HomeMy WebLinkAboutOrdinance - 2000-O0027 - Making Changes In FY 1999-2000 Budget - 06/08/2000First Reading Second Reading
May 251, 2000 June 8, 2000
Item No. 15 Item No. 15
ORDINANCE No. 2000-00027
AN ORDINANCE MAKING CHANGES IN THE FY1999-2000 BUDGET OF
THE CITY OF LUBBOCK FOR GOVERNMENTAL PURPOSES; AND
WHEREAS, Section 102.010 of the Local Government Code of the State of Texas
authorizes City Councils to make changes in budgets for municipal purposes; and
WHEREAS, the City Council deems it advisable to change the budget for municipal
purposes and reallocate funds as follows; NOW THEREFORE:
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the 1999-2000 fiscal year, revised budget of the City of Lubbock attached
hereto as Exhibit A is hereby adopted and ordered filed with the appropriate authorities.
THAT a copy of the changes made to the City of Lubbock budget pursuant to this
Ordinance shall be filed with the City Secretary and County Clerk of Lubbock County as
required by law.
AND IT IS SO ORDERED.
Passed by the City Council on first reading this 25 day of may , 2000.
Passed by the City Council on second reading this M day of June , 2000
i) I
ATTEST:
City Secretary
APPROVED AS TO CONTENT:
d. 2 L�, ""Oe
Anna Mosqueda
Director of Management Services
APPROVED AS TO FORM:
D Vandiver
First Assistant City Attorney
ccdocs/Revbudget99-OO.ord
May 16, 2000
Ordinance No. 2000-00027
Table of Contents,
Operating Funds
i
General Fund
Page 1
Enterprise Fund
Electric
Page 4
Water
Page 6
Sewer
Page 7
Solid Waste
Page 8
Airport
Page 10
Stormwater
Page 11
Internal Services Fund
Page 12
Self Insurance
Health
Page 15
Risk Management
Page 17
Transit
Page 18
Debt Service
Page 19
Capital Projects
i
Parks
Page 20
Streets
Page 23
General Capital
Page 25
General Facilities/System
Page 27
Electric Capital
Page 34
Airport Capital
Page 36
Airport Facilities/System
I
Page 42
Stormwater
Page 46
CITY OF LUBBObK
REVENUE/EXPENSE REPORT
GENERALFUND
UTILIZATION OF FUND BALANCE
TOTAL OPERATING REVENUE
TRANSFERS IN
EXPENSES/EXPENDITURES
PAYROLL
SUPPLIES
MAINTENANCE
OTHER CHARGES
CAPITAL OUTLAY
OPERATING TRANSFER-PSIP
REIMBURSEMENTS
TRANSFERS OUT
TOTAL FUND EXPENDITURES
TOTAL REVENUE
TOTAL EXPENDITURES
VARIANCE
ORIG BUDG
1999-00
REVISED
1999-00
671,753
671,753
69,348,835
71,214,919
14,162,205
14,162,205
57,739,492
57,666,641
2,784,874
2,903,776
4,715,034
4,716,084
12,331,376
12,361,077
705,847
701,897
133,837
144,152
(847,560)
(794,857)
6,619,893
8,350,107
84,182,793
86,048,877
84,182,793 86,048,877
84,182,793 86,048,877
0 0
CITY OF LUBBOCK
SCHEDULE OF DEPARTMENT REVENUES
GENERAL FUND
OPERATING REVENUES
Total Tax & Franchise Revenues
Total Licenses and Permits
Total Intergovernmental
Revenue
Total Charges for Services
Total Fines and Forfeits
Total Interest Earnings
Total Rental Revenue
Total Recoveries
Total Other Revenue
Total Contributions
Total Gen Fund Operating Revenue
TRANSFERS FROM
Total Electric Rev Fund
Total Water Rev Fund
Total Sewer Rev Fund
Total Solid Waste Fund
Total Airport Rev Fund
Hotel Motel Fund
Storm Ind Cost
Golf Rev Fund
Community Improvmt-Freeport
TRANSFERS FROM
ORIG BUDG REVISED
1999-00 1999-00
58,150,093 59,892,286
1,054,542 1,123,857
344,971
345,117
4,332,067
4,400,067
3,530,300
3,130,300
1,122,005
1,318,852
3,000
3,743
346,907
365,747
464,950
634,950
0
0
69,348,835 71,214,919
ORIG BUDG REVISED
1999-00 1999-00
7,725,245
7,725,245
2,250,167
2,250,167
1,486,949
1,486,949
1,082,676
1,082,676
1,014,678
1,014,678
303,693
303,693
44,197
44,197
43,000
43,000
211,600
211,600
14,162,205
14,162,205
CITY OF LUBBOCK
SCHEDULE OF DEPARTMENT EXPENDITURES
GENERALFUND
DEPARTMENTS
Civic Services
Electric
Financial Services
Fire
General Government
Health and Community Services
Human Resources
Police
Strategic Planning
Management Services
Transportation
GENERALFUND
TRANSFERS OUT
TFR-RES E-COMMERCE IMPACT
TFR-TO COMMUNITY IMPROVEMEN
TFR-TO PUBLIC SAFETY CP
TFR-TO PARKS CAP PRO
TFR-TO STREET CAP PROJ
TFR-TO PERM STREET MTNCE
TFR-TO GEN FAC AND SYS IMP
TRF-TO ECON DEVELOPMENT
TFR-TO TRANSIT
TFR-TO LEGISLATION
TRANSFERS OUT
ORIG BUDG REVISED
1999-00 1999-00
13,185,764
13,247,965
1,788,334
1,788,334
1,423,797
1,450,139
16,919,202
16,988,315
6,192,307
6,068,806
4,913,829
4,917,268
831,470
831,470
25,597,793
25,575,192
798,044
798,579
456,337
456,337
5,456,024
5,576,366
77,562,901 77, 698, 771
ORIG BUDG REVISED
1999-00 1999-00
0
665,866
842,067
842,067
250,000
250,000
775,000
799,961
98,626
98,626
1,700,000
1,700,000
1,900,000
2,839,387
175,000
175,000
879,200
879,200
0
100,000
6,619,893
8,350,107
3
City of Lubbock
SUMMARY Or REVENUES AND EXPENDITURES
ELECTRIC FUND
ORIG BUDG REVISED
ACCOUNT DESCRIPTION 1999-00 1999-00
REVENUES:
General Consumers Metered
64,259,557
66,052,364
Municiple Sales
5,122,776
5,822,996
Interest on Investments
19,600
0
Building Rent
165,000
165,000
Pole Rentals
74,000
77,500
Sale of Fuel
0
139,300
Off System Sales
1,650,000
1,650,000
Sales to other WTMPA Cities
300,000
300,000
Reserve for WTMPA
1,000,000
0
Miscellaneous Revenues
77,500
109,000
TFR-From Rate Stabilization
0
1,890,000
REF-Fec of Util Coll Dep
2,175,000
0
TOTAL REVENUES
74,843,433
76,206,160
OPERATING EXPENDITURES:
Electric Administration
935,052
955,052
Electric Promotion
1,547,943
1,547,943
Electric Production
Operations
39,779,144
45,462,206
Maintenance
2,126,891
2,126,891
Total Electric Production
41,906,035
47,589,097
Electric Distribution:
Engineering
983,437
983,437
Underground Lines
877,402
877,402
Overhead Lines
1,440,490
1,440,490
Customer Service
1,440,929
1,440,929
Substations
835,488
835,488
Meter Shop
370,359
370,359
Total Electric Distribution
5,948,105
5,948,105
Public Utilities Collection
Field Services
1,396,811
1,396,811
Customer Service
2,555,381
2,555,381
Total Collections Office
3,952,192
3,952,192
Business Development
213,048
213,048
Miscellaneous Expense
0
0
Uncollectible Accounts
695,004
695,004
Total Operating Expenditure
55,197,379
60,900,441
OTHER EXPENDITURES:
Payment for Debt Service
5,453,365
5,151,520
LPL Rate Stabilization
0
0
4
City of Lubbock
SUMMARY OF REVENUES AND EXPENDITURES
ELECTRIC FUND
ORIG BUDG REVISED
ACCOUNT DESCRIPTION 1999-00 1999-00
Section 2 Eco Development
Section 3 Eco Development
Contr-Traffic Signal
Indirect Cost Allocation
Total Other Expenditures
RESERVES AND RETAINAGES:
Elec Perm Cap Maint Fund
Elec System Improv Fund
Brandon Station Reserves
