HomeMy WebLinkAboutResolution - 2022-R0328 - Downtown Façade Grant to LBB Hwy 84 at 1704 Marsha SharpResolution No. 2022-R0328
Item No. 5.17
July 26, 2022
RESOLUTION
WHEREAS, pursuant to Article IV, Section 5 of the Amended and Restated Bylaws of the
Market Lubbock Economic Development Corporation (the "Corporation"), the City Council
of the City of Lubbock (the "City Council"), as the Corporation's authorizing unit, has the
authority to approve all programs and expenditures of the Corporation; and
WHEREAS, the City Council finds that it is in the best interest of the public to approve the
program or expenditure, as proposed to the City Council by the Corporation, as set forth in
Exhibit "A" attached hereto and incorporated herein by reference; NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Downtown Fagade Grant program or expenditure of the Corporation, in the
amount set forth in Exhibit "A" attached hereto and incorporated herein by reference, to be
provided to LBB Hwy 84, LLC, is hereby approved pursuant to Section 5 of the Amended
and Restated Bylaws of the Corporation.
Passed by the City Council on
ATTEST:
Rebec6aGarza, City Secktaj
APPROVED AS TO C NT:
Brianna Gerardi, Busine elopment Director
APPROVED AS TO FORM:
1/& - Awae�
elli Leisure, Assistant City Attorney
ccdocs/RES. Market Lubbock DT Facade Expenditure — LBB Hwy 84
6.30.22
July 26, 2022
Resolution No. 2022-RO328
RE 22-39
RESOLUTION APPROVING
LBB HWY 84. LLC
DOWNTOWN PERMITTABLE GRANT AND FACADE GRANT - AT 1704 MARSHA SHARP FREEWAY
THE STATE OF TEXAS
5K�If1�i�Y���i
At a regular meeting of the Board of Directors of MARKET LUBBOCK ECONOMIC DEVELOPMENT
CORPORATION, INC., a Texas nonprofit corporation (MLI), on Wednesday. June 29, 2022, held in conformity with the
bylaws, after due notice as therein provided, a quorum being present and acting. the following resolution was unanimously
adopted:
WHEREAS. MLI presented to members of the Board the proposal of a possible Economic Development Grant and Contract
to LBB Hwy 84, LLC, known as Baywood Hotels, is building a new Home 2 Suites by Hilton hotel at 1704 Marsha Sharp
Freeway, which is located in the Downtown TIF. Baywood Hotels is one of the nation's fastest growing, privately owned hotel
companies, with over $1 Billion in assets. The key to Baywood's success as managers, employers and developers is their ability
to continually offer some of the most innovative solutions in the hotel industry. There are three Baywood properties currently
in Lubbock, which include Residence Inn Lubbock in the University Area, Residence Inn Lubbock -Southwest, and Tru by
Hilton Lubbock Southwest.
The scope of facade and permittable work will include the building a a new Hone 2 Suites by Hilton totaling $13,554,540
in expenses.
The terms and conditions of such Economic Development Grant and Contract, other than the normal terms and
conditions applicable to all such Economic Development Grant and Contracts by the Corporation, are described generally as
follows, to wit:
Grant LBB Hwy 84. LLC at 1704 Marsha Sharp Freeway a Downtown Facade Grant totaling $25,000 and a Downtown
Permittable Grant for $100,000, which is located in the Downtown TIF, once proof of payment has been submitted.
WHEREAS. The Board of Directors of MLI finds that an Economic Development Grant and Contract offering the
incentive for providing assistance for renovations to their property, meet and compl) with the qualifications and purposes of the
Corporation for the granting of such Economic Development Grants and Contracts.
Upon Motion by Director, Mr. Walter Cathey, and Seconded by Director, Mr. James Conwri,ht.
IT WAS RESOLVED that MLI offer and, if accepted by Recipient, enter into an Economic Grant and Contract with
LBB Hwy 84, LLC. for improvements to the property at 1704 Marsha Sharp Freeway, Lubbock, Texas. This Economic
Development Grant and Contract will be on the normal terms and conditions of such Downtown Grant Program and Contract
offered by MLI to existing businesses and business prospects and authorize the CEO to enter into and execute all documents
related to the Economic Grant and Contract.
John Osborne, President & CEO
Linda Davis, Secretary
MARKET LUBBOCK, INC. - DOWNTOWN GRANT PROGRAM
1704 Marsha Sharp Freeway
(LBB Hwy 84, LLC)
TOTAL SCOPE OF WORK = $13,554,540
TOTAL GRANTS = $125,000
TOTAL FACADE SCOPE OF WORK = $50,000
FACADE GRANT = $25,000
TOTAL PERMITTABLE SCOPE OF WORK = $13,504,540
PERMITTABLE GRANT = $100,000
M A R K E T
Downtown Grant Program
Presented to MLI Board
June 29, 2022
Project 1704 Marsha Sharp Freeway (FaVade & Permittable)
LBB Hwy 84, LLC, via Baywood Hotels, is building a new Home 2 Suites by Hilton hotel at 1704 Marsha
Sharp Freeway, located in the Downtown TIF.
Baywood Hotels is one of the nation's fastest growing, privately owned hotel companies, with over $1
billion in assets. The key to Baywood's success as managers, employers and developers is their ability to
continually offer some of the most innovative solutions in the hotel industry. There are three Baywood
properties currently in Lubbock..... Residence Inn Lubbock -University Area, Residence Inn Lubbock -
Southwest and Tru by Hilton Lubbock Southwest.
The scope of fagade and permittable work will include the building of a new Home 2 Suites by Hilton
totaling $13,554,540 in expenses.
The MLI Board is being asked to consider a Downtown Fagade Grant of $25,000 and a Downtown
Permittable Grant of $100,000 for LBB Hwy 84, LLC at 1704 Marsha Sharp Freeway.
LUBBOCK.
Downtown Grant - Application
The information requested on this form will be used by Market Lubbock, Inc. for analysis of your project.
MLI CONTACT INFORMATION
Jorge Quirino - Director of Downtown & Special Project: Phone: 806.749.4500
Market Lubbock, Inc.
1500 Broadway, Sixth Floor, Lubbock, TX 79401 Email: iorge(Mmarketlubbock.org
Date Initial Application Submitted (Due prior to start of construction or permits assigned) 06/14/22
Projected Project Start Date I September 1 st - Slated Construction stard date
Project Property Address
Property LCAD R#
GENERAL INFORMATION
1704 Marsha Sharp Freeway (formerly 310 Ave Q)
38640
Company Name LBB Hwy 84, LLC Contact BJ Patel
Street Address 7300 Blanco Road, Suite 701 Title Vice President
City, State, Zip San Antonio, TX 78216 Phone 210 317 7472
Email bi.patel@bavwoodhotels.com
INFORMATION ABOUT THE PROJECT
Property Ownership: Own 0 Lease F--1 Grant Type: PermittableFacade 0
are building a Home 2 Suites by Hilton on this land which once housed a run down old motel. Room count
Summary of Expenses (detailed bids attached)
Projected
MLI Approved
Facade
$50,000
$25,000
Permittable
$13,504,540
$100,000
$0
$0
TOTALI
$13,554,540
$125,000
Final bids will be used to calculate the project cost and grant amount.
