Loading...
HomeMy WebLinkAboutResolution - 2022-R0059 - Developer Participation Agreement with Rocket Partners IResolution No. 2022-R0059 Item No. 7.35 January 25, 2022 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT pursuant to the provisions of the Texas Local Government Code Section 212.071 and 212.072, the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, a Developer Participation Agreement for public improvements related to Capital Improvement Project No. 92711 for the construction of a multi -company fire station located at 142nd Street and Indiana Avenue in Lubbock, Texas, by and between the City of Lubbock and Rocket Partners I, LLC, and related documents. Said Agreement is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on January 25, 2022 DANIEL M. POPE, MAYOR ATTEST: Rebe ca Garza, City Sec to APPROVED AS TO CONTENT: Jesica Mc iachern, Assistant City Manager APPROVED AS TO FO stant City Attorney RES.Dev. Part. COL & Rocket Partners I, LLC 12.1.21 Resolution No. 2022-R0059 DEVELOPER PARTICIPATION AGREEMENT BETWEEN THE CITY OF LUBBOCK AND ROCKET PARTNERS I, LLC THIS AGREEMENT is entered into this 25th day of January 20 22 by and between the City of Lubbock, Texas, a Texas Home Rule Municipality ("City"), and Rocket Partners I, LLC ("Developer"), collectively ("Parties"). RECITALS WHEREAS, on July 13, 2021 the City passed budget amendment ordinance number 2021-00077 establishing the Capital Improvement Project (CIP) 92711 for the construction and public improvements related to Fire Station 20 (the "Project") located at Indiana Avenue and 142nd Street in Lubbock, Texas, and appropriated funding in the amount of seven million six hundred and forty-five thousand and 00/100 ($7,645,000.00); and WHEREAS, CIP 92711 will include the construction of necessary infrastructure and public improvements, including but not limited to streets and alley ways, municipal water and sewer extensions, associated drainage structures, and utility extensions necessary for the construction of Fire Station 20 ("City's Work"); and WHEREAS, Developer owns, and is developing, the land surrounding CIP 92711, which will include the construction of necessary infrastructure and public improvements, including but not limited to streets and alley ways, municipal water and sewer extensions, associated drainage structures, and utility extensions in the area surrounding CIP 92711 ("Developer's Work"); and WHEREAS, the Parties can realize a significant cost savings for each Party's Work within the boundaries of CIP 92711 by utilizing the same engineering firm and Contractor for each the City's Work and Developer's Work related to the infrastructure and public improvements in and surrounding the boundaries of CIP 92711; and WHEREAS, the Parties hereby agree that in order to expedite construction and avoid duplicative costs, both Parties shall utilize one engineering firm and one Contractor jointly for the completion of said projects; and WHEREAS, Texas Local Government Code Sections 212.071 and 212.072(c) authorize a municipality to enter into a Developer Participation Agreement for improvements required by the municipality, including but not limited to increased capacity of improvements; and WHEREAS, City of Lubbock Code of Ordinances Section 38.09.003(c) requires Developer to construct half -width streets along the boundary of a proposed subdivision and pay all cost of the paving, except that the City may participate in the cost of paving under existing paving policies; and Developer Participation Agreement, CIP 92711— COL and Rocket Partners I, LLC Page 2 of 5 WHEREAS, Developer hereby agrees to construct and pave the entire width of the streets surrounding CIP 92711 in compliance with any and all applicable City ordinances, policy, procedure, or other City requirements, in