HomeMy WebLinkAboutResolution - 2022-R0295 - Change Order No. 2 Contract 15924 with Lee Lewis Construction 6.28.22Resolution No. 2022-RO295
Item No. 4.12
June 28, 2022
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute
for and on behalf of the City of Lubbock, Change Order No. 2 to that certain Contract No.
15924 by and between the City of Lubbock and Lee Lewis Construction, Inc., for UCSC Flood
Repair Project, and related documents. Said Change Order No. 2 is attached hereto and
incorporated in this resolution as if fully set forth herein and shall be included in the minutes of
the City Council.
Passed by the City Council on June 28, 2022
W"7-Z'I'or
TRAIIPAYN Y
ATTEST:
- P "A—�� A7
Re ca Garza, City Se t
APPROVED AS TO CONTENT:
Erik Rejino, Assistant City Manager
APPROVED AS TO FORM:
Am ims, Deputy City Attorney
RES.ChgOrd#2 Contract-15924 Lee Lewis Construction
06.23.22
Office of Purchasing and Contract Management
Change Order
Contract No: 15924
Contractor: Lee Lewis Construction, Inc.
Change Order No: 2
Contract Title: UCSC Flood Repair Project
Bid/RFP No:
Project No:
"Change Order" means a written order to a Contractor, executed by the Owner, in accordance with the Contract authorizing an addition to, deletion
from, or adjustment or revision of the requirements of the Contract documents, or an adjustment to the compensation payable to the Contractor, or to
the time for performance of the Contract and completion of the project, or a combination thereof, which does not alter the nature of project and is an
integral part of the project objective. Adjustments to "Estimated Quantities" to a line time in a Unit Price Contract do not require a Change Order. All
work that alters the nature of the construction or that is not an integral part of the project objective must be let out for public bid.
Description of Change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the
specifications and drawings of the project (attached additional pages is necessary:
Contract Contingency ($150,000.00)
PCCO #001 Air Quality Testing $2,400.00
PCCO #002 HVAC Testing and Balancing $8,774.00
TOTAL THIS CO: ($138,826.00)
Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material
costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial Contract, no
deviations are allowed in computing negotiated change order costs.
ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM.
ITEM
DESCRIPTION
AMOUNT
A.
ORIGINAL CONTRACT VALUE:
$1,755,050.00
B.
AMOUNT OF THIS CHANGE ORDER: Note: Council approval required if (+ _) $50,000
$138,826.00
COST CENTER: 1611 1 ACCOUNT: 9109.14397
C.
PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B:'A)
-7.91%
D.
AMOUNT OF PREVIOUS CHANGE ORDERS:
$0.00
E.
TOTAL AMOUNT OF ALL CHANGE ORDERS B+D)
($138,826.00)
F.
PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): (25%maximum)
-7.91%
G.
NEW CONTRACT AMOUNT (A+E):
$1,616 224.00
It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation
to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising
out of, or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order.
This Change Order is not valid without the following signatures lease s' n in order and return 3 or' finals with the Contract Cover Sheet to
Purchasing and ont t ment d rtment : ..��
ZZ
( ) Contr Date 77�
roject Archit gm r D to
k6a131107- OV
(3) Owner's resentative Da (4) Direct oy Purchasing & Contract Date
M eOAIAJ/- Emzv -1�-
46
(5) apital Proi t Manager Date a4 (6) ty tto—mey
:han a Orders over S50 000.00 re uire a Contract Cover Sheet and thefollowing si natures:
June 28, 2022
(7) M r IL Date (8) 711
Secretary
Council Date: June 28, 2022 Agenda Item #: 4.12
Date
June 28, 2022
Date
2022-RO295
PUR-45 (Rev 08/2018)
Lee Lewis PCCO #001
Construction, Inc.
Lee Lewis Construction Inc. - HQ Project: AA-2154 - Citizen's Tower Flood Damage
7810 Orlando Avenue 1401 Ave K
Lubbock, Texas 79423 Lubbock, Texas 79401
Phone: 806-797-8400
Fax: +1.806.797.1034
Prime Contract Change Order #001: CE #PCO #01 - Clearance Testin
TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ
1314 Avenue K, Lubbock, TX 79401, USA 7810 Orlando Ave
LUBBOCK, Texas 79457 Lubbock, Texas 79423
DATE CREATED: 5/02/2022 CREATED BY: Jason Smith (Lee Lewis Construction -
HQ)
CONTRACT STATUS: Approved REVISION: 0
REQUEST RECEIVED
FROM:
DESIGNATED REVIEWER:
DUE DATE:
INVOICED DATE: -f - -
REFERENCE:
PAID IN FULL:
No
ACCOUNTING METHOD: Amount Based
SIGNED CHANGE ORDER
RECEIVED DATE:
FIELD CHANGE: No
LOCATION:
REVIEWED BY:
REVIEW DATE:
PAID DATE
CHANGE REASON:
EXECUTED:
SCHEDULE IMPACT:
REVISED SUBSTANTIAL
COMPLETION DATE:
CONTRACT FOR:
05/02/2022
No Change Reason
No
1:Citizen's Tower Flood Damage Prime
Contract
TOTAL AMOUNT: $0.00
DESCRIPTION:
CE #PCO #01 - Clearance Testing for Mold and Bacteria
For King Consultants to do a clearance testing for mold and bacteria at the remediation.
