HomeMy WebLinkAboutResolution - 2022-R0132 - Change Order No. 2 Contract 15758 with West Texas Paving 3.22.22Resolution No. 2022-RO132 Item No. 7.16 March 22, 2022 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute and on behalf of the City of Lubbock, Change Order No. 02 to that certain Contract No. 15758 and between the City of Lubbock and West Texas Paving, Inc., for the paving of Indiana Avei 130'h to Woodrow Road, and related documents. Said Change Order No. 02 is attached her and incorporated in this resolution as if fully set forth herein and shall be included in the minu of the City Council. Passed by the City Council on March 22, 2022 DANIEL M. POPE, MAYOR ATTEST: RebeAca Garza, City Secr ary APPROVED AS TO CONTENT: Jesica cEachern, Assistant City Manager APPROVED AS TO FORM: 011iLeilsur4e,As&sistan�tCity Attorney ccdocs/RES.ChgOrd#2-Contract 15758 West Texas Paving 3.8.22 Office of Purchasing and Contract Management Change Order Contract No: 15758 Contractor: West Texas Paving, Inc. Change Order No: 2 Contract Title: Indiana Avenue 130th to Woodrow Road Bid/RFP No: 21-15758-JM Project No: 92625 "Change Order" means a written order to a Contractor, executed by the Owner, in accordance with the Contract authorizing an addition to, deletion from, or adjustment or revision of the requirements of the Contract documents, or an adjustment to the compensation payable to the Contractor, or to the time for performance of the Contract and completion of the project, or a combination thereof, which does not alter the nature of project and is an integral part of the project objective. Adjustments to "Estimated Quantities" to a line time in a Unit Price Contract do not require a Change Order. All work that alters the nature of the construction or that is not an integral part of the project objective must be let out for public bid. Description of Change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the ins and drawings of the project (attached additional pages is necessary: The work in this Change Order shall include extending the limits of the full -width pavement south to Woodrow Road. This work was originally intended to be performed as part of the Woodrow Road reconstruction, but will instead be constructed as part of the Indiana project. All work will be performed using existing line items and bid prices from the Indiana contract See attached spreadsheet for a detailed breakdown. An additional 110 calendar days will be added to the contract for the work involved. Item Unit Price Quantity Cost 1. Change Order #2 * $544,384.00 1 each $544,384.00 Total Cost $544,384.00 * See attached for detailed itemization wnere the unange Order is negotiated, the change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial Contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FnRM- ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $ 6,343,197.50 B. AMOUNT OF THIS CHANGE ORDER: Note: Council approval required if (+/-) $50,000 $ 544,384.00 COST CENTER: 4545 1 ACCOUNT: 92625.9240.30000 C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER B/A 8.58 % D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 14,620.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS B+D) $ 559,004.00 F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25% maximum) 8.81 % G. NEW CONTRACT AMOUNT A+E): $ 6,902,201.50 It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of, or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. order ,z3t_ _ Date (2) (3) 0 I ner's Re Date j ' FDirek�or of Purchasing & Contract 0I"V<_ nt 3!S/a.