Loading...
HomeMy WebLinkAboutResolution - 2022-R0011 - Contract 16220 with Caprock WasteResolution No. 2022-R0011 Item No. 7.19 January 11, 2022 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, Contract No. 16220, as per ITB 21-16220-MA, for dumpster renovation and refurbishment, by and between the City of Lubbock and Waste Connections of Texas DBA Caprock Waste of Lubbock, Texas, and related documents. Said Contract is attached hereto and incorporated in this resolution as if fully sct forth herein and shall be included in the minutes of the City Council. Passed by the City Council on January 11, 2022 L-4 DANIEL M. POPE, MAYOR ATT ,ST: L - MH-)( fty Rebecca Garza, City Secretary APPROVED AS TO CONTENT: CIern, Assistant tty zt APPROVED AS TO FORM: Ry n ooke, ss stant City Attorney RES.Contract No. 16220, Dumpster Renovation and Refurbishment-Caprock Waste 12.9.21 Resolution No. 2022-R0011 Contract 16220 CITY OF LUBBOCK, TX CONTRACT FOR SERVICES Renovate and Refurbish Dumpsters THIS CONTRACT, made and entered into this 11 th day of January , 20 22 , pursuant to a resolution heretofore adopted by the City of Lubbock, Texas, by and between the City of Lubbock ("City"), and Waste Connections of Texas DBA Caprock Waste, ("Contractor"). WITNESSETH: WHEREAS, the City of Lubbock duly advertised for bids for Renovations and Refurbish Dumpsters and bids were received and duly opened as required by law; and WHEREAS, after careful consideration of the bid submitted by Contractor, the City of Lubbock has heretofore adopted a resolution authorizing the acceptance of such bid, and the execution, in the name of the City of Lubbock a contract with said Contractor covering the purchase and delivery to renovate and refurbish dumpsters. NOW, THEREFORE, in consideration of the mutual agreement contained herein, as well as the financial consideration hereinafter referred to, the parties hereby covenant and agree as follows: 1. In accordance with City's specifications and Contractor's bid, copies of which specifications and bid are attached hereto and made part hereof, Contractor will deliver to the City, Renovations and Refurbish Dumpsters, Contract specifically referred to in the Bid Form as Items one (1) through twenty-two (22 )and more particularly described in the bid submitted by the Contractor or in the specifications attached hereto. 2. The City promises and agrees to employ, and does employ, the Contractor to cause to be done the work provided for in this Contract and to complete and finish the same according to the attached specifications, offer, and terms and conditions contained herein The Contractor shall perform the work according to the procedure outlined in the specifications and Bid Form attached hereto and incorporated herein. 3. The contract shall be for a term of one (1) year, said date of term beginning upon formal approval. The contract may be renewed for additional four (4) year terms under the same term and conditions upon written agreement from both parties. All stated annual quantities are approximations of usage during the time period to be covered by pricing established by this bid. Actual usage may be more or less. Order quantities will be determined by actual need. The City of Lubbock does not guarantee any specific amount of compensation, volume, minimum, or maximum amount of services under this bid and resulting contract. The Contractor must maintain the insurance coverage required during the term of this contract including any extensions. It is the responsibility of the Contractor to ensure that valid insurance is on file with the Purchasing and Contract Management Department as required by contract or contract may 4. This contract shall remain in effect until the first of the following occurs: (1) the expiration date, (2) performance of services ordered, or (3) termination of by either party with a 30 day written notice. The City of Lubbock reserves the right to award the canceled contract to the next lowest and best bidder as it deems to be in the best interest of the city. S: Purchase/Bid Docs.!ITB 21-16220-MA 5. This contract shall remain in effect until the expiration date, performance of services ordered, or termination of by either party with a thirty (30) day written notice. Such written notice must state the reason for cancellation. The City of Lubbock reserves the right to award the canceled contract to the next lowest and best bidder as it deems to be in the best interest of the city. 6. Contractor shall at all times be an independent contractor and not an agent or representative of City with regard to performance of the Services. Contractor shall not represent that it is, or hold itself out as, an agent or representative of City. In no event shall Contractor be authorized to enter into any agreement or undertaking for or on behalf of City. 7. Insurance Requirements SECTION A. Prior to the approval of this contract by the City, the Contractor shall furnish a completed Insurance Certificate to the City, which shall be completed by an agent authorized to bind the named underwriter(s) to the coverages, limits, and termination provisions shown thereon, and which shall furnish and contain all required information referenced or indicated thereon. THE CITY SHALL HAVE NO DUTY TO PAY OR PERFORM UNDER THIS CONTRACT UNTIL SUCH CERTIFICATE SHALL HAVE BEEN DELIVERED TO THE CITY. TYPE OF INSURANCE General Liability Commercial General Liability Per Occurrence Automotive Liability Any Auto Workers Compensation Employers' Liability COMBINED SINGLE LIMIT General Aggregate $1,000,000 Products-Comp/Op AGG$1,000,000 Contractual Liability $1,000,000 Med Exp (Any one Person) $1,000,000 Per Occurrence $1,000,000 $500,000 $1,000,000 OTHER: COPIES OF ENDORSEMENTS ARE REQUIRED City of Lubbock named as additional insured on Auto/General Liability on a primary and non- contributory basis. To include products of completed operations endorsement. Waiver of subrogation in favor of the City of Lubbock on all coverages INSURANCE COVERAGE REQUIRED SECTION B. The City reserves the right to review the insurance requirements of this section during the effective period of the contract and to require adjustment of insurance coverages and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decisions, or the claims history of the industry as well as the Contractor. SECTION C. The Contractor shall obtain and maintain in full force and effect for the duration of this contract, and any extension hereof, at Contractor's sole expense, insurance coverage written by companies approved by the State of Texas and acceptable to the City, in the following type(s) and amount(s): The City of Lubbock shall be named as an additional insured on a primary and non-contributory basis and shall include a waiver of subrogation in favor of the City on all liability coverage's except professional liability. A waiver on subrogation will be required on worker's comp coverages. All Copies of the Certificates of Insurance and all applicable endorsements are required. S: Purchase/Bid Docs•/ITB 21-16220-MA ADDITIONAL POLICY ENDORSEMENTS The City shall be entitled, upon request, and without expense, to receive copies of the policies and all endorsements thereto and may make any reasonable request for deletion, revision, or modification of particular policy terms, conditions, limitations, or exclusions (except where policy provisions are established by law or regulation binding upon either of the parties hereto or the underwriter of any of such policies). Upon such request by the City, the Contractor shall exercise reasonable efforts to accomplish such changes in policy coverages, and shall pay the cost thereof. REQUIRED PROVISIONS The Contractor agrees that with respect to the above required insurance, all insurance contracts and certificate(s) of insurance will contain and state, in writing, on the certificate or its attachment, the following required provisions: A. Name the City of Lubbock and its officers, employees, and elected representatives as additional insureds, (as the interest of each insured may appear) as to all applicable coverage; B. Provide for 30 days' notice to the City for cancellation, nonrenewal, or material change; C. Provide for notice to the City at the address shown below by registered mail; D. The Contractor agrees to waive subrogation against the City of Lubbock, its officers, employees, and elected representatives for injuries, including death, property damage, or any other loss to the extent same may be covered by the proceeds of insurance; E. Provide that all provisions of this contract concerning liability, duty, and standard of care together with the indemnification provision, shall be underwritten by contractual liability coverage sufficient to include such obligations within applicable policies. NOTICES The Contractor shall notify the City in the event of any change in coverage and shall give such notices not less than 30 days prior the change, which notice must be accompanied by a replacement CERTIFICATE OF INSURANCE. All notices shall be given to the City at the following address: Marta Alvarez, Director of Purchasing and Contract Management City of Lubbock 1314 Avenue K, 91h Floor Lubbock, Texas 79401 SECTION D. Approval, disapproval, or failure to act by the City regarding any insurance supplied by the Contractor shall not relieve the Contractor of full responsibility or liability for damages and accidents as set forth in the contract documents. Neither shall the bankruptcy, insolvency, or denial of liability by the insurance company exonerate the Contractor from liability. 9. Neither the City nor the Contractor shall assign, transfer or encumber any rights, duties or interests accruing from this Contract without the written consent of the other. 