RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED
BELOW:
WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the Subdivider of Live Oak Addition, Lots 234 & 235, and
Caprock Addition, Tract G made arrangements with Kerr Construction Company
for the construction of paving improvements on certain streets dedicated
in said subdivision under the provisions of said Ordinance prior to the
recording of the subdivision plat of the above mentioned Additions includ-
ing the following street:
Elgin Avenue from the alley South of 69th Street to and including
Cul-de-sac South of 69th Street designated as new subdivision Unit
2028-92.
AND WHEREAS, the construction of the above improvements on the above -
mentioned street was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in acc-
ordance with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned
street be and the same are hereby -:accepted and the City Engineer be
and he is hereby authorized to notify the ovmer of acceptance by the
Lubbock City Council and amount of final construction cost due the
paving contractor.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 9TH D
AY OF DECEMBER, 1982.
ALA FIEhk*F, Flago-r P Tem
ATTEST-,, y;
E 1yn Ga ga✓,-jCity SZe y
APPROVED S TO CONTENT:
Grt
Don Je ings, i.ty Engineer
APPROVED AS TO FORM:
bhn Ross, Jr., City Atter
r 1 A
CONSOLIDATED FINAL ESTIMATE
LIVE OAK ADDITION, LOTS 234 & 235
and CAPROCK ADDITION, Tract G
Accepted Dec. 9, 1982
UANTITIES
S.Y. S.Y. Alley S.Y. S.Y. L.F.
Unit & Paving L.F. Ret. & Drag. Paving Concrete C & G
Sub -Unit Location 6" Base C & G Channels Removal S1. Remov. Removal
2028-92 Elgin Ave. from Alley
S. of 69th St., to &
including Cul-de-sac
S. of 69th Street 556.85
COST ESTIMATE
556,85 S.Y. Paving 6" Base @ $7.15
318.30
L.F.
Curb & Gutter
@
$6.00
13 5.,67
S.Y.
Alley Return &
Dr.
Channels
@
$22.50
238.08
S.Y.
Paving Removal
@
$;2.50
20.20
S.Y..Concrete
Slab
Removal
@
$ 4.50
143.85
L.F.
C & G Removal
@
$ 4.50
CONTRACT COST
COST DISTRIBUTION
318.30 135.67`
$1 -3; 981.48
$1,909.80
$ 545.20
$ 647.32
$ 10;277.27
238.08 20.20 143.8`
Unit &
Sub -Unit Contract Cost Property Owner Cost City to Contractor
2028-92 $; 0,277.27 $ 1a,_`2-77 27-----------