a form and design approved by the City Engineer of the City of Lubbock, or his designee; and WHEREAS, Developer is aware that City funds for the City's Work in this Developer Participation Agreement are limited to the portion of funds meant for infrastructure and public improvements appropriated for CIP 92711; and WHEREAS, the City, after due and careful consideration, has concluded that entering into this Agreement will expedite the development of the Project and will further the growth of the City, facilitate the redevelopment of the area surrounding the Project, improve the environment of the City, increase assessed valuation of the real estate situated nearby the Project, foster increased economic activity within the City, upgrade the public infrastructure surrounding the Project, and otherwise be in the best interest of the City by furthering the health, safety, and welfare of its residents and taxpayers. TERMS NOW, THEREFORE, in consideration of the promises and mutual agreements hereinafter set forth, the Parties hereby do mutually agree as follows: 1.0 Parties Obligations 1.1 City. City shall prepare all engineering drawings necessary related to CIP 92711. 1.2 Developer. Developer shall prepare and forward to the City all engineering drawings necessary for the adjacent projects. 1.3 The Developer shall solicited and procure a Contractor to perform both the City's Work and Developer's Work included in the attached Exhibit "A" ("Joint Project"). Developer shall make every reasonable attempt to negotiate a contract between the Developer and the highest-ranking Contractor that is qualified for the Joint Project and for the best value. If either Party deems the project financially unfeasible, either the City or Developer may elect not to pursue the Joint Project and reject all bids. Rejection of all bids will terminate this agreement in its totality. 1.4 Once construction begins, all change orders will require City approval. For any change orders related to the Joint Project, Developer must submit its written recommendation to the City for each change order, and the City will promptly consider said change order. Upon project completion, City shall render payment to the Developer for each change order it recommends to, and is approved by, the City. Developer Participation Agreement, CIP 92711— COL and Rocket Partners I, LLC Page 2 of 5 2.0 Payments 2.1 Developer. Developer shall fund the Developer's Work as valued by the Contractor's bid selected by the Developer and approved by the Parties. 2.2 City. Upon selection of a qualified contractor for construction services via Developer's procurement, City shall pay the Developer Two Hundred and Fifty -Two Thousand, Three Hundred and Twenty -Five and 00/100 Dollars ($252,325.00) for City's Work as valued in the attached Exhibit `B", Preliminary Opinion of Probable Cost, plus a five percent (5%) contingency within thirty (30) business days of executing the Contractor's contract or thirty (30) business days of executing this Agreement, whichever occurs last. 2.3. Upon project completion, City shall pay the Developer fifty percent (50%) of any and all amounts incurred for change orders on the Joint Project approved pursuant to Section 1.4 herein, and a thorough account shall be made for costs of both the City's Work and Developer's Work. If any surplus funds designated for the City's CIP 92711 remain, the City shall keep its surplus funds. If City's Work costs are less than the amount given to the Developer, the Developer shall refund City any surplus funds. 2.4 In the event that all the City CIP 92711 funds set forth herein are exhausted, and project costs are greater than the CIP fund for the City Work detailed herein, Developer, and not the City, shall pay for any and all overage. 