classif. I Rate i Reg. I O. T. i Code # Alex Garcia 'Foreman _rl 4.28 200009 Robert Corona $1 2.5 0 __­ I jqpe!VAj.AltRr - 4, - - Manuel Constando !Gapr., $9.00 Ramon Torres 'Carp. Hlpr_.-, 58.00 Materials: (attach copies of tickets or invoices) Equipment _,-Unit I Unit#- T H. I FORD PAJ FC-269 3 RAMMAX 1 ?E-00.1.5 1 _IIjC 34 700 11GI) COMP 1901 OB-0041 i L.B. LSIN GA-0023 MILLER BIG 40. SS-0025 L.B. HC108 GA-0029 li PORT. GEN. GEN. OMEGA GA-0024 ;IWATER PUMP! GEN KORNG. 6W H-0035 LASER GEN. CASE 590 iTk:lii__ TRENCH BOX: GEN. MICH. L-90 CAT 930 M-W32 NH L66b K84026 7PA (list equipment & hWrS Useo for MIS work) Comments: Signed. Signed: BRB CONTRACTORS, INC. OWNER ENG. REPRESENTATIVE Date: �_ 9 Date: I 200009.WK- I YIELD CHARGE PROJECT: WORK PERFORMED BY EMPLOYEES OF VHF ELECTRICAL CONTRACTORS, INC. DATE OF WORK ORDER: // f i BRIEF DESCRIPTION OF WORK PERFORMED: �,�,,,� 1•���/e „ nA n WORKERS: DATE NAME CLASSIFICATION BOORS RATE TOTAL 4,0 2 IPMENT RENTAL: Z DATE: TOOL: oe MATERIALS USED: WORK PERFORMED FOR: Bz�� oL �„IWORK DONE BY:zxj SIGNED BY �%/,% SIGNED BY: DATE: