Loading...
HomeMy WebLinkAboutResolution - 2002-R0360 - Purchase Order- Hub City Pavers, Inc. - 09/17/2002Resolution No. 2002—RO360 September 17, 2002 Item No. 38 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock BE and is hereby authorized and directed to execute a Change Order No. 1, to Bid No.122-02/RS with associated documents on behalf of the City of Lubbock for the amended purchase order with Hub City Pavers, Inc. for paving improvements at seven new city parks. Said agreements are attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the Council. Passed by the City Council this 17th day ATTEST: 5P3 D o� Rebecca Garza, City Secretary APPROVED AS TO CONTENT: Randy Truesdell Parks & Recreation Director APPROVED AS TO FORM: 'killiam de Haas Competition and Contract Manager p:ced ChOral-Hub City Nven.r Sept. 9.2M Resolution No. 2002—RO360 CITY OF LUBBOCK CHANGE ORDER CHANGE ORDER #: #1 CONTRACTOR: Hub City Pavers, Inc. DATE: August 26, 2002 CITY OF LUBBOCK BID#: 122-02IRS PROJECT NAME: CiN of Lubbock Paving Improvements at Seven New City Parks Description of change caused by conditions encountered during construction not covered by the specifications and drawings of the project: The Parks and Recreation Department has determined that a significant savings will be realized by adding additional work to this contract. The savings will be realized by having Hub City Pavers. Inc.. perform concrete work on site for seven (7) 40' x 40' multi- purpose courts and additional interior walks. As an example, the cost of the courts added to this bid will be $25,760.00 due to the economy of scale, compared to Previous bid of $50,682.90 for similar work. We recommend the acceptance of this Change Order based on the real cost savings. Note: Addition of 45 working days with this Change Order ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $ 624,671.15 B. AMOUNT OF THIS CHANGE ORDER: Council appmval2eulnrellover$25,,000 $'127,915.49 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): 20.48 % D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 000.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B-D): $ 0B9.90 I„1.79ii', f) F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A):26%me.. 26.48 % G. NEW CONTRACT AMOUNT(A+E): $752,586.64 This.Chan e0nderisnotvalitl without thefollowln sf natures: V l-771ov R1211V COMRA OR P DOJE �R TECTIENGINEER APpmv as to Form: 6'L 4'Z4 — ? l Uz 1' ER R R BEN A 'William de Haas, onbe, Manager/Allomey V< i n �p� (- _(L l&A_�L- Victor Kilmer, Pu rasing Manager Bob Cass, City Manager Change Orders over $preul a followIng signatures: i CITY LUBBOC i ATTEST: 9/17 /02 1 9 /17 /02 /Ifyirc McDougal, Rebecca Game, City ecreWl PUR-045 (Rev 12101) City of Lubbock Paving Improvements at Seven New City Parks Bid No:122-021RS Days for completion; 90 working days Change Order #1 Add Interior walks- concrete ea. totals unit cost total cost Stroll 745 2 980 $ 2.23 $ 6,645.40 Underwood 745 2 980 $ 2.23 $ 6,645.40 Rea an ri 745 2,980 $ 2.23 $ 6.645.40 Sims 745 2.980 $ 2.23 $ 6,645.40 Lo ez 745 2,980 $ 2.23 $ 6.645.40 Cooke 1 1 1,8061 1 808 $ 2.23 1 $ 4,027.38 Duren 2 745 1,490 $ 2.23 $ 3,322.70 Sub otall $ 40,577.08 Add Interior walks- earthwork units In/ft ea. total In/it unit cost total cost Strona 4 112 448 T 6.00 2 696.00 Underwood 4 112 448 $ 6.00 $ 2,688.00 Reagan 4 112 448 $ 6.00 $ 2.688.00 Sims 4 112 448 $ 6.00 $ 2,688.00 Lopez 4 112 448 $ 6.00 $ 2688.00 Cooke 11 1,2001 1200 $ 6.00 1 $ 7,200.00 Duran 2 112 224 S 6.0013 1,344.00 Sub Total $ 21,992.00 Add Concrete Courts w/ sand unit cost total cost Strong $ 2.30 $ 3,680.00 Underwood S 2.30 $ 3.680.00 Rea an F;1,600 $ 2.30 $ 3.680.00 Sims S 2.30 $ 3 680.00 Lo ez $ 2.30 $ 3,680.00 Cooke 1,600 $ 2.30 1 $ 3.680.00 Duran 1 1,600 $ 2.301 $ 3,680.00 Sub Total 1 $ 25,760.00 McAlister Park Parking total units unit cost total ADA rem ea. 4 $ 200.00 $ 800.00 curb 8 utter In/ft 467 $ 6.25 $ 2,918.75 4" concrete s /ft 2 537 $ 2.23 $ 5,657.51 6" road base s / d 5.840 $ 6.38 $ 37,260.82 Sub Total $ 46.636.88 Deduct Sand total units unit cost total all 4" & 6" concrete placement 100.721 $ 0.07$ 7,050.47 Sub Total 7.050.47 Change Order Amount Contract Amount Percent of Contract Additional working days for completion Remaining 5% available for Change Orders New Contract Amount Grand Total $ 127,91SA9 $ 624.671.15 20% 45 $ 28,252.30 $ 752.586.64 McAlister Park Parking Contract w/ Lone Star Dirt and Paving units unit cost total two course seal coat 5,840 $ 1.30 7,592.29 Sub Total $ 7,592.29