2.5 In the event that project costs for Developer's Work are over the estimated amount given herein, Developer shall pay for any and all overage. 3.0 Breach The failure of either of the Parties to comply with their obligations shall constitute a breach of this Agreement. 4.0 Waiver The waiver of any requirement hereunder by any Party hereto shall not be effective unless properly authorized and in writing. 5.0 Term; Termination This Agreement shall automatically terminate after completion of construction, and final settlement and payment of funds between the Parties is completed. This Agreement is not subject to early termination by any Party, other than in accordance with terms of item 1.3 of this Agreement. Developer Participation Agreement, CIP 92711— COL and Rocket Partners I, LLC Page 3 of 5 6.0 Texas Law to Apply This Agreement shall be construed under and in accordance with the laws of the State of Texas, and all obligations of the Parties created hereunder are performable in Lubbock County, Texas. 7.0 Notice All notices, whether for reimbursement or otherwise, shall be in writing and may be hand delivered, or sent by registered or certified mail, postage prepaid, return receipt requested to the following addresses: City of Lubbock Attn: L. Wood Franklin, P.E. P.O. Box 2000 Lubbock, Texas 79457 Rocket Partners I, LLC Attn: Thomas K. Payne P.O. Box 64664 Lubbock, Texas 79424 8.0 Legal Construction If any one or more of the provisions contained in this agreement shall for any reason be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability shall not affect any other provision hereof and this agreement shall be construed as if such invalid, illegal, or unenforceable provisions had never been contained herein. 9.0 Non Arbitration The City reserves the right to exercise any right or remedy available to it by law, contract, equity, or otherwise, including without limitation, the right to seek any and all forms of relief in a court of competent jurisdiction. Further, the City shall not be subject to any arbitration process prior to exercising its unrestricted right to seek judicial remedy. The remedies set forth herein are cumulative and not exclusive, and may be exercised concurrently. To the extent of any conflict between this provision and another provision in, or related to, this document, the former shall control. 10.0 Entire Agreement This Agreement supersedes any and all other agreements, either oral or in writing, between the Parties hereto with respect to the subject matter hereof and contains all of the covenants and agreements between the Parties with respect to said matter. Each Party to this Developer Participation Agreement, CIP 92711— COL and Rocket Partners I, LLC Page 4 of 5 Agreement acknowledges that no representations, inducements, promises, or agreements, oral or otherwise, have been made by any Party or anyone acting on behalf of any Party which are not embodied herein and that no other agreements, statement, or promise not contained in this Agreement shall be valid or binding. No modification concerning this instrument shall be of any force or effect, excepting a subsequent amendment in writing signed by the Parties. No official, representative, agent or employee of either entity, has any authority to modify this Agreement except pursuant to express authority to do so granted by the governing body. 11.0 Parties Bound/Authority This Agreement shall be binding upon and inure to the benefit of the Parties to it and their respective legal representatives, successors and assigns where permitted by this Agreement. The undersigned represent and warrant their authority to execute this Agreement, and to bind the Parties hereto. IN WITNESS WHEREOF, the Parties hereto have executed this Agreement this 25th day of January 2022 For the City of Lubbock: —LL � DANIEL M. POTIE, Mayor Attest: Reb cca Garza, ity Secr ar as to Content: of Pfiblic Works Approved'agto Form: 7)'� Rya r ke, Assis ant City Attorney For Thomas Partners I, LLC Developer Participation Agreement, CIP 92711— COL and Rocket Partners I, LLC Page 5 of 5 Y U m MUNICIPAL PAVING AND DRAINAGE IMPROVEMENTS LLQ EDO ,L) TRACTS F K'°m m - ~ O O VIRIDIAN AN ADDITION TO THE CITY OF LUBBOCK, LUBBOCK COUNTY, TEXAS Z W SEPTEMBER 2021 w ct �11112 C G_ •r 3, r V �Qz LL Z Lu � O R I Z �r ---�- _ a _ Q APPROVED FOR U CONSTRUCTION atznazl_ iN"e,.