Loading...
HomeMy WebLinkAboutResolution - 2015-R0035 - Utility Contractors Of America - 01/22/2015Resolution No. 2015-R0035 Item No. 5.7 January 22, 2015 RESOLUTION IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for I on behalf of the City of Lubbock, Change Order No. 1 to that certain Contract No. 11709 by I between the City of Lubbock and Utility Contractors of America, Inc., per Bid # 14-11709- , for cancellation of certain tasks, and additional installation and pipeline relocation activities, I related documents. Said Change Order No. I is attached hereto and incorporated in this olution as if fully set forth herein and shall be included in the minutes of the City Council. by the City Council on January 22, 2015 TTEST: City AS TO CONTENT: Keith Smith, P.E., GLEN O RTSON, MAYOR of Public Works �ttomey VUbVoty er nnr Office of Purchasing and Contract Management Change Order Contract No: 11709 Contractor: Utility Contractors of America, Inc. Change Order No: 01 Contract Title: South Lubbock Sanitary Sewer Extension Phase I — Bid Package B Bid/RFP No: 14 -11709 -TF Project No: 92178 "Change Order" means a written order to a Contractor, executed by the Owner, in accordance with the Contract authorizing an addition to, deletion from, or adjustment or revision of the requirements of the Contract documents, or an adjustment to the compensation payable to the Contractor, or to the time for performance of the Contract and completion of the project, or a combination thereof, which does not alter the nature of project and is an integral part of the project objective. Adjustments to "Estimated Quantities" to a line time in a Unit Price Contract do not require a Change Order. All work that alters the nature of the construction or that is not an integral part of the project objective must be let out for public bid. Description of Change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the Per attached backup material this Change Order 91 includes the following items: Item t) Credit for not installing the 10 -foot diameter manhole at STA 20+89.15. Item 2) Credit for not installing the Vortex Flow insert at STA 20+89.15. Item 3) Credit for trench safety system not installed due to increased bore length. Item 4) Installing 54 -inch fiberglass pipe by other than open cut from approximately STA 49+54 to STA 50+00. Item 5) Installing a 5 -foot diameter drop manhole at STA 20+89.15. Item 6) Relocation of 8" water line in 381i Street. A time extension of 65 days is included in this change order, 30 days for right-of-way issues and the existing alignment being deflected at the beginning of the project and 35 des for replacement of the 8 -inch water line in 38" Street. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial Contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM. ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $20,293,159.95 B. AMOUNT OF THIS CHANGE ORDER: (Note: Council approval required irover $50,000) -$65,664.00 COST CENTER: ACCOUNT: C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A) -0.32% D. AMOUNT OF PREVIOUS CHANGE ORDERS: $0 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D) -$65,664.00 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): (25% maximum) -0.32% G. NEW CONTRACT AMOUNT (A+E): $20,227,495.95 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of, or resulting directly or indirectly: from the work performed or modified by the Contractor under this Change Order. J� Lfr n �C 14i1Q� rZ lI Dae (2) Project Architect/Engineer Date Approved < to Cont nt: gDat Ownertl3esres ative �-- (5) Capita rojecis Manager Date 1/22/15 Date Council Date: January 22, 2015 Agenda Item #: 5.7 Alaroved (nit�tome /* AAQ Date s (6) Dt cior of rchasing & Contract Date Management #: 2015-R0035 PUR45 (Rev 012012) Kimlep Horn December 11, 2014 Mr. Zoltan Fekete, P.E. City of Lubbock, Texas 1625 13th Street Lubbock, Texas RE: South Lubbock Sanitary Sewer Extension, Phase I — Bid Package B Change Order Number 1 KHA No. 063126015 Dear Zoltan: The following is a description of the items that are involved in change order number one (1) for the above referenced project. 1. Through value engineering it was determined that the Vortex Flow insert for the manhole at STA 20+89.15 would not be utilized in a way that would be the most efficient and, therefore, was removed from the project. With the Vortex Flow insert being removed the need for a 10 -foot diameter was no longer necessary resulting in a credit of $130,000.00. 2. This item is the removal of the Vortex Flow insert from the project as described above resulting in a credit of $100,000.00. 3. Due to conflicts with gas lines and water lines an additional 46 linear feet of by other than open cut was added to the project resulting in a decrease of the amount of trench safety required for open cut and a credit of $184.00. 4. Due to conflicts with gas lines and water lines an additional 46 linear feet of 54 -inch sewer pipe by other than open cut was added to the project resulting in an increase of $34,500.00. 5. To replace the 10 -foot manhole that was removed at STA 20+89.15 from the project, a new 5 -foot diameter fiberglass drop manhole was needed, resulting in an increase of $98,000.00. 