System Maint Reserve
Street Light Capital Proj
Streetlighting
Transfer to General Fund:
In Lieu of Property Tax
Transfer to General Fund
Gas Tax
Reserve for Econ Development
Reserve for VV7MPA
Trsfr Gen Fund -Infrastructure
Trsfr-Community Improvement
Trsfr-Legislation
Tsfr Int Sery Perm Cap Maint
Total Reserves/Retainages
TOTAL FUND EXPENDITURES
REIMBURSEMENTS
Reimb-Personal Services
Reimb-Supplies
Reimb-Other Charges
Reimb-Data Processing
TOTAL REIMBURSEMENTS
REMAINING BALANCE
286,164
286,164
161,064
161,064
105,000
0
818,754
818,754
6,824,347
6,417,502
3,664,762 3,664,762
250,000 250,000
0 0
0 0
120,000 120,000
1,788,334 1,788,334
1,175,323
1,175,323
2,215,362
2,215,362
527,472
527,472
100,000
100,000
1,000,000
0
1,200,000
1,200,000
730,454
0
50,000
0
0
0
12, 821, 707
11, 041,253
74,843,433 78,359,196
0 (1,140,739)
0 (87,000)
0 (326,250)
0 (696,000)
0 (2,249,989)
0 96,953
5
CITY OF LUBBOCK
SUMMARY OF REVENUE AND EXPENDITURES
WATER FUND
REVENUES
General Consumers Metered
Municipal Sales
Sales To Other Cities
Municipalities
Fire Hydrant Rental
Interest on Investment
Service Charges Checks
Reconnection Service Fee
Miscellaneous Other
LAH Recreation
TOTAL REVENUES
OPERATING EXPENSES
Water Utilities Administratio
Engineering
Metering & Customer Services
Equipment Maintenance
Pipeline Maintenance
Laboratory Services
Pumping & Control
Water Treatment
Water Production
Water Reservoir
Collections
Uncollectible Accounts
TOTAL OPERATING EXPENSES
OTHER EXPENDITURES
Payment to Debt Service
Indirect Cost Allocation
TOTAL OTHER EXPENDITURES
RESERVES AND RETAINAGES:
Water Permanent Capital Maint
Rate Stabilization Reserves
Trans to Other Funds
Trans - Legislation
Trans to Community Improver
In Lieu of Property Tax
Transfer to General Fund
TOTAL RESERVES/RETAININGS
TOTAL FUND EXPENDITURES
REMAINING BALANCE
ORIG BUDG REVISED
1999-00 1999-00
26,135,199
26,135,199
834,149
834,149
250,000
250,000
165,689
165,689
48,000
48,000
131,900
412,097
16,000
16,000
120,000
120,000
27,092
256,461
91,000
91,000
27,819,029 28,328,595
439,586
439,586
370,283
370,283
972,353
972,353
331,944
331,944
1,125,091
1,260,091
358,640
358,640
2,175,449
2,175,449
3,945,429
4,174,798
835,615
835,615
801,062
801,062
1,256,288
1,451,032
227,808
227,808
12,839, 548 13,398,661
11,554,699 11,574,777
516,681 516,681
12,071,380 12,091,458
799,909 767,828
37,544
0
0
0
50,000
50,000
287,162
287,162
899,000
899,000
834,486
834,486
2,908,101
2,838,476
27,819,029
28,328,595
0
0
Z
CITY OF LUBBOCK
SUMMARY OF REVENUE AND EXPENDITURES
SEWER FUND
REVENUES
Sewer Service Charges
Land Application
Sales of Effluent
Interest on Investments
Miscellaneous Revenues
Transfer from Debt Service
Transfer from Airport
Sale of Surplus Equip
Transfer From Rate Stab.
TOTAL REVENUES
OPERATING EXPENSES
Water Reclamation
Wastewater Collection
Land Application
Industrial Monitoring/Pre'
Wastewater Laboratory
Collections
Uncollectable Accounts
Misc Other Expenses
TOTAL OPERATING EXPENSES
OTHER EXPENDITURES
Payment to Gen. Debt Service
Indirect Cost Allocation
SRF Debt Service
Interest on Bonds
TOTAL OTHER EXPENDITURES
RESERVES AND RETAINAGES:
Sewer Permanent Capital Maint
Sewer Capital Projects
Rate Stabilization Reserves
Trans - Legislation
Trans to Community Improvem
Trans to Solid Waste Cap.
In Lieu of Property Tax
Transfer to General Fund
TOTAL RESERVES/RETAININGS
TOTAL FUND EXPENDITURES
REMAINING BALANCE
ORIG BUDG REVISED
1999-00 1999-00
14,627, 303 14.627, 303
1,162,000 1,162,000
576,000
576,000
312,100
296,880
8,590
8,590
0
0
0
0
26,181
26,181
1,433,166
1,433,166
18,145,340
18,130,120
3,899,708 3,899,708
841,692 841,692
2,246,090 2,396,090
417,627 417,627
285,175 285,175
292,511 310,901
91,423 91,423
0 0
8,074,226 8,242,616
7,263,089 7.263,089
279,084 279,084
0 0
0 0
7,542,173 7,542,173
1,113,087
929,477
0
0
0
0
50,000
50,000
157,989
157,989
0
0
706,500
706,500
501,365
501,365
2,528,941
2,345,331
18,145,340
18,130,120
0
0
7
CITY OF LUBBOCK
SUMMARY OF REVENUES AND EXPENDITURES
SOLID WASTE FUND
ORIG BUDG
REVISED
ACCOUNT DESCRIPTION
1999-00
1999-00
REVENUES:
Garbage Service Charges:
Residential Collections
8,619,294
8,619,294
Commercial Collections
0
0
Municipal Collections
113,756
113,756
Roll -Off
0
0
Net Garbage Service Charges:
8,733,050
8,733,050
Landfill Fees
4,317,128
4,317,128
Municipal Landfill Fees
3,831,150
3,831,150
Composting Revenue
43,500
43,500
Interest on Investments
243,900
235,624
Sale of Equipment
12,448
12,448
Recycling Programs
6,630
6,630
Transfer from Debt Service
0
0
Miscellaneous Revenues
50
50
TOTAL REVENUES:
17,187,856
17,179,580
OPERATING EXPENDITURES:
Residential Collection
5,851,818
5,851,818
Commercial Collection
0
0
Solid Waste Disposal
1,811,688
1,824,164
Contractual Services
458,654
458,654
Recycling
524,953
524,953
Collections
270,369
274,303
Uncollectible Accounts
120,352
120,352
Total Operating Expenditures 9,037,834 9,054,244
OTHER EXPENDITURES
Indirect Cost Allocation 387,048 387,048
Miscellaneous Expense 0 0
Transfer to General Fund 517,628 517,628
Waste Relocation Amortized 264,844 264,844
In Lieu of Property Tax 178,000 178,000
Payment to Debt Service 796,248 796,248
Total Other Expenditures 2,143,768 2,143,768
8
CITY OF LUBBOCK
SUMMARY OF REVENUES AND EXPENDITURES
SOLID WASTE FUND
RESERVES AND RETAINAGES:
Solid Waste Perm. Cap. Maint.
1,481,295
1,481,295
Solid Waste Capital Projects
1,863,745
1,863,745
Cap Proj Fd-Post Clos Care
215,230
215,230
Transfer- Legislation
80,000
80,000
Transfer to Comm Investmt
1,172,543
1,172,543
Rate Stabilization Reserves
1,193,441
1,168,755
Total Reserves/Retainages
6,006,254
5,981,568
Total Fund/Expenditures
17,187,856
17,179,580
Remaining Balance
0
0
9
CITY OF LUBBOCK
SUMMARY OF REVENUES/EXPENDITURES
AIRPORT FUND
ACCOUNT DESCRIPTION
REVENUES:
Landing Area
Hanger Area
Terminal Area
Parking Area
Agriculture and Rent
Industrial Area
Interest on Investments
Marketing Contrib-Hotel Tax
Miscellaneous
TFR-From Jetbridge Reserve
TFR-From Airport FSI
TOTAL REVENUES
OPERATING EXPENDITURES:
Administration and Marketing
Operations
Maintenance
Security Access
Security Police
Parking
Total Oper. Expenditures
OTHER EXPENDITURES:
Trnfr to Gen Fd-Terminal Rf
Trans to General Fund/ARFF
Airline Contract Jetbridge
Contr to EF&SI-Power Lines
Transfer to Sewer -Parking
Indirect Cost Allocation
Total Other Expenditures
RESERVES AND RETAINAGES:
Trnsfr to Airport Cap.
