HomeMy WebLinkAboutResolution - 2017-R0488 - Change Order 001 - CSA Construction - 12/18/2017Resolution No. 2017-RO488
Item No. 6.11
December 18, 2017
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for
and on behalf of the City of Lubbock, Change Order No. 001 to that certain Contract No. 12943
by and between the City of Lubbock and CSA Construction, Inc., for North and South Water
Treatment Plant Improvements per Bid # 16-12943-TF, and related documents. Said Change
Order No. 001 is attached hereto and incorporated in this resolution as if fully set forth herein and
shall be included in the minutes of the City Council.
Passed by the City Council on December 18, 2017
DANIEL M. POPE, MAYOR
ATTEST:
- P, 0 JO /-f F, - J(��
Re ecca Garza, City Secret y
APPROVED AS TO CONTENT:
Michael G. Keenum, P.E., City Engineer
APP OVED AS TO FORM:
l�wh.
e-11i Leisure, Assistant City Attorney
ccdocslRES.ChgOrd#00I.Contract#I2943.North and South Water Treatment Plant Improvements
1 1.14.2017
Office of Purchasing and Contract Management
Change Order
Contract NoAW IZa,43
Contractor: CSA Construction, Inc.
Change Order No: 001
Contract Title: North and South Water Treatment Plant Improvements
Bid/RFP No: 16-129" TF
Project No: 91032.9241.30000/92353.9241.30000 0425-021-01
tzR93
"Change Order" means a written order to a Contractor, executed by the Owner, in accordance with the Contract authorizing an addition to, deletion
from, or adjustment or revision of the requirements of the Contract documents, or an adjustment to the compensation payable to the Contractor, or to
the time for performance of the Contract and completion of the project, or a combination thereof, which does not alter the nature of project and is an
integral part of the project objective. Adjustments to "Estimated Quantities" to a line time in a Unit Price Contract do not require a Change Order. All
work that alters the nature of the construction or that is not an integral part of the project objective must be let out for public bid.
Description of Change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the
s ecincanons ano arawin s or me ro ecr tattacnea aamnonai pages is necessary:
PCM001 North Plant -Additional duct bank to connect the North Plant main switchgear electrical feed to project scope.
PCM002 — North Plant — Block credit from changing Disinfection veneer block to straight block from split face.
PCM003 — South Plant — Additional core holes to enable new chemical piping.
PCM004 — North Plant — Relocation of existing plant fiber optic cables to clear project defined conduit of electrical feed.
PCM006 — North Plant — Electrical feed change from additional pump house junction box to the control room MCC.
PCM008 — South Plant — Additional coupling material for proper piping connections.
Contractor has requested 38 additional days to complete the work for these contract changes
Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material
costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial Contract, no
deviations are allowed in computing negotiated change order costs.
ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM.
ITEM
DESCRIPTION
AMOUNT
A.
ORIGINAL CONTRACT VALUE:
$8 618 000.00
B.
AMOUNT OF THIS CHANGE ORDER: Note: Council approval required if +/- $25,000
$69 627.00
COST CENTER:6211 I ACCOUNT: 91032.9241.30000/92353.9241.30000
C.
PERCENT OF CONTRACT VALUE THIS CHANGE ORDER /A
.008%
D.
AMOUNT OF PREVIOUS CHANGE ORDERS:
$0.00
E.
TOTAL AMOUNT OF ALL CHANGE ORDERS B+D
$69 627.00
F.
PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25% maximum
.008°%
G.
NEW CONTRACT AMOUNT A+E :
$8 687 627.00
It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation
to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising
out of, or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order.
(1) Contractor
(5) Capital Project Manager
over
(7) Mayor
11 /01 /2017
Date
A
ate
Date
(2) ProjqFt Architec gineer
12/18/2017
Date (8)
Secretary
2017-11-01
Date
ov 13 2017
Date
< <'1 't
Date
12/18/2017
Date
Council Date: December 18, 2017
Agenda Item #: _
6.11 Resolution #: 2017-RO488
r FREESE
? MNICHOLSS PROPOSED CONTRACT MODIFICATION (4.41 /
PROJECT. Improvements to the North and South WTPs II PROJECT NUMBER:
OWNER: City of Lubbock 91032.9241.3000
BUILDER: C.S.A. 1603
ENGINEER: Freese & Nichols, Inc. LUB16498
DESCRIPTION: Ductbank to MCC-RM Power Feed PCM No: 001
NOTIFICATION TO BUILDER:
The Owner proposes to make the additions, modifications or deletions to the Work described in the
Contract Documents as shown in Attachment "A". We request that you take the following action
within 10 calendar days:
Notify us that you concur that this change does not require a change in Contract time or
amount. A Field Order will be issued.
X Submit a Price/Credit Proposal with detailed cost breakdown of labor, materials,
equipment and all other costs related to this change. Impacts on Contract Time shall be
shown in a revised schedule, included with the submitted proposal.
Proceed with the change. Payment will be made at the unit price bid.
Proceed with the change under the time and materials provisions of the Contract.
Authorization to proceed with changes must be approved by the Owner through Change Order in
accordance with the Contract Documents.
By: Brian Beach Date:
BUILDER'S RESPONSE:
We respond to your request as follows:
We propose that this is a no cost or time change. Issue Field Order.
X We submit the attached Price/Credit Proposal with detailed cost breakdown and revised
schedule for performing the described change.
We are proceeding with the change at the unit price bid.
We are proceeding with the change under the time and materials provisions of the
Contract.
By: Brian Beach Date:
ACTION TAKEN:
Proposed Contract Modification rejected. See comments.
Field Order will be issued.
X Change Order will be issued.
By: Brian Beach Date:
PROPOSED CONTRACT MODIFICATION
ATTACHMENT A
The Owner proposes to make the following additions, modifications or deletions to the work described
in the Contract Documents. Authorization to proceed with these changes must be approved by Field
Order or Change Order in accordance with the Contract Documents, prior to commencing the work
involved.
Site for proposed change viewed from the North. Running conduit from existing conduit stub out at far
right to existing conduit from removed transformers.
--a
View from West Side of PCM site. Running conduit from existing conduit stub out at right to existing
conduit stub out on left of picture
By: Byron Stickney Date: 3/28/2017
CSA CONSTRUCTION, INC.
2314 McAllister Road
Houston, TX 77092
P: 713-686-8868/F: 713-689-8889 C5
OWNER: City of Lubbock, Texas
PROJECT: Improvments to the North & South WTP's
ENGINEER: Alan Plummer
CM: Freese & Nichols
CONTRACTOR: CSA Construction, Inc.
PREPARED BY: George Craig
DATE: March 10, 2017
DESCRIPTION OF CHANGE: New Ductbanks, Conduit, Tap Box at the existing Switchgear Building for MCC-RM Power Feed.