COMPANY BACKGROUND
List any person or entity that has at least 5% ownership in the Applicant Company:
Name Percent Name Percent
Subodh Patel 1 50% INick Naik 50%
Is the firm registered with the Secretary of State's Office to do business in Texas? Yes IW
Are you in good standing with the State of Texas? Yes IV
If you answered "No" to either of the above two questions, please explain
Is the firm and/or principals delinquent on any federal, state or local tax obligations? No
Has the company or principals of the company had prior bankruptcies or lawsuits? No
If you answered "Yes" to either of the above two questions, please explain
MLI 3.8.21
Is the firm receiving tax revenue from any government agency? No Wr
APPLICANT'S CHECKLIST:
Initial application received by MLI prior to the start of construction and/or before permits are assigned
All remaining documents must be received and an application packet presented to the MLI Board no Q
more than three months after the initial application is received by MLI.
Contact Brianna Gerardi, City Director of Development bgerardi@mylubbock.us , to determine:
Does the scope of work meet downtown standards and guidelines? 0
Are permits required for any aspect of the scope of work? Q
Are public improvements required? Q
Documents Required for Final Grant Application
Copies of City permits, if applicable Q
Detailed/Itemized Bids Q
Before Pictures 0
Copy of building's current certificate of occupancy (request at El
Architectural Renderings (if applicable) Q
Architectural Plans (if applicable) Q
After Completion of Construction
Certificate of Occupancy or Similar City Document Approving Q
Completion (Applicant responsible for final scope of work matching
approved scope)
Proof of Payment:
PAID Invoices (must reference the approved project) Q
Processed Checks, Bank or Credit Card Statements Q
matching PAID invoices (legible copies)
Signature (not required for electronic submittals): BJ Patel via email
Date: 6/14/2022
K
MLI 3.8.21
. -ib"
I-ML-
7-1
..........
25
?"-IONWAI —,"Now
00
Lw HOME
HO
DD&B
CONSTRUCTION
HOME2 SUITES - LUBBOCK, TX
05/04/2022
EXHIBIT - A
BID PROPOSAL
PROJECT NAME - Home2 Suites by Hilton
PROJECT LOCATION - Lubbock, TX
DIV
DESCRIPTION
Final proposal
1
General Conditions
General Conditions
$ 675,000.00
Postage/Shipping
$ 2,000.00
Temp Labor
$ 51,520.00
Temporary heating
$ 10,000.00
Project security
$ 45,000.00
Misc. Expenses
$ 35,100.00
Equipment Rental
$ 70,000.00
Travel / Stay / Rental expenses
$ 50,000.00
Job Trailer
$ 21,000.00
Storage Conex
$ 7,000.00
Temp Water
$ 12,000.00
Temp Electric
$ 38,000.00
Temp Fence
$ 18,000.00
Portable toilets
$ 14,100.00
Waste Management and Dumpster
$ 60,000.00
General project cleaning
$ 20,000.00
Blueprint and Copies
$ 3,000.00
Safety
$ 5,000.00
Street Sweeping
$ 18,000.00
Final Cleaning
$ 48,000.00
2
Site Work
Survey
$ 23,000.00
Testing
$ 30,000.00
Demo
NIC
Sitework
$ 225,000.00
Underground Utilities - Sewer, Water, FL, SD
$ 180,000.00
Asphalt Paving
$ 256,300.00
Striping & signage
$ 8,000.00
Landscaping & Irrigation Allowance
$ 95,000.00
Erosion Control
$ 20,000.00
Termite control @ slab
$ 3,000.00
Bike Racks
$ 1,500.00
DD & B Page 1 Owner
rrr D D & B
�1 CONSTRUCTION
HOME2 SUITES - LUBBOCK, TX
05/04/2022
3
Concrete
Building Concrete
$ 279,000.00
Site Concrete
$ 196,000.00
Gyperete
$ 140,000.00
4
Masonry
CMU @ Dumpster, Storage & Pool Wall
$ 75,000.00
Block Wall
Ind above
S
Metals
Structural Steel
$ 175,300.00
Misc Steel (elevator steel, bollards, dumpster gates, handrail etc)
$ 50,000.00
Metal Fence at Pool
$ 18,000.00
Beacon Glass Steel Allowance
$ 5,000.00
6
Woods And Plastics
Framing & Trusses - Material & Labor
$ 2,378,520.00
Blocking & Misc framing
Ind in Framing
Guest Room Millwork & Tops - Material
NIC
Public area Millwork & Tops (Mat & Install)
$ 122,000.00
7
Thermal & Moisture Protection
Building Insulation
$ 285,000.00
EIFS
$ 390,000.00
Exterior Wall Tile
$ 14,000.00
TPO Roofing
$ 256,000.00
Fire stopping
$ 25,000.00
8
Doors & Windows
Doors, Frames & hardware
$ 240,000.00
Doors & hardware - Labor
$ 112,000.00
General carpentry
$ 75,000.00
Shower doors material
$ 65,000.00
Shower doors install
$ 42,000.00
Automatic Entry Doors
$ 22,000.00
