Loading...
HomeMy WebLinkAboutResolution - 2015-R0044 - H.D. Weaver Ditching Service - 02/12/2015Resolution No. 2015-R0044 February 12, 2015 Item No. 5.5 RESOLUTION IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for i on behalf of the City of Lubbock, Contract No. 12159 for Water & Sanitary Sewer Tap tallation and Construction Services, by and between the City of Lubbock and H. D. Weaver tching Service, Inc., and related documents. Said Contract is attached hereto and incorporated this resolution as if fully set forth herein and shall be included in the minutes of the City by the City Council on February 12, 2015 TTEST: Garza, City "4w GLffr. TRTSON, MAYOR AS TO CONTENT: P. E., EVVINJI161381 Attorney Weaver Ditching Service Inc 1. 14.15 Resolution No. 2015-R0044 Contract 12159 City of Lubbock, TX Contract for Services Water & Sanitary Sewer Tap Installation and Construction Services THIS CONTRACT made and entered into this 12'h day of February, 2015, by and between the City of Lubbock ("City"), and H.D. Weaver Ditching Service, Inc., ("Contractor"). WITNESSETH: WHEREAS, the City of Lubbock duly advertised for bids for Water & Sanitary Sewer Tap Installation and Construction Services and bids were received and duly opened as required by law; and WHEREAS, after careful consideration of the bid submitted by Contractor, the City authorized the execution, in the name of the City of Lubbock a contract with said Contractor covering the purchase and delivery of the said Water & Sanitary Sewer Tap Installation and Construction Services. NOW, THEREFORE, in consideration of the mutual agreement contained herein, as well as the financial consideration hereinafter referred to, the parties hereby covenant and agree as follows: 1. In accordance with City's specifications and Contractor's bid, copies of which are attached hereto and made part hereof, Contractor will deliver to the City Water & Sanitary Sewer Tap Installation and Construction Services and more specifically referred to as Items Al through C8 on the bid submitted by the Contractor or in the specifications attached hereto. 2. The City promises and agrees to employ, and does employ, the Contractor to cause to be done the work provided for in this Contract and to complete and finish the same according to the attached specifications, offer, and terms and conditions contained herein. 3. The Contractor shall perform the work according to the procedures outlined in the Bid Form and Specifications attached hereto. The contract shall be for a term of one year, with the option of three, one year extensions, said date of term beginning upon formal approval. The City does not guarantee any specific amount of compensation, volume, minimum or maximum amount of services under this contract. 4. This contract shall remain in effect until the expiration date, performance of services ordered, or termination of by either party with a 30 day written notice. Such written notice must state the reason for cancellation. The City of Lubbock reserves the right to award the canceled contract to the next lowest and best bidder as it deems to be in the best interest of the city. 5. Contractor shall at all times be an independent contractor and not an agent or representative of City with regard to performance of the Services. Contractor shall not represent that it is, or hold itself out as, an agent or representative of City. In no event shall Contractor be authorized to enter into any agreement or undertaking for or on behalf of City. 6. The contractor shall obtain and maintain in full force and effect during the term of the contract, commercial general liability coverage with insurance carriers admitted to do business in the State of Texas. The insurance companies must carry a Best's Rating of A- VII or better. The policies will be written on an occurrence basis, subject to the following minimum limits of liability: TYPE AMOUNT General Liability Commercial General Liability General Aggregate 1,000,000 Products-Comp/Op AGG Contractual Liability Personal & Adv. Injury XCU, Heavy Equipment Automotive Liability 1,000,000 Combined Single Limit Any Auto Employers Liability 1,000,000 Workers Compensation Statutory Amounts The City of Lubbock shall be named as additional insured on a primary and non-contributory basis on auto/general liability, with a waiver of subrogation in favor of the City of Lubbock on all coverages. Copies of all endorsements are required. The contractor will provide a Certificate of Insurance to the City as evidence of coverage. The certificate will provide 30 days notice of cancellation, and under the cancellation section, the wording "endeavor to" and "but failure to mail such notice shall impose no obligation or liability of any kind upon the company, its agents or representatives" will be crossed out. A copy of the additional insured endorsement attached to the policy will be included with the certificate. The contractor shall also maintain workers compensation insurance in the statutory amount. If at any time during the life of the contract or any extension, the contractor fails to maintain the required insurance in full force and effect, all work under the contract shall be discontinued immediately. Any failure to maintain the required insurance may be sufficient cause for the City to terminate the contract. 7. Neither the City nor the Contractor shall assign, transfer or encumber any rights, duties or interests accruing from this Contract without the written consent of the other. 8. The City reserves the right to exercise any right or remedy available to it by law, contract, equity, or otherwise, including without limitation, the right to seek any and all forms of relief in a court of competent jurisdiction. Further, the City shall not be subject to any arbitration process prior to exercising its unrestricted right to seek judicial remedy. The remedies set forth herein are cumulative and not exclusive, and may be exercised concurrently. To the extent of any conflict between this provision and another provision in, or related to, this document, this provision shall control. 9. At any time during the term of the contract, or thereafter, the City, or a duly authorized audit representative of the City or the State of Texas, at its expense and at reasonable times, reserves the right to audit Contractor's records and books relevant to all services provided to the City under this Contract. In the event such an audit by the City reveals any errors or overpayments by the City, Contractor shall refund the City the full amount of such overpayments within thirty 30 days of such audit findings, or the City, at its option, reserves the right to deduct such amounts owing the City from any payments due Contractor. 