DESCRIPTION
LABOR
QUANTITY UNIT
TAXABLE EXEMPT
TOOLS & EQUIP MATERIAL
TOTAL UNIT TOTAL UNIT TOTAL TOTAL
Additional Electrical work per above
description 1 Is - - 28,524.00 28,524 28,524
SUBTOTALS
Clarifications
1. SCl/CSA requests an additional 30 days.
- 28,524 28,524
OHBP 10% 2,852
Total 31,376
C System Control & Instrumentation
11218 IH-10 EAST, CONVERSE, TX 78109
SYSTEM CONTROLS & INSTRUMENTATION 210-661-9901 (Office) 210-666-5575 (Fax)
PROPOSAL
SUBMITTED TO: CSA
PROJECT NAME: Lubbock North WTP
Change Order 001 Ductbank for MCC-RM power feed
CONTACT: George
PHONE:
':1111111111
SCOPE OF WORK: Installing new ductbank (2) 4" conduits from old transformer pad to the existing (2) 4" spare
conduits at the northeast courner of the Switchgear building. Install a tap box (NEMA 3R) on
the old transformer pad and a pull box (NEMA 4X) at the existing spare conduits at the
northwest corner of the switchgear building.
TOTAL AMOUNT $28,524.36
Additional Days: 30 additional days are required for this work from the date of the signed Change
Order and Notice to Proceed with this work is received, subject to availability of
personnel when signed Change Order is received, to the extend personnel are
unavailable, the time extension will/must be extended to the extent necessary to
allow personnel availability for this work and arrival of the equipment and materials.
EXCLUSIONS: 1. Sales tax.
2. Asphalt repairs to the road, removal and re -installing the fence to the manhole and
all other exception as stated on the contract.
3. Any other materials or equipment not listed on this Proposal
This Proposal may expire in 30 days or upon written retraction by SCI.
If you have any questions regarding this Proposal, please give me a call.
SUBMITTED BY: System Control & Instrumentation, Ltc
Michael Jarrett 2/8/2017
Project Manager Date
System Controls & Instrumentation, Ltd.
11218IH-10 E.
Converse, TX 78109
PAGE
Phone: (210) 661-9901 Fax: (512) 666-5575
Description Ref Ref Amount Op Rate Amount
Material
Material Total=
See Attachment
$11,957.19
x
1.00
11957.19
Shipping Costs
0.00
Subtotal
11957.19
Direct Labor
Project Manager
Per Hour
1.00
x
75.00
75.00
Superintendent
Per Hour
12.10
x
65.00
786.50
Electrician
Per Hour
121.00
x
55.00
6655.00
Instrument tech
Per Hour
0.00
x
55.00
0.00
La°b& Ad ustrhent, Elevated Work 10'-20'
0.00
Programmer
Per Hour
0.00
x
85.00
0.00
Estimator
Per Hour
1.00
x
60.00
60.00
Subtotal
7576.50
Indirect Labor
Submittals & O&M Manuals
Calc
0.00
x
33.00
0.00
Testing
Calc
0.00
x
45.00
0.00
Training
Calc
0.00
x
45.00
0.00
Drawings
Calc
1.00
x
33.00
33.00
Purchase Agent
Calc
1.00
x
40.00
40.00
Procurement
Calc
1.00
x
20.00
20.00
Subtotal
93.00
Labor Burden
Percent
7669.50
%
45.00
3451.28
Travel
Lodging
Per Day
0.00
x
75.00
0.00
Meals
Per Day
0.00
x
30.00
0.00
Subtotal
0.00
Equipment
Equipment Rental
See Attahment
Tools
Labor Total
11120.78
%
3.00
333.62
Expendable
Material Total
11957.19
%
3.00
358.72
Procrement Vechicle
60.00 Per Day
0.00
x
60.00
0.00
Electrician/Super/Tech Vechicle
60.00 Per Day
0.00
x
60.00
0.00
Programmer Vechicle
60.00 Per Day
0.00
x
60.00
0.00
Subtotal
692.34
Subtotal
Liability/Builters Risk Insurance + Bond
23770.30
%
0.00
0.00
23770.30
Job total
OVERHEAD & PROFIT
Job Subtotal
23770.30
%
20.00
4754.06
$28,524.36
SUBCONTRACTOR
0.00
%
5.00
0.00
$0.00
BOND
28524.36
% 1
0.00
0.00
BID TOTAL $28,524.36
System Controls S Instrumentation
11218 IH-10 E.
Converse, TX
Page 2
Material
Item Vendor/Units QTY Unit
Material
Adj
Material
Extended
Labor
Unit
Labo
Adj
Labor
Extended
see attached takeoff
1
$11,957.19
1.00
$11,957.19
121.0000
1.00
121.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
1 0.0000
1.00
0.0000
$0.00
Total Materials:
1 1.00
$0.00
$11,957.19
1 0.0000 1.00
Total Labor.
0.0000
121.0000
Combined All - Job File Pricing
JOB 365 426: Lubbock MCC-RM Feeder (Company Name) PRINTED 3/2/2017 2:00:22 PM
ESTIMATE 1 426: Lubbock MCC-RM Feeder (Company Address 1) MATERIAL Primary
DATA SET 1 Comm Indust TSC/EST 09/05 (Company Address 2) LABOR Primary
(Company Address 3)
(Company Phone) / (Company Fax)
(Company Email)
NOTES
Item
Material
Labor
(Size
_
Item Desc
I Qtyj_ UOMIMat
Uniti
MatAdj4
Mat Ext!
Lbr Unit i
LbrAdji
Lbr Ext
Pull Box
1.00
2000.00
1.00
_
2,000.00
2.0000
1.0000
2.0000
Gutter
1.00
2415.25
1.00
2,415.25
2.0000
1.0000
2.0000
Strut Feet
6.00
65.00
1.00
390.00
0.5000
1.0000
3.0000
4"
PVC SCH 40 UGRD
96.00 FEET
5.28
1.00
50688
0.0550
1.0000
52800
4"
ALUM CONDUIT
20.00 FEET
25.41
1.00
50820
0.1310
1.0000
21 6200
4"
PVC ADPT/FEMALE
4.00 EACH
5.78
1.00
23 12
0.2500
1.0000
1 0000
4"
LOCKNUT
4.00 EACH
7.76
1.00
31 04
0.0800
1.0000
0 32.00
4"
BONDING BUSHINGS -INS
4.00 EACH
42.60
1.00
170.40
0.9500
1.0000
3 8000
4"
CUT/THREAD-LABOR
8.00 EACH
Skip
1.00
000
1.2500
1.0000
100000
4"
PVC EXPANSION COUP
4.00 EACH
485.00
1.00
1,940.00
0.6000
1.0000
2 400u
4"
ALUM MYERS HUBS
4.00 EACH
35.23
1.00
14092
0.8000
1.0000
3.200 )
1/4.