��te._I__ Z o LL CT tt.�TOM l iwoxc iou,w e.r Th ese tens shall remem on Iheloh SRO 6ulinu OWl5iNLi+On_ � N Z Job Urdm Mt210S7 Engmttring Plan pt012N9 e d Sheet List Table Sheet Number Sheet Title COMA 1RACT4 i - K YFpNi FT/AL PLAT MOOD f�AL NOTES C300.1 OYENN.L PAVING t rRACrS B crA7 w f '� E�STwATES LOCATION MAP I I NOT TO SCALE I I• s.00' moth STREET ' xw^alyyE a$ sorar«�]r jR�� 1 sarar•w $ gw l 4 TRACT R iG V B C T11KT x (t 8 g g TRKT r g TRACT r R C TRACT N' F I M Igti A W' 7PAfl "A' + z $ PL[A:E DEP.4RTNENT tVrH Q SU9ST�7gpD/T/py Wr FLArrrD' f Z C $ :I ( $ Q s� i TRncr r SS 9 4 F Iz t e B e NN`SPS}[ J W. NEW STREET Iic-w ? 8 g $ 142nd STREET y - - NnFbYlew AT.! TO' • w rH]tlYiGYN c2'i61v AGT FYATTED w ' rv. ww.r• '• _ PRF,I!A;.WY T]l� MiMK +OT RF RF�g1IpL0IgR ANY Py wirrannw�w.r wr -_ TRS OOCUM N MUSE TOR_RL w.PURPOSLSO!A4 ,]o�u+aw.. .uas.wr RI.]I,.wNN 1K �YuaPww Mw.-wwu luc � �Mr.-www TY%GLSTREETSTREEI YM TYPICL ALLEYSTREET a ALLEY.ALLEY ALLEY -ALLEY (IH' KENO OR GREATER) (LESS THAN W BEND) INTERSECTION WHERE °' UerAnsm INTERSECTION MERE CORNER IS CORNER IS CHAMFERED CHAMFERED TRACTS "F" - "Kw, VIRIDIAN TO THE CITY OF LUBBOCK. LUBBOCK COUNTY. TEXAS GENERAL NOTES: S..k: 11w AOOITIONAL NOTEs, eai-wwa:.sww+. ...wa Vl Mma wn.lr-.uT SURVEY CONTROL. " rw�]rrww WNTw wwFa. SaYwano.]nwCM ]w �.wwr�s ]wn 1nw Wu]NRw]wwA Wwj4w~Hsw N.w.wnW..w.wrw'p. IWp]w MYw sRM M..I "�fas.Y.Y ]l.warW,xawCarYtw.IN�l, Aean ANAI . AIY.wPcwn Y ww ]awl uw Mwe wrwMY. N W Iw"Y iw ACM ��w �twY�IvwrIN M+IrnrW.r..¢v.Y.uw1Yw.IwN SJwYM MpY+. Y N O. Y IYMn.1 f� qrM n.r.Y.wrrl rMM F rsYu.In M ;ovae al A; EXISTING UNDERGROUND UTILITIES: r�Yiww iuR�v.°m�i`°1 L0m1N0"neaeuaaaro uRnn.wa �[ �uauwo•o uruis•sw.wK Qw aaermrFa.m awK. YmamnN w.•.tl MooRwRKiamiaiCcarQ 4WY Ynit. aYF a Form OPawY u RAINYrta R riciRi.Yna F aurz a r.Ram. M avmr f aulKTm waver MrRCR1il00•rtP M IR[A].'YOYMIa Ran R R M mrtwOTYfa 411OCn ro <OIYLPr 4l MRLtlll�A110r rWl tlFFRa roi[ InRF R•uro•wD Yrur. oevrY+. f[n. root-r[Q TRENCN PROTECTIOM OD1M r[Rb K 0• rai ii.l� FYRtra R iPw6 q1 .rn`Q.wiQ[a atlrtna Ruts c Fa40 n YSt4c 4furA ic.Canaevairarel lro•.srn eA lwr m•'avuaa ro�irn�.rcl niwYOa�r M[ ter. aiK mrrorF.ccia cno M am[ or TKa RAre. Ma Iwi.0114iYRO1e. M OMrYR01 Roll wK D[RRYnD ODIC1PTfYYMm•M F1Y Rrl•Q R'1OM36XIA f0(�TO�PQLr Y1 F[WO m�iftlQ[1[1a H�r[i1 DRO LRIf COMPACTION TESTING: Fe.um •Q it iaMo ror[ww coon raT a uo. non. arro.la wiRmrtl4m roaese. orreaRerae wr rwatl xr rnn uRR • Rtnx[mr uuawflm[ Ro ro¢rvic r • m sTroeis FYcrw omn rRYR waaoonm. Flea im Tcara w. ror Rlcrwrc iR M RroOoow�A�w�aimr.cru rRFa, Rxaura YaR rwF r.o rotl a M iRra rw�r wiKui wi"iRwu�.o Rrteorow.°erw i rM .Y:m.Cr rlw ciox RLLMTERSKOENSITY REOMhM TS: ru ROQ evmXn ro Mroao.c ecm Y-e[•oeem-l-s u w.la Y __ rRX60Ol.•DR[YbLLOeOR•RO.nprtaro mnc s+YcfoRwmn. mYY4a mYF ua*ovY •coYF1c+F1 1 rwr CQnla mnawm..[lurc n.e.m. L •YnLwmaaR[uceoRRrm roRcn.ncro.IwmrtnroFY FRnQppRi.R•YRRFi rN tln0�mr a' wael[�oerrRiMcc.onR�eatl.o eaXea[m�errlen°mun°n ao maLwWaFriaml e. fYR14f6R0DYl0 RRLQTro11Y1eRR TfLL WrgeL roODYIU 1WLLt iwRlafa n•Rm ORReOimeplR mfRlra nRV.01 RaZmtlC[OIaaMN10 �mfaalOtlR1N1[a01Q�ialeDTl ro� Wt6lLL i10Yl Qr[fDla W M roeK IY YR R1AL FYL • O rMQ mrtmeomora[il Y.FYroVm. } L•MI:. ReLL wR ereRa oaRRrm OPM RRtirOta NR• RYl Q TFa R Ra . RReq tl ro i RRQRn.M l aMlll�it?R n•ea Orlli.MlW�rao'M mRReRLQ mMR.