Aluminum Windows & Louvers
$ 160,000.00
Aluminum Storefronts
$ 52,000.00
Electronic Lockset - Mat & Install
$ 60,000.00
9
Finishes
Drywall- Material & install Tape, texture
$ 850,000.00
Flooring Material Allowance
$ 140,000.00
Flooring Install
$ 243,000.00
FRP
$ 7,000.00
Acoustical Tile Ceiling System
$ 30,000.00
DD & B Page 2 Owner
DD&B
� CONSTRUCTION
HOME2 SUITES - LUBBOCK, TX
05/04/2022
Painting
$ 192,000.00
Vinyl Wall Covering Installation
$ 85,000.00
10
Specialties
Toilet and Bath Accessories - Material
$ 30,000.00
Toilet and Bath Accessories - Labor
$ 16,800.00
Tub surround - Material
$ 65,000.00
Tub surround - Install
$ 30,800.00
BOH Shelving allowance
$ 10,000.00
Corner Guards - Mat & labor
$ 9,000.00
Toilet partitions - Material & Labor
N/A
Fire extinguishers
$ 10,000.00
Mirrors at Gym
$ 4,500.00
Flagpole - Material & Install
$ 4,000.00
BBQ Grill - Material & Labor
$ 14,000.00
Fire Pit - Material & Labor
$ 7,500.00
Wood Fence around Mechanical Units
$ 3,000.00
Stainless Steel Crane Guardrail : 7/SP-2 - Material & Install
$ 500.00
Proposed Gate per CO3.0 Allowance
$ 3,000.00
Screen Wall per CO3.0 Allowance
$ 16,500.00
Porte Cochere Stained Wood Trellis
$ 10,000.00
String Lights for Porte Cochere
$ 500.00
Beacon Glass
$ 38,500.00
11
Equipment
NIC
12
Furnishing
FF & E Installation
$ 149,400.00
Interior Signage Install
Incl above
13
Special Construction
Swimming Pool
$ 125,000.00
14
Conveying Systems
Laundry Chute
$ 17,500.00
Elevators: 2 Each
$ 241,000.00
IS
Mechanicals
Plumbing
$ 1,100,000.00
HVAC
$ 750,000.00
PTAC
$ 178,000.00
Verdant Thermostats
$ 23,000.00
16
Electrical
DD & B Page 3 Owner
rr-F DSD & B
CONCTION
-I nun nrvnc.rarHI -
HOME2 SUITES - LUBBOCK, TX
05/04/2022
Electrical
$ 1,094,000.00
Electric light fixtures Allowance
$ 140,000.00
Automatic Fire Sprinkler
$ 155,000.00
Fire pump Allowance
$ 40,000.00
Fire Alarm & Monitoring
$ 95,000.00
Low Data, TV & Cable
$ 86,500.00
CCTV Rough In Allowance
$ 5,000.00
Music System Rough In Allowance
$ 3,200.00
GC Overhead and Profit
$ 250,000.00
TOTAL BUDGET
$ 13,554,540.00
DD & B Page 4 Owner
rrF DD &B
CONSTRUCTION
c.rn1 ruurruru nun nn•na,rar nr .naura
HOME2 SUITES - LUBBOCK, TX
05/04/2022
EXHIBIT - B
DRAWING LOG
HOME2 SUITES -MARSHA SHARP FREEWAY & AVENUE Q, LUBBOCK, TX-79401
SHEET #
SHEET NAME
DATE: REV. #
CIVIL
C01.0
COVER SHEET
01/31/22
C01.1
GENERAL NOTES
01/31/22
CO2.0
ALTA / ACSM SURVEY (BY OTHERS)
07/12/21
CO2.1
DEMOLITION PLAN
01/31/22
CO3.0
SITE PLAN
01/31/22
CO3.1
STAKING PLAN
01/31/22
CO3.2
HARDSCAPE DETAILS 1
01/31/22
CO3.3
HARDSCAPE DETAILS II
01/31/22
C04.0
UTILITY PLAN
01/31/22 -
004.1
UTILITY DETAILS 1
01/31/22
C04.2
UTILITY DETAILS II
01/31/22
C04.3
PIPE PROFILES
01/31/22 -
CO5.0
GRADING AND DRAINAGE PLAN
01/31/22
COSA
EXISTING DRAINAGE AREAS
01/31/22
C05.2
PROPOSED DRAINAGE AREAS
01/31/22
C06.0
EROSION CONTROL PLAN
01/31/22 -
006.1
EROSION CONTROL DETAILS
01/31/22
LS100
LANDSCAPE PLANTING PLAN
11/15/21
LS500
LANDSCAPE PLANTING DETAILS
11/15/21
LS501
LANDSCAPE PLANTING SPECIFICATIONS
11/15/21
LI100
IRRIGATION PLAN
11/15/21
LI500
IRRIGATION DETAILS
11/15/21
ARCHITECTURAL
CS-1
COVER SHEET
01/31/22
CS-2
PROJECT AND CODE DATA
01/31/22
CS-3
GENERAL NOTES, LEGENDS, ABBREVIATIONS
01/31/22
SP-1
ARCHITECTURAL SITE PLAN
01/31/22
SP-2
POOL / PATIO AREA PLAN & ELEVATION
01/31/22
SP-3
POOL AREA - SECTION & DETAILS
01/31/22
SP-4
DUMPSTER ENCLOSURE PLAN & DETAIL
01/31/22 -
SP-5
PORTE COCHERE PLAN, RCP & ROOF PLAN
01/31/22
A-0.1
FIRE RATED ASSEMBLIES: INDIVIDUAL ENCASEMENT 1
01/31/22
A-0.1.1
FIRE RATED ASSEMBLIES: INDIVIDUAL ENCASEMENT II
01/31/22
A-0.2
FIRE RATED ASSEMBLIES: WALLS 1
01/31/22
A-0.2.2
FIRE RATED ASSEMBLIES: WALLS III
01/31/22
A-0.3
FIRE RATED ASSEMBLIES: HORIZONTAL 1
01/31/22 -
A-0.4
FIRE RATED ASSEMBLIES: FLOOR / CEILING PENETRATIONS
01/31/22 -
DD & B Page 5 Owner
rrr D D & B
CONSTRUCTION
HOME2 SUITES - LUBBOCK, TX
05/04/2022
A-0.5
ACCESSIBILITY: STANDARD DETAILS 1
01/31/22 -
A-0.5.1
ACCESSIBILITY: STANDARD DETAILS II
01/31/22 -
A-0.5.2
ACCESSIBILITY DETAILS: MISCELLANEOUS
01/31/22 -
A-0.5.3
ACCESSIBILITY: PLUMBING FIXTURE DETAILS
01/31/22 -
A-0.5.4
ACCESSIBILITY DETAILS: ELEVATORS
01/31/22 -
A-0.7
WALL TYPES & FLOOR / CEILING / ROOF TYPES