10. All funds for payment by the city under this contract are subject to the availability of an annual appropriation for this purpose by the City. In the event of nonappropriation of funds by the City Council of the city of Lubbock for the goods or services provided under the contract, the City will terminate the contract, without termination charge or other liability, on the last day of the then -current fiscal year or when the appropriation made for the then -current year for the goods or services covered by this contract is spent, whichever event occurs first. If at any time funds are not appropriated for the continuance of this contract, cancellation shall be accepted by the Seller on 30 days prior written notice, but failure to give such notice shall be of no effect and the City shall not be obligated under this contract beyond the date of termination. 11. The Contractor shall not assign or sublet the contract, or any portion of the contract, without written consent from the Director of Purchasing and Contract Management. Should consent be given, the Contractor shall insure the Subcontractor or shall provide proof on insurance from the Subcontractor that complies with all contract insurance requirements 12. This Contract consists of the following documents set forth herein; Invitation to Bid 15 -12159 - TF, Specifications, and the Bid Form. IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed the day and year first above written. Executed in triplicate. CITY OF LUBBOCK ATTEST: Reb cca Garza, City Secreta APP OVED A O -CONTENT: L. W od lin, P.E., City Engineer APPROVED AS TO FORM: Amy Sims, Deputy ttorney N191aMTS Ci 6T:I BY d4� Auth a Re a ative Randy Jeffreys, President Print Name 101 E. Harvard Address Lubbock, Texas 79403 City, State, Zip Code City of Lubbock, TX ITB 15 -12159 -TF Water & Sanitary Sewer Tap Installation and Construction Services Specifications INTRODUCTION AND OVERVIEW The City of Lubbock Public Works Water Engineering is seeking a contract(s) for installation of various water and sanitary sewer components. Major contract items are: installation of sewer and water taps, installation of water lines and valves, installation of fire hydrants, installation of sanitary sewer lines and manholes, boring and casing installation, and rental of various pieces of construction equipment with operators. Construction materials are to be provided by the City of Lubbock and installed by the successful bidder. PART1 GENERAL 1.1 WORK INCLUDED A. Contractor to provide water and sanitary sewer utility installation services as specified, including: 1. Sanitary sewer service (taps) connections. 2. Water service connections (taps). 3. Potable water main construction. 4. Sanitary sewer main construction. 5. Boring services. 6. Hydro excavation services. 7. Equipment and operator rental services. 8. Testing services and equipment for water and sanitary sewer construction. 9. Compaction or 1 %: sack controlled low strength material (flowable fill) 10. Contractor is responsible for all traffic control devices. Traffic control shall meet or exceed the TMUTCD for all work on City of Lubbock streets and roads. All TXDOT streets or roads must also meet or exceed standards unique to TxDOT permit requirements. 11. SCBA equipment for confined space entry 12. Contractor is responsible for providing a testing lab for density tests to 95% of standard proctor. The testing will be subsidiary to the bid items of this contract. B. Materials will be provided by the City of Lubbock to the Contractor's designated area. 1. Water tap material. 2. Sanitary sewer tap material. 3. Potable water main pipe, valves, fittings, fire hydrants and accessories. 4. Sanitary sewer main pipe, manholes and manhole covers and accessories. 5. Steel casing, casing spacers and end seals, if used. 6. Paving repair materials and services for paving cuts in streets and alleys. 7. Gravel embedment. 8. Testing supervision for water and sewer construction projects C. Material Ownership All materials will be delivered to the Contractor's designated area by City of Lubbock forces. Once the Contractor takes possession of the materials provided by the City of Lubbock, the materials then become the responsibility of the Contractor. Any materials requiring replacement due to damage, theft, or any reason will be the responsibility of the Contractor to replace. If additional materials are needed the contractor must request these items from the City of Lubbock. All additional materials will be delivered to the Contractor's designated area by City of Lubbock forces. D. Unit Prices 1. Work will be paid for on the basis of the unit prices submitted in the bid documents. 2. Unit bid prices are to include all equipment, labor and ancillary components necessary for a complete and functional installation. 3. Invoicing to the City of Lubbock must be itemized, based on the unit price list. 1.2 QUALITY ASSURANCE A. Regulatory Requirements. 1. All work will conform to the most recent version of the City of Lubbock Water Utilities Design Standards for Water and Sewer Construction. 2. Contractor is required to provide proper notification to the State of Texas One Call network and comply with State regulatory notification requirements in addition to the City of Lubbock While Line Ordinance. 3. All work shall conform to the most recent version of applicable standards of the Occupational Health and Safety Administration (OSHA). 4. Contractor performing work shall be Confined Space Certified as regulated by the Occupational Health and Safety Administration (OSHA). 5. Traffic control measures shall conform to the most recent version of the Texas Manual on Uniform Traffic Control Devices. 6. All work shall conform to the most recent version of applicable requirements of the Texas Commission of Environmeoral Quality (TCEQ). 7. All work shall be in compliance with other local, state and federal regulations as appropriate. 8. All work within public rights of ways will require a completed permit with the City of Lubbock call Claude Kniesley 806-775-3157. 9. All work within TxDOT (Texas Department of Transportation) rights of ways will have a completed permit before any work can begin. The contractor must keep this permit at the job site while construction is ongoing. In addition the contractor must notify TxDOT 48 hours in advance of construction activities call Linda Parker 806-748-4407 1.3 SEQUENCING AND SCHEDULING A. Installation Time 1. Water and sewer taps shall be completed within 21 calendar days from the date the order is received by the Contractor and all work refusals must be declared within 5 business days of receipt of order. If the order is not refused within 5 business days the contractor will be required to perform the work with no price adjustment being given for any extenuating circumstances. a. Certain water and sanitary sewer taps will be required to be installed with in 24 hours after the order is issued should there be a health, safety and public welfare concern established. b. The Chief Water Utilities Engineer will determine the establishment of a health, safety and welfare concern. C. Any Taps exceeding the 21 calendar day time limit, through no fault of the City, will be assessed a 100 dollar per day Liquidated Damage. 