6. Due to the location and condition of the existing 8 -inch water line along 38'h Street, it was determined that the entire 740 linear feet of the 8 -inch water line (including one fire hydrant, valve, tee, and service tap) would be replaced resulting in an increase of $32,020.00. An additional 35 days is requested for this item. The change in contract price associated with these changes is detailed below: • Original contract price: $20,293,159.95 • Net change of this change order: -$65,664.00 • Contract price with all approved change orders: $20,227,495.95 Kimlep Horn Page 2 As you are aware, the existing sanitary sewer line that UCA connected to with this project was not within the alignment per the record drawings or design. Therefore adjustments to the alignment had to be made causing delays in the project. An additional 30 days are recommended for this work. • Original Period l contract time: 300 days • Original Period 1 NTP date: May 19, 2014 • Contract time change with this change order: 65 days • Contract time with all approved change orders: 365 days • Revised Substantial Completion Date for Period 1: May 19, 2015 Should you have any questions please do not hesitate to give me a call. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. Texas Firm Registration No. F-928 Aaron K Rader, P.E. Copy to: City of Lubbock: Wood Franklin, P.E., John Turpin, P.E., Josh Kristinek UCA: Ty Lane Walker RPR Services: Ricky Walker, Mark Perry Kimley-Horn: Jeff James, P.E. MFM UtildieSW63126015SLSSE Phl BPS CCAIRR�CHG ORMChange OrdeeOMhange Order 1 KHA LeUw.d= Utility Contractors of America, Inc. 5805 CR 7700 Lubbock, TX 79424 (806) 863-2642 To: Kimley-Horn and Associates From: UCA Attn: Aaron Rader Date: December 4, 2014 Project: South Lubbock Sanitary Sewer Extension - Phase 1 Contractor's Request to Change Changes: UCA is respectfully requesting to change the proposal to include the following items. Description Quantity Unit Unit Cost Total Install a drop manhole in leiu of Items 30 & 31 1 EA $98,000.00 $98,000.00 Delete Item 30 -10' Manhole -1 EA $130,000.00 ($130,000.00) Delete Item 31- Vortex Flow Insert -1 EA $100,000.00 ($100,000.00) Install 8" water line to replace leaking line @ 38th St 740 LF $40.00 $29,600.00 Install Fire Hydrant 1 EA $820.00 $820.00 Install 6" Gate Valve & Box 1 EA $550.00 $550.00 Install 8x6 Tee 1 EA $310.00 $310.00 Install 1" Service Tap 1 EA $740.00 $740.00 54" Tunnel under gas line @ 38th & MLK 46 LF $750.00 $34,500.00 Delete Trench Safety -46 LF $4.00 ($184.00) Add 65 days to Contract Time leaking water line replacement 35 Days $0.00 alignment & low issues @ beginning of job 30 Days I i 0.00 Date: Accepted: Total: ($65,664.00) VJirwlalios UCA Signature: Date: Title: Cost to install 5' Drop Manhole @ Sta 20+89 Labor & Equipment 51,663.50 Materials 33,547.71 Profit & Overhead 12,781.68 Total 97,992.89 Material Prices Associated Fiberglass Station 20+89 1 7,101.03 7,101.03 Hobas P54-25-0072-FP-FWCE-PE 20 158.25 3,165.00 54"x36" FWC Tee, 1M w/Stub (623-53) 1 6,305.00 6,305.00 24" Pipe 30.15 55.00 1,658.25 Closure -SS -24 2 715.00 1,430.00 24"x24" FWC Tee, 0 Miter (623-54) 1 1,879.00 1,879.00 24"x24" FWC Elbow, 3 Miter (623-55) 1 2,355.00 2,355.00 South Plains Concrete Manhole, Tee Base, 54" Bend 1 3,750.00 3,750.00 O'Tool 32" Pamrex "Sanitary Sewer" Ring & Cover 1 640.00 640.00 Ram-Nek Sealant 1 16.35 16.35 Pipe Lube 1 12.00 12.00 Lone Star Dirt & Paving Crushed Concrete 72.68 6.00 436.08 S&T Materials 2sk Stabilized Base 24 60.00 1,440.00 2sk Stabilized Base 48 60.00 2,880.00 2sk Stabilized Base 8 60.00 480.00 TOTAL MATERIALS 33,547.71 KIMLEY-HORN AND ASSOCIATES, INC. 801 Cherry Street, Suite 950 Fort Worth, TX 76102 CHANGE OR EXTRA WORK ORDER NO. 1 PROJECT DESCRIPTION: KHA Project No.: OWNER: CONTRACTOR: ORIGINAL CONTRACT AMOUNT: REVISED CONTRACT AMOUNT PER CHANGE ORDER No. 1: South Lubbock Sanitary Sewer Extension Phase 1, Bid Pacakge B 063126015 City of Lubbock UCA $20,293,159.95 $20,227,495.95 CHANGE OR EXTRA WORK TO BE PERFORMED Date: December 11, 2014 Item Approx. $32,020.00 $32,020.00 Decrease in Increase in No. Quantity Description of Item Unit Price Con V. Price Comr. Price 30 (I) 10 -Foot Diameter Sanitary Sewer Manhole $130,000.00 ($130,000.00) 31 (1) Vortex Flow Insert- Line A Sta. 20+89.15 $100,000.00 ($100,000.00) 41 (46) Trench Safety System $4.00 ($184.00) 74 46 48 -Inch Fiberglass Sewer Pipe (SN 46) by Other Than $750.00 $34,500.00 Open Cut 75 1 5-11 Dia Fiberglass Drop Manhole at STA 20+89.15 76 1 Replace 8" Water Line on 38th Street 740 8" C900 PVC Water Line I installation of Standard Fire Hydrant I Installation of 8" Gate Valve and Box I Installation of8'x6" Tee I I" Service Tap Total Increase in Contract Amount: Total Decrease in Contract Amount: Net Change in Contract Amount: Percent of Contract Value This Change Order: Amount of Previous Change Orders: Total Amount of All Change Orders Percent of Contract Value All Change Orders: Revised Contract Amount: Original Period 1 Contract Time Net Change in Contract Time of Completion: Revised Contract Time of Completion: A'. IIW IIe1ti.,�IZW 1}SISY VE11119 (CAAfMpUPV(,�g PJnn,WllvYvp.N $98,000.00 $98,000.00 $32,020.00 $32,020.00 $40.00 S29.600.00 S820.00 5820.00 5550.00 S550.00 $310.00 S3I0.00 5740.00 $740.00 ($230,184.00) $161.520.00 ($65.664.00) -0.32% $0.00 ($65.664.00) -0.32% $20,227,495.95 300 65 365