ATTACHMENTS: -T---- --- --- -- 4
CHANGE ORDER LINE ITEMS:
#
Budget Code
Description
Amount
1
1-004.2 OWNERS
CONTINGENCY.SUBCONTRACTOR
Clearance Testing
$(2,400.00)
2
6-100.1 ROUGH CARPENTRY.MATERIALS
Cleamce Testing
$2,400.00
Grand Total:
$0.00
The original (Contract Sum)
Net change by previously authorized Change Orders
The contract sum prior to this Change Order was
The contract sum will not be changed by this Change Order in the amount of
The new contract sum including this Change Order will be
The contract time will not be changed by this Change Order.
$1,755,050.00
S0.00
$1,755,050.00
$0.00
$1,755.050.00
Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 5/5/2022 10:01 AM
Lee Lewis
Construction, Inc.
CITY OF LUBBOCK
1314 Avenue K, Lubbock, TX 79401, USA
PCCO #001
Lee Lewis ConsbrucUon - NO
7810 Orlando Ave
Lubbocc , Texas 794
SIGMA WE
Prb,ded On: 5/5/2022 10:01 AM
Kincy Consultants, Inc.
1205 East 46th Street
Lubbock, TX 79404
Phone # 806-763-6157
Fax # 806-763-6160
o
Date
Invoice #
3/25/2022
A-00-105481
Bill To
Lee Lewis Construction
7810 Orlando Avenue
Lubbock, TX 79423
Sales Rep
Terms
Project
J Hassoldt
Net due 30 days
21-03-111
Description
Qty
Rate
Amount
Clearance testing for mold and bacteria following remediation at the
1
1.650.00
1,650.00
City of Lubbock, USCS Building located at 1401 Avenue K in
Lubbock, Texas - 03/11/22
Air-O-Cell samples for mold and bacteria (per each)
5
150.00
750.00
f E' ODOR JC1B/O PHASE CA
GOAD
Thank you for your business.
Total $2,400.00
Balance Due $2,400.00
Lee Lewis
Construction, Inc.
Lee Lewis Construction Inc. - HQ
7810 Orlando Avenue
Lubbock, Texas 79423
Phone: 806-797-8400
Fax: +1.806.797.1034
�O
Project: AA-2154 - Citizen's Tower Flood Damage
1401 Ave K
Lubbock, Texas 79401
Prime Contract Change Order #002: CE #PCO #02 - Testing and Bala
TO: CITY OF LUBBOCK FROM: Lee Lewis Construction - HQ
1314 Avenue K, Lubbock, TX 79401, USA 7810 Orlando Ave
LUBBOCK. Texas 79457 Lubbock, Texas 79423
DATE CREATED: 5/02/2022
CONTRACT STATUS: Approved
REQUEST RECEIVED
FROM:
DESIGNATED REVIEWER:
DUE DATE:
INVOICED DATE:
REFERENCE:
PAID IN FULL:
ACCOUNTING METHOD:
SIGNED CHANGE ORDER
RECEIVED DATE:
No
Amount Based
FIELD CHANGE: No
CREATED BY'
Jason Smith (Lee Lewis Construction -
HQ)
REVISION:
0
LOCATION:
REVIEWED BY.
REVIEW DATE:
05/02/2022
PAID DATE:
CHANGE REASON:
EXECUTED:
SCHEDULE IMPACT:
REVISED SUBSTANTIAL
COMPLETION DATE:
CONTRACT FOR:
TOTAL AMOUNT:
DESCRIPTION:
CE #PCO #02 - Testing and Balancing of HVAC system
To do testing and balancing of the HVAC system. This will de deducted from the contingency.
ATTACHMENTS:
CHANGE ORDER LINE ITEMS:
No Change Reason
No
1:Citizen's Tower Flood Damage Prime
Contract
$0.00
#
Budget Code
Description
Amount
1
1-004.2 OWNERS
CONTINGENCY.SUBCONTRACTOR
Deduct for testing and balancing
$(8,774.00)
2
15400.2 PLUMBING.SUBCONTRACTOR
Testing and balancing of HVAC system
$8,774.00
Grand Total:
$0.00
The original (Contract Sum) $1,755,050.00
Net change by previously authorized Change Orders $0.00
The contract sum prior to this Change Ober was $1,755,050.00
The contract sum will not be changed by this Change Order in the amount of $0.00
The new contract sum including this Change Order will be $1,755,050.00
The contract time will not be changed by this Change Order.
Lee Lewis Construction Inc. - HQ Page 1 of 2 Printed On: 5/5/2022 10:01 AM
Lee Lewis
Construction, Inc.
CITY OF LUBBOCK
PCCO #002
Lee Lewis Construction - HO
1314 Avenue K, Lubbock, TX 79401, USA 7810 Orlando Ave
� Q5 5 2Z
SIGNATURE
Lee Lewis Consl Inc. - HO
z,
Anthony Mechanical, Inc.
Mechanical Contractors
526 E. 40t' Street
Lubbock, TX 79462
(806) 747-4151
Lubbock Power and Light
Test and Balance HVAC System
We propose as a Base Bid to provide the following
• ND White rebalance HVAC system.
Total Base Bid
OUR BASE BID EXCLUDES THE FOLLOWING
• SALES TAX
• ALLOWANCES
• BOND PREMIUMS
• OVERTIME PREMIUMS
• ELECTRICAL
• FIRE ALARMS
• CONTROLS
• ROOF OR WALL PATCHING
• CONCRETE
• PAINTING OR COLOR CODING
• GENERAL CONTRACTOR WORK
Jason Richards
2/28/2022
Price good for 30 days
$ 8,774.00