Air Facil & Sys Imp Fund
Total Reserves/Retainages
Total Fund Expenditures
Remaining Balance
ORIG BUDG REVISED
1999-00 1999-00
777,000
798,476
341,500
340,800
2,205,100
2,232,868
1,140,700
1,069,116
60,000
35,000
153,900
169,077
53,814
65,903
22,950
22,950
37,449
117,449
20,000
20,000
0
0
4,812,413 4,871,639
713,502 713,502
571,120 560,620
1,583,817 1,467,467
374,963 374,963
373,061 373,061
0 0
3,616,463 3,489,613
31,800
31,800
781,884
781,884
20,000
20,000
33,306
33,306
127,966
127,966
200,994
200,994
1,195,950
1,195,950
0
50,000
0
136,076
0
186,076
4,812,413
4,871,639
0 0
10
City of Lubbock
SUMMARY OF REVENUES AND EXPENDITURES
STORMWATER UTILITY FUND
ORIG BUDG
REVISED
ACCOUNT DESCRIPTION
1999-00
1999-00
REVENUES
Interest on Investments
14,700
14,009
General Consumers Metered
1,920,000
1,920,000
Book Sales
500
500
TOTAL REVENUES
1,935,200
1,934,509
OPERATING EXPENDITURES
Stormwater Permit Compliance
0
0
Stormwater Utility Operations
484,112
484,112
Miscellaneous Expense
0
0
Utility Collections
40,544
161,004
TOTAL EXPENSES
524,656
645,116
OTHER EXPENDITURES
Indirect Cost Allocations
44,197
44,197
TOTAL OTHER EXPENDITURES
44,197
44,197
RESERVES AND RETAININGS
Trans to SW Cap Proj Fund
0
0
Trans to General Capital
213,000
213,000
Repayment to Water Fund
120,000
120,000
Stormwater Capital Projects
1,033,347
912,196
Transfer to Storm Sewer Cap
0
0
TOTAL RESERVES AND RETAININGS 1,366,347 1,245,196
TOTAL FUND EXPENDITURES 1,935,200 1,934,509
REMAINING BALANCE 0 0
11
CITY OF LUBBOCK
SUMMARY OF REVENUES/EXPENDITURES
INTERNAL SERVICES FUND
ORIG BUDG
REVISED
ACCOUNT DESCRIPTION
1999-00
1999-00
Fleet Revenue:
Dept -Sales Labor
1,366,365
1.366,365
Dept-Admin Charges
148,100
148,100
Dept -Equip. Rental
10,000
10,000
Dept -Outside Charges
785,295
785,295
Sales Auto Parts
1,448,937
1,448,937
Sales Gasoline
1,206,541
1,206,541
Outside Purchased Gas
302,485
302,485
COGS - Auto Parts
(1,232,854)
(1,232,854)
COGS - Unleaded
(570,786)
(570,786)
COGS - Diesel
(470,518)
(470,518)
COGS - Other Fuel
0
0
COGS - Outside Purch. Gas
(250,093)
(250,093)
COGS - Outside Purch. Diesel
(13,302)
(13,302)
COGS - Outside Charges
(747,899)
(747,899)
Misc. Recoveries of Expense
0
0
Interest on Investment
0
0
Total Fleet Revenue
1,982,271
1,982,271
Fleet Operations
(1,931,024)
(1,931,024)
FLEET NET REVENUE
-----------
51,247
-----------
51,247
Radio Shop Revenue
Dept -Sales Labor & Parts 414,685 414,685
Interest on Investment 0 0
COGS- Radio Parts (62,000) (62,000)
Total Radio Shop Revenue 352,685 352,685
Radio Shop Operations (352,685) (352,685)
RADIO SHOP NET REVENUE 0 0
Information Svcs Revenue
Dept- Gen Data Processing
3,248,822
3,248,822
Total Information Svcs Revenue
3,248,822
3,248,822
Information Svcs Operations
(3,218,915)
(3,218,915)
INFORMATION SVCS NET REVENUE
-----------------------
29,907
29,907
Comm Center Revenue
Dept -Communications Charges 1,638,548 1,679,548
Total Communications Revenue 1,638,548 1,679,548
Comm. Center Operations (1,638,548) (1,679,548)
-----------------------
COMM CENTER NET REVENUE 0 0
IVA
CITY OF LUBBOCK
SUMMARY OF REVENUES/EXPENDITURES
INTERNAL SERVICES FUND
ACCOUNT DESCRIPTION
Telephone Services
Phone -Surcharge
Phone -System
Total Telephone Services Rev
Telephone Svcs Operations
Telephone Transfers
Total Telephone Expenditures
Telephone Svcs NET REVENUE
Facilities Mgt Revenue
Miscellaneous Bldg Maint
Building Rent
Dept -Bldg Service Charge
Dept -Vending Machine
Building Maint Charges
Interest on Investment
Total Facilities Mgt Revenue
Facilities Mgt Operations
Facilities Mgt NET REVENUE
Custodial Svcs Revenue
Custodial Charges
Total Custodial Revenue
Custodial Contract
CUSTODIAL NET REVENUE
Print Shop Revenue
Dept -Sales Office Supplies
Dept -Sales Printing
Dept -Sales Xerox
Dept -Mailroom Handling Fee
COGS -Office Supplies
COGS -Printing Supplies
Interest On Investment
Total Print Shop Revenue
Print Shop Operations
Print Shop Net Revenue
ORIG BUDG REVISED
1999-00 1999-00
369,255 369,255
1,094,847 1,094,847
1,464,102 1,464,102
(1,075,983) (1,075,983)
(388,119) (388,119)
(1,464,102) (1,464,102)
0 0
22,043
22,043
11,712
11,712
186,888
189,388
3,750
3,750
882,548
897,048
0
0
1,106,941
1,123,941
(1,106,941)
(1,123,941)
0 0
791,926 791,926
791,926 791,926
(791,926) (791,926)
0 0
384,000 384,000
312,000 330,000
42,000
42,000
53,070
53,070
(333,913)
(333,913)
(110,000)
(110,000)
0
0
347,157
365,157
(345,669)
(359,269)
1,488
5,888
13
CITY OF LUBBOCK
SUMMARY OF REVENUES/EXPENDITURES
INTERNAL SERVICES FUND
ORIG BUDG
REVISED
ACCOUNT DESCRIPTION
1999-00
1999-00
Warehouse Revenue
Dept -Sales General Stores
2.538,025
2,538,025
Dept -Junk Whrhse
34,500
34,500
COGS -General Stores
(2,307,296)
(2,307,296)
Interest On Investment
0
0
Total Warehouse Revenue
265,229
265,229
Warehouse Operations
(255,481)
(284,283)
WAREHOUSE NET REVENUE
9,748
(19,054)
Env Compliance Revenue
Environmental Compliance 200,665 200,665
Interest On Investment 0 0
Total Env Compliance Revenue 200,665 200,665
Env Compliance Operations (200,665) (200,665)
ENV COMPLIANCE NET REVENUE 0 0
Switchboard Revenue
Dept -Switchboard Revenue 67,119 67,119
Interest on Investment 0 0
Total Switchboard Revenue 67,119 _ 67,119
Switchboard Operations (67,119) (67,119)
-----------------------
Switchboard Net Revenue 0 0
Investment Pool
Dept -Investment Pool Rev 209,630 334,195
Total Investment Pool Revenue 209,630-334,195
Investment Pool Operations (209,630) (334,195)
-----------------------
Investment Pool Net Revenue 0 0
Legislation
Interest on Investment 0 0
Dept -Legislation Revenue 330,000 280,000
Total Legislation Revenue 330,000 280,000
Legislation Operations (330,000) (280,000)
-----------------------
Legislation Net Revenue 0 0
14
City of Lubbock
SUMMARY OF REVENUES AND EXPENDITURES
SELF INSURANCE HEALTH FUND
ORIG BUDG
REVISED
ACCOUNT DESCRIPTION
1999-00
1999-00
REVENUES:
Interest on Investments
263,206
292,422
Prem-Medical
0
0
Med-Premium Employees
1,982,192
1,982,192
Med-Premium City
6,499,890
6,499,890
Den -Premium Employees
241,947
241,947
Den -Premium City
524,427
524,427
Prem-Basic Life
56,550
56,550
Prem-Optional Life
340,963
340,963
Prem-Depend & Child Life
38,116
38,116
Prem-Personal Accid Insur
63,882
63,882
Prem-Retiree/COBRA
1,384,120
1,384,120
Early Retiree -Reimbursement
0
0
LTD -Employee
33,261
33,261
LTD -City
193,994
193,994
Prem-Philadelphia Life
80,236
80,236
Prem-Cancer Insurance
158,314
158,314
TOTAL REVENUE
11,861,098
11,890,314
OPERATING EXPENDITURES:
Self Insurance Health
187,090
187,090
Total Operating Expenditures