••Cr� mru"M°�r isi�ieM�m:iAmaam rulrom. IaRQei•M aeNYe R M rn•t f V. wrQ O[YO T M—MWWf000OYM1Ren RYYQiermri•YwroR—' Iwl MmrRitl•RLi mr roFlllM RL rtan RRtnRMIQ•nR1Yp RYL6 YRMD r0 M oR RA M OOnIm Y•µr M rorLL11I.. a •I1De6R MXIaOY•S•�i�M}miYPIP i1R1lR41QmrIlYDO ra W fYAn 1LLwrp.. RY1L QafRlrm i0 M Rrt Fa.JO]OII Yr1e1 M YYK ROR-Ofnn AODMNAL GRADING NOTES: fLL rIRY.m art rofµ R.O[a m•l1 i OoarwFrm.i i FRR aRirP rrax Y rorearel m f IpiR.l. m.rR•C[a roatKQ a f Yi.Y 0 TYPnt smtnn IfT 0.[[[eOrt a [IL auY [cR atRXia omiu wwi <�ro�io aim aYs wn •ait YMiiuia�ru f u YmL Fn ri®. Atlnnr ill MI o< rFPn um 011� iM�r00M2M 1bf aD6M rV[Q W1pRM F Vr CONSTRUCTION STANDARDS EROSION CONTROL zm s ro auo YO1pwiwr irw.iT[Ara �NKMai� YY1/U Ql Ma N M rrQa W WL RRR ro M TRAFFIC CONTROL: CONSTRUCTION INSPECTION: rRRia.sac rani iFrRe..rowanaFuc r:"me rr ol'��.a[cipQOwlY�o mi`.Rlw�iwa+�R o.ra. ICMu rr�TO'Rue wo�imo mRFia cYar.aumow.eRerm.r Tune a lm n1 rofrwrt swtlo[Fn RYLL c RRNRe9 n M oRnl l.mY,RI. GL2ELEVATN)NB AND dMENSI0N3: pA 0aCNDOYY SI rOX1f.RNf.rromiRl mMRa rec: i.KRiz a°Om.rmic [�uv:roe aa°mr1Oruain Yi eovr°Yw��ervr a .0 o.RmR rc iwrm Te M r•R v o•R uaas YM..c �rm. [r•iaO C�NM. M10YK 6r i�YO aYo �illl��r •u uMv ar.rvR •R •lbY aY.roa.[ O vet PAVING NOTES: o tlse i�iweYfvuQrw taefiD F YNRwG rrw M uRST en Ma rsca c I•KeM, mrtucru Ruly Fat[ nCmu mQ m,acn 4r, wuT wi PYu .Qr an s luuml srro•ma. •u mYe.. ro ..m .F.Ka awu c .warm ro wesFe o..oc •Dob.rTO Fml OVwrLL Oeewl Real K ¢gnl•-rm rn 1raQT MMIe UTOOeF OlY rrat6 aT 0]rtwOtq •i 4 Sn¢! riaYCMr4 wrF r•N4 eoaTNCra CONTACTS: QI¢oRl ea o..r�+. uc A ueRw atlr •wKraF Fy.lwrw.Rerl a} y01 •rrF A YOal 1G•e[.[ IaKF fA' IYaI ItJ-0[1• on Iw[I+ wIwf w •m.F k l.[em�riYFtnd IAa Y�oY r�ee-L�n PUBLIC UTILITY CONTACTS: TGag c.rc i CR m, r. +''sera rY uoP ri-[w-lao m ,,tiY.svr cw.a cusiRe care srtc•�cu.r uoY miCa ol�r �OTs.oe A I.GM i� lrwRw -n00 II..R. neY Ir IW ln•Tr01 rr er w ar.lrt m A ICY ltlou. n ncN Yrr�ue� nY`r rru`..a.r.�.. •,nrr rna.�r. A iCR w-4s: t,tl.a`.rr Ynea uo[ND E %ISTIND PROPOSED cc 4 YR•lY O® ace 0 RwwRmorr.RR o wR n+XnYE yee rrofa Rx.n wi r -Ian- eeYeR [o: mwrl 0. .. A n wl re K e 9AOR0[I W[ olY+na �1 ...�,v1ilOOM1F� wRtdAN TRACTS F-K GENERAL NOTES C300.0 Tp►►��.dd C— TDD [ --- Dfm• LnpYtlO Rmnrlp Daw ci IN D oalfD LEK7H A R/ APE WAW9 0 70 TIE'ACE D O EIOSTNO MOROSED !DlYD u �_ -4 n +trrtnw .tK O � �Netn�.nwY Q � enaNt[nNNm Q .netu Ym aP.n [ v- � �o+r[.ennuP Yews [a P u a m•.t 'rEYtr wi n we tDft Ytwrn ....o-rm.r«« amR f•f r nreC Pam f 9MR02� IF 91 TRACTS K I I APPROVED FOR CONSTRUCTION ovERALL Ints� Nunn.p'Date 101122021 j PANNG PLAN Theseyldns shall remain on the tob she CUrme wnstNCllOn s C300.1 Johthdcr021057 Ug.--gP1.10012x9 mncTr az' Q�t• worweSttibdow. �� I, vyz .� ........ � �! Cellee�as 1 v' �r•r•���r. r•Nr.I•uWj 4 ••-- r 3 MST PLATTED ' I �lr — 3226 - C.. TB 3 4 M 3224 Gn.. Ewpw lRl RmwlRl D.. 3222 3222 >•.>m B.DBeee • LCNBIn wA R40u3 YIE NC4SWEO lO lIC E40E V QMB 3220 ua6Ro 32is 321e elwTva .RwoseO .. r .. 3216 5216 a j j .Rr•..,w Oisms& c -0.30 0.00 0.30 I.00 1.30 2.00 2.30 3.00 3.30 4.00 4.30 3.00 3.30 6.00 ... ...ran.r.nw. — 142ND STREET NORTH GUTTER o oa-M n r. 3222 3722 •• - ..ra rrwin. r.w us nn o[tu.tu �220 3220 321e 3218_ FF vIwDIAN I6 3216 9 TRACTS F - K APPROVED FOR CONSTRUCTION ? �� 112ND STREET -o•so o•oo o•w 1•00 1•50 2.00 2•50 3.00 7.30 4•00 4. So 3.00 5•30 6•00 �4JB�Date 101722027 ! PLAN6PROFILE 142ND STREET SOUTH GUTTER These�tansshaltEemain0nthejob site durmo rAnslNCtion . C300.2 2 J.b OEda 4321057 hngmmmg Plan 430 3289 ""^"""'m"'°�'°' "•• -0.50 0.00 0.50 1.00 1.50 2.00 2.50 5.00 5.50 e•00 4.50 5.00 5.50 6.00 e -D•s0 D•w o eo I w I w e•w rw rw D•av »• o w a w o �.. e w GENEVA AVE EAST GUTTER n1 II 1 11 11 1 /r 1 Y- 140TH STREET -,O.o LF OF EIOBT.