S.S.FLAT WASHERS
10.00 EACH
0.25
1.00
250
0.0500
1.0000
0.5000
3/8.
S.S.FLAT WASHERS
10.00 EACH
0.25
1.00
2.50
0.0600
1.0000
0.6000
1/4-20
S.S.HEX NUTS
10.00 EACH
0.25
1.00
2.50
0.0500
1.0000
0.5000
3/8-16
S.S.HEX NUTS
10.00 EACH
0.25
1.00
2.50
0.0700
1.0000
0.7000
4"
S.S.STRUT STRAPS
8.00 EACH
4.00
1.00
32.00
0.0600
1.0000
0.4800
1-1/2 PVC CTD CHANNL
30.00 FEET
13.33
1.00
399.90
0.1000
1.0000
3.0000
1 1/2"
PVC CTD RITE -ANGLE
4.00 EACH
2.25
1.00
9.00
0.1100
1.0000
0.4400
4/0
BARE CU STR
48.00 FEET
4.32
1.00
207.36
0.0220
1.0000
1.0560
4/0
AUCU CRIMP LUG
4.00 EACH
16.05
1.00
64.20
0.7200
1.0000
2.8800
500
AUCU CRIMP LUG
12.00 EACH
42.36
1.00
508.32
1.1200
1.0000
13.4,100
4X2
BASE SPACER
20.00 EACH
2.01
1.00
40.20
0.0200
1.0000
0.4000
18W X 36D
HAND DITCHING
48.00 FEET
8.00
1.00
38400
0.3000
1.0000
14.4000
18W X 36D
BACKFILL HAND DITCH
48.00 FEET
8.00
1.00
384.00
0.3000
1.0000
14.4000
6" WARNING TAPE PLAS
48.00 FEET
0.75
1.00
36.00
Manual
1.0000
0.0000
#5 STEEL
200.00 FEET
0.90
1.00
180.00
0.0300
1.0000
6.0000
3000# CONCRETE
3.00 CYD
125.00
1.00
3715.00
2.0000
1.0000
6.0000
4"
PVC COATED GRC 40MIL
20.00 FEET
30.63
1.00
612.60
0.4370
1.0000
8.7400
4"
PVC COATED ELB 40MIL
4.00 EACH
147.20
1.00
588.80
2.9900
1.0000
11.9600
Grand Totals
F 11,957.19
F 121.1160
Dann I of 1
FREESE
?NICHOLS PROPOSED CONTRACT MODIFICATION 4.41 /
PROJECT: Improvements to the North and South WTPs II PROJECT NUMBER:
OWNER: City of Lubbock 91032.9241.3000
BUILDER: C.S.A. 1603
ENGINEER: Freese & Nichols, Inc. LUB16498
DESCRIPTION: Change Split Face Block to Plain Grey Block PCM No: 002
NOTIFICATION TO BUILDER:
The Owner proposes to make the additions, modifications or deletions to the Work described in the
Contract Documents as shown in Attachment "A". We request that you take the following action
within 10 calendar days:
Notify us that you concur that this change does not require a change in Contract time or
amount. A Field Order will be issued.
X Submit a Price/Credit Proposal with detailed cost breakdown of labor, materials,
equipment and all other costs related to this change. Impacts on Contract Time shall be
shown in a revised schedule, included with the submitted proposal.
❑ Proceed with the change. Payment will be made at the unit price bid.
❑ Proceed with the change under the time and materials provisions of the Contract.
Authorization to proceed with changes must be approved by the Owner through Change Order in
accordance with the Contract Documents.
By: Brian Beach Date: 3/27/17
BUILDER'S RESPONSE:
We respond to your request as follows:
❑ We propose that this is a no cost or time change. Issue Field Order.
X We submit the attached Price/Credit Proposal with detailed cost breakdown and revised
schedule for performing the described change.
Il We are proceeding with the change at the unit price bid.
❑ We are proceeding with the change under the time and materials provisions of the
Contract.
By: George Craig Date:
ACTION TAKEN:
❑ Proposed Contract Modification rejected. See comments.
❑ Field Order will be issued.
X Change Order will be issued.
By: Date:
PROPOSED CONTRACT MODIFICATION
ATTACHMENT A
CSA CONSTRUCTION, INC.
2314 McAllister Road
Houston, TX 77092
P: 713-686-8868/F: 713-689-8889
OWNER: City of Lubbock, Texas
PROJECT: Improvments to the North & South WTP's
ENGINEER: Alan Plummer
CM: Freese & Nichols
CONTRACTOR: CSA Construction, Inc.
PREPARED BY: George Craig
DATE: April 3, 2017
DESCRIPTION OF CHANGE: Delete colored split face veener at new disinfection building and replace with smooth face gray CMU veener.
TAXABLE EXEMPT
LABOR TOOLS & EQUIP MATERIAL
DESCRIPTION QUANTITY UNIT TOTAL UNIT TOTAL UNIT TOTAL TOTAL
Credit to change from colored split face to
smooth face gray 1 Is - - (4,000.00) (4,000) (4,000)
SUBTOTALS
Clarifications
1. Includes changing all veneer walls from colored split face veener to smooth faced gray CMU.
2. No painting is included. A block sealer will still be applied per the approved sealer subimttal.
3. Mortar will be gray and not colored.
4. Control Joint caulking will be gray to match the gray block.
(4,000) (4,000)
(4,000)
MFREESE
?NICHOLS PROPOSED CONTRACT MODIFICATION 4.41 /
PROJECT: Improvements to the North and South WTPs II PROJECT NUMBER:
OWNER: City of Lubbock 91032.9241.3000
BUILDER: C.S.A. 1603
ENGINEER: Freese & Nichols, Inc. LUB16498
DESCRIPTION: Additional Core Holes at South Plant PCM No: 003
NOTIFICATION TO BUILDER:
The Owner proposes to make the additions, modifications or deletions to the Work described in the
Contract Documents as shown in Attachment "A". We request that you take the following action
within 10 calendar days:
Notify us that you concur that this change does not require a change in Contract time or
amount. A Field Order will be issued.
X Submit a Price/Credit Proposal with detailed cost breakdown of labor, materials,
equipment and all other costs related to this change. Impacts on Contract Time shall be
shown in a revised schedule, included with the submitted proposal.
Proceed with the change. Payment will be made at the unit price bid.
Proceed with the change under the time and materials provisions of the Contract.
Authorization to proceed with changes must be approved by the Owner through Change Order in
accordance with the Contract Documents.