2. Water and sanitary sewer main construction will begin within a minimum of 14 calendar days of issuance of a notice to proceed. 3. Normal installation will require 48 hours waiting period before work may begin to comply with the State notification requirements. 4. All taps are to be installed within 21 days of the tap application date. City shall supply electronically a list of any installations that the City proposes to install in-house to avoid duplication and expense by either City or Contractor, which includes emergency installations; emergencies as set forth in Texas Utilities Code, title 5, Chapter 251. Contractor shall complete installation and electronically input the necessary information on the individual tap cards within the City's system, thereby notifying the City of the completion date and all pertinent documentation of the specific tap including depth and location. City retains capability of immediately accessing this information and answering to the satisfaction of the inquiring customer. All reports, summaries or documentation related to that specific address are thereby retained and controlled by the City. Contractor shall immediately via electronically generated correspondence, make City aware of circumstances beyond his control of any specific installation problem, prohibiting the Contractor's ability to meet the deadline for specified compliance. B. A $100 mobilization credit will be applied to Contractor's invoices for instances that involve verified remobilization caused by developers and landowners who fail to prepare for the installation of taps at the job site. The verification and or approval of a mobilization credit is at the total discretion of the City of Lubbock on a case by case basis. The contractor must provide sufficient information as to the need for remobilization. 1.4 WARRANTY A. Contractor shall provide a standard one year construction warranty on all work performed under this contract. This includes, but not limited to, backfill requirements, pavement and alleys repairs under this contract. B. Contractor is responsible for performing any repairs necessary during this one-year period at no added cost to the City of Lubbock. C. The time for this warranty begins at the time of acceptance of the work associated with each job order. The work will be considered accepted when the City of Lubbock makes payment for the work. 1.5 EXPERIENCE A. Contractor will have a minimum of five (5) years experience in Municipal water and sanitary sewer construction of a similar nature to the scope of work herein specified and must list five (5) major projects constructed within the past five (5) years that illustrate Contractor's experience with projects similar to the project herein specified. B. Contractor will have experience working in alleys or other congested environments and good public interaction as determined by reference checks and as determined by the Director of Water Utilities. C. In order to comply with state regulations the contractor must have at a minimum 1 staff member licensed by the TCEQ (Texas Commission of Environmental Quality) with a class A, B, C or D water operators license on site during any construction activities. If the license holder is a class D on site a staff member with a class C or greater license must be available by phone at all times during installation activities, PART SERVICES 2.1 Sanitary Sewer Service Connections A. Contractor will be required to white line the site for utility locates, and request locates, prior to any work being performed. B. Contractor is required to extend the service pipe to the property line, which typically varies from 5 to 20 feet. Connection of the tap to the service line shall be the responsibility of the customer. C. Backfill in accordance with the most recent Public Works Engineering Minimum Design and Construction Standards of the City of Lubbock. At a minimum mechanical compaction shall meet 95% Modified Proctor Density (with moisture content of +/-2% of optimum) in paved areas and 90% Modified Proctor Density (with moisture content of +/-2% of optimum) in unpaved areas. Backfill shall be accomplished in 6-8" lifts in unpaved areas. Density testing of compacted areas must be performed at least once per installation and for every 50'of pipe length and every 2 feet of lift. Contractor shall use 1 '/2 sack controlled low strength material (flowable fill) with pea gravel in areas paved or proposed to be paved. All flowable fill shall be T- Capped in accordance with the City of Lubbock Ordinance. The contractor is responsible for haul off of excess material when flowable fill is used. D. Sewer tap shall be left at a 5 foot depth and tightly plugged at property line, unless otherwise instructed in the work order. E. Clean up construction area after completion of work returning the area to as near as possible to pre - construction conditions. F. Involves the excavation to the sanitary sewer main and installation of the requested size service saddle to the sewer main. The sewer main will vary in diameter from 6 inches to 12 inches. G. The Contractor must demonstrate the necessity for special provisions due to rock excavation. Upon City approval, allowance shall be made for the application of 50,OOO1b excavator unit pricing. 2.2 Water Service Connections A. Contractor will be required to white line the site for utility locates, and request locates, prior to any work being performed. B. Contractor is to extend the service line to the property line, which typically varies from 5 to 20 feet. C. Backfill in accordance with the most recent Public Works Engineering Minimum Design and Construction Standards of the City of Lubbock. At a minimum mechanical compaction shall meet 95% Modified Proctor Density (with moisture content of +/-2% of optimum) in paved areas and 90% Modified Proctor Density (with moisture content of +/-2% of optimum) in unpaved areas. Backfill shall be accomplished in 6-8" lifts in unpaved areas. Density testing of compacted areas must be performed at least once per installation and for every 50 feet of pipe length and every 2 feet of lift. Contractor shall use 1 %= sack controlled low strength material (flowable fill) with pea gravel in areas paved or proposed to be paved. All flowable fill shall be T- Capped in accordance with the City of Lubbock Ordinance. The contractor is responsible for haul off of excess material when flowable fill is used. D. Install meter box and valve box to proposed grade as per City specifications. E. Clean up construction area after completion of work returning the area to as near a possible to pre - construction conditions. F. Requires excavation to the water main and installation of the requested size water tap on the water main. The water main diameter will vary from 4 to 16 inches. G. The contractor has a right to refuse work twice per month. The right of refusal does not carry over if it is left unused. Work refused shall be final. Once refusal notice has been given to the City it cannot be retracted or exchanged. 