10. The City reserves the right to exercise any right or remedy available to it by law, contract, equity, or otherwise, including without limitation, the right to seek any and all forms of relief in a court of competent jurisdiction. Further, the City shall not be subject to any arbitration process prior to exercising its unrestricted right to seek judicial remedy. The remedies set forth herein are cumulative and not exclusive, and may be exercised concurrently. To the extent of any conflict between this provision and another provision in, or related to, this document, this provision shall control. 11. At any time during the term of the contract, or thereafter, the City, or a duly authorized audit representative of the City or the State of Texas, at its expense and at reasonable times, reserves the right to audit Contractor's records and books relevant to all services provided to the City under this Contract. In the event such an audit by the City reveals any errors or overpayments by the City, Contractor shall refund the City the full amount of such overpayments within thirty (30) days of S: PurchaseBid Docs. ITB 21-16220-MA such audit findings, or the City, at its option, reserves the right to deduct such amounts owing the City from any payments due Contractor. 12. All funds for payment by the city under this contract are subject to the availability of an annual appropriation for this purpose by the City. In the event of non -appropriation of funds by the City Council of the city of Lubbock for the goods or services provided under the contract, the City will terminate the contract, without termination charge or other liability, on the last day of the then - current fiscal year or when the appropriation made for the then -current year for the goods or services covered by this contract is spent, whichever event occurs first. If at any time funds are not appropriated for the continuance of this contract, cancellation shall be accepted by the Seller on 30 days' prior written notice, but failure to give such notice shall be of no effect and the City shall not be obligated under this contract beyond the date of termination. 13. The Contractor shall not assign or sublet the contract, or any portion of the contract, without written consent from the Director of Purchasing and Contract Management. Should consent be given, the Contractor shall insure the Subcontractor or shall provide proof on insurance from the Subcontractor that complies with all contract insurance requirements. 14. Contractor acknowledges by supplying any Goods or Services that the Contractor has read, fully understands, and will be in full compliance with all terms and conditions and the descriptive material contained herein and any additional associated documents and Amendments. The City disclaims any terms and conditions provided by the Contractor unless agreed upon in writing by the parties. In the event of conflict between these terms and conditions and any terms and conditions provided by the Contractor, the terms and conditions provided herein shall prevail. The terms and conditions provided herein are the final terms agreed upon by the parties, and any prior conflicting terms shall be of no force or effect. 15. The Contractor (i) does not engage in business with Iran, Sudan or any foreign terrorist organization and (ii) it is not listed by the Texas Comptroller under Section 2252.153, Texas Government Code, as a company known to have contracts with or provide supplies or services to a foreign terrorist organization. As used in the immediately preceding sentence, "foreign terrorist organization" shall have the meaning given such term in Section 2252.151, Texas Government Code. 16. The requirements of Subchapter J, Chapter 552, Government Code, may apply to this contract and the contractor or vendor agrees that the contract can be terminated if the contractor or vendor knowingly or intentionally fails to comply with a requirement of that subchapter. To the extent Subchapter J, Chapter 552, Government Code applies to this agreement, Contractor agrees to: (1) preserve all contracting information related to the contact as provided by the records retention requirements applicable to the governmental body for the duration of the contract; (2) promptly provide to the governmental body any contracting information related to the contract that is in the custody or possession of the entity on request of the governmental body; and (3) on completion of the contract, either: (A) provide at no cost to the governmental body all contracting information related to the contract that is in the custody or possession of the entity; or (B) preserve the contracting information related to the contract as provided by the records retention requirements applicable to the governmental body. 17. Pursuant to Section 2271.002 of the Texas Government Code, a) This section applies only to a contract that: (1) is between a governmental entity and a company with 10 or more full-time employees; and (2) has a value of $100,000 or more that is to be paid wholly or partly from public funds of the governmental entity. (b) A governmental entity may not enter into a contract with a S: Purchase/Bid Docs ITB 21-16220-MA company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. 