By: Brian Beach Date:
BUILDER'S RESPONSE:
We respond to your request as follows:
We propose that this is a no cost or time change. Issue Field Order.
X We submit the attached Price/Credit Proposal with detailed cost breakdown and revised
schedule for performing the described change.
We are proceeding with the change at the unit price bid.
We are proceeding with the change under the time and materials provisions of the
Contract.
By: CSA George Craiq Date:
ACTION TAKEN:
Proposed Contract Modification rejected. See comments.
Field Order will be issued.
X Change Order will be issued.
By: Date:
PROPOSED CONTRACT MODIFICATION
ATTACHMENT A
The Owner proposes to make the following additions, modifications or deletions to the work described
in the Contract Documents. Authorization to proceed with these changes must be approved by Field
Order or Change Order in accordance with the Contract Documents, prior to commencing the work
involved.
Contractor to provide 2 core holes with 3 link seal connections. 1 core drill will be located through the
2"d floor in the NaOCI chemical room on the second floor in the South plant. There will be 2 link seals
for this drilled hole. The Contractor will provide a continuous 6" curb with #5 rebar 12" OCEW and#5
dowels @ 12" OC, 3" offset from the hole in the NaOCI chemical room floor.
Contredon
Con:etuaus mix+ale Gab wan nydlat r,
walerstop
SurfaOa roLig nless to "' aTpbo ae to whin
I • of edge of epoxy bonding agent pnor to
mrnGetc ptatenteni
Robs. M5 ® 12'(see general ccncrelo
notes)
1• PVC
toe by --
city
1 tie tn•a�+
d apNagm valve
by Coy
t�NatlCVPVC
�jl �:_. �_
E. by City
s�
1 PVC
clbnw by city -
Centnctor
Coro drill pipe penetration
tough elab with two (2) kM
seals Standard Dalai) 321.
-- --
- y� Pack 2' ri n shemk grout on top
or lop link seal
The Second hole will be through the west wall of the chlorine dioxide feed room with 1 link seal.
By: Byron Stickney Date: 10/27/2017
CSA CONSTRUCTION, INC.
2314 McAllister Road
Houston, TX 77092
P: 713-686-8868/F: 713-689-8889 CS
OWNER: City of Lubbock, Texas
PROJECT: Improvments to the North & South WTP's
ENGINEER: Alan Plummer
CM: Freese & Nichols
CONTRACTOR: CSA Construction, Inc.
PREPARED BY: George Craig
DATE: July 7, 2017
DESCRIPTION OF CHANGE: Core Drill & Concrete Work at South WTP per the provided sketches
TAXABLE EXEMPT
LABOR TOOLS & EQUIP MATERIAL
DESCRIPTION QUANTITY UNIT TOTAL UNIT TOTAL UNIT TOTAL TOTAL
Core Drilling & Associated Concrete work
at South WTP 1 Is 2,940.00 2,940 2,336.00 2,336 1,165.00 1,165 6,441
SUBTOTALS
Clarifications
1. Link Seal Materials Included
2. No pipe material or installation included.
3. Owner to confirm with CSA on final location of each cored hole.
4. CSA requests an additional 3 days.
5. No electrical work included
6. No painting of any kind included.
7. No wall sleeves included.
2,940 2,336 1,165 6,441
Tax 8.25 % 193
Subtotal 6,634
OH&P 15% 995
Total 7,629
Y _.
` i'
Sr
L' } 1" PVC 1 i
,. tee by
t '
1 - City
p 1" true union -
�'-'" diaphragm
l valve by City
ti 1" PVC
elbow by
1/NaOCl/PVC Ci
by city
Contractor:
Core drill pipe penetration through
slab with two (2) link seals - Standard
Detail 327,
topped with non -shrink grout
77,
i
Contractor:
Continuous concrete curb with
' hydrophilic waterstop.
Surface roughness to %" amplitude to
within 1" of edge of epoxy bonding
agent prior to concrete placement
- Rebar: #5 @ 12" (see general concrete
notes)
r
r•
Plan view of pipe penetration — not to scale
Continuous
concrete curb
M
#5 rebar @ 12"
OCEW
1
(horizontal) and
#5 dowels @ 12" 3"
OC with 4" Link sealr4l�
1/NaOCl/PVC
embedment (not
shown)
6„ 3„ 11 p}T 311
6„
3"
M
FREESE
?NICHOLS PROPOSED CONTRACT MODIFICATION 4.41 /
PROJECT: Improvements to the North and South WTPs II PROJECT NUMBER:
OWNER: City of Lubbock 91032.9241.3000
BUILDER: C.S.A. 1603
ENGINEER: Freese & Nichols, Inc. LUB16498
DESCRIPTION: Relocate Fiber Optic Cable in Existing Conduit PCM No: 004
NOTIFICATION TO BUILDER:
The Owner proposes to make the additions, modifications or deletions to the Work described in the
Contract Documents as shown in Attachment "A". We request that you take the following action
within 10 calendar days:
Notify us that you concur that this change does not require a change in Contract time or
amount. A Field Order will be issued.
X Submit a Price/Credit Proposal with detailed cost breakdown of labor, materials,
equipment and all other costs related to this change. Impacts on Contract Time shall be
shown in a revised schedule, included with the submitted proposal.
Proceed with the change. Payment will be made at the unit price bid.
Proceed with the change under the time and materials provisions of the Contract.
Authorization to proceed with changes must be approved by the Owner through Change Order in
accordance with the Contract Documents.
By: Brian Beach Date: 3/27/17
BUILDER'S RESPONSE:
We respond to your request as follows:
We propose that this is a no cost or time change. Issue Field Order.
X We submit the attached Price/Credit Proposal with detailed cost breakdown and revised
schedule for performing the described change.
We are proceeding with the change at the unit price bid.
We are proceeding with the change under the time and materials provisions of the
Contract.
By: George Craig Date:
ACTION TAKEN:
Proposed Contract Modification rejected. See comments.
Field Order will be issued.
X Change Order will be issued.
By: Date:
PROPOSED CONTRACT MODIFICATION
ATTACHMENT A
The Owner proposes to make the following additions, modifications or deletions to the work described
in the Contract Documents. Authorization to proceed with these changes must be approved by Field
Order or Change Order in accordance with the Contract Documents, prior to commencing the work
involved.
Contractor will remove (2) existing fiber optic lines (1-12 fiber, 1-24 fiber) lines from current project
defined conduit and pull (2) new fiber optic lines (1-12 fiber, 1-24 fiber) through abandoned conduit to
make room for project defined power cables from EMH-04 to EMH-06. The (2) new fiber lines will be
re -spliced to existing lines to ensure continued connection for City of Lubbock plant operations and
maintenance staff.