2.3 Potable Water Main Construction A. Contractor will excavate and install water mains, fittings, valves and accessories as required for a complete installation. B. Contractor will comply with the most recent version of the City Of Lubbock Water Utilities excavation standards. Typical burial depth is 5 feet to the top of pipe or encasement. C. Backfill in accordance with the most recent Public Works Engineering Minimum Design and Construction Standards of the City of Lubbock. At a minimum mechanical compaction shall meet 95% Modified Proctor Density (with moisture content of +/_2% of optimum) in paved areas and 90% Modified Proctor Density (with moisture content of +/-2% of optimum) in unpaved areas. Backfill shall be accomplished in 6-8" lifts in unpaved areas. Density testing of compacted areas must be performed at least once per installation and for every 50'of pipe length and every 2 feet of lift. Contractor has the option use 1 %z sack controlled low strength material (flowable fill) with pea gravel in areas paved or proposed to be paved. All flowable fill shall be T- Capped in accordance with the City of Lubbock Ordinance. Use of optional flowable fill for mains construction is at the contractors cost. The contractor is responsible for haul off of excess material when flowable fill is used. D. Contractor is responsible for all costs associated mobilization, demobilization, removal and disposal of excess excavation material and construction debris, and pavement cuts, and all other work necessary for a complete and functional installation no additional compensation other than the associated pay items above will be given. E. The Contractor must demonstrate the necessity for special provisions due to rock excavation. Upon City approval, allowance shall be made for the application of 50,OOO1b excavator unit pricing. 2.4 Sanitary Sewer Main Construction A. Contractor will excavate and install sanitary sewer mains, manholes and accessories as required for a complete installation. B. Contractor will comply with the most recent version of the City Of Lubbock Water Utilities excavation standards. Bury depth will vary, but minimum cover shall be 4 feet. C. Backfill in accordance with the most recent Public Works Engineering Minimum Design and Construction Standards of the City of Lubbock. At a minimum mechanical compaction shall meet 95% Modified Proctor Density (with moisture content of +/-2% of optimum) in paved areas and 90% Modified Proctor Density (with moisture content of +/-2% of optimum) in unpaved areas. Backfill shall be accomplished in 6-8" lifts in unpaved areas. Density testing of compacted areas must be performed at least once per installation and for every 50'of pipe length and every 2 feet of lift. Contractor has the option use 1 %z sack controlled low strength material (flowable fill) with pea gravel in areas paved or proposed to be paved. All flowable fill shall be T- Capped in accordance with the City of Lubbock Ordinance. Use of optional flowable fill for mains construction is at the contractors cost. The contractor is responsible for haul off of excess material when flowable fill is used. D. Contractor is responsible for all costs associated with mobilization, demobilization, removal and disposal of excess excavation material and construction debris, and pavement cuts, and all other work necessary for a complete and functional installation. E. The Contractor has a right to refuse work twice per month. The right of refusal does not carry over if it is left unused. Work refused shall be final. Once refusal notice has been given to the City it cannot be retracted or exchanged. F. The Contractor must demonstrate the necessity for special provisions due to rock excavation. Upon City approval, allowance shall be made for the application of 50,OOO1b excavator unit pricing. 2.5 Boring Services A. Contractor will provide all equipment and labor necessary to bore, install steel casing, install pipe in casing, and install pipe spacers as needed. B. Casing may be in joints 40 feet in length or shorter. Contractor shall provide labor, materials and equipment necessary to weld casing segments together. C. Contractor shall be responsible for all costs associated with mobilization, demobilization, removal, disposal of excess excavation material and construction debris, pavement cuts and repairs, and all other work necessary for a complete and functional installation. D. Contractor shall comply with the most recent version of the City Of Lubbock Water Utilities excavation standards. Any changes that are made while unit price contract is in effect shall be addressed on a case-by-case basis. E. At a minimum mechanical compaction shall meet 95% Modified Proctor Density (with moisture content of +/-2% of optimum) in paved areas and 90% Modified Proctor Density (with moisture content of +/-2% of optimum) in unpaved areas. Backfill shall be accomplished in 6-8" lifts in unpaved areas. Density testing of compacted areas must be performed at least once per installation and for every 50'of pipe length and every 2 feet of lift. Contractor shall use 1 '/z sack controlled low strength material (flowable fill) with pea gravel in all paved areas or areas proposed to be paved. The contractor is responsible for haul off of excess material is used. F. Payment for boring service will be based on length of casing installed or beginning and ending stations as staked by the Owner when not encased. G. Boring operations do not supplement work of City crews. No refusal of work will be allowed with requests to bore. 2.6 HYDRO EXCAVATION A. Contractor shall have a maximum of 5 days to respond to each work request. Delays in response will affect performance reports and yearly contract renewal. Weather and other factors causing delays will be evaluated on a case-by-case basis. B. Hydro excavator shall be Super Products Mud Dog 1200, or equal, capable of at least: a. 2500 psi water pressure b. 1000 gallons on -board water supply c. 25" Hg vacuum pressure and 5000 cfin air capacity d. 12 cubic yards on -board spoils volume C. Contractor shall provide all equipment and labor necessary to complete the work assigned including necessary tools, equipment, and supply of water. D. The City will not supply water for excavation truck prior to, during, or after the job. E. The City shall white line proposed area to be potholed, but Contractor shall be responsible for requesting locates as well as verifying and protecting underground utilities. F. Contractor may only dispose of spoils on site with permission City project manager or inspector. 