Loading...
HomeMy WebLinkAboutResolution - 111055M - Resolution Missing. Paving Improvements Kerr And Middleton Paving Contractors. - 11/10/1955CITY OF LUBBOCK TEXAS November 10, 1955 Honorable Mayor and City Commission Iaibbock, Texas Gentl®menx moss M I have examined the paving improvements constructed by Kerr and Middleton, Paving Contractors, under their contract with the Subdivider of MoCulloch Addition No. 9 in accordance with New Subdivision Ordinance No. 1331 and Find the improvements on Salem Avenue designated as New Subdivision Unit No. 196, as listed on the attached final estimate sheet to have been completed in accordance with plans and specifications and recommend that you accept the improvements on said avenue. BVPswm Very truly Yours, "John T. Hiokecrson City Engineer CONSOLIDATED FINAL ESST_DWE FOR A F©RTION F T& P XIN _ 1I R S IN &C=0CH IT IE9 ACCEPTED- NOVMER IQ. 1955 G*W*Q. �] RM0=1 CONSTRUCTEI? BY KERB AND MIDDLETON IIANTITIES Unit No. Location SOY, S,,Y. L.F. S.Y. cone. PaLng MIZA Prenj. Cab & g=gT Al R N-S 196 Salem Ave. 16'It4, S. of SPL of 42nd St, to 2.5 ft. S, of SFL of alley South of 42nd St. -379,82 A25M 39200Q1 6 Totals 3.79.89 495.73 303.00 31.67 COST _„ESTIM.ATE 379.89 S. Y. Paving (Surf., & Base) 0 $1.15 = 436.87 495.73 S. Y. Subgrade Preparation.0.0.20 - 99.15 303.00 L. F. Curb & Gutter'® 1.50 _ 45400 31.67 S. Y. Concrete alley _return @ 3#75 = 119.76, Total Contract Cost 1109,28 1.0% Engineering 1191k4 Total Cost 1220,21 COST DISTRIBTJT Subdividerts Total. Cite City to Contract Credit 17nit X2. TotAl Cost Lod Coot CMtruct2lC N-S 196 I10220,gl 11,10giZ8 .. 0 8 93 Totals $1.,220,21 91,109.29 y,. 110.93 -0- 1,109,t28 $UO.93