18. The Contractor shall retain all information received from or concerning the City and the City's business in strictest confidence and shall not reveal such information to third parties without prior written consent of the City, unless otherwise required by law. 19. The Contractor shall indemnify and save harmless the city of Lubbock and its elected officials, officers, agents, and employees from all suits, actions, losses, damages, claims, or liability of any kind, character, type, or description, including without limiting the generality of the foregoing, all expenses of litigation, court costs, and attorney's fees, for injury or death to any person, or injury to any property, received or sustained by any person or persons or property, to the extent arising out of, related to or occasioned by, the negligent acts of the Contractor, its agents, employees, and/or subcontractors, related to the performance, operations or omissions under this agreement and/or the use or occupation of city owned property. The indemnity obligation provided herein shall survive the expiration or termination of this agreement. 20. This Contract consists of the following documents set forth herein; Invitation to Bid No. 21-16220- MA, Specifications, and the Bid Form. -- INTENTIONALLY LEFT BLANK -- S: Purchase/Bid Docs ITB 21-16220-MA IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed the day and year first above written. Executed in triplicate. CITY OF LUBBOCK Daniel M. Pope, Mayor ATT T: Rebecca Garza, City Secretary APPROVED AS TO CONTENT: Brenda A. Haney, ctor of Solid Waste APPROVED AS TO FORM: Ryan Br oke Assi ant City Attorney CONTRACTOR BY ;aste Connections of Texas DBA Caprock Waste Authorized Represent �?ik.d `y Print Name S-Us Address GG yy26k-- 7x 74? �3 City, State, Zip Code S: Purchase/Bid Docs• ITB 21-16220-MA ITB 21-16220-MA Renovate and Refurbish Dumpsters BID FORM Complete repair/refurbishing of container —steel #0-1 bottom, add steel tubular -stopper as needed: 25 EA Two -Cubic yard, side loading containers (as specified herein) Complete repair/refurbishing of container —steel — it #0-2 bottom, add steel tubular -stopper as needed: 2080 EA Three -Cubic yard, side loading containers (as specified herein) Complete repair/refurbishing of container — steel #D-s bottom, add steel tubular -stopper as needed: 90 EA Four -Cubic yard, side loading containers (as specified herein) ff Complete repair/refurbishing of container — #04 plastic bottom, add steel tubular -stopper as 25 EA needed: Two -Cubic yard, side loading containers (as specified herein) Complete repair/refurbishing of container — #0-5 plastic bottom, add steel tubular -stopper as 61) EA needed: Three -Cubic yard, side loading containers (as specified herein) Complete repair/refurbishing of container — p46 plastic bottom, add steel tubular -stopper as 90 EA needed: Four -Cubic yard, side loading containers (as specified herein) Complete repair/refurbishing of container —steel #0-7 bottom and plastic bottom, add steel tubular- 5 stopper as needed. One and a half -Cubic yard, EA side loading containers (as specified herein) Complete repair/refurbishing of container —steel #0-8 bottom and plastic bottom, add steel tubular- 5 stopper as needed. Two Cubic yard, side EA loading containers (as specified herein) Complete repair/refurbishing of container —steel ao-9 bottom and plastic bottom, add steel tubular- 25 EA stopper as needed. Three -Cubic yard, side loading containers (as specified herein) Complete repair/refurbishing of container —steel a0-10 bottom and plastic bottom, add steel tubular- 20 EA stopper as needed. Four -Cubic yard, side loading containers (as specified herein) 7 $ 575.00 $14,375.00 7 $ 575.00 $1.196.000.00 7 $ 575.00 $ 51,750.00 7 $ 575.00 $14,375.00 $ 675.00 $ 362 250.00 7 $ 575.00 $ 51.750.00 7 $ 755.00 $ 3.775.00 7 $ 765.00 $ 3,775.00 7 $ 755.00 $18.875.00 7 $ 755.00 $15,100.00 Page 1 of 2 Renovate and Refurbish Dumpsters BID FORM Repair, paint and replace lids with new plastic #o-t 1 lids and add steel tubular -stopper as needed: 5 r a One and a half -Cubic yard, side loading containers (as specified herein) Repair, paint and replace lids with new plastic #0-12 lids and add steel tubular -stopper as needed: 5 FA Two -Cubic yard, side loading containers (as specified herein) Repair, paint and replace lids with new plastic #013 lids and add steel tubular -stopper as needed: 15, E A Three -Cubic yard, side loading containers (as specified herein) Repair, paint and replace lids with new plastic #0 t4 