[G — B OUTTER TO RE REMOKO ISEE R.IE X -- '0. 56 MATCH w In 1 I; Q 111 Q 1P > I P I TT W 1 r --------------------1 I I I 1 45.OLF OTCMTMCURBBQATEA ;I1 I I I I DBE REeOWD (SEE COL RATE X-.IIpI I 1 LF TO K REMOLD EPRE(ED BT OTMER9 -- _0 35% I I CD I Q r20.56 2056 w GENEVA AVENUE CURB & GUTTER DEMO DETAIL NOT TO SCALE c— Too. W.,. RO6e(11)MZ OMM aDm owR® DRo-0mJ a OuO OrAO u Y. A ifDOP o[pDDo • LENOiM uq RFOMS M MEN D TO TK I CE OF CMB APPROVED FOR CONSTRUCTION ✓r 1��%1cn -ate 10/122021 These Mans shall remain an the p0 site OMnlr0 0OnsImcuon — — LGEIEMD ?f"r[iwr i. wiiE'� c>mTBro PRoroscD � ., Ir TwT G Gf: uYe•nr[.IrTRY O Q nr[w•,•[•n iLp Ao -]Lu- m,1M Er � , Y:nvY"OO VIPoDIAN Wro, •,r GENEVA AVE W`a`�`•°°°0` rj PLAN6PROflLE �C300.3 g iR4Cf •C TR4Cr N 11UC� Y T>KT'1 M4R �f' � - €��i * T114CT Y 18 Q� Zlb 3224 3222 3220 Rio 3216 5.50 3.00 4.30 4.00 3.50 3.00 2.30 2•00 I.30 1.00 0.50 0.00 .0.30 ALLEY A gr t` ��Yhi1r _ 1 rtE.reaRlailixr savrw I 1 I o slssr�rw4lvnr � E TR>cr'c • � � �' IpRTR 3224 3224 rwb�>rrrcrwcaaro na>L.4 3 Wzz 3220 3218 3218 �E E-W 2•w - I•w - u >u ALLEY B T c—rwe bwR L«41e 101Re1n11.) 0- NOGpO C! if.D10 ab.W00 N L]b Tm0 Ob.OaW • L [W tN YD RpOu! YK 1C45VR0 t0 llE fM% Of OFB LEOERO IEOERD CqR, EASIINO MDaOlED EAST1110 >ROPOlED ct V .rtl .�.e...l J!/R - �� I • tips>pl O ® sus slob Omer 021057 3,I TMCTS F K II APPROVED FOR CONSTRUCTION (AIyEY A, ALLEY B) IE>r O'bate 101122021 j3 PIJW 6 PROFILE Thes�l ns shall remain on the lob = site dunF1}r2 gion _ FE00.4 MUNICIPAL WATER DISTRIBUTION AND SANITARY SEWER IMPROVEMENTS TRACTS F - K, VIRIDIAN AN ADDITION TO THE CITY OF LUBBOCK, LUBBOCK COUNTY, TEXAS AUGUST 2021 CONTENTS Sheet Number Sheet Title ... COVER ... TRACTS F - R FNAL FLAT C200.0 GENERAL NOTES C200A HHOPAL WATER OSTR8VnON PLAN C210.1 LL OVERALL ICCOAL SANITARY SEWER PLAN aMi SAWrARY SEWER PLAN a PROFL.E S- I C210.3 SANITARY SEWER FLAN a PROFL.E 5-2 Jab Order n.? 1060 Engineering Plan bi D•I611 Job Order #121081 APPROVED FOR CONSTRUCTION 1►�i'bate 0&79/2027 Thesei]ens shall remain on the jnb_ site 0ur�construction Plan 03•1)•1859 y��S KIIWPYII�ICESOAYR UTILITY LOCATE NOTE: ossnKTa swu. oort•n wssu raursn.soumN •r0000RQ OII+IKaAlD lNaf YP RRUTa6a0 m Nn°�iot rtirw[�rwr�ircroimic [om°ic t`maOivwnw[`t"�`as`onwr .`�.wr'�`enm m°RfM SYOi"aua [au'o[ca �we�n sr[ RIIVRTI �•����Ar �qMK W�tt[w0.MNOM•+L 0.•u. afKL, [r<. Kt VMO sal NOY`{. EXISTING UNDERGROUND UTILITIES: Aoniu[+01 O�TNOaI rq la'1M tl Ca61r+G Vmg10110 ulUi[0 wq M ,wva mmwaro ur[rrn so.+�rx Ma.eu+m r+o�.gn cart. neaeM O[•if M [O[MAtA• v[• �O O.Y1M'rG M!uaAonsov+uscs xcw a wrm w+a .0 vow unno n K• [n+Or w spnlL A AOOaa6 M aq[A / LTtYa 11M Mr IM.CtL. L00•Tr0 M IaapWllO VnfrO AaM rt 6 M oaml•nA[Y [[ �ror.^aOExers`aro nNOra`�r°'narwx°r'i�iroT[+a'ws•crures �rtv.°o+s•rtT. saro+[[[ ra em Arurr ossurc+. a00I ro rtuKu TRENCH PROTECTION: Dona [cm [r w.a roa.wimtcra a itoaao ra r`a`�" riTasR• i•wa wcrtcna[ swu sc srawo nKTM •rw[wt RaAcwno airMKVLs.alloauaonv.r ms.tm+••rna w.T'wcYDK»K+.�nnM.eT"u[°Ys". n[` R:va�wn."eNe'src�r'..[oswiweew`' NTOi M /a/t a M4 RII6. .ro ��TOORR ML KYwmOW 0`11uC1Yi0 WLM+i'�, it COMPACTION TESTING: rt YR��iamX01romm a°r..a�a`+ce+mr �wwrrts sr�imc: rs anaa°Odrtuc mae� � � m°`icsn sw:i ar iocrtOt`wrt .was +p1rt KKfaa4[ OwR �ro>r•cnO nGe•re[rrwrn VOTMr[0 wia wam'a.�.w[ r�+esi wrwua.rsnv nsmi•°cr+ n`�r[ Mr VOG a rrtw DaTIe[ CONSTRUCTION STANDARDS: �i t:COM�rM`�OiiwO[ �r•rW��'O K��r6�1. KJmr a M EROSION NTROL M A.sAA.0 ssrai Twr TK roa TRt[ a[KA0. Krr rt+msmxK TRAFFIC CONTROL: ��ra�i wr�ntt •o�a•TaW r�r+rn+a eallKet l[•IaeM CONSTRUCTION INSPECTION merwtro Nrterw to rnM auu K r0••w[0 FT mT v u[[Oo+ —TYKU61R01n6TKna1Ura— ELEVATIONe AND DIMENSIONS•. ELa[MroO •K Xe0•• rE >SO OKR K6aM. f00T•M YMO u ar[m n•me •st aPc owiuuA a n[. UTILITY NOTES: ssy�gru NAv[t rr[ •K on a�wpxr•�+rnvM r +�r�nmsz asr.