187,090
187,090
OTHER EXPENDITURES:
Claims
8,389,338
8,389,338
Claims Liability
0
0
Reinsurance-Trustmark
939,943
939,943
Life
City Basic Life
56,550
56,550
Optional Life
340,963
340,963
Dependent Life
38,116
38,116
Child Life
0
0
Retiree Life
0
0
Administration-UICI
417,064
417,064
Personal Accident Insurance
63,882
63,882
Long Term Disability
Long Term Disability
0
0
LTD -Employee
33,261
33,261
LTD -City
193,994
193,994
Cancer Insurance
158,314
158,314
Philadelphia Life
80,236
80,236
Miscellaneous Expenditures
Retiree ACH Discounts
0
0
15
" City of Lubbock
SUMMARY OF REVENUES AND EXPENDITURES
SELF INSURANCE HEALTH FUND
ORIG BUDG REVISED
ACCOUNT DESCRIPTION 1999-00 1999-00
Professional Services 0 0
Special Projects 0 0
Total Other Expenditures 10,711,661 10,711,661
REIMBURSEMENTS
Reimburs-from Claims
Reimburs-from Admin
TOTAL REIMBURSEMENTS
TOTAL FUND EXPENDITURES
REMAINING BALANCE
0 0
0 0
0 0
10, 898, 751 10, 898, 751
962,347 991,563
16
City of Lubbock
SUMMARY OF REVENUES AND EXPENDITURES
SELF INSURANCE RISK MANAGEMENT FUND
ORIG BUDG
REVISED
ACCOUNT DESCRIPTION
1999-00
1999-00
REVENUE:
Interest on Investments
389,544
498,293
Ref-Misc Recoveries of Exp
10,000
10,000
Prem-Workers Comp Claims
2,072,922
2,072,922
Prem-Prop Premiums to Depts
0
0
Prem-Liability Prem to Dept
1,452,028
1,452,028
Prem-Surety & Notary
7,049
7,049
TOTAL REVENUE
3,931,543
4,040,292
OPERATING EXPENDITURES
Self Insurance Risk
255,407
335,407
Total Operating Expenditures
255,407
335,407
OTHER EXPENDITURES
Workers Comp Prem Pymts
345,000
545,000
Liability Insurance
260,204
260,204
Work Comp Admin
25,000
25,000
Work Comp Claims
1,070,000
1,070,000
Automobile Liability
200,000
200,000
General Liability
750,000
750,000
Fire Cas and Boiler
0
0
Insur Deductible
4,500
4,500
Sur & Notary Bonds
6,224
6,224
Public Official Bonds
120,000
120,000
Outside Legal Service
25,000
25,000
Professional Services
4,500
4,500
Gains/Losses
0
0
Total Other Expenditures
2,810,428
3,010,428
REIMBURSEMENTS
Reimbursement Other Charges
0
0
Reimbursement Workers Comp
0
0
Total Reimbursements
0
0
RESERVES AND RETAINAGES
Tfr-To Gen Fac & Sys Improv 0 0
Desig-Legal Issues 500,000 500,000
Total Reserves/Retainages 500,000 500,000
TOTAL FUND EXPENDITURES 3,565,835 3,845,835
REMAINING BALANCE 365,708 194,457
17
FISCAL YEAR 1999-2000
SUMMARY OF REVENUES AND EXPENDITURES
TRANSIT REVENUE FUND
ACTUAL
APPROVED
ACTUAL
APPROVED
REVISED
1997-98
1998-99
1998-99
1999-00
1999-00
DESCRIPTION REVENUES:
Grant Revenues:
Federal Operating Assistance
$2,074,274
$1,700,000
$1,393,996
$1,400,000
$1,400,000
State Operating Assistance
$600,000
$836.000
$946,952
$800,000
$800,000
Federal Capital Assistance
$1,167,238
$2,532.400
$1,251,232
$3.588,000
$4,415,625 `
Federal Planning Assistance
$68,968
$64,000
$52,046
$64,000
$64,000
State Planning Assistance
$48,000
$45,000
$45,000
$45,000
$45,000
State Capital (Federal 5309)
$0
$0
$0
$0
$11000,000 '
Other - Texas Tech
$0
$30,000
$0
$300,000
$60,000
Total Grant Revenue
$3,958,480
$5,207,400
$3,689.226
$6,197,000
$7.784,625
Contribution from the City:
City Operating Assistance
$0
$260,100
$0
$266.200
$0
City Capital Assistance
$291,809
$603,100
$309,493
$597,000
$863.200
City Planning Assistance
$15,400
$16,000
$13,012
$16,000
$16,000
Total Contribution from the City
$307,209
$879,200
$322.505
$879,200
$879,200 "
Other Revenue:
Fare Box $974,127 $971,500 $914,742 $983,000 $983,000
Texas Tech University $714,657 $754,000 $865,406 $897,000 $826,660
Route Guarantee / Advertising $191,703 $193,400 $193.500 $210,000 $210,000
Total Other Revenue $1,680,487 $1,918,900 $1,973,648 $2,090,000 $2,019,660
Total Revenues: $6,146,176 $8,005,500 $5,985,379 $9,166,200 $10,683,485
OPERATING EXPENDITURES:
Operations
$4,554,761
$4,715,000
$4,314,596
$4,556,200
$4,905,492
Capital
$1,459,047
$3,165,500
$1,560,725
$4,485,000
$5,652,993
Planning
$132,368
$125,000
$110.058
$125,000
$125,000
Total Expenditures
$6,146,176
$8,005,500
$5,985,379
$9,166,200
$10,683,485
Remaining Balance
$0
$0
$0
$0
$0
Amount includes carryover from previous years to be fully expensed this FY with the parking lot construction and bus acquisition.
Amount is only current year budget Does not include any carryover from previous years.
18
CITY OF LUBBOCK
SUMMARY OF REVENUES AND EXPENDITURES
DEBT SERVICE FUND
Beginning Fund Balance
Revenues:
Tax Collections
Interest on Investments
Hotel Tax
Transfer from Water Fund
Transfer from Sewer Fund
Transfer from Solid Waste
Transfer from Airport PFC Fund
Total Revenues
Expenditures:
General Fund Bonds
PSIP Bonds
Airport GO Bonds
Airport PFC Bonds
Water GO Bonds
Sewer GO Bonds
Solid Waste GO Bonds
Civic Center Bonds
Fiscal Agent Fees
Collections
Arbitrage Rebate Services
Total Expenditures
Remaining Fund Balance
ORIG BUDG REVISED
1999-00 1999-00
1,349,535 1,349,407
7,515,549
7,515,549
37,000
82,100
390,903
390,903
6,249,421
7,263,499
7,263,089
7,397,195
796,248
796,248
687,745
522,813
22,939,956
23,968,306
5,314,748
5,899,222
928,625
928,625
1,146,304
754,161
687,745
522,813
6,249,421
7,263,499
7,263,089
7,397,195
796,248
796,248
390,903
390,903
10,000
30,000
135,000
-
18,000
-
22,940,084
23,982,665
1,349,407
1,335,048
19
CITY OF LUBBOCK
REVISED FISCAL YEAR 1999-00
CAPITAL PROJECTS BUDGET
PARKS CAPITAL PROJECTS
LIFE TO
APPROVED
REVISED
TOTAL
PROJECT NAME
DATE
1999-00
1999-00
2000-01
2001-02
2002-03
2003-04
BUDGET
Rodgers Pool ADA Upgrade
225,000
0
171,000
0
0
0
0
396,000
Land Acquisition Little League Park
0
0
85,000
0
0
0
0
85,000
TOTAL PROJECTS BUDGET
$225,000
$0
$256,000
$0
$0
$0
$0
$481,000
SOURCE OF FUNDING
Existing Park Projects
$0
$0
$97,000
$0
$0
$0
$0
$97,000
Transfer from GF&SI (ADA)
0
0
23,000
0
0
0
0
23,000
Transfer from General Fund
0
0
24,961
0
0
0
0
24,961
Parks Capital Projects Fund
0
0
85,000
0
0
0
0
85,000
Community Development
225,000
0
0
0
0
0
0
225,000
Unallocated Bonds
0
0
26,039
0
0
0
0
26,039
TOTAL FUNDING
$225.000
$0
$256,000481,0
20
FUND: PARKS CAPITAL PROJECTS FUND PROJECT #: 905-00000
LOCATION: ROGERS PARK --AMHERST STREET AND GA
PROJECT: RODGERS POOL-ADA UPGADE PROJECT PARK DEVELOPMENT COORDINATOR
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT WILL FUND THE ADA UPGRADE FOR ROGERS SWIMMING POOL. THE IMPROVEMENTS WILL INCLUDE A
NEW PARKING LOT, A NEW WADING POOL WITH ZERO DEPTH ENTRY, RESTROOM RENOVATIONS AS WELL AS
MAKING THE TICKET COUNTER ACCESSIBLE. THE EXISTING POOL WILL ALSO BE RENOVATED TO INCLUDE ZERO
DEPTH ENTRY AS WELL AS A TRANSFER SYSTEM AS A SECONDARY MEANS OF ACCESSIBILITY.