lids and add steel tubular -stopper as needed ° EA Four -Cubic yard, side loading containers (as specified herein) Repair, paint and replace lids with new steel lids #0-15 and add steel tubular- stopper as needed: Two- 5 EAL Cubic yard, side loading containers (as specified herein) Repair, paint and replace lids with new steel lids #0 16 and add steel tubular- stopper as needed: Three- 8 EA Cubic yard, side loading containers (as specified herein) Repair, paint and replace lids with new steel lids 90 17 and add steel tubular- stopper as needed: Four- 7 EA Cubic yard, side loading containers (as specified herein) Paint container only and add steel tubular- #0-18 stopper as needed: One and a half -Cubic yard, 5 EA side loading containers (as specified herein) { Paint container only and add steel tubular- #0-19 stopper as needed: Two -Cubic yard, side loading 10 EA containers (as specified herein) Paint container only and add steel tubular- #0-20 stopper as needed: Three -Cubic yard, side 75 EA loading containers (as specified herein) Paint container only and add steel tubular- #0-21 stopper as needed: Four -Cubic yard, side 30 EA loading containers (as specified herein) Paint container light blue (sky blue or powder #0-22 blue) and modify container by adding metal 30 EA chutes to metal lid for recycling of accepted commodities (as specified herein) 7 $ 375.00 $1.875.00 7 $ 375.00 $1.875.00 $ 375.00 $ 5,625.00 7 $ 375.00 $ 3,750.00 i i- I - I 7 $ 700.00 $ 3,500.00 - -j -- - - - - I 7 $ 700.00 $ 5,600.00 7 $ 350.00 $ 2,450.00 7 $ 350.00 $1.750.00 7 $ 350.00 $ 3,500.00 7 $ 350.00 $ 26,250.00 7 $ 350.00 $10.500.00 7 $ 650.00 $19,600.00 Page 2 of 2 Renovate and Refurbish Dumpsters CITY OF LUBBOCK SOLID WASTE SERVICES SPECIFICATIONS FOR REFURBISHING SIDE LOADING GENERAL SPECIFICATIONS: It is the intent of the City of Lubbock. Texas. to secure bids for repairs/refurbishing maintenance of one -and -a -half cubic yard (1 12 ); two (2) cubic yard. three (3) cubic yard and four (4) cubic yard Side Loading containers. Each container must be re -stenciled on the front and inverted under right lift arm, (facing container) with glossy black spray lacquer with 3" high X 13 4"Hide serial numbers. Serial numbers will be provided by the Solid Waste Services Department. Each serial number must include an R, the year of repair and a dash — before each serial number provided by the department. For example, R14-(serial number provided by department). In addition. the letters "Keep Lids Closed" must be stenciled on the front center (below lids) with glossy black spray lacquer with 3" high X 13 4" wide letters. The contractor shall protect and save harmless the owner from all and every demand for damages, royalties or fees on any patented invention used by him/her in connection with the work done or materials furnished under this contract; provided. however. that if any patented materials. machinery, appliance or invention is clearly specified in this contract. then, and in the event, the cost of procuring the rights of use and legal release or indemnity determined and directed to be included in the bid price at the time the proposal is submitted. Strike this Prices bid shall include delivery to 1631 84th Street. Lubbock, Texas or alternate delivery site as directed by the Sentence Solid Waste Services Department40_)Zi All containers shall be guaranteed for twelve (12) months after delivery against defective workmanship and materials. All materials will be furnished by vendor. Containers to be refurbished will be checked out to successful bidder by City serial number noting type of repairs to be completed and checked back in when completed. Vendor shall be paid on the number of completed containers for each category of repair. Successful bidder shall pick up containers to be repaired from 1631 84th Street or alternate Strike this pick up location, and return completed containers to Solid Waste Services Department Container Section at the same Sent nce address. Containers will be loaded and unloaded by City of Lubbock personnel. r The number of containers to be refurbished weekly will be determined by Solid Waste Services Department and the determined number will be given to the bidder. At least 11211 or less. of the total number of dumpsters in the bid will be refurbished on a monthly basis. The following are minimum specifications for the refurbish repair work to be done: I. STEEL All steel metal shall be hot -rolled commercial quality steel. Container bottom, front, rear and sides when necessary, welded continuously on the interior: Side Loading - 12 gauge. Container lids welded continuously on the interior: Side Loading - 16 gauge. Container bottom when necessary shall be hot rolled commercial quality steel. ITB#19 . - .doc 3 Renovate and Refurbish Dumpsters Container bottom shall include two skids, which will be part of the sides: Side Loading - 12 