WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of The Meadows Addition, Lots 1328-1345 made
arrangements with W. D. Turner Construction Company for the construction of
paving improvements on certain streets dedicated in said subdivision under
the provisions of said Ordinance prior to the recording of the subdivision
plat of the above addition including the following streets:
East 1/2 of Aberdeen Avenue from its intersection with a line
27 feet North of the North Lip Line of 84th Street to its
intersection with a line 7 feet North of the North Property
Line of the alley North of 84th Street known and designated as
New Subdivision Sub -Unit Number 45 of Unit Number 2028.
Slide Road (Alley Return Only) on West side of Slide Road North
of 84th Street known and designated as New Subdivision Sub -Unit
Number 46 of Unit Number 2028.
AND WHEREAS, the construction of the above improvements on the above -
mentioned streets was performed under the supervision of the City Engineer,
and said improvements have been completed and have been inspected and found
to have been constructed in accordance with City specifications and in
accordance with the provisions of City Ordinance 1331.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned streets
be and the same are hereby accepted and the City Engineer be and he is
hereby authorized to notify the developer of said acceptance and authori-
zation of payment to the contractor.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 13TH DAY OF MAY, 19
ATTEST:
Evelyn Ga'ffga, . City Sec�fe�ry
APPROVED �� TO CONTENT:
Don Je tings, 1001 y Engineer
APPROVED AS TO FORM:
L HENRY- . , 14ayo ro Tem
CONSOLIDATED FINAL ESTIMATE
THE MEADOWS ADDITION
LOTS 1328-1345
Accepted May 13th, 1982
QUANTITIES
L. F.
C&G
Removal
S. Y.
S. Y.
and
Unit &
Paving
L.F.
Alley
Pavement
Sub -Unit
Location
6" Base
C & G
Return
Repair
2028-45 East 1/2
of Aberdeen Ave.
from 27'
N. of NLL of
84th St.
to 7' N. of NPL
of Alley
N. of 84th St.
220.83
123.44
20.20
2028-46 Slide Road
(Alley Return
Only) on
W. side of Slide
Road N.
of 84th St.
35.42
22.42
34.00
Total
220.83
158.86
42:62..
34.00
COST DISTRIBUTION
Unit &
Contract
Developer
Sub -Unit
Cost
Cost -
2028-45
$3,189.81
$3,189.81
2028-46
$1,129.99
$1,129.99
Total
$4,319.80
$4,319.80
COST ESTIMATE
220.83 S.
Y. Paving 6" Base
@ $
8.25 $
1,821.85
158.86 L.
F. Curb & Gutter
@ $
6.50 $
1,032.59
42.62 S.
Y. Alley Return
@ $ 28.00 $
1,193.36
34.00 L.
F. C & G Removal and
Pavement Repair
@ $
8.00 $
272.00
�''
CONTRACT COST
$
4,319.80