THIS WILL BE THE FIRST FULLY ACCESSIBLE POOL OPERATED BY THE CITY OF LUBBOCK.
ANNUAL OPERATING IMPACT
THE OPERATING IMPACT WILL BE NEGLIGIBLE ON EXPENSES. POTENTIAL ADA LAWSUITS WILL BE AVOIDED ONCE
THE ACCESSIBLE POOL IS OPERATIONAL.
PROJECT SCHEDULING
DESIGN 10000
BID20000
CONSTRUCTION
IT{ON0
INSTALLATION 000
END
START �END
START END
END
START—END
10/99 08/00
08/00 09/00
F$500
10/00 03/01
$33,000
$362,500
$[= 0 Ed
$0
ACCOUNT IACCOUNT �t
ACCOUNT ACCOUNT
ACCOUNT
FULL-TIME SAL 8002 OFFC SUP 8107
FULL-TIME SAL 8002
OFFC SUP 8107 ADVRTSNG & PROM
PROF SVCS 8302
OTHER OFFC SUP 8110
WATER SYS IMP 9241
PROF SVCS 8302
REC SYS IMP 9246
WLKS, DRVS & PRKNG
LOTS 8291
FENCES 9282
OMPLETION 03/01
TOTAL $396,000.00
SOURCE OF FUNDING
L-T-D REV 99-00 BUD 00-01
TOTAL FUTURE
OMMUNITY DEVELOPMENT
225,000
225,000
UNALLOCATED BONDS
26,039
26,039
PARKS CAPITAL PROJECTS FUND
97,000
97,000
RANSFER FROM GENERAL FUND
24,961
24,961
TRANSFER FROM ADA PROJECT
23,000
23,000
OTAL
$225,000 $171,000
$396,000
21
FUND: PARKS CAPITAL PROJECTS FUND PROJECT #: 905-00000
LOCATION: NORTHWEST LITTLE LEAGUE BOUNDARIES
PROJECT: LAND ACQUISITION -LITTLE LEAGUE PARK PROJECT PARK DEVELOPMENT COORDINATOR
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT WILL FUND THE LAND ACQUISITION FOR A LITTLE LEAGUE COMPLEX FOR NORTHWEST LITTLE
LEAGUE (NWLL). THE AREA BEING CONSIDERED IS BETWEEN CANYON LAKE #2 AND NORTH LOOP 289.
APPROXIMATELY TEN (10) ACRES ARE NEEDED FOR THE PROJECT. THIS PROJECT WILL BE THE FIRST PHASE WITH
FUTURE PHASES OF DEVELOPMENT CONTINGENT UPON FUNDING. CURRENTLY, THE NWLL PLAYS ON TWO FIELDS
AT HELEN HODGES PARK. THE LEAGUE NEEDS A THIRD FIELD, HOWEVER THERE IS NOT ENOUGH ROOM TO BUILD
A THIRD FIELD AT THE CURRENT LOCATION. FURTHERMORE, PARKING IS A MAJOR PROBLEM AT HODGES PARK.
ANNUAL OPERATING IMPACT
THE ANNUAL OPERATING IMPACT WILL BE INSIGNIFICANT UNTIL THE BALL FIELDS ARE ACTUALLY CONSTRUCTED.
PROJECT SCHEDULING
DESIGN 10000
BID 20000
CONSTRUCTION 30000
ACQUISITION 40000
INSTALLATION 50000
START END START END
START I END I I START END
07/00 12/00
L START I END
$0 $0
l ACCOUNT __� ACCOUNT
$0 11 $85,000 1
j ACCOUNT I ACCOUNT-�
$0
ACCOUNT
REC SYS IMP 9246
COMPLETION 12/00
TOTAL $85,000.00
SOURCE OF FUNDING
L-T-D REV 99-00 BUD 00-01
TOTAL FUTURE
PARKS CAPITAL PROJECTS FUND
85,000
85,000
[TOTAL
$85,000
$85,000
22
CITY OF LUBBOCK
REVISED FISCAL YEAR 1999-00
CAPITAL PROJECTS BUDGET
STREETS CAPITAL PROJECTS
LIFE TO APPROVED REVISED TOTAL
PROJECT NAME DATE 1999-00 1999-00 2000-01 2001-02 2002-03 2003-04 BUDGET
Wheelchair Ramps 25,000 0 25,000 0 0 0 0 50,000
TOTAL PROJECTS BUDGET $25,000 $0 $25,000 $0 $0 $0 $0 $50,000
SOURCE OF FUNDING
Streets Capital Projects Fund 25,000 0 25,000 0 0 0 0 50,000
TOTAL FUNDING $25,000 $0 $25,000 $0 $0 $0 $0 $50,000
23
FUND: STREET CAPITAL PROJECTS FUND PROJECT #: 915-9810
LOCATION: CITY-WIDE
PROJECT: WHEELCHAIR RAMPS PROJECT CITY ENGINEER
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT WOULD PROVIDE FOR THE INSTALLATION OF 55 WHEELCHAIR RAMPS IN ACCORDANCE WITH ADA
REGULATIONS. THESE RAMPS WOULD BE INSTALLED BY THE STREET DEPARTMENTS CONCRETE CONSTRUCTION
SECTION. THE LOCATION OF THE RAMPS TO BE CONSTRUCTED WILL BE DETERMINED BY MEMBERS OF THE
DISABLED COMMUNITY ON AN AS REQUESTED BASIS.
DEPENDING ON THE NUMBER OF REQUESTS, THE PAVED STREETS AND CONCRETE CONSTRUCTION ACTIVITY AND
PERFORMANCE MEASURES COULD BE REDUCED AS MUCH AS 30 PERCENT. PROJECTED REIMBURSEMENTS WOULD
NOT BE CHANGED.
ANNUAL OPERATING IMPACT
THIS IS AN ONGOING PROJECT. THEREFORE,' NO COMPLETION DATE HAS BEEN IDENTIFIED.
PROJECT RCHEntILING
DESIGN 10000
2000END
CONSTRUCTIOACQUI ITIONEND00
I
STARTD
START IEND000
L. STARTLATIO END
$0 09/96 , ongoing �_ $0
$0 $0 $50,000 $0 $p
ACCOUNT ACCOUNT ACCOU__NT___71 ACCOUNT ACCOUNT
FULL-TIME SAL 8002
STREET SYS IMP 9240
OMPLETION ongoing TOTAL $50,000.00
OURCE OF FUNDING L-T-D REV 99-00 BUD 00-01 TOTAL FUTUR
TREETS CAPITAL PROJECTS FUND 25,000 25,000 50,000
[TOTAL $25 000 $25,000 $50.000
24
CITY OF LUBBOCK
REVISED FISCAL YEAR 1999-00
CAPITAL PROJECTS BUDGET
GENERAL CAPITAL PROJECTS
LIFE TO APPROVED REVISED TOTAL
PROJECT NAME DATE 1999-00 1999-00 2000-01 2001-02 2002-03 2003-04 BUDGET
Coliseum Roof Replacement 1,741,309 0 365,000 0 0 0 0 2,106,309
TOTAL PROJECTS BUDGET $1,741,309 $0 $365,000 $0 $0 $0 $0 $2,106,309
SOURCE OF FUNDING
General Capital Project Fund
Unallocated Bond Proceeds
1993 General Obligation Bonds
TOTAL FUNDING
0
0
65,697
0
0
0
0
65,697
0
0
299,303
0
0
0
0
299,303
1,741,309
0
0
0
0
0
0
1,741,309
$1,741,309
$0
$365,000
$0
$0
$0
$0
$2,106,309
25
FUND: GENERAL CAPITAL PROJECTS FUND PROJECT #: 940-9936
LOCATION: 2720 6TH STREET
PROJECT: COLISEUM ROOF REPLACEMENT PROJECT FACILITIES MANAGER
MANAGER:
PROJECT DESCRIPTION
REPLACEMENT OF EXISTING ROOFING SYSTEM. PRESENTLY, THERE ARE SEVERAL MAJOR AND MINOR LEAKS
WHICH OCCUR WHEN IT RAINS OR SNOWS. ATTEMPTS TO REPAIR HAVE NOT BEEN SUCCESSFUL. THE PROJECT
WOULD COVER REPAIRS TO THE METAL RIB COVERS AND A NEW COATING. EXISTING ROOFING SYSTEM IS OVER 25
YEARS OLD AND HAS OUTLIVED ITS EXPECTED LIFE.