� a e (5) Capital Aroject Manager Date (6) ity Attorney 000.00 reauire a Contract (7) Mayor Council Date: March 22, 2022 03/22/2022 Date (8) Agenda Item #: 7.16 3/-7/z 2— Date 3/07/Z2, Date 03/22/2022 Date 2022-RO132 PUR-45 (Rev 08/2018) PROGRAM ESTIMATE FOR CHANGE ORDER #2 TO RFP 21-15758-JM CONTRACT NO.15758 TYPE: WIDEN INDIANA AVENUE FROM TWO LANES TO FIVE LANES LENGTH: FEET = 895 MILES = 0.17 LIMITS: CR 2100 (INDIANA AVE) FROM WOODROW ROAD TO CR 7560 PREPARED BY: KIMLEY-HORN Date: 03/07/22 ITEM NO. TxDOT NO. SPEC NO. DESCRIPTION UNIT CITY PRICE AMOUNT 1 100 PREPARING ROW STA 9.00 $2,000.00 $18.000.00 4 104 REMOVING CONC DRIVEWAYS SY 368.00 $20.00 $7,360.00 6 105 REMOVE ASPHALT PAVEMENT 2.5" TO 3.5" SY 2393.00 $4.00 $9,572.00 8 110 EXCAVATION ROADWAY CY 3289.00 $5.00 $16.445.00 10 1 132 1 EMBANKMENT FINAL DENS CONT CY 186,00 $6.00 $1,116.00 11 164 BROADCAST SEED PERM URBAN SANDY SY 3793.00 $0.50 $1,897.00 12 216 VEGETATIVE WATERING MG 47.85 $40.00 $1,914.00 14 247 FL BS (CMP IN PLACE A GR 1-2 12' SY 6882.00 $20.00 $137,640.00 15 305 SALVAGE & HAUL ASPHALT PAVEMENT 2" TO 4" TON -MI 5265.00 $0,25 $1,316.00 16 1 310 1PRIME COAT MG30 GAL 1239.00 $4.00 $4,956.00 17 316 ASPHALT AC-15P DETOUR AREAS GAL 249.00 $4.50 $1,121,00 18 316 AGGREGATE PB) (GR-4) (SAGA DETOUR AREAS CY 1 8.00 $60.00 $480.00 19 341 HMAC -C SAGB PG70-28 2' TON 732.00 $120.00 $87,840.00 20 341 HMAC B PG 70-28 4" TON 1426.00 $105.00 $149,730.00 24 432 CONCRETE RIPRAP 4" CY 10.00 $300.00 $3,000.00 34 496 REMOV STR PIPE LF 66.00 $30,00 $1,980.00 35 496 REMOV STR SET EA 2.00 $1,000.00 $2,000.00 38 BARRICADES, SIGNS, AND TRAFFIC HANDLING MO 3.001 $5,000.00 $15,000.00 40 506 ROCK FILTER DAMS INSTALL 1 LF 90.00 $30.00 $2.700.00 44 506 BIODEG EROSN CINT LOGS INSTL 8' LF 40.00 $5.00 $200.00 45 506 BIODEG EROSN CINT LOGS REMOVE LF 20.00 $5.00 $100.00 47 CONSTRUCTION TEMPORARY PAVEMENT WIDENING SY 656,00 $30.00 $19,680.00 49 529 CONC CURB 8 GUTTER 11 LF 1284.00 $15.00 $19,260.00 51 529 CONC CURB 8 GUTTER ALLEY GUTTER SY 29.00 $80.00 $2,320.00 52 530 INTERSECTIONS CONC SY 93.00 $80.00 $7,440.00 53 530 DRIVEWAYS CONC SY 271.00 $80.00 $21,680.00 58 560 MAILBOX INSTALL-S TWG-POST TY 4 EA 2.00 $300.00 $600.00 65 644 REMOVE SM RD SN SUPBAM EA 3.00 $200.00 $600.00 66 644 IN SM RD SN SUPBAM TYIOBWG 1 A P EA 3.00 $700.00 $2,100.00 71 666 RE PM W/RET REQ TY I "SLD 100MIL LF 1663.00 $0.701 $1,164.00 72 666 REFL PAV MRK TY I 8" SLD t00MIL LF 1 520.00 $1.00 $520.00 75 668 PREFAB PAV MRK TY B 24' SLD LF 61.00 $10.00 $610.00 76 666 RE PM W/RET REQ TY I Y ' BRK 100MIL LF 227.00 $1.00 $227.00 77 666 RE PM W/RET REQ TY I ' SLD 100MIL LF 2667.00 $0.75 $2,000.00 78 666 REFL PAV MRK TY I 12" SLD tOOMIL LF 28.00 $5.00 $140.00 79 668 PREFAB PAV MRK TY B ARROW EA 2.00 $700.00 $1,400.00 81 672 REFL PAV MRKR TY II -A -A EA 46.00 $6.00 $276.00 PROJECT JATAL 1 $544,384.00 Page 1 of 1 z 1,94 i o- so, 'HDRZ lilt SCALE -,0 A; k 14 E-7 jI PERMANEWr, FULL, M15TH 'TEMPORARY TIE-IN TO PAVEME41 TO BE 4r CONSTRUC3M ME CO #2 EXISTING WOODROW RD ­F - I - T r it D p SE .................. LK R&I ROW ----------------------------- -------- ------ --- 4WOO & EXISTING ROW C.- ------ _77 X YWIM it ,I It f 401 1 It it k I I I -_ SN.- It I L4 DISCOLINT STORAGE Z­ �70 gt, INDIANA AVENUE PROPOSED EXTENSION LIMITS EXHIBIT Kim lelyr* Horn I—fq HUGO REED AND FOR CO #2 WOODROW ROAD 03/07/2022