�a �aP r miars�'[o uua orw.ne.oim. �rW�SYI M1�i1[r40�i06t�lr•YPirpappYOr� •Or.(pT swvrt wYfgrr rMwN ca.tuo: [+• Omr i[0 {•Se[!rt 40•M•A 4aa+VR•G[[•K ••'�A VerL OnO+•O[WRA LEaENo [gsrvC vRoro[co —� --1 ..n•a.c.wu —rr— —e— WUc•t•O rowa�K �Y%ria eo[AteK V+YK[ ® sam R[wNraaw �mnSrtw[e •[nra way¢ [v rmsrvro mra r.nn'�Qir•rt rtuena'+[wroa Rrroon 30[Y1K� �IRRNif01 CONTACTS: aaawn.a uc n um w�AKr awe a.a. vs •[ k. n um +c�sw wr +s +s•a weou +c•sssi n uen +u•xe PUBLIC UTILITY CONTACTS: iae rrs..m R Ito w•mo •r r. nei rr Isoe r«.ms ... r mn.saw swa snA rnrs n ice man• sma+... Tsan ascot a[n w u.+ w i•Oe m.ltls •a.. e.sr •n o� ao. sw u� n Uoe sn•raA on.an Tso r. Icem•rw �>. s... rn.arz. no n. Iseow asn en�K �o...r ay..s[ s.....A...c ors rs�nsa msu-ass sertrre. r W.ns tirm w usru s+� aR sr n`Tsen APPROVED FOR CONSTRUCTION I..Nw 7�AaaM'f]ate 08119/2021 -hese Ctans shall remain on the leb site du nng construction +poa► atRm••mww o• w:iwoo0vr w.:.a +NTs•msm a•am•mai.®.s. M82@I omsla VIPoDIW y TRACTSF-K i GENERAL NOTES } sa ..rs C200.0 i��--- ---------------- A ~: _ WATER LINE SUMMARY LINE VH 10• Cllw PVC frA110M Iv0111NING G]rING Mf[I•nIOM a]aA ):m+atsa a»tmxn REIw)E Exlsrsw+r Nuc rc nrD[Ms,Tw trout nW1Al )YUSMLttS AVM17IIN1+ 1 NFTFF —I. iF\'LL VF•VM Vf Pl MI C,Rf.411 Tf FpE NrOIWIT IFrtl aac )}]rJtaTb AY•14••>• IOtr tEENE511PWIFvVEtVLLVe 00%. SOU1N renR VLLVE • VKVE BOIL F+1 rrenw H vwn.»w fnL nrlwu+t LINE C-90D PVC snrlox MMTIANr, f•hlMr. Iwcunlnn a0a0 H1N46ri1 A]fNILTp rMIK. ateo )}]>]a)b a%tt0AGT1 SEE aCaR wr ]•I[A I"?MbM M113Wl rtt' TEE MOIITN rMTE W4W V&W RO.I VEST rWTE VtiYE • VLLK BD• -Im ll v wt vxmaan ro•eEND -1. mnnaw m•mT.nb r..R I¢nn an]Sn 1}]%OaAJ eXt]I N'S fLI. r•a ICE NTO Fn6TNGf Oa2M:YMtCRIIVr LINE M Ir C400 PVC sT•TIA• Iwnlnw usnlw mscMnlAM 0.9ac )+>}•}rOn Ll00Ta}}n} CUlxntu lFE N10 GJISTWGrOIXO NCVMTCRI ryF,f0lrrxr WTf YLLh i VLLH N1R, t•]T ! 4•if YLLh i VLLh •01 s.»s: r»}mn:]e •]aaty »}• aE[]•ta)v.} I 1 jl`, IS S Y. Ol AiRNALT Aj�1 RE PE LATEClJT S TALL _4L 'PAR PER LATEST dTY aLU880M STANDARDS. _ ATOAASTMECr ® • WATER FAESSWE AND O-EM SMAU L TESTNGrt LO[A—AO\n[Mir10\EO EIR• STlfOAROS ATD $FEOFCATOMS COMOAATKN STOP MO CQPFA TMNG: LEAVE e SEtiq,l I.OT.021A1ItN0) FM UTIITY WATEILK E>906FM TO MUTATE 111101, KOIICAIEfrtS RERTANNG TO THE LOCAll Y ARE FOR S0EWTC 0.M SES O LY COMTRKTOR SN L [00FtMMrE MING LO Il AND 5000LLNG WRN ANROFRATE AUTNORTCS a LF. OF CLAD AND ra Q}T TER DEMO FOR PADPOSE0 WATER LO1E 1 Y f 7 IN ALLATION % raAcrY Tw[rN- m 3 7 S S IK • NOT FLATTEOF AoraarrEa *Ta►i�l���� r•P v stw. .•.,..p ...F.e rw \w F xs.2rm Z14 v¢Niuul�a LEGEND EIITMO fM]OPOSEO r r,sna\M cc O® Nr•rwsi O O AN]•�iM•IW�R VIRIDIAN TRACTS F-K APPROVED FOR _ CONSTRUCTION MUNICIPAL WATER it �svp.l 'Dato 08/192021 t DISTRI�BLITION Thesepi? ns shal remam_on t" jok._ y SDC dUfIhD CRN51R3Cion i Juh0,&,Pl21081 [nalnannE Plm A3-D-1859 "�""^'°"" 7 nror a�rrEo F #!T►A vROWlfD LEDfND �j � wi K.ruc lr1iYYlfAOxCW.•fl M.V �PoII —r— OD —r— t�lxM uaawCM rew..r law.a Flw� r.uwru .Wx.w �.— —.— Wus mlr.0 fiCCCU.E Ap�FL��TTEO [ VIRICJAN TRACTS F -K s APPROVED FOR CONSTRUCTION 7 MUNICIPA 0SJ1S2021 f�XllsEMR �, C PLAN These,yLans shall remain w the Iqh } site duri (q wnstwctm _ .ww W..nw F C 210.1 Job O,dcr U?11060 hngi,—gPlan Ul-D-16t1 w..�..-..... •.-a�w- t -0.50 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Jub lhde h221060 EX13TM0 LFGEMp ""O$t. Q Op wen Q arxr[..rttr, top plow.[ 3 t.1-LOOaOe T.— ���!•�•`pF 5; � ��A' {t ��u��pWr EdxE 1ti T,Ta , MNRQI 4 S APPROVED FOR r CONSTRUCTION ? VIRIDIAN TRACTS F -K yJJITARY SEWER 1 71 081182021 PLAN PROFILE Date 4S Theseplans shall remain on "' "u site dunn0 conslNction C210.2 _- APPROVED FOR CONSTRUCTION 1�]+*G�Dale mig 202t TTese mans shall remain on the ob_ site dunng cOn3iru0hon TRGFr Y o-ea t ] Tq Y I ea Y NV7T Fid TTEO m�ssn N. •� ..w—irn.n., � NV om NORTl .0•50 0•00 1.00 2.00 3.00 3.50 LINE S - 2 6^_ETWO F'ROVOEFD lE0EN0 ,� �Fipli.Kr}v�COORpN��.I.]]i,�]Ef��y?,�LO i9!]i T6SITT ��y�rpp itEfaa Grt— swam 2 IE �TQQ �4t5 Lu::.. t;�2��. 