01/31/22 -
A-1.1
FLOOR PLAN: LEVEL 1
01/31/22 -
A-1.2
FLOOR PLAN: LEVEL 2
01/31/22 -
A-1.3
FLOOR PLAN: LEVEL 3
01/31/22 -
A-1.4
FLOOR PLAN: LEVEL
01/31/22 -
A-2.1
ROOF PLAN
01/31/22 -
A-2.2
ROOF DETAILS
01/31/22 -
A-3.1
REFLECTED CEILINGS PLAN: LEVEL 1
01/31/22 -
A-3.1
REFLECTED CEILINGS PLAN: LEVEL 2
01/31/22 -
A-4.1
EXTERIOR ELEVATIONS 1
01/31/22 -
A-4.2
EXTERIOR ELEVATIONS II
01/31/22 -
A-5.1
BUILDING SECTIONN: TRANSVERSE
01/31/22 -
A-5.2
WALL SECTIONS: EXTERIOR WALLS
01/31/22 -
A-5.3
WALL SECTIONS: EXTERIOR WALLS
01/31/22 -
A-5.4
WALL SECTIONS: INT. FIRE PARTITION & FIRE BARRIER WALLS
01/31/22 -
A-5.5
STAIR "A" PLANS & SECTIONS
01/31/22 -
A-5.6
STAIR "B" PLANS & SECTIONS
01/31/22 -
A-5.7
STAIR DETAILS
01/31/22 -
A-5.8
BUILDING SHAFTS PLANS & SPECIFICATIONS
01/31/22 -
A-5.9
PLAN DETAILS
01/31/22 -
A-5.10
SECTION DETAILS - PARAPETS
01/31/22 -
A-5.11
SECTION DETAILS - FLOOR / WALL INTERSECTIONS
01/31/22 -
A-5.12
MISCELLANEOUS DETAILS
01/31/22 -
A-6.1
LOBBY AREA FLOOR PLAN
01/31/22 -
A-6.1A
LOBBY AREA - FURNITURE & EQUIPMENT PLAN
01/31/22
A-6.2
LOBBY AREA REFLECTED CEILING PLAN
01/31/22 -
A6.SA
GUEST UNIT INDEX 1
01/31/22 -
A6.5B
GUEST UNIT INDEX II
01/31/22 -
A6.6
GUEST UNIT PLANS: 'A' KING STUDIO
01/31/22 -
A6.7
GUEST UNIT PLANS:'Al' TUB &'Ala' RIS M.F. KING STUDIO
01/31/22 -
A6.8
GUEST UNIT PLANS: 'B' & 'B3' Q/Q STUDIO
01/31/22 -
A6.9
GUEST UNIT PLANS:'Bl' M.F. & CONNECTING Q/QSTUDIO
01/31/22 -
A6.30
GUEST UNIT PLANS: 'B2' CONNECTING Q/Q STUDIO
01/31/22 -
A6.11
GUEST UNIT PLANS:'84' Q/QSTUDIO
01/31/22 -
A6.12
GUEST UNIT PLANS:'C' KING ONE BEDROOM
01/31/22 -
A6.13
GUEST UNIT PLANS:'Cla' M.F. RIS + C.F. 1 BEDROOM KING
01/31/22 -
DD & B Page 6
Owner
NSD&B C N
�rni a... ,nun,," c,r.."Nr'. -ra
A6.14 GUEST UNIT PLANS: 'C2' KING ONE BEDROOM
A6.15 GUEST UNIT PLAN & ELEVATIONS
A6.16 GUEST BATHROOMS: ELEVATIONS
HOME2 SUITES - LUBBOCK, TX
05/04/2022
01/31/22 -
01/31/22
01/31/22 -
A-7.0
TOILET ACCESSORIES SCHEDULE
01/31/22 -
A-7.1
INTERIOR ELEVATIONS, PLAN & DETAILS: PUBLIC BATHROOMS
01/31/22 -
A-7.2
INTERIOR ELEVATIONS: LOBBY & CORRIDOR
01/31/22 -
A-7.3
INTERIOR ELEVATIONS & DETAILS: PUBLIC AREAS / BOH
01/31/22 -
A8.1
DOOR HARDWARE SCHEDULES & NOTES
01/31/22 -
A8.2
WINDOW SCHEDULE
01/31/22 -
A-9.1
CASEWORK: BREAKFAST COUNTER AND SERVERY
01/31/22 -
A-9.2
CASEWORK: BREAKFAST COUNTER AND BUSSING STATION
01/31/22 -
A-9.3
CASEWORK: MEDIA WALL & COFFEE BAR
01/31/22 -
A-9.4
CASEWORK: MEDIA WALL & COFFEE BAR, DISH RECOVERY & H2 MARKET
01/31/22 -
A-9.5
CASEWORK: FRONT DESK
01/31/22 -
A-9.6
CASEWORK: BUSINESS CENTER A, GUEST LAUNDRY & VANITY
01/31/22 -
A-9.7
CASEWORK: BUSINESS CENTER "OPTION B"
01/31/22 -
A-9.8
CASEWORK: WINDOW PERCH
01/31/22 -
A-9.9
CASEWORK: WORK STAT., MGR, WORK SURFACE, & EMPLOYEE BREAK RM
01/31/22 -
A-9.10
CASEWORK: HOUSE LAUNDRY, ENG. OFFICE, & SALES OFFICE
01/31/22 -
STRUCTURAL
INDEX
INDEX
01/31/22 -
FD-1.0
GENERAL STRUCTURAL NOTES
01/31/22
FD-2.0
STATEMENT OF SPECIAL INSPECTIONS
01/31/22
FD-3.0
FOUNDATION TYPICAL DETAILS
01/31/22
FD-3.1
FOUNDATION FOOTING DETAILS
01/31/22
FD-4.0
FORMING PLAN
01/31/22
FD-4.1
HOLD-DOWN PLAN
01/31/22
FD-4.2
REINFORCEMENT PLAN
01/31/22
FD-5.0
SUPPLEMENTAL TYPICAL DETAILS
01/31/22
GSN-1
GENERAL STRUCTURAL NOTES FRAMING
01/31/22
GSN-2
GENERAL STRUCTURAL NOTES FRAMING
01/31/22
FR-0.1
FRAMING TYPICAL DETAILS
01/31/22 -
FR-0.2
FRAMING TYPICAL DETAILS
01/31/22 -
FR-0.3
FRAMING TYPICAL DETAILS
01/31/22 -
FR-0.4
FRAMING TYPICAL DETAILS
01/31/22 -
FR-0.5
FRAMING TYPICAL DETAILS
01/31/22 -
FR-0.6
FRAMING TYPICAL DETAILS
01/31/22 -
FR-0.7
FRAMING TYPICAL DETAILS
01/31/22 -
FR-1.1
1ST FLOOR CEILING PLAN
01/31/22 -
FR-1.2
2ND FLOOR CEILING PLAN
01/31/22 -
FR-1.3
3RD FLOOR CEILING PLAN
01/31/22
FR-1.4
4TH FLOOR CEILING PLAN
01/31/22
FR-1.5
ROOF PLAN
01/31/22
SW-1.1
1ST FLOOR SHEAR WALL PLAN
01/31/22 -
DD & B Page 7 Owner
r�� C CONSTRUCTION
HOME2 SUITES - LUBBOCK, TX
05/04/2022
SW-1.2 2ND FLOOR SHEAR WALL PLAN
SW-1.3 3RD FLOOR SHEAR WALL PLAN
SW-1.4 4TH FLOOR SHEAR WALL PLAN
01/31/22 -
01/31/22
01/31/22 -
MECHANICAL
M-1.1
FIRST FLOOR PLAN H.V.A.C.
01/31/22
M-1.2
SECOND FLOOR PLAN H.V.A.C.
01/31/22
M-1.3
THIRD FLOOR PLAN H.V.A.C.
01/31/22
M-1.4
FOURTH FLOOR PLAN H.V.A.C.
01/31/22
M-1.5
ROOF PLAN H.V.A.C.