By: Byron Stickney Date: 3/28/2017
CSA CONSTRUCTION, INC.
2314 McAllister Road
Houston, TX 77092
P: 713-686-8868/F: 713-689-8889 CS
OWNER: City of Lubbock, Texas
PROJECT: Improvments to the North & South WTP's
ENGINEER: Alan Plummer
CM: Freese & Nichols
CONTRACTOR: CSA Construction, Inc.
PREPARED BY: George Craig
DATE: June 5, 2017
DESCRIPTION OF CHANGE: Relocate 2 existing fiber cables in existing ductbank to free up a 4" conduit that was shown to be a spare
TAXABLE EXEMPT
LABOR TOOLS & EQUIP MATERIAL
DESCRIPTION QUANTITY UNIT TOTAL UNIT TOTAL UNIT TOTAL TOTAL
SCI Work 1 Is - - 6,855.00 6,855 6,855
SUBTOTALS - - 6,855 6,855
OH&P 0% -
Total 6,855
Clarifications
SYSTEM CONTROLS & INSTRUMENTATION
SUBMITTED TO: CSA
System Control & Instrumentation
11218 IH-10 EAST, CONVERSE, TX 78109
210-661-9901 (Office) 210-666-5575 (Fax)
PROPOSAL
PROJECT NAME: Lubbock North WTP
CONTACT: George
PHONE:
FAX:
Change Order 002 Relocation of existing fiber for MCC-RM power feeder
SCOPE OF WORK: We had to relocate (2) existing fiber cable in the ductback to free up the 4" conduit which was
shown on the contract drawings as spare.
TOTAL AMOUNT $6,855.52
Additional Days: 0 additional days are required for this work from the date of the signed Change
Order and Notice to Proceed with this work is received, subject to availability of
personnel when signed Change Order is received, to the extend personnel are
unavailable, the time extension will/must be extended to the extent necessary to
allow personnel availability for this work and arrival of the equipment and materials.
EXCLUSIONS: 1. Sales tax.
2. Asphalt repairs to the road, removal and re -installing the fence to the manhole and
all other exception as stated on the contract.
3. Any other materials or equipment not listed on this Proposal
This Proposal may expire in 30 days or upon written retraction by SCI.
If you have any questions regarding this Proposal, please give me a call.
SUBMITTED BY: System Control & Instrumentation, Ltc
Michael Jarrett 6/4/2017
Project Manager Date
System Controls & Instrumentation, Ltd.
PAGE 1
Description Ref Ref Amount Op Rate Amount
Material
Material Total=
See Attachment
$2,305.04
x
1.00
2305.04
Shipping Costs
0.00
Subtotal
2305.04
Direct Labor
Project Manager
Per Hour
0.00
x
75.00
0.00
Superintendent
Per Hour
3.54
x
65.00
229.91
Electrician
Per Hour
8.37
x
55.00
460.35
Instrument tech
Per Hour
27.00
x
55.00
1485.00
Labor Adjustment, Elevated Work 10'-20'
0.00
Programmer
Per Hour
0.00
x
85.00
0.00
Estimator
Per Hour
0.00
x
60.00
0.00
Subtotal
2175.26
Indirect Labor
Submittals & O&M Manuals
Calc
0.00
x
33.00
0.00
Testing
Calc
0.00
x
45.00
0.00
Training
Calc
0.00
x
45.00
0.00
Drawings
Calc
0.00
x
33.00
0.00
Purchase Agent
Calc
0.00
x
40.00
0.00
Procurement
Calc
0.00
x
20.00
0.00
Subtotal
0.00
Labor Burden
Percent
2175.26
%
45.00
978.86
Travel
Lodging
Per Day
0.00
x
75.00
0.00
Meals
Per Day
1.00
x
30.00
30.00
Subtotal
30.00
Equipment
Equipment Rental
See Attahment
Tools
Labor Total
3154.12
%
3.00
94.62
Expendable
Material Total
2305.04
%
3.00
69.15
Procrement Vechicle
60.00 Per Day
0.00
x
60.00
0.00
Electrician/Super/Tech Vechicle
60.00 Per Day
1.00
x
60.00
60.00
Programmer Vechicle
60.00 Per Day
0.00
x
60.00
0.00
Subtotal
223.77
Subtotal
Liability/Builters Risk Insurance + Bond
5712.93
%
0.00
0.00
5712.93
Job total
OVERHEAD & PROFIT
Job Subtotal
5712.93
%
20.00
1142.59
$6,855.52
SUBCONTRACTOR
0.00
%
5.00
0.00
$0.00
BOND
6855.52
%
0.00
0.00
BID TOTAL $6,855.52
System Controls & Instrumentation
112181H-10 E.
Converse, TX
Page 2
Item
Material
Vendor/Units CITY Unit
Material
AdJ
Material
Extended
Labor
Unit
Labo
AdJ
Labor
Extended
fiber outdoors lice enclosure
4
$94.95
1.00
$379.80
0.5000
1.00
2.0000
12 strand fiber cable
650
$0.9965
1.00
$647.73
0.0047
1.00
3.0550
24 strand fiber cable
650
$1.9654
1.00
$1,277.51
0.0051
1.00
3.3160
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.00001
1.00
1 0.0000
$0.00
Total Materials:
1.00
$0.00
$2,305.04
1 0.00001 1.00
Total Labor.
0.0000
8.3700
FFREESE
M'<'NICHOLS PROPOSED CONTRACT MODIFICATION 4.41 /
PROJECT: Improvements to the North and South WTPs II PROJECT NUMBER:
OWNER: City of Lubbock 91032.9241.3000
BUILDER: C.S.A. 1603
ENGINEER: Freese & Nichols, Inc. LUB16498
DESCRIPTION: Control Room Power Feed PCM No: 006
NOTIFICATION TO BUILDER:
The Owner proposes to make the additions, modifications or deletions to the Work described in the
Contract Documents as shown in Attachment "A". We request that you take the following action
within 10 calendar days:
❑ Notify us that you concur that this change does not require a change in Contract time or
amount. A Field Order will be issued.
X Submit a Price/Credit Proposal with detailed cost breakdown of labor, materials,
equipment and all other costs related to this change. Impacts on Contract Time shall be
shown in a revised schedule, included with the submitted proposal.
❑ Proceed with the change. Payment will be made at the unit price bid.
❑ Proceed with the change under the time and materials provisions of the Contract.
Authorization to proceed with changes must be approved by the Owner through Change Order in
accordance with the Contract Documents.
By: Byron Stickney Date: 8/15/2017
BUILDER'S RESPONSE:
We respond to your request as follows:
❑ We propose that this is a no cost or time change. Issue Field Order.
