HomeMy WebLinkAboutResolution - 1273 - Accept Paving Improvements - Kerr Co - Portion Of Elgin Ave - 12_09_1982Resolution 1273 - 12/9/82 rS1'VW'G RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A STREET AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the Subdivider of Live Oak Addition, Lots 234 & 235, and Caprock Addition, Tract G made arrangements with Kerr Construction Company for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of the above mentioned Additions includ- ing the following street: Elgin Avenue from the alley South of 69th Street to and including Cul-de-sac South of 69th Street designated as new subdivision Unit 2028-92. AND WHEREAS, the construction of the above improvements on the above - mentioned street was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in acc- ordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned street be and the same are hereby -:accepted and the City Engineer be and he is hereby authorized to notify the ovmer of acceptance by the Lubbock City Council and amount of final construction cost due the paving contractor. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 9TH D AY OF DECEMBER, 1982. ALA FIEhk*F, Flago-r P Tem ATTEST-,, y; E 1yn Ga ga✓,-jCity SZe y APPROVED S TO CONTENT: Grt Don Je ings, i.ty Engineer APPROVED AS TO FORM: bhn Ross, Jr., City Atter r 1 A CONSOLIDATED FINAL ESTIMATE LIVE OAK ADDITION, LOTS 234 & 235 and CAPROCK ADDITION, Tract G Accepted Dec. 9, 1982 UANTITIES S.Y. S.Y. Alley S.Y. S.Y. L.F. Unit & Paving L.F. Ret. & Drag. Paving Concrete C & G Sub -Unit Location 6" Base C & G Channels Removal S1. Remov. Removal 2028-92 Elgin Ave. from Alley S. of 69th St., to & including Cul-de-sac S. of 69th Street 556.85 COST ESTIMATE 556,85 S.Y. Paving 6" Base @ $7.15 318.30 L.F. Curb & Gutter @ $6.00 13 5.,67 S.Y. Alley Return & Dr. Channels @ $22.50 238.08 S.Y. Paving Removal @ $;2.50 20.20 S.Y..Concrete Slab Removal @ $ 4.50 143.85 L.F. C & G Removal @ $ 4.50 CONTRACT COST COST DISTRIBUTION 318.30 135.67` $1 -3; 981.48 $1,909.80 $ 545.20 $ 647.32 $ 10;277.27 238.08 20.20 143.8` Unit & Sub -Unit Contract Cost Property Owner Cost City to Contractor 2028-92 $; 0,277.27 $ 1a,_`2-77 27-----------