01/31/22
M-2.1
H.V.A.C. SCHEDULES
01/31/22
M-3.1
H.V.A.C. DETAILS
01/31/22
M-3.2
H.V.A.C. DETAILS
01/31/22
PLUMBING
P-0.0
PLUMBING SCHEDULES, LEGENDS & SPECIFICATIONS
01/31/22
P-0.1
PLUMBING DETAILS
01/31/22
P-0.2
PLUMBING DETAILS
01/31/22
P-0.3
PLUMBING SCHEDULES & DETAILS
01/31/22
P-0.4
PLUMBING SCHEDULES & DETAILS
01/31/22
P-1.1
PLUMBING WASTE AND VENT LEVEL # 1
01/31/22
P-1.2
PLUMBING WASTE AND VENT LEVEL # 2
01/31/22
P-2.1
PLUMBING WATER AND GAS LEVEL # 1
01/31/22
P-2.2
PLUMBING WATER AND GAS LEVEL # 2
01/31/22
P-2.3
PLUMBING WATER AND GAS LEVEL # 3
01/31/22
P-2.5
PLUMBING ROOF PLAN
01/31/22
P-3.1
PART PLANS WASTE AND VENT
01/31/22
P-3.1A
PART PLANS WATER AND GAS
01/31/22
P-3.2
UNIT PLANS PLUMBING
01/31/22 -
P-4.1
RISERS WASTE AND VENT
01/31/22
FIRE PROTECTION
FP-0.1
FIRE PROTECTION SPECIFICATIONS AND LEGENDS
01/31/22
FP-0.2
FIRE SPRINKLER DETAILS
01/31/22 -
FP-1.1
FIRE SPRINKLER FLOOR PLAN LEVEL 1
01/31/22
FP-1.2
FIRE SPRINKLER UPPER FLOOR PLAN
01/31/22
FP-1.3
FIRE SPRINKLER ROOF PLAN
01/31/22
ELECTRICAL
E-0.1
ELECTRICAL LEGENDS, SCHEDULES AND NOTES
01/31/22
E-0.2
SITE PLAN ELEATRICAL
01/31/22
E-0.2A
PHOTOMETRIC PLAN ELECTRICAL
01/31/22
E-0.3
RISER DIAGRAM ELECTRICAL
01/31/22 -
E-1.1
LEVEL ONE LIGHTING PLAN ELECTRICAL
01/31/22
E-1.2
LEVEL TWO LIGHTING PLAN ELECTRICAL
01/31/22
E-2.1
LEVEL ONE POWER PLAN ELECTRICAL
01/31/22
E-2.2
LEVEL TWO POWER PLAN ELECTRICAL
01/31/22
E-2.5
ROOF POWER PLAN ELECTRICAL
01/31/22
E-3.1
PART PLANS ELECTRICAL
01/31/22
DD & B Page 8 Owner
rrr
D D & B
HOME2 SUITES - LUBBOCK, TX
CONSTRUCTION
,,.�. nerrre,ry ,wn nnn<,r.uHi .n.�u.n
05/04/2022
E-3.1A
PART PLANS ELECTRICAL
01/31/22 -
E-3.2
UNIT PLANS ELECTRICAL
01/31/22 -
E-3.2A
UNIT PLANS ELECTRICAL
01/31/22 -
E-3.3
ELEVATOR PLAN ELECTRICAL
01/31/22 -
E-4.1
PANEL SCHEDULES ELECTRICAL
01/31/22 -
E-4.2
PANEL SCHEDULES ELECTRICAL
01/31/22 -
E-4.3
LOAD SUMMARY ELECTRICAL
01/31/22 -
DD & B Page 9 Owner
rrr DD & B CONSTRUCTION
c n�. rreur� nn,u n..�n rx vr. nr..urr r <n,va•r <
HOME2 SUITES - LUBBOCK, TX
05/04/2022
EXHIBIT - C
CONSTRUCTION CLARIFICATIONS
CLARIFICATIONS
1 Temporary utilities including temporary fence, job trailer, portable toilets, cleaning are included
2 Survey included for control & project limits, building layout, building pad layout, grid lines, retaining walls
3 Price does not include any certified easement survey and final ALTA survey
4 Cost for material testing, special inspections and 3rd party inspections included as allowance
5 Demo per sheet CO2.1 is assumed to be done by the Owner and hence not considered in this proposal
6 Removal or relocation of utilities per note 8 on sheet CO2.1 to be coordinated by the Owner
7 Price includes striping existing soils to a subgrade elevation per the grading plan
8 No hazardous materials, unsuitable soils or unknown conditions are considered in this proposal
Any tree mitigation is excluded and to be paid by the owner
10 No asbestos survey is included and any work associated with asbestos abatement not included
11 Scarify the subgrade, moisture condition and compact to a minimum of 95% standard proctor
12 All the scope listed to be done by the Utility Company on sheet C04.0 is not included in our proposal
13 Domestic water line, irrigation line, fire line & sewer line included
14 No street repair is included as all the utilities will be tied in from the property line
15 Backflow preventers included as allowance as no details have been provided
16 Any and all work noted to be done by others is not included in our proposal
17 No traffic control plan provided, hence included as an allowance
18 Price includes termite treatment for foundation only
19 Landscaping and Irrigation included
20 All planters to be supplied and installed by owners
21 Light duty pavement areas are considered with 9" aggregate base and 2" of HMAC
22 Heavy duty pavement areas are considered with 10" aggregate base and 2.5" of HMAC
23 No bike racks shown, hence not included
24 Stamped concrete included at the entry porte cochere area
25 Stained concrete included for front and back outdoor patio lounge
26 All curbs considered to be poured monolithically with the paving
27 No pavers are considered in this proposal
28 5" slab on grade included
29 Includes 3/4" levelrock gyperete and no sound mat is considered
30 No design / sections provided for the block wall shown on sheet CO3.0, hence we have considered split face CMU wall
31 Dumpster & outdoor storage is considered to be W tall CMU wall with EIFS finish on the exterior and paint on the interior
32 Structural Steel columns and beams included
33 Steel for Beacon Glass is included as allowance as plans do not call out for any details
34 We have included primer painting for all steel and no galvanisation is considered
35 No mechanical screens shown for rooftop equipment, hence not included
36 Includes all exterior, interior wood framing, trusses, exterior sheathing and blocking as necessary
37 Wood blocking included in the guestrooms for headboards, mirrors, TV units, toilet accessories
38 Guestroom millwork / FF&E including kitchen wall, vanity, mirrors in bathroom to be procured by owner & installed by GC
39 Guestroom appliances to be procured and installed by owner
40 Public area FF&E to be supplied by owner and installed by GC
41 Public area millwork to be procured and installed by GC
42 GC is not responsible for quantifying materials on any owner furnished items
43 DD&B excluded receiving, unloading, storing and securing any Owner Furnished / Owner Installed items
44 Any site / patio / pool furniture, portable planters, benches or sculptures are excluded
45 All window sills to procured by owner and installed by GC
DD & B Page 10 Owner
rrr D D & B
CONSTRUCTION
+rarn,
HOME2 SUITES - LUBBOCK, TX
05/04/2022
46 All window treatments to be supplied and installed by owner
47 Roofing to be mechanically attached 60 Mil white TPO
48 Sheet metal, coping caps, scuppers, downspouts, walk pads are included
49 1-1/2"EIFS system with integral color included for the building exterior
50 We have considered all the doors to be laminated doors with knockdown frames. We can use rediframes for a deduct cost of
$25,000.00
51 DD&B assumes that the door schedule has been coordinated by the designer and represents the required fire ratings
52 10mm Bypass Tempered Glass shower doors included for guest bathrooms
53 Automatic sliding door system included for the vestibule area
54 Windows included per the window schedule
55 Louvers to be with a pre set colors from manufacturer's standard color chart and does not include any custom colors
56 Storefront glass to be 1" insulated glass with low-E
57 Storefronts doors included with standard hardware
58 Electronic locks / card readers to be procured from Dormakaba
59 All vinyl covering material to be supplied by the Owner
60 Floor finish schedule and floor finishes have not been provided, hence flooring material is considered as allowance for Tile,
Quarry Tile, VCT and base for all areas receiving this floor material
61 No wall tile is considered in guest bathrooms. All walls are considered to receive wallpaper
62 Acoustical ceilings included as shown per plan
63 We have considered FRP in the kitchen and water heater room
64 Wingits Toilet Accessories included for all guest bathrooms and public restrooms
65 6 x 24 vision pattern surround panels in solid white matt finish included for all shower surrounds
66 3/4" corner guards are considered in public areas and elevator lobbies
67 Back of house white melamine shelving is considered in linen storage / Housekeeping on all floors
68 All fitness room equipment to be procured and installed by the Owner