X We submit the attached Price/Credit Proposal with detailed cost breakdown and revised
schedule for performing the described change.
❑ We are proceeding with the change at the unit price bid.
❑ We are proceeding with the change under the time and materials provisions of the
Contract.
By: CSA George Craig Date:
ACTION TAKEN:
❑ Proposed Contract Modification rejected. See comments.
❑ Field Order will be issued.
X Change Order will be issued.
By: Date:
PROPOSED CONTRACT MODIFICATION
ATTACHMENT A
The Owner proposes to make the following additions, modifications or deletions to the work described
in the Contract Documents. Authorization to proceed with these changes must be approved by Field
Order or Change Order in accordance with the Contract Documents, prior to commencing the work
involved.
Option 1 — Restore the system to current level:
Adjust the trip setting of the switchgear breaker from "400 amp" to "600 amp". Provide a tap box (Tap
Box 4) in the Pump House Pipe Gallery. In lieu of providing one set of 3#500MCM conductors from
the main electrical switchgear to the MCC, provide two sets of 3#350MCM from main electrical
switchgear to Tap Box 4. Terminate the new conductors to the existing conductors at Tap Box 4. The
existing conductors were installed in the Phase I Improvements. The tap at the control room MCC will
remain.
Option 2 — Remove the tap at the Control Room MCC:
Adjust the trip setting of the switchgear breaker from "400 amp" to "600 amp". Provide a tap box (Tap
Box 4) in the Pump House Pipe Gallery. In lieu of providing one set of 3#500MCM conductors from
the main electrical switchgear to the MCC, provide two sets of 3#350MCM from main electrical
switchgear to Tap Box 4. Terminate the new conductors to the existing conductors at Tap Box 4. The
existing conductors were installed in the Phase I Improvements. Install a 350 amp breaker in the
Control Room MCC. Re -utilizing the feed from Tap Box 3 to the Power Panel, feed the power
panel from the MCC.
By: Byron Stickney Date: 8/15/2017
RFI RESPONSE
ASSOCIATES, INC.
LW1kL ENVIRONMENTAL ENGINEERS • DESONERS • SCIENTISTS
RESPONSE - RFI-22, CONTROL ROOM MCC:CR NEW POWER FEED
Question: We need the below items address for the Control Room MCC-CR new power feed.
I. In spec 01105 "SEQUENCE OF CONSTRUCTION" 1.4 B. j. it is calling for us to
remove the last two feeders feeding the existing pump house switch board from
the existing switchgear. If we remove both feeders, this will de -energize the
control room's MCC:CR. We understand the remaining feeders to the existing
pump house switch board will need to be removed so we can re -use one of the
existing conduits for the new power feed to MCC:CR. To minimize power outage
we propose to remove only one of the feeders from the existing pump house
switch boards to keep the MCC.CR energized until we are able to pull the new
power feed. Once this is complete then we can schedule to shut down the
control room's MCC:CR. Is this acceptable and will one set of 3-350mcm be
enough amperage for control room MCC:CR?
2. When looking into how the keep MCC:CR energized until we are able to install
the new power feed we found the following. One of the existing power feed sets
has been tapped in the gutter located in the pipe gallery, just outside of the
control room. We believe this power tap is to feed the 480VAC panel `J' in the
control room. We will need a directive on how to refeed both the MCC:CR and
panel `J'.
a. Do we tap the new feed in the gutter as it is currently installed?
b. Is there room to add a breaker in MCC:CR to add a breaker to feed
Panel VT This will also give a means of disconnecting power to panel ` ,
without disconnecting power to MCC:CR.
c. Other options?
Response: Please refer to ATTACHMENT 1-RFI22 for additional details.
The "as design" one line diagram has a single set of 3#500MCM conductors being
installed from the main electrical building switchgear to the control room MCC. The
conductors were sized for the load in the MCC.
As explained in the RFI, there is a tap made on the incoming conductors to feed
the 480V panel for the control room. The tap is located in the filter gallery before
the conductors enter the MCC. The single set of 3#500MCM conductors cannot
carry the load of both the panel board and the MCC.
Option 1 — Restore the system to current level:
• Adjust the trip setting of the switchgear breaker from "400 amp" to
"600 amp".
• Provide a tap box (Tap Box 4) in the Pump House Pipe Gallery.
• In lieu of providing one set of 3#500MCM conductors from the main
electrical switchgear to the MCC, provide two sets of 3#350MCM from main
electrical switchgear to Tap Box 4.
• Terminate the new conductors to the existing conductors at Tap Box 4. The
existing conductors were installed in the Phase I Improvements.
• The tap at the control room MCC will remain.
Page 1 of 2
RPI-22 RESPONSE
Option 2 — Remove the tap at the Control Room MCC:
• Adjust the trip setting of the switchgear breaker from "400 amp" to
"600 amp".
• Provide a tap box (Tap Box 4) in the Pump House Pipe Gallery.
• In lieu of providing one set of 3#500MCM conductors from the main
electrical switchgear to the MCC, provide two sets of 3#350MCM from main
electrical switchgear to Tap Box 4.
• Terminate the new conductors to the existing conductors at Tap Box 4. The
existing conductors were installed in the Phase I Improvements.
• Install a 350 amp breaker in the Control Room MCC.
• Re -utilizing the feed from Tap Box 3 to the Power Panel, feed the power
panel from the MCC.
Page 2 of 2
D
(A
.0
N m CONTROL ROOM
(n MCCCR
C)
z
D
N
0
m
CONTROL ROOM
(n POWER PANEL
C)
z
1-1
CHEMICAL\�\�\\\\\\�\\\�.��\\\�i
BUILDING
m
MCC:CB�
�J°��
x CONTROL ROOM
3 500MCMt1 OC, 4' C.
Ry�
�S
N Ma.'CR
Si
�
0
@@
Gn
0 CONTROL ROOM
POWER PANEL
�O
z
CONTROL ROOM
MCC.'CR
0 CONTROL ROOM
0 POWER PANEL
0 3/350MCMt7/OG, 3'
N 1CONTROL
ROOM
1 SETS OF
3/350MCM+2/OO, 3' C.
CHEMICAL
BUILDING MCC:CB
7 SETS OF
3/350MCM42/00, 3' C.
2 SETS OF
3j350MCM,2/0G, 3' C:
Q
D;a
n�
_;u
ZO
. Z
N
TT m
N
CSA CONSTRUCTION, INC.
2314 McAllister Road
Houston, TX 77092
P: 713-686-8868/F: 713-689-8889 c5D
OWNER: City of Lubbock, Texas
PROJECT: Improvments to the North & South WTP's
ENGINEER: Alan Plummer
CM: Freese & Nichols
CONTRACTOR: CSA Construction, Inc.