ANNUAL OPERATING IMPACT
REPAIRS ASSOCIATED WITH THE ROOF LEAKS WOULD BE ELIMINATED. THIS WOULD BE APPROXIMATELY $9,000.00
PER YEAR.
PROJECT SCHEDULING
DESIGN 10000
BID 20000
CONSTRUCTION 30000
ACQUISITION 40000
INSTALLATION 50000
START END
START
START END
START END
START END
IF
SEND
F—$1,983,,Anq$0
$121,000
$2,0 0
$0
ACCOUNT
ACCOUNT
ACCOUNT 71 ACCOUNT —�
ACCOUNT
OFFC SUP 8107
PROF SVCS 8302
OFFC SUP 8107
PROF SVCS 8302
ADVRTSNG 8 PROM
PROF SVCS 8302
BLDGS MUNICIPAL 9210
[COMPLETION 8/00
TOTAL $2,106,309.00
SOURCE OF FUNDING
L-T-D REV 99-00 BUD 00-01
TOTAL FUTURE
UNALLOCATED BONDS
GENERAL CAPITAL PROJECTS FUND
1,741,309 299,303 0
65,697
2,040,612 0
65,697
OTAL
$1,741309 $365,000 $0 $2,106,309 $0
26
CITY OF LUBBOCK
REVISED FISCAL YEAR 1999-00
CAPITAL PROJECTS BUDGET
GENERAL FACILITIES AND SYSTEM IMPROVEMENTS
LIFE TO
APPROVED
REVISED
TOTAL
PROJECT NAME
DATE
1999-00
1999-00
2000-01
2001-02
2002-03
2003-04
BUDGET
EIS Structural Standards Complianc
410,740
0
200,000
0
0
0
0
610,740
Police Enhancements/Technology
1,433,000
0
452,613
0
0
0
0
1.885,613
Coliseum Box Office Renovation
0
20,000
19,000
0
0
0
0
39,000
Muni Bldg Security Upgrades
0
0
147,000
0
0
0
0
147,000
Civic Ctr Renov Master Plan
0
0
65,000
0
0
0
0
65,000
Civic Center Cooing Tower Rplcmt
0
0
130,000
0
0
0
0
130,000
TOTAL PROJECTS BUDGET $1,843,740 $20,000 $1,013,613 $0 $0 $0 $0 $2,877,353
SOURCE OF FUNDING
Designation GF&SI
Transfer from Gen Cap (Proj 9000)
Transfer from General Fund
General Facilities & System Impry
TOTAL FUNDING
$0
$0
$87,226
$0
$0
$0
$0
$87,226
0
0
42,000
0
0
0
0
42,000
0
0
884,387
0
0
0
0
884,387
1,843,740
20,000
0
0
0
0
0
1,863,740
$1,843,740 $20,000 $1,013,613 $0 $0 $0 $0 $2,877,353
27
FUND: GENERAL FACILITIES AND SYSTEM FUND PROJECT #: 945-8401
IMPROVEMENTS CAPITAL PROJECTS LOCATION: VARIOUS LOCATIONS
PROJECT: EIS STRUCTURAL STANDARDS COMPLIANCE PROJECT ENVIRONMENTAL INSPECTION SERVICES
MANAGER: MANAGER
PROJECT DESCRIPTION
THIS PROJECT WILL PROVIDE FUNDING FOR DEMOLITION OF SIXTY CONDEMNED BUILDINGS THROUGHOUT THE
CITY OF LUBBOCK. REMOVING UNSIGHTLY, DETERIORATING STRUCTURES PROMOTES A CLEAN AND SAFE
ENVIRONMENT. WHEN IT IS DETERMINED THAT A STRUCTURE IS SUB -STANDARD, THE PROJECT IS PLACED OUT
FOR BID. CURRENTLY, BIDS ARE AVERAGING $2.89 PER SQUARE FOOT. THE ENVIRONMENTAL INSPECTION
SERVICES MANAGER KEEPS AN ITEMIZED ACCOUNT OF THE EXPENSES INCURRED BY THE CITY FOR DEMOLITION
OR REMOVAL OF ANY STRUCTURE AND THE CLEANING OF THE LOT. THIS AMOUNT IS PAYABLE IMMEDIATELY AND
IT IS FILED AS A LIEN AGAINST THE PROPERTY.
ANNUAL OPERATING IMPACT
PROJECT SCHEDULING
DESIGN 10000
BID 20000
CONSTRUCTION 3000011
FACQUISITION 40000 11
INSTALLATION 50000
START END
START END
START END
START END I
L START I END
IF
96 ONGOING
p
I
$0
$200,000
$0
P $0
ACCOUNT
_$0
-ACCOUNT
ACCOUNT
ACCOUNT
r ACCOUNT
lCOMPLETION ONGOING TOTAL $200.000.00
SOURCE OF FUNDING L-T-D REV 99-00 BUD 00-01 TOTAL FUTUR
GENERAL FACILITIES & SYSTEM 410,740 200,000 610,740
IMPROVEMENTSFUND 0
[TOTAL$410,740_ $200,000 $610.740
28
FUND: GENERAL FACILITIES AND SYSTEM FUND PROJECT #: 945-9156
IMPROVEMENTS CAPITAL PROJECTS LOCATION: POLICE SQUARE
PROJECT: POLICE ENHANCEMENTS/TECHNOLOGY PROJECT INFORMATION TECHNOLOGY MANAGER
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT WILL FUND IN -CAR VIDEO CAMERAS AS DIRECTED BY CITY COUNCIL. PROJECT WILL ALSO FUND
AUDIO EQUIPMENT AND VEHICLES. FURNITURE FOR PATROL DIVISION WILL BE PURCHASED AT REVISED 99-00.
ANNUAL OPERATING IMPACT
COST TO MAINTAIN EQUIPMENT.
PROJECT SCHEDULING
DESIGN 10000
BID_20000
CONST�ION 30000
ACQUISITION 40000
INSTALLATION 50000
START END START END
START END START END START END
F 10 7i9$1885,603/00
$0IF $0
$0
ACCOUNT ACCOUNT
I - ACCOUNT ACCOUNT ACCOUNT
COMM EQUIP 9223
MOTOR VEHICLES 9220
OFFC FURN & EQUIP
9222
OMPLETION 09/00
TOTAL $1,885,613.00
SOURCE OF FUNDING
L-T-D REV 99-00 BUD 00-01 TOTAL FUTURE
GENERAL FACILITIES & SYSTEM
0
IMPROVEMENTS FUND
1,433,000 452,613 1,885,613
OTAL
$1 433 000 $452 613 $1 885 613
FUND: GENERAL FACILITIES AND SYSTEM FUND PROJECT M 945-90035
IMPROVEMENTS CAPITAL PROJECTS LOCATION: MUNICIPAL COLISEUM
PROJECT: COLISEUM BOX OFFICE RENOVATION PROJECT FACILITIES MANAGER
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT WILL PROVIDE ADDITIONAL BOX OFFICE EQUIPMENT REQUIRED FOR HANDLING TICKETS MORE
EFFICIENTLY AT THE COLISEUM AND FOR HANDLING TICKETS AT THE UNITED SPIRIT ARENA. THIS WOULD INCLUDE
UPGRADING THE PHONE LINES FROM MEMPHIS PLACE MALL TO THE COLISEUM, AS EXISTING PHONE LINES ARE
CONSTANTLY CAUSING PROBLEMS WITH THE SYSTEM. IT WOULD ALSO INCLUDE ADDITIONAL EQUIPMENT
RQUIRED TO HANDLE THE TICKETING NEEDS FOR THE UNITED SPIRIT ARENA. WHEN THE BUDGET WAS SUBMITTED
LAST YEAR, THE ARENA WAS NOT OPEN YET AND THE HANDLING OF THEIR TICKETS HAD NOT BEEN DECIDED. THEY
ARE WANTING TO DO A LONG TERM AGREEMENT FOR SELECT -A -SEAT TO HANDLE THEIR NON -ATHLETIC EVENT
TICKETS
ANNUAL OPERATING IMPACT
ADDITIONAL OPERATING COSTS FOR NEW TELEPHONE LINES. REVENUES GENERATED FROM THE UNITED SPIRIT
ARENA EVENTS WILL COVER THE COST OF THIS PROJECT
PROJECT SCHEDULING
DESIGN 10000
BID 20000
CONSTRUCTION ACQUISITION 40000
INSTALLATION 50000
START END
START END
START END START END
START END
10/99 1 09/00
$0 $0 $0 $0 $39,000
ACCOUNT ACCOUNT ACCOUNT ACCO L ACCOUNT
COMPLETION 09/00 TOTAL $39,000.00
SOURCE OF FUNDING L-T-D REV 99-00 BUD 00-01 TOTAL FUTUR
GENERAL FACILITIES & SYSTEM 20,000 19,000 39,000
IMPROVEMENTS FUND 0
20,000 $1
30
FUND: GENERAL FACILITIES AND SYSTEM FUND PROJECT #: 945-
IMPROVEMENTS CAPITAL PROJECTS LOCATION: MUNICIPAL BUILDING
PROJECT: MUNICIPAL BUILDING SECURITY UPGRADES PROJECT FACILITIES MANAGER
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT WILL PROVIDE FOR SECURITY IMPROVEMENTS,OFFICE CONSTRUCTION, FURNITURE, AND SUMP
PUMP REPLACEMENT AT THE MUNICIPAL BUILDING.