69 BBQ Grills & Fire Pit included at locations shown on the drawings
70 Interior signage supply by owner & install by owner
71 Exterior signage supply and install by owners, wiring to be provided by GC
72 Any safety deposit boxes & lockers are excluded
73 Single flagpole included as shown
74 Wood fence around mechanical units is included
75 Screen wall shown on sheet CO3.0 is considered as allowance as no details have been provided
76 Pool coping, waterline tile & delineation the included as an allowance
77 Pool deck finish to be decorative round aggregates
78 No fencing around the pool is sown, hence not included
79 16 Gauge aluminized linen chute included in the proposal
80 No electric interlock is considered for the linen chute
81 Traction elevators with standard interior finishes included
82 Price includes 12 months maintenance with 8 hour callback service for elevators
83 Water piping to be pex piping and fittings
84 Grease interceptor included as per the plans
85 Oil interceptor is not included as we are using traction type of elevators
86 Lint interceptor is not included in plumbing VE package as we suggest to procure from the laundry equipment supplier
87 Water softener to be supplied and installed by owner. Backwash line and softener hook up will be by GC
88 Commercial Laundry Equipment is to be furnished and installed by Owner. Contractor provides rough -in and hookup
89 Residential appliances to be furnished and installed by Owner. GC to provide rough -in and hookup
90 Hose for laundry equipment to be supplied by owner and installed by GC
91 All Kitchen Equipment, shelving and material supplied and installed by owner
92 GE PTAC units included for all guestrooms
93 Greenheck RTU included
94 Certified test and balance to be done by the owner
DD & B Page 11 Owner
rrr D D & B HOME2 SUITES - LUBBOCK, TX
CONSTRUCTION
05/04/2022
95 Verdant thermostats included
96 All recessed lighting to be procured and installed by GC
97 All decorative and non -hard wired light fixtures are owner furnished and installed
98 Light fixture package included as allowance with VE fixtures that meet the Brand Standards
99 EV charging station supply and install by owners, wiring to be provided by GC
100 Sprinkler system design per NFPA 13 for common areas and 13R in guestrooms
101 All sprinkler piping to be CPVC, except the standpipe at stairways
102 Cost for Fire pump is provided as an allowance. We will get an actual price once the fire flow test report is made available
103 Fire Alarm included to meet applicable codes and standards for a fully sprinkled 4 story building
104 Proposal includes Addressable Fire Alarm System
105 Cat6 cabling included for phone, data and TV locations
106 Cabling for music system and security systems is included as allowance
107 Temporary electric is through the power company. Generator cost is for the job trailer only
108 Temporary heating is excluded
109 Prevailing wages are excluded
110 Price includes sales tax on material only
111 DD&B assumes that the Architect, Civil Engineer and MEP Engineers, for use by DD&B and its subcontractors, will make CAD
files available at no cost
112 It is assumed that all drawings are designed to meet State, local and franchise requirements. Any notes referring to design or
code requirements are assumed to be part of permit requirements and that DD&B or its subcontractors shall not be
responsible for design or any work not specifically specified in the Contract Documents. It is not the Contractors'
responsibility to interpret or determine its scope of work from information shown on the code page
113 DD&B assumes that existing conditions as shown on the Contract Documents are correct and assumes no liability for
additional cost associated with differing conditions.
114 DD&B will examine areas and conditions and notify the Architect of such items that may be detrimental to proper and timely
completion, however, should conditions occur that DD&B did not have knowledge of or acquire knowledge of, DD&B will not
be held liable. For conditions that are identified, DD&B is not responsible for the correction of said conditions.
115 It is assumed by DD&B that if a product is listed in the Plans or Specifications, it meets or exceeds those standards called out
for. It is not the Contractor's responsibility to verify if products listed in the documents meet Specification requirements
116 Architect/Engineer review period is not to exceed 5 working days from receipt of submittals. Priority submittals are expected
to be reviewed in an expedited manner.
117 No costs are included for TXDOT permits, Corp of Engineer Permits or any required relocation of public utilities. DD&B
excludes all building permits, plan review fees, utility tap fees & backflow devices, ROW permits & fees, City required bonds
and other related fees and costs
118 DD&B assumes site survey shows any and all known improvements
119 DD&B assumes that all required rough -ins for Owner furnished items are indicated on the drawings
120 DD&B assumes that the Owner and their Design Consultants have coordinated with IHG and have incorporated all IHG
requirements into the design
121 Plan revisions that are not properly identified and annotated from the Bid Set cannot be assured as included and will need to
be incorporated as additional services due to improper documentation
122 All asbestos, lead, contaminated soil, underground tanks or other hazardous material removal or mitigation is excluded
123 Premium cost for handling/disposing and importing replacement fill due to ash material or contaminated soils is excluded
124 DD&B assumes continuous flow of work without interruption and delays due to circumstances beyond the Contractor's
control. Notice to Proceed on select portions of the work rather than complete project release may result in delays to the
critical path due to but not limited to engineering and production of long lead time items.
125 ID drawings & Specification manual have not been 100% complete and any references to requirements of ID
drawings are excluded
126 Any and all design deficiencies or design mistakes are not considered in this price
127 Any additional time or cost due to Owner / Architect / Engineer response delay is not included in this price
128 Costs arising from Tariffs, unexpected price increase in material & freight is not considered in this proposal
129 DD&B cannot sign up any contractors until the receipt of "For Construction Set"
130 DD&B will require 6 weeks from the receipt of "For Construction Set" before breaking ground
131 Off -Site storage, On -Site storage, warehousing is assumed by the Owner. Storage for any materials that need to be procured
ahead of time due to long lead times / cost inflations is to be provided by Owner
DD & B Page 12 Owner
rr-F DD & B
CONSTRUCTION
... rrtucr uiu nun nnn c+r.0 N —nn ivy a
HOME2 SUITES - LUBBOCK, TX
05/04/2022
132 Advance deposits will be needed to secure job material and Owner to provide assistance with the deposit payments
133 Material delays arising due to late deposit payments is not the responsibility of the GC
134 Any weather delays, unforeseen conditions, Acts of God, job site shut down by the local / state jurisdictions during any
pandemics, man -power reduction due to pandemics are not accounted for in project schedule and General conditions
135 Due to current market conditions, prices of construction materials have been largely fluctuating and we have provided the
price as of the proposal submission date. Price will be updated once shop drawings and submittals have been approved by
the engineer and cost difference will be paid by the owner.