gauge. Bumper angle will be located in front of the lift arm and will be 2" x 3" x 1 4" x 20" long angle iron. The angle will wrap around the corner from the front of the container. Welds shall be continuous on the interior and exterior of the container, except where stated to the contrary. and shall form a secure bond between metals. Puddling and splattering are unacceptable. PolyethyleneiPlastic Bottoms When plastic bottoms are requested in lieu of steel bottom, container bottom shall be made of 3/16" high molecular weight polyethylene, seamless extending a minimum of ten (10) inches up the inside wall of the container. The City Of Lubbock will accept bottoms produced by Brvan Container Company, Bryan, TX (888.611.3333). or approved equal. Dimensions of plastic bottoms from Brian Container Company are as follows: 2 cubic yard = 37 7/8 inches 3 cubic yard = 47 '/2 inches 4 cubic yard = 47 '/2 inches Specifications for installing plastic bottoms from Bryan Container Company: After construction of metal box with cross members on the bottom, insert plastic bottom from top. To secure plastic bottom to metal container, either pop rivet or weld Z bars to side of container. SEE ATTACHMENT A. STEEL TUBULAR LID -STOPPER Tubular lid -stopper shall be constructed of',i " round steel tubing. 16" long, with two (2) 4" legs. Legs shall be welded to the steel portion of the container. SEE EXAMPLE PICTURED IN ATTACHMENT BI. LIDS Lids shall be made in three (3) parts. with the rear lid to be constructed of 16 gauge hot -rolled steel for Side Loading containers and hinged with 3,4" pipe. Front lids shall be plastic. manufactured independent of each other and hinged to rear lid with 1 2" solid steel rod. Rear lid shall be 15" X 60" constructed of 16 gauge hot -rolled steel for Side Loading containers. Color shall be sandalwood brown or similar color to match existing containers. Front lids. 30" long X 29" wide shall be .250" thick and shall weigh seven (7) pounds and be composed of 1000a recycled materials. Front edge of lid shall have two finger grips for added stiffening and convenience in opening the lid. Front lid outside ears shall be slightly thicker to deter splitting of plastic lid. Front lid color shall be black. with the City of Lubbock logo and the letters. "Lubbock. Texas" embossed (molded) on each small lid. Front lids must be designed with extra high ribs to provide structural strength, durability. and prevent sagging in hot weather. Front lid color and design must match the current lid used by the City of Lubbock. Front lids must be guaranteed not to chalk, split or crack due to ultraviolet exposure for (3) three years from date of delivery. IT8#19 - doc Renovate and Refurbish Dumpsters When directed by Solid Waste Services, front lids may be requested as: 16 gauge hot -rolled commercial quality steel. 4a. MODIFICATIONS For three (3) cubic yard and four (4) cubic yard Side Loading containers: When directed by Solid Waste Services. the 16 gauge hot -rolled commercial quality steel front lids shall be modified by adding chutes constructed of 16 gauge hot -rolled steel. Chute additions shall be painted light blue (sky blue or powder blue) to match current color used by City SEE EXAMPLES PICTURED IN ATTACHMENT B2. CLEANING All welds shall be cleaned to bright metals and shall be free of all foreign material, slag, rust, dirt. oil or other material which will show an unevenness after painting. Failure to do so shall be cause for rejection until deficiency is correct. PAINTING The interior and exterior of the containers shall be painted with a two (2) coat system consisting of a corrosion inhibitive fast drying primer followed by a high gloss acrylic enamel finish coat. Primer coat shall be a fast dry zinc chromate. The finish coat shall be a high gloss, quick drying. acrylic enamel paint. Paint shall be clean and free from foreign material and shall be applied evenly without runs or sags. For two (2 cubic yard, three (3) cubic yard and four (4) cubic yard Side Loading containers. the finish color shall be sandalwood brown or similar color to match existing containers. When directed by Solid Waste Services, for three (3) cubic yard and four (4) cubic yard Side Loading containers, the finish color shall be light blue (sky blue or powder blue) or similar color to match existing recycling containers. The above primer and paint shall be applied on the interior and exterior of the containers. The containers must be cleaned of all foreign material, slag, rust, dirt, oil or other material before the primer and paint are applied to ensure adhesion of the primer and paint. Paint shall be guaranteed for one ( I ) year against cracking, checking or loss of adhesion and appreciable color change or chalking of the finish coat of paint. SEE ATTACHMENTS C & D SPECIFICATION VARIATIONS Variations from these specifications WILL NOT BE ACCEPTABLE. ITBk19 doc Renovate