ANNUAL OPERATING IMPACT
NONE.
PROJECT SCHEDULING
DESIGN 10000
BID 20000
CONSTRUCTION 30000
ACQUISITION 40000
ON 50000
START END
START END
START END
START END
"STARLTEND
6/00 6/00
1F$2,000
6/00 7/00
�E
8/00 12/00
�F--$0
$10,000
$135,000
F $0
ACCOUNT-�j
ACCOUNT ACCONTl ACCOUNT
j ACCOUNT
OFFC SUP 8107
PROF SVCS 8302
OFFC SUP 8107
PROF SVCS 8302
ADVRTSNG & PROM
PROF SVCS 8302
BLDGS MUNICIPAL 9210
COMPLETION 12/00
TOTAL $147,000.00
SOURCE OF FUNDING
L-T-D REV 99-00 BUD 00-01
TOTAL FUTURE
GENERAL FACILITIES AND SYSTEM
IMPROVEMENTSFUND
0 147,000 0
147,000 0
0
OTAL
$0 $147,000 $0
$147,000 $0
31
FUND: GENERAL FACILITIES AND SYSTEM FUND PROJECT #:
IMPROVEMENTS CAPITAL PROJECTS LOCATION: 1501 6TH STREET
PROJECT: CIVIC CENTER RENOVATION MASTER PLAN PROJECT FACILITIES MANAGEMENT
MANAGER:
PROJECT DESCRIPTION
THIS PROVIDES FOR THE PROFESSIONAL SERVICES NEEDED TO UPDATE THE CIVIC CENTER MASTER PLAN. THE
ORIGINAL MASTER PLAN WAS DEVELOPED IN 1993. A MARKETING AND NEEDS ANALYSIS WAS COMPLETED IN 1997.
NEW COMPONENTS HAVE BEEN IDENTIFIED THAT ENCOMPASS THE CIVIC CENTER DISTRICT AND THE PLAN NEEDS
TO BE UPDATED AS TO FEASIBILITY. PROFESSIONAL SERVICES WOULD INCLUDE DEVELOPING PRELIMINARY
SCHEMATICS AND EVALUATING LAND USES AND COST PROJECTIONS.
ANNUAL OPERATING IMPACT
MINOR EXPENSES ASSOCIATED WITH THE STUDY CAN BE EXPECTED.
PROJECT SCHEDULING
DESIGN_10000
BID 20000
CONSTRUCTION 30000
ACQUISITION 40000
INSTALLATION 50000
START END
START END
START END
START END
START END
6/00
$65,0 On-goingIF
$0
$0
$0
$0
�— ACCOUNT ACCOUNT
ACCOUNT ACCOUNT
I ACCOUNT
PROF SVCS 8302
COMPLETION On -going
TOTAL $65,000.00
SOURCE OF FUNDING
L-T-D REV 99-00 BUD 00-01
TOTAL FUTURE
GENERAL FACILITIES AND SYSTEM
IMPROVEMENTSFUND
65,000
65,000
0
OTAL
$65,000
$65,000
32
I
FUND: GENERAL FACILITIES AND SYSTEM FUND PROJECT #:
IMPROVEMENTS CAPITAL PROJECTS LOCATION: 1501 6TH STREET
PROJECT: CIVIC CENTER COOLING TOWER PROJECT FACILITIES MANAGEMENT
REPLACEMENT MANAGER:
PROJECT DESCRIPTION
THIS PROJECT WOULD PROVIDE FOR THE REPLACEMENT OF THE EXISTING COOLING TOWERS LOCATED AT THE
FACILITY'S PHYSICAL PLANT. THE EXISTING COOLING TOWERS ARE APPROXIMATELY TEN (10) YEARS OLD AND DUE
TO THE HARD WATER CONDITIONS EXPERIENCED IN THIS AREA, HAVE REACHED THEIR USEFUL LIFE EXPECTANCY.
THE COOLING TOWERS ARE ESSENTIAL IN THE OPERATION OF THE FACILITYS COOLING SYSTEM IN ORDER TO
MAINTAIN AN ACCEPTABLE COMFORT LEVEL FOR OUR PATRONS. THE CONDITION OF THE COOLING TOWERS HAS
DETERIORATED TO THE POINT THAT SYSTEM FAILURE IS VERY LIKELY. ONE COOLING TOWER (OF THE THREE) IS
ALREADY NON-FUNCTIONING AND THE REMAINING TWO ARE WORN OUT. IF SYSTEM FAILURE OCCURS, BOTH THE
CIVIC CENTER AND MAHON LIBRARY WILL LOSE COOLING.
ANNUAL OPERATING IMPACT
ROUTINE AND EMERGENCY REPAIRS WOULD BE GREATLY REDUCED.
PROJECT SCHEDULING
DESIGN 10000
BID 20000
lCONSTRUCTION 30000
ACQUISITION 40000
INSTALLATION 50000
START END
START I
I START END
START I ENU;�JL
START IEND
6/00 9/00IF
9/00
11/0$120,000 /01
$7 000
$3,00010/00
$0
- $0 El
ACCOUNT -��-ACCOUNT
ACCOUNT -� I ACCOUNT �
ACCOUNT
OFFC SUP 8107
PROF SVCS 8302
OFFC SUP 8107
PROF SVCS 8302
ADVRTSNG & PROM
PROF SVCS 8302
BLDGS MUNICIPAL 9210
COMPLETION 3/01
TOTAL $130,000.00
SOURCE OF FUNDING
L-T-D REV 99-00 BUD 00-01
TOTAL FUTURE
GENERAL FACILITIES & SYSTEM
IMPROVEMENTS FUND
0 130,000 0
130,000 0
0
OTAL
$0 $130 000 $0
$130 000 $0
33
CITY OF LUBBOCK
REVISED FISCAL YEAR 1999-00
CAPITAL PROJECTS BUDGET
ELECTRIC CAPITAL PROJECTS FUND
LIFE TO APPROVE REVISED TOTAL
Proj. # PROJECT NAME DATE 1999-00 1999-00 2000-01 2001-02 2002-03 2003-04 BUDGET
9654 Utility Billing System 150,000 0 3,000,000 0 0 0 0 3,150,000
TOTAL PROJECTS BUDGET $150,000 $0 $3,000,000 $0 $0 $0 $0 $3,150,000
SOURCE OF FUNDING
Electric Fund
Water Fund
Internal Service Fund
1999 Electric Revenue Bonds
TOTAL FUNDING
50,000
0
0
0
0
0
0
50,000
50,000
0
0
0
0
0
0
50,000
50,000
0
0
0
0
0
0
50,000
0
0
3,000,000
0
0
0
0
3,000,000
$150,000
$0
$3,000,000
$0
$0
$0
$0
$3,150,000
34
FUND: ELECTRIC CAPITAL PROJECTS FUND PROJECT #: 213-9654
LOCATION: LUBBOCK BUSINESS CENTER
PROJECT: UTILITY BILLING SYSTEM PROJECT INFORMATION TECHNOLOGY MANAGER
MANAGER:
PROJECT DESCRIPTION
A NEW SYSTEM IS NEEDED FOR UTILITY BILLING. THIS PROJECT HAS BEEN SEPARATED FROM THE INFORMATION
SERVICES UPGRADE CAPITAL PROJECT AND WILL TRY JUST THOSE EXPENSES FOR UTILITY BILLING.
