Loading...
HomeMy WebLinkAboutResolution - 1096 - Accept Paving Improvements - WD Tuner - Lots 1328-1345, Meadows Addition - 05_13_1982R -- RESOLUTION 1096 - 5/13/82 RESOLUTION RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of The Meadows Addition, Lots 1328-1345 made arrangements with W. D. Turner Construction Company for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of the above addition including the following streets: East 1/2 of Aberdeen Avenue from its intersection with a line 27 feet North of the North Lip Line of 84th Street to its intersection with a line 7 feet North of the North Property Line of the alley North of 84th Street known and designated as New Subdivision Sub -Unit Number 45 of Unit Number 2028. Slide Road (Alley Return Only) on West side of Slide Road North of 84th Street known and designated as New Subdivision Sub -Unit Number 46 of Unit Number 2028. AND WHEREAS, the construction of the above improvements on the above - mentioned streets was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned streets be and the same are hereby accepted and the City Engineer be and he is hereby authorized to notify the developer of said acceptance and authori- zation of payment to the contractor. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 13TH DAY OF MAY, 19 ATTEST: Evelyn Ga'ffga, . City Sec�fe�ry APPROVED �� TO CONTENT: Don Je tings, 1001 y Engineer APPROVED AS TO FORM: L HENRY- . , 14ayo ro Tem CONSOLIDATED FINAL ESTIMATE THE MEADOWS ADDITION LOTS 1328-1345 Accepted May 13th, 1982 QUANTITIES L. F. C&G Removal S. Y. S. Y. and Unit & Paving L.F. Alley Pavement Sub -Unit Location 6" Base C & G Return Repair 2028-45 East 1/2 of Aberdeen Ave. from 27' N. of NLL of 84th St. to 7' N. of NPL of Alley N. of 84th St. 220.83 123.44 20.20 2028-46 Slide Road (Alley Return Only) on W. side of Slide Road N. of 84th St. 35.42 22.42 34.00 Total 220.83 158.86 42:62.. 34.00 COST DISTRIBUTION Unit & Contract Developer Sub -Unit Cost Cost - 2028-45 $3,189.81 $3,189.81 2028-46 $1,129.99 $1,129.99 Total $4,319.80 $4,319.80 COST ESTIMATE 220.83 S. Y. Paving 6" Base @ $ 8.25 $ 1,821.85 158.86 L. F. Curb & Gutter @ $ 6.50 $ 1,032.59 42.62 S. Y. Alley Return @ $ 28.00 $ 1,193.36 34.00 L. F. C & G Removal and Pavement Repair @ $ 8.00 $ 272.00 �'' CONTRACT COST $ 4,319.80