and Refurbish Dumpsters SHOP DRAWING Bidder will furnish Shop Drawing depicting his proposal for refurbishing the different sizes of Side Loading containers. Shop Drawing is to be submitted with bid. CATEGORIES OF REPAIRS/REFURBISHING A complete refurbish includes replacing as needed the front back and both sides with 12 gauge steel as far up as needed to get the container back to reusable condition A complete refurbish also Consists of painting of the interior and exterior and putting new lids on the container. Work to be performed by successful bidder shall include one or more of the following categories of repairs/refurbishing: 1. Complete repair/refurbishing of container — Steel bottom Bottom and front and rear and sides: 12 gauge hot -rolled commercial quality steel for Side Loading containers. welded continuously on the exterior of the container. Skids welded in place on existing containers: Side Loading — 12 gauge. Replacement of lids. Paint will be applied according to specifications. 2. Complete repair/refurbishing of container — Plastic bottom Front. rear and sides: 12 gauge hot -rolled commercial quality steel for Side Loading containers. welded continuously on the exterior of the container. Bottom: 3/16" high molecular weight polyethylene. seamless extending a minimum of ten (10) inches up the inside wall of the container. Skids welded in place on existing containers: Side Loading 12 gauge. Replacement of lids. Paint will be applied according to specifications. Repair. paint and replace lids. • Plastic and metal lids will be replaced with new plastic lids. • If metal lids are requested. repair of metal lids and'or the placement of metal lids: Side Loading - 16 gauge hot rolled. • Paint will be applied according to specifications. Painting of container only. • Paint will be applied according to specifications. 5. Repair and replace roll -off metal containers. hinges. locks and 12 gauge metal rail nose rollers. doors and steel roller shaft.. SEE EXAMPLES & DRAWING IN ATTACHMENTS E, F AND G. See Attachment E for the preferred placement of reinforcing side plates. See Attachment F for the preferred placement of bottom channels and chain attachment. See Attachment G for container drawing. iTsate doc Renovate and Refurbish Dumpsters Sample containers may be seen by bidder at 1631 84th Street, Solid Waste Services Container Section. 10. QUANTITY OF CONTAINERS - MORE OR LESS Complete repair/refurbishing of container - steel bottom and add tubular lid -stopper as needed: • Estimated 745 (More or Less) Side Loading (approx. 14 per week) => 25 - 2 cubic yards => 630 - 3 cubic yards =:> 90 - 4 cubic yards 2. Complete repair 'refurbishing of container -- plastic bottom and add tubular lid -stopper as needed: • Estimated 745 (More or Less) Side Loading (approx. 14 per week) => 25 - 2 cubic yards => 630 - 3 cubic yards => 90 - 4 cubic yards 3. Complete repair: refurbishing of container -- steel bottom and plastic bottom, add steel tubular - stopper as needed: * Estimated 2.110 (More or Less) Side Loading (approx. 40 per week) => 5 - 1 'I cubic yards => 5 -- 2 cubic yards => 2.080 - 3 cubic yards => 20 - 4 cubic yards 4. Repair, paint and replace lids with new plastic lids and add tubular lid -stopper as needed: * Estimated 30 (More or Less) Side Loading (as needed) => 5 - 1 ',, cubic yards => 5 - 2 cubic yards =:> 15 - 3 cubic yards => 10 - 4 cubic yards 4. Repair, paint and replace lids with new steel lids and add tubular lid -stopper as needed • Estimated 20 (More or Less) Side Loading (as needed) => 5 - 2 cubic yards =:> 8 - 3 cubic yards => 7 - 4 cubic yards (includes replacement of damaged plastic or metal lids with new plastic lids, and replacement of damaged plastic or metal lids with new metal lids, as per direction of Solid Waste Services) 5. Painting of container only and add tubular lid -stopper as needed: * Estimated 115 (More or Less) Side Loading (approx. 2 per week) => 5 - 1 / cubic yards => 10 - 2 cubic yards => 75 - 3 cubic yards => 30 - 4 cubic yards ITBk19 - doc 7 Renovate and Refurbish Dumpsters 6. Modify three cubic yard and four cubic yard containers by adding metal chute and painting of chute and container. • Estimated 30 (More or Less) Side Loading (as needed) - �- 30 -- 3 or 4 cubic yards SEE ATTACHMENT H I I. QUALIFICATION OF BIDDER Bidders must be able to demonstrate experience and successful completion of large-scale metal fabrication projects. 