2.6 Electronic Communication A. Contractor shall be capable of communicating with the City of Lubbock through email and have access to the Internet. B. Contractor is required to have the capability to receive and respond to tap orders through the City of Lubbock's electronic tap system. C. Contractor is required to demonstrate this capability at the time of bid submission. D. Documentation of water and sewer tap locations as installed shall be provide by contractor in entry of work completed. PART EXECUTION 3.1 Examination A. Contractor is responsible for inspecting each construction site to determine the conditions are suitable for the planned activity. B. Unsuitable conditions shall be brought to the attention of the Owner prior to the commencement of any work. 3.2 Preparation A. Contractor is responsible for verifying and protecting surrounding utilities and areas. B. Contractor is responsible for compliance with the Texas Excavation Safety System and the most current City of Lubbock Ordinance associated with white line notification. C. Any repair to damaged areas or utilities shall be at the Contractor's expense. D. Contractor is responsible for proper notification of other utilities before commencing work. E. Contractor is responsible for providing all traffic control setup, devices, barricades, preparation and submission of a traffic control plan to the governing agency as necessary at the expense of the contractor. F. All work shall include installation and maintenance of all BMP's (Best Management Practices) as necessary to comply with the City of Lubbock storm water ordinance and TCEQ (Texas Commission of Environmental Quality) construction general permits. This work is subsidiary to the various bid items of the contract. 3.3 Installation A. Contractor shall install components in accordance with the latest requirements of the City of Lubbock Design Standards. B. Contractor shall disinfect water mains and components in accordance with the latest version of the City Of Lubbock Design Standards and the requirements of the Texas Council on Environmental Quality. Contractor is responsible for providing the disinfectant chemicals at no additional expense to the City of Lubbock. C. At a minimum mechanical compaction shall meet 95% Modified Proctor Density (with moisture content of +/-2% of optimum) in paved areas and 90% Modified Proctor Density (with moisture content of +/-2% of optimum) in unpaved areas. Backfill shall be accomplished in 6-8" lifts in unpaved areas. Density testing of compacted areas must be performed at least once per installation and for every 50'of pipe length and every 2 feet of lift. Contractor shall use 1 '/� sack controlled low strength material (flowable fill) with pea gravel in all paved areas or areas proposed to be paved. The contractor is responsible for haul off of excess material is used. 3.4 Field Quality Control A. Test installed components in accordance with the latest version of the City Of Lubbock Design Standards and the Texas Council on Environmental Quality. B. City of Lubbock personnel will inspect all aspects of construction for safety and compliance at the Engineers own discretion. C. Water main construction must be disinfected and pressure tested in accordance with the most recent version of the City Of Lubbock Design Standards. D. Sanitary sewer mains must be mandrel tested in accordance with the most recent version of the City Of Lubbock Design Standards. E. Sanitary sewer manholes must be vacuum tested in accordance with the most recent version of the City Of Lubbock Design Standard. F. Sanitary sewer line mains must be pressure tested in accordance with the most recent version of the city of Lubbock Water Utilities Design Standards. G. Density testing will be performed for every 2 feet of lift and 50'of pipe length. At a minimum at least one test will be performed per installation. All density testing is at the contractor's expense. REVISED �(!C( f iia L BID FORM JJ Water & Sanitary Sewer Tap Installation and Construction Services City of Lubbock, TX ITB 15 -12159 -TF In compliance with the Invitation to Bid 15 -12159 -TF, the undersigned Bidder having examined the Invitation to Bid and Specifications, and being familiar with the conditions to be met, hereby submits the following Bid for furnishing the material, equipment, labor and everything necessary for providing the items listed below and agrees to deliver said items at the locations and for the prices set forth on this form. A bid will be subject to being considered irregular and may be rejected if it shows omissions, alterations of form, conditional alternate bids, additions or alternates in lieu of the items specified, if the unit prices are obviously unbalanced (either in excess of or below reasonably expected values), or irregularities of any kind. The Invitation to Bid 15 -12159 -TF is by reference incorporated in this contract. The Bid Form most be completed in blue or black ink or by typewriter. ITEM DESCRIPTION QTY (More Ulm UNIT COST" EXTENDED COST or Less) ROUP A: SERVICE CONNECTIONS EWER SERVICE CONNECTIONS (Asspecified herein) Al Service Connections 0' to 4' Deep. As 75 EA $500.00 $37,500.00 ecified herein A2 Service Connections 5' to 8' Deep. As 100 EA $525.00 $52,500.00 ecified herein A3. Service Connections 8' to 12' Deep. As 100 EA $ 550.00 $55,000.00 specified herein A4. Service Connections 12' to 15' Deep. 75 EA $575.00 $43,125.00 s specified herein A5. Service Connections 15' to 18' Deep. 25 EA $1,300.00 $ 32,500.00 As specified herein A6. Service Connections 18' to 20' Deep. 10 EA 1,660.00 $16,600.00 As specified herein A7 Cubic Yards Flowable Fill for Paved 200 EA 50.00 $70,000.00 Areas. Asspecified herein WATER SERVICE CONNECTIONS (Asspecified herein) A8 One Inch Water Meter Tap. As 800 EA $355.00 $284,000.00 specified herein A9 Two inch Tap for One and one-half Inch 20 EA $455.00 $ 9,100.00 Water Meter. Asspecified herein A10 Two Inch Water Meter Tap. A 50 EA $550.00 $27,500.00 specified herein Al I our inch Tap for Three Inch Water 25 EA 10.00 $10,250.00 Meter. Asspecified herein A 12 1.5 Cubic Yards Flowable Fill for Paved 500 EA $270.00 $135,000.00 teas. Asspecified herein TRAFFIC CONTROL Asspecified herein) Cost per job for complete setup of A13. TXDOT approved and permitted (Cost plus 10% with City approved submittal of cost barricades asspecified herein. summary from barricades and signage sub -contractor) A14. Cost per job for complete setup oil barricade for City thoroughfare (T -I 0 (Cost plus 10% with City approved submittal of cost -2) ass ecified herein. summary from barricades and signage sub -contractor) S: Purchase(Bid Docs/ITB 15 -12159 -TF, Water & Sanitary Sewer Tap Installation and Construction Services REVISED ITEM DESCRIPTION QTY (More U/M UNIT COST* EXTENDED COST or Less) Cost per job for complete setup o A15. barricades for other City street closure 25 EA $300.00 $7,500.00 as specified herein. ASHPALT AND CONCRETE CUT AND REMOVAL Asspecified herein Square Foot of Asphalt Cut an A16. Removed for pipeline installation. As 2,000 SF $14.00 $28.000.00 ecified herein Square Foot of Concrete Cut an A17. Removed for pipeline installation. As 600 SF $14.00 $8,400.00 ecified herein Cost for ditch in Rock to be verified b A18. City of Lubbock Inspector prior to 40 HR $100.00 $4,000.00 commencement of work (per hour encountered). Asspecified herein TOTAL FOR GROUP A, ITEMS 1 THROUGH 18.