PREPARED BY: George Craig
DATE: September 1, 2017
DESCRIPTION OF CHANGE: Option # 2 Remove the Tap at the Control room MCC, per PCM 006
TAXABLE EXEMPT
LABOR TOOLS & EQUIP MATERIAL
DESCRIPTION QUANTITY UNIT TOTAL UNIT TOTAL UNIT TOTAL TOTAL
Cost from SCI for Option # 2 1 Is - - - - 20,547.00 20,547 20,547
SUBTOTALS - - 20,547
20,547
Tax 8.25 %
-
Subtotal
20,547
OH&P 15%
3,082
Total
23,629
Clarifications
1. CSA requests an additional 5 days
C-�i;o
System Control & Instrumentation
5404 FM 1044 New Braunfels, Texas 78130
SYSTEM CONTROLS&INSTRUMENTATION 830-420-3392 (Office) 830-420-3395 (Fax)
PROPOSAL
SUBMITTED TO: CSA
PROJECT NAME: Lubbock North WTP
CONTACT: George
PHONE:
FAX:
Change Order 002 Power feed to MCC-CR per PCM #006 Option 2
SCOPE OF WORK: BASED ON PCM #006 OPTION 2
TOTAL AMOUNT $20,547.54
Additional Days: 05 additional days are required for this work from the date of the signed Change
Order and Notice to Proceed with this work is received, subject to availability of
personnel when signed Change Order is received, to the extend personnel are
unavailable, the time extension will/must be extended to the extent necessary to
allow personnel availability for this work and arrival of the equipment and materials.
EXCLUSIONS: 1. Sales tax.
2. Asphalt repairs to the road, removal and re -installing the fence to the manhole and
all other exception as stated on the contract.
3. Any other materials or equipment not listed on this Proposal
This Proposal may expire in 30 days or upon written retraction by SCI.
If you have any questions regarding this Proposal, please give me a call.
SUBMITTED BY: System Control & Instrumentation, Ltc
Michael Jarrett 9/1/2017
Project Manager Date
System Controls & Instrumentation, Ltd.
PAGE 1
Description Ref Ref Amount Op Rate Amount
Material
Material Total=
See Attachment
$8,876.70
x
1.00
8876.70
Shipping Costs
0.00
Subtotal
8876.70
Direct Labor
Project Manager
Per Hour
0.00
x
75.00
0.00
Superintendent
Per Hour
8.69
x
65.00
564.72
Electrician
Per Hour
86.88
x
55.00
4778.40
Instrument tech
Per Hour
0.00
x
55.00
0.00
Labor -Adjustment, Elevated Work 10'-20'
0.00
Programmer
Per Hour
0.00
x
85.00
0.00
Estimator
Per Hour
0.00
x
60.00
0.00
Subtotal
5343.12
Indirect Labor
Submittals & O&M Manuals
Calc
0.00
x
33.00
0.00
Testing
Calc
0.00
x
45.00
0.00
Training
Calc
0.00
x
45.00
0.00
Drawings
Calc
0.00
x
33.00
0.00
Purchase Agent
Calc
0.00
x
40.00
0.00
Procurement
Calc
0.00
x
20.00
0.00
Subtotal
0.00
Labor Burden
Percent
5343.12
%
45.00
2404.40
Travel
Lodging
Per Day
0.00
x
75.00
0.00
Meals
Per Day
0.00
x
30.00
0.00
Subtotal
0.00
Equipment
Equipment Rental
See Attahment
Tools
Labor Total
7747.52
%
3.00
232.43
Expendable
Material Total
8876.70
%
3.00
266.30
Procrement Vechicle
60.00 Per Day
0.00
x
60.00
0.00
Electrician/Super/Tech Vechicle
60.00 Per Day
0.00
x
60.00
0.00
Programmer Vechicle
60.00 Per Day
0.00
x
60.00
0.00
Subtotal
498.73
Subtotal
Liability/Builters Risk Insurance + Bond
17122.95
%
0.00
0.00
17122.95
Job total
OVERHEAD & PROFIT
Job Subtotal
17122.95
%
20.00
3424.59
$20,547.54
SUBCONTRACTOR
0.00
%
5.00
0.00
$0.00
BOND
20547.54
%
0.00
0.00
BID TOTAL $20,547 54
System Controls & Instrumentation
112181H-10 E.
Converse, TX
Page 2
Item
Vendor/Units QTY
Material
Unit
Material
AdJ
Material
Extended
Labor
Unit
Labo
I AdJ
Labor
Extended
350MCM
ft
1650
$7.75
1.00
$12,787.50
0.0000
1,00
0.0000
350MCM
ft
1650
$7.75
1.00
$12,787.50
0.0420
1.00
69.3000
TAP BOX
EA
1
$504.00
1.00
$504.00
1.0000
1.00
1.0000
TAP KITS
EA
8
$25.00
1.00
$200.00
0.3000
1.00
2.4000
350 AMP BREAKER FOR MCC-CR
EA
1
$4.700.00
1.00
$4.700.00
6.0000
1.00
6.0000
3" ALUM CONDUIT
FT
10
$17.87
1.00
$178.70
0.0865
1.00
0.8650
3" ALUM 90s
EA
2
$186.00
1.00
$372.00
0.3250
1.00
0.6500
3" ALUM LL FITTING
EA
1
$171.00
1.00
$171.00
0.3250
1.00
0.3250
3" ALUM COUPLING
EA
4
$48.00
1.00
$192.00
0.0850
1.00
0.3400
REMOVE AND REPULL CABLE TO POWER PANEL
EA
1
$0.00
1.00
$0.00
6.0006
1.00
6.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
500MCM
ft
-2100
$10.96
1.00
$23,016.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
1 0.0000
1.00
0.0000
$0.00
1.00
$0.00
1 0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
1.00
$0.00
0.0000
1.00
0.0000
$0.00
Total Materials:
1.00
$0.00
$8,876.70
0.0000 1.00
Total Labor.
0.0000
86.8800
FREESE
F
2 1NICHOLSS PROPOSED CONTRACT MODIFICATION 4.41 /
PROJECT: Improvements to the North and South WTPs II PROJECT NUMBER:
OWNER: City of Lubbock 91032.9241.3000
BUILDER: C.S.A. 1603
ENGINEER: Freese & Nichols, Inc. LUB16498
DESCRIPTION: Additional FCA's for South Plant Piping PCM No: 008
NOTIFICATION TO BUILDER:
The Owner proposes to make the additions, modifications or deletions to the Work described in the
Contract Documents as shown in Attachment "A". We request that you take the following action
within 10 calendar days:
Notify us that you concur that this change does not require a change in Contract time or
amount. A Field Order will be issued.