12. TERM OF CONTRACT The terms of the bid will be for one year with the option to renew annually tip to four (4) additional years upon mutual written agreement of both parties. At annual renewal, the rates may be adjusted upward or downward at a percentage not to exceed the effective change in the Consumer Price Index (CPI) or Product Price Index (PPI), whichever is most effective for the specific contract for the previous 12-months. At the City's discretion, the effective change rate shall be based on either the local or national index average rate for all items. If agreement cannot be reached, the contract is terminated at the end of the current contract period. ITBft19 - - .doc Renovate and Refurbish Dumpsters ATTACHMENT A el, The Extended -Life Container 10-Year Ward pa., jg .4f .4r Our container offers a unique, low -maintenance option for the waste collection industry. The Extended -Life Container features a plastic pan supported by structural steel members and held in place by our proprietary steel "z" strips. Our steel reinforced plastic bottom offers: • Rust -free bottoms STEEL RIVET CONTAINER SIDE • Less noise • Lighter weight ATTACHMENT A -4--STEEL V STRIP • Less stress on trucks PLASTIC BOTTOM • At least $30 a year in fuel savings � • high impact resistance Bryan Containers "_e Next Step in Container Evolution Bryan Container Company, Inc. a P.O. Box 32 ■ Bryan, Texas 77806 Telephone: 409/822-7: 98 ■ Toll Free: 8881611-3333 • Fax: 409/775-0319 ITBk19 dur Renovate and Refurbish Dumpsters ATTACHMENT B1 — STEEL TUBULAR LID -STOPPER 16" (3/ round steel tubing) 4" (1/ round steel tubing) Pipe dimensions = 3/4 " round steel tubing IT8k19 - • .doc 10 Renovate and Refurbish Dumpsters ATTACHMENT B2 Modifications — 3 4 cubic yard c6ntai iTaale - • Am 11 ATTACHMENT C MPI #95 Quick Drying Metal Primer Renovate and Refurbish Dumpsters t Master Painters Institute Approved Product List Back to Main Peas -Previous I Product eeuct Index Next> ATTAr■ C -I Al -MPI Nuinber MPI #95 Q.D. Primer for Aluminum Page 1 of 1 A solvent based, alkyd or modified alkyd type, quick drying, anti corrosive metal primer for cleaned interior and exterior steel and prepared aluminum. This coating can be used in residential, commercial and industrial locafions that are exposed to light corrosive atmospheres. This primer can be finish coated with conventional latex and alkyd paints as well as MPI #96 Quick Drying Gloss and #110 High Performance Latex. Application is by airless and conventonal spray equipment, and can be touched -up by brush. (Characteristics reviewed include corrosion resistance and dry time. See MPI 'Evaluated Performance' Specs for complete details, specific requirements, and/or reference specs.) MPI VOC Ranges E3 <401 g/L E2 401 — 450 E1 451 — 550 I Blanks may indicate information I (grams/L.) g/L g/L unavailable. Listing Mfr Label Product Name Code E Range Benjamin Moore Benjamin Moore Rapid Dry Metal Primer CM05 2 California Paints H.P. Industrial Prime Line Metal Primer - Grey 1704 2 Cloverdale Paint Quick Dry Non -Lifting Metal Primer 71312 1 Color Wheel CGI Contractors Choice Ironize Inhibitive Primer 640 3 Columbia Paint CGI Industrial Universal Low VOC Phenolic Primer 07-576-PP 2 Columbia Paint CGI Industrial Lead -Free Primer - Red 07-437-PP 1 Columbia Paint CGI Industrial Lead Free Primer - Gray 07-426-PP 1 Coronado Paint Quick Dry Alkyd Metal Primer 895 Line 1 Frazee CGI Metal Prime 661 1 General Paint CGI Q.D. Anti Corrosive Primer Red/Grey 06-154/160 1 Griggs Paint Deer Valley OD Grey Primer 200A04 3 ICI Paints Devoe Coatings Devguard T & S Primer 4160 2 ICI Paints Devoe/Fuller Surmax DP27915/17 2 ICI Paints Devoe Coatings Rustguard QD Shop Coat Primer 4140 3 ICI Paints (Canada) Devoe Devguard 4160 2 Miller Paint CGI Aluminum & Ferrous Metal Primer 484 2 Miller Paint CGI PPG Zinc Chromate Primer 6-204 3 Mills Paint Superior Quality Fast Dry White Barrier Primer 551 Northern Paint Colorlox Fast Dry Grey Primer 601-58 Para Paints Insl-X Speedy Metal Primer MP-915 2 Parker Paint CGI Parker Paint Overlay Red Primer 1679 2 Porter Paints U-Prime Fast Dry Universal Primer 286 2 PPG Speedhlde Quick Dry Metal Primer 6-204 3 Rodda Paint Professional Maint Barrier III HS 708295X 3 Sioo Coatings Rust-Oleum Speedy Dry 1573 1 Spectra -Tone CGI Insl-X Speedy Metal Primer MP-915 Tower Paint Red Oxide Metal Primer T110 2 http://www.paintinfo.com/mpi/approved/mpi095.htm 5/18/2004 IT8#19 - .doc 12 ATTACHMENT D Renovate and Refurbish Dumpsters In I . For Dallas/Fort Worth, Wichita Falls, Waco, Tyler areas •r: For HOUSton, College Statton, Pasadena, Reaurnont areas ATTACHMENT D f-r,r San Angelo, Midland, Abilene, Amarillo. Lubbock, El Pa,,o areas 800.326.7881 Joseph S. Barry. President F,Dr Austin, San Antonio, Corpus Christ;, Laredo area~ Imp t�� ii'. t??,ti ttt j_i tlt,l ,•..ri ITB#19 Am m 13 f h '11rl.t Renovate and Refurbish Dumpsters ATTACHMENT E Preferred placement for reinforcing side plate. w Incorrect placement for reinforcing side plates. o a ride i _ it - t .� .a►r.I eat A IT8a19 ': 4 ATTACHMENT F Renovate and Refurbish Dumpsters Preferred placement of Bottom Channels. tC� Chain attachment - metal lids portion to side of dumpster. iTea19 - - -dog 15 Renovate and Refurbish Dumpsters NEW CONTAINER SPECIFICATION - FOR REFERENCE FOR RENOVATIONS/REFURBURSHING ATTACHMENT G — DRAWING - COMPLETE .k I E s