EXCLUSIONS
1 Impact Fees
2 Tap Fees
3 All design, permitting and installation fees for permanent power is excluded
4 CAD Files. CAD files to be provide to GC per request
5 Offsite utility and Civil Work
6 Utility Charges and Connection fees
7 Franchise fees
8 Telephone & Music system equipment and install
9 Building Fees. Trade Permit Fees Paid by GC
10 Engineering fees
11 CCTV cabling and installation
11 Building Commissioning & Special Inspections
12 Permanent Power bills. Temporary electric and water is including during construction only
13 Telephone, data, TV & security equipment & installation. Only wiring is included in our proposal.
14 Primary conduits and primary wiring from power company location to property line is excluded. Our proposal includes
running conduits for the power company from the property line to the transformer
15 FF&E exclusions as follows:
a. Guestroom appliances - supply & install by owner
b. Guestroom FF&E - supply by owner & install by GC
c. Guest & House Laundry equipment - supply and install by owner
d. Any window treatments - supply and install by owner
e. Vending machines and ice machines - supply by owner and install by GC
f. Fitness room equipment - supply and install by owner
g. Kitchen equipment - supply and install by owner
18 No rock excavation of any kind included for any grading, foundation, utility or building construction
19 Radio Frequency booster system and testing is excluded
20 Access control permit and work is excluded
21 Getting gas line to the building. Utility company to get the gas line till the water meter room
22 Water Softener material is excluded
23 Car Charging Station are excluded
24 Solar panels and lightning protection is excluded
25 Payment & Performance Bond
26 Builders Risk Insurance
DD & B Page 13 Owner
rrr �DSD&BN
HOME2 SUITES - LUBBOCK, TX
05/04/2022
EXHIBIT - D
COORDINATION MATRIX
GUESTROOMS
DESCRIPTION
PURCHASE
ACCEPT
DELIVERY
STORE &
PROTECT
INSTALL
SEATING
OWNER
GC
GC
GC
IRON STAND AND HOLDER
OWNER
OWNER
OWNER
GC
HARD -WIRE LIGHTING
OWNER
GC
GC
GC
FREE STANDING CASEGOODS
OWNER
GC
GC
GC
VANITIES/TOPS/KITCHEN MILLWORK
OWNER
GC
GC
GC
WINDOW SILLS
OWNER
GC
GC
GC
WINDOW TREATMENTS WITH CORNICE
OWNER
OWNER
OWNER
OWNER
ARTWORK/MIRRORS
OWNER
GC
GC
GC
BED WRAPS/SKIRTS
OWNER
OWNER
OWNER
OWNER
CARPET/CARPET BASE
OWNER
GC
GC
GC
VINYL WALL COVERING
OWNER
GC
GC
GC
TILE AND TILE BASE
GC
GC
GC
GC
RECESSED LIGHT
GC
GC
GC
GC
SHOWER CURTAINS
OWNER
OWNER
OWNER
OWNER
BATH ACCESSORIES/PLUMBING FIXTURES
GC
GC
GC
GC
SHOWER DOOR
GC
GC
GC
GC
THRESHOLD/SCHLUTER/STAIR NOSING
GC
GC
GC
GC
TELEPHONE/CLOCK
OWNER
OWNER
OWNER
OWNER
SHOWER SURROUNDS
GC
GC
GC
GC
BREAKFAST/BAR AREAS, BOH & MEETING
ROOM
DESCRIPTION
PURCHASE
ACCEPT
DELIVERY
STORE &
PROTECT
INSTALL
SEATING
OWNER
GC
GC
GC
FREE-STANDING LIGHTING
OWNER
GC
GC
GC
HARD -WIRE LIGHTING
OWNER
GC
GC
GC
VINYL WALL COVERING
OWNER
GC
GC
GC
TABLES
OWNER
GC
GC
GC
WINDOW TREATMENTS WITH CORNICE
OWNER
OWNER
OWNER
OWNER
ARTWORK
OWNER
GC
GC
GC
CARPET/CARPET PAD
OWNER
GC
GC
GC
RECESSED LIGHT
GC
GC
GC
GC
TELEPHONE
OWNER
OWNER
OWNER
OWNER
VCT/VCT BOH
GC
GC
GC
GC
VINYL WALL COVERING
OWNER
GC
GC
GC
TELEVISION
OWNER
OWNER
OWNER
GC
MIRRORS
OWNER
GC
GC
GC
PROJECTOR/WRITING BOARD
OWNER
OWNER
OWNER
OWNER
LIGHTING CONTROLS
N/A
N/A
N/A
N/A
FITNESS
ROOM
DD & B Page 14 Owner
rr� DSD&BCONN
u,u� rurrru,u nun nr. r u,r.urJT a uvic r.
HOME2 SUITES - LUBBOCK, TX
05/04/2022
ir DESCRIPTION
PURCHASE
ACCEPT
DELIVERY
STORE &
PROTECT
INSTALL
WATER COOLER/HYDRATION STATION/CLOCK
OWNER
GC
GC
GC
WIPES/DISPENSER
OWNER
OWNER
OWNER
OWNER
LEANING MIRROR FRAME
OWNER
GC
GC
GC
MIRROR
GC
GC
GC
GC
RECESSED LIGHT
GC
GC
GC
GC
TELEPHONE
OWNER
OWNER
OWNER
OWNER
TOWEL CABINET
OWNER
GC
GC
GC
WINDOW TREATMENTS
OWNER
OWNER
OWNER
OWNER
FITNESS EQUIPMENT WITH CABLE MANAGEMENT
OWNER
OWNER
OWNER
OWNER
MILLWORK
GC
GC
GC
GC
FITNESS FLOORING AND BASE
GC
GC
GC
GC
VINYL WALL COVERING
OWNER
GC
GC
GC
POOL
AND PATIO
DESCRIPTION
PURCHASE
ACCEPT
DELIVERY
STORE &
PROTECT
INSTALL
SEATING/TABLE/FFE
OWNER
GC
GC
GC
TELEPHONE
OWNER
OWNER
OWNER
OWNER
RECESSED LIGHT
GC
GC
GC
GC
FIREPLACE, FIRE PIT, BARBEQUE GRILL
GC
GC
GC
GC
CORRIDORS
DESCRIPTION
PURCHASE
ACCEPT
DELIVERY
STORE &
PROTECT
INSTALL
SCONCES/DECORATIVE LIGHT FIXTURES
OWNER
GC
GC
GC
RECESSED LIGHT
GC
GC
GC
GC
TELEPHONE
OWNER
OWNER
OWNER
OWNER
ARTWORK
OWNER
GC
GC
GC
VINYL WALL COVERING
OWNER
GC
GC
GC
WINDOW TREATMENTS
OWNER
OWNER
OWNER
OWNER
DOORS AND HARDWARE
GC
GC
GC
GC
WINDOW SILLS
OWNER
GC
GC
GC
MISCELLANEOUS
DESCRIPTION
PURCHASE
ACCEPT
DELIVERY
STORE &
PROTECT
INSTALL
INTERIOR SIGNAGE
OWNER
OWNER
OWNER
GC
BUILDING/MONUMENTSIGNAGE
OWNER
OWNER
OWNER
OWNER
FLAG POLE
GC
GC
GC
GC
CAR CHARGING STATIONS
OWNER
OWNER
OWNER
OWNER
TELEPHONE
OWNER
OWNER
OWNER
OWNER
DUMPSTER
GC
GC
GC
GC
DD & B Page 15 Owner
r F CONSTRUCTION
HOME2 SUITES - LUBBOCK, TX
05/04/2022
CCTV
OWNER
OWNER
OWNER
OWNER
MANAGER/SALES OFFICE DESK/FRONT DESK MACHINES
OWNER
OWNER
OWNER
OWNER
GUEST LAUNDRY MACHINE
OWNER
OWNER
OWNER
OWNER
KITCHEN APPLIANCES
OWNER
OWNER
OWNER
OWNER
VENDING AND ICE MACHINES
OWNER
GC
GC
GC
WATER SOFTENER
OWNER
OWNER
OWNER
OWNER
COMMERCIAL WASHERS AND DRYERS
OWNER
OWNER
OWNER
OWNER
METAL SHELVING/PARTITION PUBLIC RESTROOM
OWNER
OWNER
OWNER
OWNER
FOOD SERVING EQUIPMENT
OWNER
OWNER
OWNER
OWNER
VINYL WALL COVERING
OWNER
GC
GC
GC
EMPLOYEE LOCKERS//INFLAMMABLE TOOL BOX
OWNER
OWNER
OWNER
OWNER
BOH SHELVING
GC
GC
GC
GC
RECESSED LIGHT/WALL MOUNTED
GC
GC
GC
GC
SAFETY DEPOSIT BOXES
OWNER
OWNER
OWNER
OWNER
PUBLIC AREA VANITY
GC
GC
GC
GC
PUBLIC AREA MILLWORK
GC
GC
GC
GC
CARD READERS
GC
GC
GC
GC
TOILET ACCESSORIES
GC
GC
GC
GC
BIKE RACK
GC
GC
GC
GC
LUGGAGE CART
OWNER
OWNER
OWNER
OWNER
HAIR DRYER
OWNER
OWNER
OWNER
OWNER
MARKET AREA EQUIPMENT
OWNER
OWNER
OWNER
OWNER
TOILET ACCESSORIES
GC
GC
GC
GC
DD & B Page 16 Owner
DSD & B
CONCTION
.� r. m.rur u-nnar .�n�n nn•nnr.0 Nr omit r.
