Loading...
HomeMy WebLinkAboutResolution - 062851B - State Highway Department Requested To Build A Storm Sewer - Avenue A Underpass - 06_28_1951 PMOLUTION Cofy � � , the storm sewer designed to drain the Broadway underpass is sent inadequate in size and the underpass is frequently flooded, and; 'v'rJ1cCart y A^ it will become necessary at some date in the future to widen Ot .Hi. also 'aVand iprove�this underpass, and; 11r.01d hap H , the Texas State Highway Department is now in the process of M1r.H01me plan nib the construction of an underpass on Avenue A at about 14th Street 7-7-51 wit a':new storm sewer designed to properly drain that'underpass, and is will"i:n to construct the storm sewer of sufficient size to receive the drainage from the Broadway underpass when and if it should become desirable to �uupplement the drainage of the Broadway underpass, provided the City will boar that portion of the cost of this line over and above the cost of a l nle of sufficient size to drain the Avenue A underpass, and; Mom, it is estimated that the total cost to the City will be ap- proximately 7,500- Mii TH=- Oil, BE, IT RMOLVED BY THE CITY CGUISSION OF THE CITY OF LUBBpCK: THAT, the State Highway Department be requested to design and build a storm sewer from the Avenue A underpass of sufficient size to receive the stonri,taters flowing into both the Broadway underpass and Avenue A underpass, and;' 'TT, the City of Lubbock bear that portion of the cost of this storm sewer, over and above the cost of a storm sewer line designed to drain only the Avenue A underpass, and; THAT, this cost will be paid from City of Lubbock storm sewer bond funds. AM,IT IS SO ORDMMG Passed airl approved by the City Commission this the 28th day of Jane , 1951- i ATTZST: a_ Xay0 City ',Secret ax �