11YM•lEMM l W )" PLLTTEO S s 5.50 5.00 4.00 3.00 2.00 1.00 0.00 -0.50 LINE S-3 Job Order 0221060 Eng—ing Plan h l D.1631 VIRIDIAN TRACTS F-K S SAMTARV SEWER r PLAN 6 PROFILE } wn N.nl S.2 C210.3 EXHIBIT 'B' HUGO REED AND ASSOCIATES, INC. 1601 AVENUE N r LUBBOCK, TEXAS 79401 r 8061763-5642 r FAX 8061763-3861 TEXAS REGISTERED ENGINEERING FIRM F-760 TEXAS LICENSED SURVEYING FIRM 100676-00 LAND SURVEYORS CIVIL ENGINEERS PRELIMINARY OPINION OF PROBABLE COSTS Viridian Tract F Shared Cost Estimate City of Lubbock/1585 Development, Inc. December 13, 2021 Item COL COL 1585 Dev. 1585 Dev. No. Item Description Quantity /Units Unit Cos[ Total Item Cost Cost Share Total Item Cost Share Total Item Percentage Cost Percentage Cost WATER DISTRIBUTION $83,613.00 $41.806.50 $41,806.50 Item COL COL 1585 Dev. 1585 Dev. No. Item Description Quantity /Units Unit Cost Total Item Cost Cosl Share Total Item Cost Share Total Item percentage Cost Percentage Cost SANITARY SEWER S-1 8" Sewer at 4' 6' cut 450 L.F. $28.50 $12.825.00 50% $6,412.50 50% $6.412.50 S 2 8" Sewer at 6' 8' cut 325 L.F. $31.50 $10,237.50 _ 50% $5,118.75 50% $5.118.75 S-3 10" Sewer at 6'-8' Cut 194 L.F. $36.00 $6,984.00 50% $3.492.00 50% $3,492.00 S-4 10" Sewer at 8'-10' cut 390 L.F. $39.00 $15,210.00 50% $7,605.00 50% $7,605.00 S-5 Standard Manhole 48" I.D. _ 5 EACH $5,500.00 $27,500.00 50% $13,750.00 50% $13.750.00 S-6 Extra Vertical Feet std.48" mh.y 13 E.V.F. $180.00 $2,340.00 50% $1,170.00 50% $1,170.00 S-7 8" x 4" Service Tee w/plug 5 EACH $250.00 $1,250.00 50% $625.00 50% $625.00 S-8 4" Service/riser Pipe 65 L.F. $18.00 $1,170.00 50% $585.00 50% $585.00 S-9 1 Plug 1 EACH $400.00 $400.00 50% $200.00 50% $200.00 5-10 re Trench Protection(4'-10'] 1,359 L.F. $2.50 $3,397.50 50% $1.698.75 50% $1,698.75 S-11 Manhole Adjustment (paved areas only) 5 Each $1 000 00 $5 000 00 50% $2 500 00 50% $2 500 00 $86,314.00 $43,157.00 $43,157.00 COL COL 1585 Dev. 1585 Dev. Item No. Item Description Quantity/Units Unit Cost Total Item Cost Cost Share Total Item Cost Share Total Item Percentage Cost Percentage Cost PAVING P-1 HMAC Type "C" 2" and caliche base 3,472 S.Y. $30.00 $104,160.00 50% $52,080.00 50% $52.080.00 P-2 24" curb and gutter 1,485 L.F. $20.00 $29.700.00 50% $14.850.00 50% $14,850.00 P-3 6" conc.fillets and valley gutters 93 S.Y. $65.00 $6,045.00 60% $3.022.50 50% $3,022.50 P4 6" thick concrete alley returns 26 S.Y. $65.00 $1,690.00 50% $845.00 50% $845.00 P-5 Concrete alley paving 837 S.Y. $65.00 $41,405.00 50% $20.702.50 50% $20,702.50 P-6 Lump Sum lot cuts and fills 1 L.S. $30.000.00 $30,000.00 50% $15.000.00 50% $15,000.00 P-7 Curb & Gutter Removal 86 L.F. $8.00 $688.00 50% $344.00 50% $344.00 P-8 Rip -rap Removal 121 S.Y. $15.00 $1,815.00 50% $907.50 50% $907.50 P-9 Dry Stone rip -rap 220 S.Y. $65.00 $14,300.00 50% $7.150.00 50% $7,150.00 $229.803.00 $114,901.50 $114,901.50 ESTIMATED COST OF CONSTRUCTION $399.730.00 $199.865.00 $199.865.00 MUNICIPAL FEES City of Lubbock plan review and construction in ection fees $2.320.00 50% $1,160.00 50% $1,160.00 ENGINEERING AND RELATED SERVICES Topographic survey for In-house use only $4,000.00 50% $2.000.00 50% $2.000.00 Engineering design, City submittals, construction documents, and record documentation $32,000.00 50% $16.000.00 50% $16,000.00 Construction staking as required b)r Code $16.000.00 50% $8.000.00 50% $8,000.00 MISCELLANEOUS 10%CONTINGENCY $50,600.00 50% $25,300.00 50% $25,300.00 TOTAL CITY OF LUBBOCK COST SHARE TOTAL $252 32b 00 1585 DEVELOPMENT INC. COST SHARE TOTAL $252,325.00 TOTAL PROJECT COST $504,650.00 Copyright Hugo Reed and Assoaates, Inc.