X Submit a Price/Credit Proposal with detailed cost breakdown of labor, materials,
equipment and all other costs related to this change. Impacts on Contract Time shall be
shown in a revised schedule, included with the submitted proposal.
Proceed with the change. Payment will be made at the unit price bid.
Proceed with the change under the time and materials provisions of the Contract.
Authorization to proceed with changes must be approved by the Owner through Change Order in
accordance with the Contract Documents.
By: Brian Beach Date:
BUILDER'S RESPONSE:
We respond to your request as follows:
We propose that this is a no cost or time change. Issue Field Order.
X We submit the attached Price/Credit Proposal with detailed cost breakdown and revised
schedule for performing the described change.
We are proceeding with the change at the unit price bid.
We are proceeding with the change under the time and materials provisions of the
Contract.
By: CSA George Craig Date:
ACTION TAKEN:
Proposed Contract Modification rejected. See comments.
Field Order will be issued.
X Change Order will be issued.
By: Date:
PROPOSED CONTRACT MODIFICATION
ATTACHMENT A
The Owner proposes to make the following additions, modifications or deletions to the work described
in the Contract Documents. Authorization to proceed with these changes must be approved by Field
Order or Change Order in accordance with the Contract Documents, prior to commencing the work
involved.
Contractor to add 2 additional FCA couplings to south plant piping to provide proper connection to
existing welded piping.
ADD FCXS
jW d
By: Byron Stickney Date: 10/17/2017
CSA CONSTRUCTION, INC.
2314 McAllister Road
Houston, TX 77092
P: 713-686-8868/F: 713-689-8889 CSD
OWNER: City of Lubbock, Texas
PROJECT: Improvments to the North & South WTP's
ENGINEER: Alan Plummer
CM: Freese & Nichols
CONTRACTOR: CSA Construction, Inc.
PREPARED BY: George Craig
DATE: October 10, 2017
DESCRIPTION OF CHANGE: Install two 16 FCA's at sheet C-810 to adapt the existing steel pipe to the new ductile iron tee.
Reference SD-082
TAXABLE EXEMPT
LABOR TOOLS & EQUIP MATERIAL
DESCRIPTION QUANTITY UNIT TOTAL UNIT TOTAL UNIT TOTAL TOTAL
Purchase FCA's-Cohen 1 Is - - 2,602.00 2,602 2,602
Installation-CSA 2 ea 300.00 600 100.00 200 - 800
SUBTOTALS
600 200 2,602 3,402
Tax 8.25 % 17
Labor Burden 30% 180
Subtotal 3,599
P 15% 540
Total 4,138
ON SITE PHONE N... Your Yard
REQUIRED SHIP DATE 10/3/2017
CSA Construction, Inc.
2314 McALLISTER ROAD
HOUSTON, TX 77092
5817286
Order Date 10/3/2017
LUBBOCK N WTP
6001 NORTH GUAVA
LUBBOCK, TX 79403
KEVIN 713-204-0643
1603-18 2016-210 IMPROVEMENTS TO IN... BC
Net 30 COHEN TRUCK
Ordered Shipped Part Nu... Description
*ADDED FCA'S FOR EXT 16"
STEEL PIPE -PLEASE SHIP
DIRECT
2 3528-16 16" 3528 FLGD COUPLING
ADAPTER 17.626 OD X 16"
FLANGE - FABRICATED FCA
P *PER SHEET C-810 &
2016-210-M5
*ADDED- FCA'S NEEDED FOR
TIE IN AT EXISTING STEEL
PIPE
Tag Num... Rate WT.
1001.1 1,301.23
Any and all errors or shortages with shipments must be reported within five
(5) days of receipt of shipment.
CERTIFICATE OF INTERESTED PARTIES
FORM 1295
1 of 1
Complete Nos. 1- 4 and 6 if there are interested parties.
OFFICE USE ONLY
Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties.
CERTIFICATION OF FILING
Certificate Number:
1 Name of business entity filing form, and the city, state and country of the business entity's place
of business.
2017-292414
CSA Construction, Inc.
Houston, TX United States
Date Filed:
12/11/2017
2 Name of governmental entity or state agency that is a party to the contract for which the form is
being filed.
City of Lubbock
Date Acknowledged:
12/11/2017
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
16-12943-TF
Improvements to the North and South Water Treatment Plants Change Order #1
4
Name of Interested Party
City, State, Country (place of business)
Nature of interest
(check applicable)
Controlling
I Intermediary
Austin, Rich
Chappell Hill, TX United States
X
Mayfield, Richard
Cypress, TX United States
X
Craig, George
Houston, TX United States
X
Schultz, Kenneth
Houston, TX United States
X
5 Check only if there is NO Interested Party. ❑
6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct.
Signature of authorized agent of contracting business entity
AFFIX NOTARY STAMP / SEAL ABOVE
Sworn to and subscribed before me, by the said this the
day of
20 , to certify which, witness my hand and seal of office.
Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath
Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.3337
CERTIFICATE OF INTERESTED PARTIES
Complete Nos. 1- 4 and 6 If there are interested parties.
Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties-
2 Name of business entity filing form, and the city, state and country of the business entity's place
of business.
CSA Construction, Inc.
Houston, TX United States
Name of govemmental entity or state agency that is a party to the contract for Mich the rorm Is
being fit".
City of Lubbock
FORM 1295
iof1
OFFICE USE ONLY
CERTIFICATION OF FILING
Certificate Number.
2017-292414
Date Filed:
12/il/2017
Date Acknowledged:
3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a
description of the services, goods, or other property to be provided under the contract.
16-12943-TF
Improvements to the North and South Water Treatment Plants Change Order #1
4 Name of Interested Party
City, State, Country (place of business)
ture of Interest
(heck applicable)
Controlling
Intermediary
Austin, Rich
Chappell Hill, TX United States
X
Mayfield, Richard
Cypress, TX United States
X
Craig, George
Houston, TX United States
X
Schultz, Kenneth
Houston, TX United States
X
C r6nwL nab• i1 N.-- I &IA I ........ I
- ------ -- -- ----- -- ...__._____ . '-- .
Li
6 AFFIDAVIT I swear, or rm, er p ty of perjury, that the above disclosure is true and correct
MARJORY ELIZ 130H SANDERS
• My Notary ID# 126620389
Expires August 29, 2020
�� • Rich A tin Si re of authorized agent of contracting business entity
AFFIX NOTARY STAMP / SEAL ABOVE
Sworn to and subscribed before me, by the said _ Fme dgp this the _ 11 rh _ day of ber
20 17 to cerfify which, witness my hand and seal of office.
[)
of Ricer pads ministering on
Printed name of officer administering oath Title of officer administering oath
Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.3337