$ 820,975.00 ROUP B: MAIN CONSTRUCTION, BORE & INSTALL, MISCELLANEOUS EQUIPMENT AND ASPHALT AND CONCRETE POTABLE WATER MAIN CONSTRUCTION (Asspecified herein BI " Class 150 Water Pipe. As specified 1,000 FT $14.00 14,000.00 erein B2 6" Class 150 Water Pipe. As specified 5,000 FT $16.00 $80,000.00 herein B3 8" Class 150 Water Pipe. As specified 5,000 FT $18.00 $90,000.00 herein B4. 10" Class 150 Water Pipe. As specified 1,000 FT $20.00 $20,000.00 herein BS 12" Class 150 Water Pipe. As specified 1,000 FT $22.00 $22,000.00 erein B6 16" Class 150 Water Pipe. As specified 500 FT $24.00 $12,000.00 herein B7 " Gate Valve and Box. As specified 10 EA 240.00 $2,400.00 herein B8 " Gate Valve and Box. As specified 30 EA S260.00 $7,800.00 herein B9 8" Gate Valve and Box. As specified 30 EA $280.00 $8,400.00 erein 1310. 10" Gate Valve and Box. As specified 10 EA $300.00 $3,000.00 herein BI 1. 12" Gate Valve and Box. As specified 10 EA $320.00 $3,200.00 herein S: Purchase/Bid Docs/ITB 15 -12159 -TF, Water & Sanitary Sewer Tap Installation and Construction Services 2 REVISED ITEM DESCRIPTION QTY (More U/M UNIT COST' EXTENDED COST or Less) B12 16" Gate Valve and Box. As specified5 EA $360.00 $1,800.00 erein B13 " x 4" Main Line Tap. As specified 50 EA $800.00 $40,000.00 erein B14 " x 6" Main Line Tap. As specified 50 EA POO.00 $30,000.00 erein B15. 811x 4" Main Line Tap. As specified50 EA 20.00 $41,000.00 erein B16. 8 x 6" Main Line Tap. As specified50 EA $840.00 $42,000.00 herein 617 8" x 8" Main Line Tap. As specific 50 EA $600.00 $30,000.00 herein B18 10" x 4" Main Line Tap. As specifiedIO EA $900.00 9,000.00 herein B19 10" x 6" Main Line Tap. As specified10 EA $920.00 $9,200.00 herein B20. 10" x 8" Main Line Tap. As specified10 EA 940.00 9,400.00 herein B21 10" x 10" Main Line Tap. As specifie 10 EA $960.00 $9,600.00 herein B22 12" x 4" Main Line Tap. As specified 25 EA $960.00 $24,000.00 herein B23 12" x 6" Main Line Tap. As specified 25 EA $980.00 $24,500.00 herein B24 12" x 8" Main Line Tap. As specified 25 EA $1,000.00 $25,000.00 herein B25 Illerein 12" x 10" Main Line Tap. As specified 25 EA $1040.00 $26,000.00 B26 12" x 12" Main Line Tap. As specified Verein 25 EA $800.00 $20,000.00 B27 16" x 4" Main Line Tap. As specified 5 EA $1,100.00 $5,500.00 erein B28 16" x 6" Main Line Tap. As specified5 herein EA 1,140.00 $5,700.00 B29 16" x 8" Main Line Tap. As specified 5 EA $1,160.00 5,800.00 herein B30. 16" x 10" Main Line Tap. As specified5 herein EA $1,180.00 $5,900.00 16" x 12" Main Line Tap. As specified B31. herein 5 EA $1,200.00 $6,000.00 B32 5' Bury Fire Hydrant Set for new50 EA $600.00 $30,000.00 installation. Ass specified herein B33. Additional Fire Hydrant Bury Depth. As specified herein 100 FT $50.00 $5,000.00 B34. ire Hydrant Adjustment. As specified20 EA 50.00 $1,000.00 erein B35, Ductile Iron Fitting (including ells. tees, bends, etc.). Ass specified herein 30 EA $40.00 $1,200.00 B36. " Ductile Iron Fitting (including ells tees, bends, etc.). Ass specified herein 30 EA $60.00 $1,800.00 S: Purchase/Bid Docs/ITB 15 -12159 -TF, Water & Sanitary Sewer Tap Installation and Construction Services 3 REVISED ITEM DESCRIPTION QTY (More U/M UNIT COST" EXTENDED COST ur Less) B37. 8 Ductile Iron Fitting (including ells 30 EA $80.00 $2,400.00 tees, bends, etc.). As specified herein B38 10" Ductile Iron Fitting (including ells 20 EA $100.00 $2,000.00 tees, bends, etc.. Asspecified herein B39. 12 Ductile Iron Fitting (including ells 30 EA $120.00 $3,600.00 tees, bends, etc.. Asspecified herein B40. 16" Ductile Iron Fitting (including ells 20 EA $160.00 $3,200.00 tees, bends, etc.). Asspecified herein Additional Water Main Depth in excess B41. of 5 feet of cover (per linear foot). A 500 FT $3.00 $1,500.00 s ecified herein SANITARY SEWER MAIN CONSTRUCTION (Asspecified herein) B42 " PVC Sanitary Sewer Pipe 0' to 4' 200 FT $16.00 $3,200.00 Deep. Asspecified herein B43. PVC Sanitary Sewer Pipe 4' to 6' 200 FT $17.00 $3,400.00 Deep. Asspecified herein B44 " PVC Sanitary Sewer Pipe 6' to 8' 300 FT $18.00 $5,400.00 Deep. Asspecified herein B45. PVC Sanitary Sewer Pipe 8' to 10' 300 FT $19.00 $5,700.00 Deep. Asspecified herein B46. 6" PVC Sanitary Sewer Pipe 10' to 12' 300 FT $20.00 $6,000.00 ,Deep. Asspecified herein B47." PVC Sanitary Sewer Pipe 12' to 14' 200 FT $21.00 $4,200.00 ee . Asspecified herein B48. 8 PVC Sanitary Sewer Pipe 0' to 4' 100 FT $17.00 $1,700.00 ee . Ass ecified herein B49 8" PVC Sanitary Sewer Pipe 4' to 6' 100 FT $18.00 $1,800.00 Deep. Asspecified herein B50 8 PVC Sanitary Sewer Pipe 6' to 8' 100 FT $19.00 $1,900.00 Deep. Asspecified herein B51 8" PVC Sanitary Sewer Pipe 8' to 10' 100 FT $20.00 $2.000.00 ee . Asspecified herein B52 8" PVC Sanitary Sewer Pipe 10' to 12' 100 FT $21.00 $2,100.00 DeeD. Ass ecified herein B53. 8 PVC Sanitary Sewer Pipe 12' to 14' 100 FT $22.00 $2,200.00 Deep. Asspecified herein B54. 8 PVC Sanitary Sewer Pipe 14' to 16' 100 FT 23.00 2,300.00 Deep. Ass specified herein B55. 8 PVC Sanitary Sewer Pipe 16' to 18' 100 FT $24.00 $2,400.00 ee . Asspecified herein B56. Sanitary Sewer Pipe 18' to 20' Lep. e . Asspecified herein 100 FT $25.00 $2,500.00 B57 10" PVC Sanitary Sewer Pipe 0' to 4' Deep. Asspecified herein 1 00 FT $18.00 $1,800.00 B58 10" PVC Sanitary Sewer Pipe 4' to 6' Deen. Ass ecified herein 100 FT $19.00 $1,900.00 B59. 10" PVC Sanitary Sewer Pipe 6' to 8' Deep. Ass specified herein 100 FT $20.00 $2,000.00 S: Purchose/Bid Docs/1TB 15 -12159 -TF, Water & Sanitary Sewer Tap Installation and Construction Services REVISED ITEM DESCRIPTION QTY (mare U/M UNIT COST* EXTENDED COST or Less) B60. 10" PVC Sanitary Sewer Pipe 8' to 10' 100 FT $21.00 $2,100.00 Deep. As specified herein B61. 10" PVC Sanitary Sewer Pipe 10' to 12' 100 FT $22.00 $2,200.00 Deep. As specified herein B62 10" PVC Sanitary Sewer Pipe 12' to 14' 100 FT 23.00 $2,300.00 Deep. Asspecified herein B63. 10" PVC Sanitary Sewer Pipe 14' to 16' 100 FT 24.00 $2,400.00 Deep. As secified herein B64. 10" PVC Sanitary Sewer Pipe 16' to 18' 100 FT 5.00 $2,500.00 ee . Ass ecified herein B65. 10" PVC Sanitary Sewer Pipe 18' to 20' 100 FT $26.00 $2,600.00 ee V. Asspecified herein B66. 12" PVC Sanitary Sewer Pipe 0' to 4' ]00 FT $18.00 $1,800.00 Deep. Asspecified herein 667 12" PVC Sanitary Sewer Pipe 4' to 6' 100 FT $19.00 $1,900.00 Deep. Asspecified herein B68 12" PVC Sanitary Sewer Pipe 6' to 8' 100 FT $ 20.00 $ 2,000.00 Deep. Asspecified herein B69. 12" PVC Sanitary Sewer Pipe 8' to 10' iDeep. 