HOME2 SUITES - LUBBOCK, TX
05/04/2022
PRICE OF MATERIALS The prices of construction materials have been fluctuating largely due to COVID-19, oil prices and
natural disaster. Due to current market volatility, we are not able to hold the material / labor prices until the start date of a
particular trade activity. The prices in this estimate is based on the material proposals received as of 05/04/2022. We will
re -price the project at the beginning of construction, any difference in the prices will be passed on to the owner.
TARIFF'S Many of our materials are procured and sourced from overseas. If during construction period there is any Tariffs
that are levied or implemented, we will pass those Tariffs onto the Owners to be paid as a change order.
DD & B Page 17 Owner
1704 Marsha Sharp Freeway — Architectural Plans
(Full set of plans on file.)
i
II1111 IIIII 111111111 II IIIII 171111 'j h .- 11 IIIIIII II IIII IIIIIII II I1111 II1111 I
11 ITII11 1111 I n•f"flTTIlilll l 11 1 1 1 III1 1 1 1 111 IIII I I IIIII.1 111111 1 III1 1I I I' 111 _ _ I-F-I I-I-I-114l T Tlt 4+1 -4i4- i—i-s•i—I FHr'-t_: ter- M• f ' TI1111 111111..... 1111111.....-'11111�1J I I 1 11 11.1111 � h 17 I I I I II 1111111 ±1 1 '1IIIIII } II.:�::«I 1 • II 71 IIII III 1F I IIIII .:•.1"� I IIIIIIIIII 1II111i1 11 1 11 1 If 1 1 111:•II JI��I 1 1" _ J •.
1'1' 1 1 1 1 I ti.•..... IIII .I 1. '„I t.IJ 1 1 1 I I I IYr '. 1 1 I 11 1 1 1 1 1 1 1 1 1 1 i 1 1 1 1 1 1•� 1 1
• y I n l l III III - I I l l i l i{ 1`i t I 1 1 . J� I III P I 1 i 1 1 � l l l 11 1 III 1 I I I I I I I 1
lilt a
1 1 1 1 1 1 1 1 1 � f• a :�I I I 1 1 1 111 I I I I I I F 11 1 I 1 .. I I I I - I 1 1 1 l 1 1 1� 1 1 1 1 1 1
111 1 1 1 ��• •11 1 I I I f I� 1'-� i �' + IV. c�i�q 1 - � j'' , •
111111111111 I 11 III 111 `�y�+ I L;�11II11 11aj11 I• •1! IIIII 111111111111 lilt ,
111 ililii ll'lll 111 I ="fl Iilttl -T I 1 11' I II ll1 I I 1
:ILL 1111 I, 11 1 I 11 I IIII 1'I " III, II 11 IIIIrl 11$ m III I Ill IIII 1111 111111 y
I a l ,I I I I 111 Ilt 1 1 4 I ,� 1 „ „ h i l l
1 1 1 1 1 1 I I I I I I 1 1 1 11 1 1 1 1 I N I I I 1 1 Id 1 I S`: • H I I 1 1 1 1 1 1 1 1 1 1 1 11 I 1 1 1 I I 1 J,/Mi•i"•
I I iii 1 i i i i i i i i I i I 1 1 1 1 1 i I i i i i i i i r�•Y'.. 11 1� 1 1 -.'� .' i t l r� :' Y I 1 I I 1 1 r � r i i I'1'1p1 .___. • Illill IIIII Ill II IIIII III11 I111 i11 I11 :I� ,IIIII I1111IIIIIII I11111 111 I
1 111 1 IIIII I I I I I I I I I I I I I I I I, I I I I iiiii 11111111111 , I •�•�•• IIIII 1 1 1 III I IIIII 11 IIII IIIIII I111 - tl t11111111t�.1 i'1+ 11t111 lilitiiiiilt IIIii. ,
11 I 11. 1 e' 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 iii 1 1 I I I I I IIIIIII 1 1 1 1 1 r.::' v 1 1 1 1 1 IIII I, 1 I l t f' 1 1 1 1 1 I I iiii 'YI'F•� �M
111111 IIIII III111 I �1111 1 II11}Illrwr.:„• III I11111111111 fill; 111111 ••'^
IIII 1 IIIIIII11111 IIIIII It111111�1111111111 �111-LI t.-iltt IIII 111111 Illil 111111 �'+n :' i I IIIII IIIII IIIIIII,I, 11 II �I•:i 11rl-,, 11 IIII• tv 11 11111III It II 1III11
--- Ili •.,w� ri. I I 1"I 111 117i1 it—
- -- - - —
w .1i 1 1 IIII I I 111 1
�5ii �. :iii i ii i I •����:�� � �
i I 711 i1 in r
:51.f.'6C7 •Y� trl .1:1`,• .iii., a fin: .:5:::" d t t
-- I •r �M.N•.M �rM • � � � •
h Irmo Im •FI 1 h — '.!•: :'�_�.` .—j �a
' NL 111
y M l ` r•q� i•M.r•.• •i•.a
03
FR—
■ 1R,�:1C .•�� .� � y..� ti.�%�4 w:.. w•.w w ter. w•... .1 is •%� � ��. Y:•�i.�-.1 •Y.T IrIT?ID .
• �. _, ... •.. n:•i•�A•r�l�y.l 1_w•.1 .. �..«. o�ra ail •
:••:•�••'�"' !O�B1'Ili.'.'7'.:7iR,w•�•jl'e�.`Sr••.r 1• a d� •• i
•�' •':'.
r1•T'I,IFir1r•'• •.r . ;�•• C .c tiS:l•.:,1
'4n
■ Yrr,• I.F
_ G� 9. � TI..' •.' .nn� L
Ir • i
T �7�TINwI Ms I � t
�tz• rr': • • =r
c9) . kl^. Ld Aan•r•1 rr r 1
..7-I r�1•. Ir. Ilj
1� Y
Yr1 r.. I.r •�- � J1 - , r•YI
rl�'ri�1i d
• . I'lil�
II •'
I
afT: ern •r Nu
U
11
il
• —��Ta \ li ..ta.l Wsnl a. •.rs T
^
.r' �1 • :i•:n. .• o.• 2 T .p h61.4 Am.'• B.m
r•e 11 �Ir �. .. �� N ` C _
v.. p
• o
x
l•�1.•. PIM•.1Isr.ai,.A
TI � arA':17u' I
B Y Lp / M — _•1
��%••• AIM.1 J6 T4Y1. •p FD-3.0
1 'Ya
❑O w U n
r f n.,r• I Ir
' 1• 1
•.•. T