100 FT $21.00 $2,100.00 Asspecified herein B70, 12' PVC Sanitary Sewer Pipe 10' to 12' 100 FT 22.00 $ 2,200.00 Dee . Asspecified herein B71 12" PVC Sanitary Sewer Pipe 12' to 14' 100 FT $23.00 $2,300.00 ee . Asspecified herein B72 12" PVC Sanitary Sewer Pipe 14' to 16' 100 FT $24.00 $2,400.00 ee . Ass ecified herein B73 12" PVC Sanitary Sewer Pipe 16' to 18' 100 FT $25.00 $ 2,500.00 Deen. Ass ecified herein B74 12" PVC Sanitary Sewer Pipe 18' to 20' 100 FT $26.00 $2,600.00 ee . Ass ecified herein B75. Standard Manhole 4' or less. As 100 EA $750.00 $75,000.00 specified herein B76. -ost for Additional Vertical Feet50 FT $100.00 5,000.00 Standard Manhole. Ass specified herein B77 Drop Manhole 4' or less. As specified 50 EA $1000.00 $50,000.00 herein B78. ost for Additional Vertical Feet Drop 100 FT 150.00 $15,000.00 anhole. Ass specified herein B79. ost to Tie to an Existing Manhole. As 100 EA $50,000.00 ecified herein F500.00 B80 6" x 4" Wye with Plug. As specific 10 EA $100.00 $1,000.00 erein B81. 8 x 4" Wye with Plug. As specified 10 EA $125.00 $1,250.00 erein B82 10" x 4" Wye with Plug. As specified 10 EA $150.00 $1,500.00 erein B83 12" x 4" Wye with Plug. As specified l0 EA $175.00 $1,750.00 herein " Service Extension to Property Lin B84. with Plug in excess of 15 feet. As 100 EAS 150.00 $15,000.00 -specified herein S: Purchase/Bid Dms/ITB 15 -12159 -TF, Water & Sanitary Sewer Tap Installation and Construction Services 5 IS ITEM DESCRIPTION QTY (.More U/M UNIT COST* EXTENDED COST or Less) B85. 6" Plug. As specified herein 10 EA $25.00 $250.00 B86. 8" Plug. As specified herein 10 EA $25.00 $250.00 B87. 10" Plug. As specified herein 10 EA $25.00 $250.00 B88 12" Plug. As specified herein 10 EA $ 25.00 $250.00 BORE FOR AND INSTALL CASING AND PIPE Asspecified herein) Bore on grade and Install 12" Steel B89. Casing and install PVC pipe with 100 FT $50.00 $5,000.00 acers. Ass ecified herein Bore on grade and Install 14" Steel B90. Casing and install PVC pipe with 100 FT $60.00 $6,000.00 acers. Ass ecified herein Bore on grade and Install 16" Steel B91. Casing and install PVC pipe with 100 FT $70.00 $7,000.00 spacers. Asspecified herein Bore on grade and Install 18" Steel B92. Casing and install PVC pipe with 100 FT $80.00 $8,000.00 spacers. Asspecified herein Bore on grade and Install 20" Steel B93. Casing and install PVC pipe with 100 FT $100.00 $10,000.00 Is pacers. Asspecified herein Bore on grade and Install 24" Steel B94. Casing and install PVC pipe with 100 FT $120.00 $12,000.00 spacers. Asspecified herein B95. Bore on grade and Install 6 Inch PVC 100 FT $30.00 $3,000.00 ipe. As specified herein B96. Bore on grade and Install 8 Inch PVC 100 FT' $40.00 $4,000.00 ipe. As specified herein B97. Bore on grade and Install 10 Inch PVC 100 FT $50.00 $5,000.00 ipe. As specified herein B98, ore on grade and Install 12 Inch PVC 100 FT $60.00 $6,000.00 I pe. As specified herein B99. Bore on grade and Install 16 Inch PVC 100 FT $80.00 $8,000.00 ipe. As specified herein MISCELLANEOUS EQUIPMENT AND OPERATOR Asspecified herein resh Compressed air Supply fo BI00. Confined Space Entry SCBA work (rat 24HR $60.0. $1,440.00 er hour). Asspecified herein S: Purchase/Bid Docs/ITB 15 -12159 -TF, Water & Sanitary Sewer Tap Installation and Construction Services REVISED ITEM DESCRIPTION QTY (.More U/M UNIT COST" EXTENDED COST or Less) Backhoe & Operator for Miscellaneous 13101. xcavation John Deere 310 Extendahoe 24 HR $60.00 r Equal (rate per hour). As specified$1,440.00 herein Backhoe & Operator for Miscellaneous B102 xcavation John Deere 310 Extendahoe 3 DY $400.00 $1,200.00 r Equal (rate per day). As specified erein Backhoe & Operator for Miscellaneous 13101 Excavation John Deere 310 Extendahoe 1 WK $1,500.00 $1,500.00 or Equal (rate per week). As specified herein 50,000 L.B. Excavator & Operator fo 13104. Miscellaneous Excavation (rate pet 8 HR $80.00 $640.00 hour). Asspecified herein 50,000 L.B. Excavator & Operator fol: B105. Miscellaneous Excavation (rate pet 1 DY $500.00 $500.00 Asspecified herein 50,000 L.B. Excavator & Operator for 13106. Miscellaneous Excavation (rate pet 1 WK $2,000.00 $2,000.00 eek). Asspecified herein Miscellaneous Man-hours Labor: 13107 Approved by Owner in Writing Prior to 10 HR $ 50.00 $500.00 he Commencement of Work. As ecified herein ASHPALT AND CONCRETE CUT AND REMOVAL Asspecified herein Square Foot of Asphalt Cut an 13108. Removed for pipeline installation. As 2,000 SF $14.00 $28,000.00 ecified herein Square Foot of Concrete Cut an B109. Removed for pipeline installation. As 600 SF 14.00 $8,400.00 ecified herein Cost for ditch in Rock to be verified b 13110.Ity of Lubbock Inspector prior tc 40 HR $100.00 $4,000.00 ommencement of work (per hou ncountered). Asspecified herein TRAFFIC CONTROL Asspecified herein Cost per job for complete setup of (Cost plus 10% with City approved submittal of cost B 111. XDOT approved and permitted summary from barricades and signage sub -contractor) arricades ass ecified herein. Cost per job for complete setup o a (Cost plus 10% with City approved submittal cost B 112. barricade for City thoroughfare (T-1 summary from barricades and signage sub -contractor) -2) ass ecified herein. Cost per job for complete setup o 8113. barricades for other City street closures 25 EA 300.00 7,500.00 asspecified herein. S: PurchascBid DocsaTB 15 -12159 -TF, Water & Sanitary Sewer Tap Installation and Construction Services 7 ISA -01A ITEM DESCRIPTION QTY (Nom Ulm UNIT COST* EXTENDED COST or Less) TOTAL FOR GROUP B, ITEMS 1 THROUGH 113.$1,118,920.00 ROUP C: HYDRO EXCAVATION SERVICES (As specified herein) Mobilization and demobilization o Cl.hydro-excavator and crew to include 20 EA $600.00 $12,000.00 rite deposition, watering, and travel time. C2.Hydro-excavator and crew 20 HR $200.00 54,000.00 TRAFFIC CONTROL (As specified herein) Cost per job for complete setup of C3. XDOT approved and permitted n (Cost plus 10% with City approved submittal of cost arricades ass ecified herein. summary from barricades and signage sub -contractor) Cost per job for complete setup o a (Cost plus l0/o with City approved submittal cost C4. barricade for City thoroughfare (T-1 & 2 as specified herein. summary from barricades and signage sub -contractor) Cost per job for complete setup o C5. barricades for other City street closures 25 EA 300.00 $7,500.00 ks specified herein. ASHPALT AND CONCRETE CUT AND REMOVAL Asspecified herein Square Foot of Asphalt Cut an C6. Removed for pipeline installation. As 2,000 SF S14.00 $28,000.00 ecified herein Square Foot of Concrete Cut an C7. Removed for pipeline installation. As 600 SF $14.00 $8.400.00 ecified herein Cost for ditch in Rock to be verified b C8 City of Lubbock Inspector prior to 40 HR $100.00 $4,000.00 commencement of work (per hour encountered). Asspecified herein TOTAL FOR GROUP C, ITEMS 1 THROUGH 8. —_ M 63,900.00 — OVERALL TOTAL FOR ITEMS 1 THROUGH 133.$ 2,003,795.00 *PRICE: F.O.B. Destination, Freight Pre -Paid and Allowed S: Purchase/Bid Dws)ITB 15 -12159 -TF. Water & Sanitary Sewer Tap Installation and Construction Services REVISED Unless otherwise specified herein, the City may award the bid either item-by—item or on an all -or -none basis for any item or group of items shown on the bid. The City of Lubbock is seeking a contract for Water & Sanitary Sewer Tap Installation and Construction Services with one or more contractors. In order to assure adequate coverage, the City may make multiple awards, selecting multiple vendors to provide the products desired, if multiple awards are in the best interest of the City. A decision to make a multiple award of this Bid, however, is an option reserved by the City, based on the needs of the City. PAYMENT TERMS AND DISCOUNTS - Bidder offers a prompt payment discount of N/A %, net N//Calendar days. Discounts will not be considered in determining low bid. Unless otherwise indicated on the Bid Form, payment terms will be NET THIRTY DAYS. The City will pay the successful bidder within thirty days after the receipt of a correct invoice or atter the date of acceptance, whichever event occurs later. Discounts for prompt payment requiring payment by the City within a stipulated number of days will be interpreted as applying within the stipulated number of calendar days after the date of receipt by the City of a correct invoice or after the date of acceptance that meets contract requirements, whichever event occurs later. Discounts for payment in less than ten days will not be considered. MOST FAVOURED PRICING: The Bidder certifies that the price quoted is not in excess of the lowest price charged anyone else, including its most favoured customer, for like quality and quantity of the products/services; does not include an element of profit on the sale in excess of that normally obtained by the Bidder on the sale of products/services of like quality and quantity; and does not include any provision for discounts to selling agents. If at any time during the contract period, the supplier should sell or offer for sale to any other customer, an equal or less quantity of similar contract products of like or better quality, at a lower net price(s) than provided herein, supplier agrees to notify the City and sell same product(s) at the lower price(s) on all deliveries made during the period in which such lower price(s) is effective. INTERLOCAL PURCHASING (optional): The City desires to make available to other local governmental entities of the State of Texas, by mutual agreement with the successful bidder, and properly authorized interlocal purchasing agreements as provided for by the Interlocal Cooperation Act (Chapter 791, Government Code), the right to purchase the same services, at the prices quoted, for the period of this contract. Each bidder shall indicate on the Bid Form in the space provided below if he/she will honor Political Subdivision orders in addition to orders from the City of Lubbock. Should these other governmental entities decide to participate in this contract, would you (the bidder) agree that all terms, conditions, specifications, and pricing would apply? Other governmental entities that might have interests in this contract are Frenship Independent School District, Lubbock Housing Authority, Lubbock County, Lubbock County Hospital District, Lubbock Independent School District, South Plains Association of Governments, City of Texarkana, Texas Tech University, West Texas Municipal Power Agency, Lynn County, and City of Wolfforth. YES—X NO • If you (the bidder) checked YES, the following will apply: • Governmental entities utilizing Interlocal Agreements for Cooperative Purchasing with the City of Lubbock will be eligible, but not obligated, to purchase materials/services under the contract(s) awarded as a result of this solicitation. All purchases by governmental entities other than the City of Lubbock will be billed directly to that governmental entity and paid by that governmental entity. City of Lubbock will not be responsible for another governmental entity's debts. Each governmental entity will order their own materials/service as needed. THIS BID IS SUBMITTED BY HD Weaver Ditching Service, Inc. a corporation organized under the laws of the State of Texas , or a partnership consisting of or individual trading as of the City of Lubbock Firm: H.D. Weaver Ditching Service, Inc. Address: 101 E Harvard City: Lubbock State: Texas Zip 79403 Bidder acknowledges receipt of the following addenda: Addenda No. 1 Addenda No. 2 Addenda No. Addenda No. _ Date 12-31-2014 Date 1-6-2015 Date Date S: Purchase/Bid Does/ITB 15 -12159 -TF. water & Sanitary Sewer Tap Installation and Construction Services M/WBE Firm:1 Woman I Black Amcric Hispanic American Asian Pacific sign by hand Officer Name and Tgdr Randy Jeffreys, President Please Print Business Telephone Number 806 763-2723 FAX: 806 763-0444 E-mail Address: randyieffreys(d)msn.com FOR CITY USE ONLY Bid Form Item Number(s) Awarded to Above Named Firm/Individual: Date of Award by City Council (for bids over 850,000): Date P.O./Contract Issued: RETURN COMPLETED & SIGNED BID FORM ALONG WITH CITY OF LUBBOCK SPECIFICATIONS. LABEL THE OUTSIDE OF YOUR SEALED BID WITH THE ITB NUMBER, THE CLOSING DATE AND TIME, AND YOUR COMPANY NAME AND ADDRESS. S: Purchase/Bid Docs/ITB 15.12159 -TF, Water & Sanitary Sewer Tap Installation and Construction Services 10 DATE January 14, 2015 bbock TEXAS TO Marta Alvarez, Director of Purchasing and Contract Management FROM Greg Baier, P.E. CC R. Keith Smith, P.E. SUBJECT Contract Award Recommendation ITB 15 -12159 -TF, Water & Sanitary Sewer Tap Installation and Construction Services BACKGROUND/DISCUSSION: This is a one year contract with the option for up to three (3) additional one-year extensions to install various water and sanitary sewer system components. Major items include installation of: sewer and water taps, water lines and valves, bores and casing. This contract also includes rental of assorted construction equipment with operators. Construction materials are to be provided by the City of Lubbock and installed by the successful bidder. Bids were received from the following: Company Group A Group B Group C H.D. Weaver Ditching Service $ 820,975 $ 1,118,920 $ 63,900 Utility Contractors of America 0 2,281,800 140,000 Burdett Ditching 1,010,950 0 0 The contract is awarded by the unit price. The total amount of the award is estimated based on expected quantities, and actual expenditures may be more or less depending on actual need. The price per unit will not change. SUMMARY/RECOMMENDATION: Staff recommends the service contract be awarded to H.D. Weaver Ditching Service, Inc. of Lubbock, TX for groups A, B, and C. The contract shall be for a term of one year, with the option of three, one year extensions, said date of term beginning upon formal approval. FISCLA,L IMPACT: Re olvmg eni0rpnofunds, paid by cus om A in two accounts 6470.9242.30000 for sem Group B in two accounts 6423.9242.30000 extensions for this purpose. Project _._. Group C activities. John Turpin, P.E. Chief Water Utilities Engineer City of Lubbock A line fees, have been established for: Group and 6370.9241.30000 for water taps; and ter extensions and 6115.9241.30000 for water $_ of which $_ is available for