ANNUAL OPERATING IMPACT
PROJECT SCHEDULING
DESIGN 10000
BID 20000
CONSTRUCTION 30000
ACQUISITION 40000
INSTALLATION 50000
START END
START 1 END
START END 11
START I
START END
07/98$75,000 8/98
�/98 01/00
01!$3,075,000/00
$0
��
F7-=,0
ACCOUNT ACCOUNT
PROF SVCS 8302
j ACCOU-N-T--�l ACCOUNT ACCOUNT
COMM EQUIP 9223
PROF SVCS 8302
[COMPLETION 11l00
TOTAL $3.150,000.00
SOURCE OF FUNDING
L-T-D REV 99-00 BUD 00-01 TOTAL FUTURE
ELECTRIC CAPITAL
PROJECTS FUND
1999 ELECTRIC REVENUE BONDS
0
150,000 150,000
3,000,000 3,000,000
OTAL
$150 000 $3 000 000 $3 150 000
35
CITY OF LUBBOCK
REVISED FISCAL YEAR 1999-00
CAPITAL PROJECTS BUDGET
AIRPORT CAPITAL PROJECTS
LIFE TO
APPROVED
REVISED
TOTAL
PROJECT NAME
DATE
1999-00
1999-00
2000-01
2001-02
2002-03
2003-04
BUDGET
West Port Access Road
1,067,623
0
670,697
0
0
0
0
1,738,320
ARFF Training Area
0
1,344,536
1,902,586
0
0
0
0
3,247,122
Install Runway/Taxiway Guidance
0
0
151,850
0
0
0
0
151,850
Land Acquisition West of 1-27
0
0
200,000
0
0
0
0
200,000
Master Plan for Airport Landscape
0
0
50,000
0
0
0
0
50,000
TOTAL PROJECTS BUDGET $1,067,623 $1,344,536 $2,975,133 $0 $0 $0 $0 $5,387,292
SOURCE OF FUNDING
Airport Capital Projects Fund
$0
$0
$200,000
$0
$0
$0
$0
$200,000
Transfer from Airport Operations
0
0
50,000
0
0
0
0
50,000
FAA -Entitlement Grant
0
1,210,083
1,848,992
0
0
0
0
3,059,075
Passenger Facility Charge
1,067,623
134,453
876,141
0
0
0
0
2,078,217
TOTAL FUNDING
$1,067,623
$1,344,536
$2,975,133
$0
$0
$0
$0
$5,387,292
36
FUND: AIRPORT CAPITAL PROJECTS FUND PROJECT #: 253-9939
LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: WEST PORT ACCESS ROAD PROJECT DEPUTY DIRECTOR OF AVIATION
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT CONSISTS OF CONSTRUCTING AN EXTENTION TO THE VEHICLE ACCESS ROAD WHICH RUNS ALONG
THE WEST SIDE OF THE AIRPORT FROM REGIS STREET TO THE EXECUTIVE TEE HANGARS. THE ROADWAY WILL BE
EXTENDED TO THE NORTH TO SERVE THE DEVELOPING WEST AIRPORT DISTRICT.
ANNUAL OPERATING IMPACT
MINOR MAINTENANCE OF ROADWAY OVER TIME.
PROJECT SCHEDULING
DESIGN 10ELND::�[_
BID 20000
CONSTRUCTION 30000 ACQUISITION 40000
I
INSTALLATION 50000
START
START END
START END START END ISTART
END
07/00 11100
12/00 01/01
08/01 3/02
F_
$170,000
$2,000
$1,566,320
$0
$0
ACCOUNT
PROF SVCS 8302
ACCOUNT ACCOUNT_�r_ACCOUNT ACCOUNT
ADVRTSNG & PROM SYS IMP -OTHER 9251
OMPLETION 3/02
TOTAL $1,738,320.00
SOURCE OF FUNDING
L-T-D REV 99-00 BUD 00-01 TOTAL FUTURE
PASSENGER FACILITY CHARGES
1,067,623 670,697 1,738,320
OTAL
$1,067,623 $670,697 $1,738,320
37
FUND: AIRPORT CAPITAL PROJECTS FUND PROJECT M 253-90067
LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: ARFF TRAINING AREA PROJECT DEPUTY DIRECTOR OF AVIATION
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT CONSISTS OF CONSTRUCTING AN AIRCRAFT RESCUE AND FIREFIGHTING TRAINING AREA ON
AIRPORT PROPERTY.
ANNUAL OPERATING IMPACT
PROJECTED OVERTIME SAVINGS OF $5,000, DUE TO FAA MANDATED TRAINING BEING CONDUCTED ON SITE.
PROJECT SCHEDULING
DESIGN 10000
BID 20000
CONSTRUCT00 ACQUISITION 40000
ON 50000
I�STAR
START END
START END
START END START END
END
3/00 9/00
10/00 11/00
12/00 1 9/01
1$2,800,000
$445,122
$2,000
$0
$0
ACCOUNT j ACCOUNT j
ACCOUNT ACCOUNT
ACCOUNT
PROF SVCS 8302 ADVRTSNG & PROM
SYS IMP -OTHER 9251
COMPLETION 9/01
TOTAL $3,247,122.00
SOURCE OF FUNDING
L-T-D REV 99-00 BUD 00-01
TOTAL FUTURE
FAA ENTITLEMENT GRANT
PASSENGER FACILITY CHARGE
1,210,083 1,712,327
134,453 190,259
2,922,410
324,712
OTAL
$1 344 536 $1 902 586 $3 247 122
38
FUND: AIRPORT CAPITAL PROJECTS FUND PROJECT #: 253-0000
LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: INSTALL RUNWAY/TAXIWAY GUIDANCE PROJECT DEPUTY DIRECTOR OF AVIATION
SIGNS MANAGER:
PROJECT DESCRIPTION
THE PROJECT WILL UPGRADE THE AIRFIELD, GUIDANCE SIGNAGE IN ORDER TO COMPLY WITH FAA REGULATIONS.
ANNUAL OPERATING IMPACT
THERE WILL BE NO OPERATING IMPACT. THIS PROJECT UPGRADES AN EXISTING LIGHTING SYSTEM.
PROJECT SCHEDULING
DESIGN 10000
BID 20000
CONSTRUCTION 30000
ACQUISITION 40000 11
INSTALLATION 50000
START END
START END
START END
START END
L.START END
6/00 6/00
7/00 7/00
8/00 3/01
$19,940
$2,000
$129,910 ji
$0
$0
ACCOUNT ACCOUNT
PROF SVCS 8302 ADVRTSNG & PROM
ACCOUNT �l UNT ACCO
SYS IMP -OTHER 9251
r ACCOUNT
OMPLETION 3/01
TOTAL $151,850.00
SOURCE OF FUNDING
L-T-O REV 99-00 BUD 00-01
TOTAL FUTURE
FAA ENTITLEMENT GRANT
PASSENGER FACILITY CHARGES
136,665
15,185
136,665
15,185
OTAL
$151,850
$151,850
T
i
FUND: AIRPORT CAPITAL PROJECTS FUND PROJECT #: 253-0000
LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: LAND ACQUISITION WEST OF 1-27 PROJECT DEPUTY DIRECTOR OF AVIATION
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT WILL FUND THE ACQUISITION OF 170 ACRES OF LAND IMMEDIATELY WEST OF INTERSTATE HIGHWAY
27 OFF THE APPROACH END OF RUNWAY 8.
ANNUAL OPERATING IMPACT
MINIMAL IMPACT. ONCE CLEARED OF DEBRIS, THE AIRFIELD OPEARATIONS STAFF WILL BRING THE PROPERTY
INTO ITS ROUGH MOWING CYCLE DURING GROWING SEASON.
PROJECT SCHEDULING
DESIGN 10000
BID 20000
CONSTRUCTION 30000 ACQUISITION 40000
INSTALLATION�END
START END
START END
START END START END
START
6/00 6/00
9/0 /01 IE
$5,000
$0
$0
$195,000
$0EEI
ACCOUNT
_
ACCOUNT
ACCOUNT ACCOUNT
ACCOUNT
LAND 9280
OMPLETION 1101
TOTAL $200,000.00
SOURCE OF FUNDING
L-T-D REV 99-00 BUD 00-01
TOTAL FUTURE
AIRPORT CAPITAL PROJECTS FUND
200,000
200,000
[TOTAL
$200 000
$200 000
all
FUND: AIRPORT CAPITAL PROJECTS FUND PROJECT #: 253-0000
LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: MASTER PLAN FOR AIRPORT LANDSCAPE PROJECT DEPUTY DIRECTOR OF AVIATION
COORIDOR PROJECT MANAGER:
PROJECT DESCRIPTION
THIS PROJECT WILL FUND A MASTER PLAN FOR THE CREATION AND DEVELOPMENT OF AN AIRPORT COORIDOR
LANDSCAPE. THE COORIDOR WILL ENHANCE THE VISUAL IMPACT OF THE AIRPORT ENTRANCE.
ANNUAL OPERATING IMPACT
NO IMPACT IS PROJECTED FOR THE AIRPORT. THE PARKS DEPARTMENT WILL BE THE CUSTODIAN OF THE LAND
AND WILL MAINTAIN THE LANDSCAPE. KEEP LUBBOCK BEAUTIFUL WILL FUND THE LANDSCAPE.
PROJECT SCHEDULING
DESIGN 10000
BID 20000
CONSTRUCTION 30000
ACQUISITION 40000
INSTALLATION 50000
START END
START END
START END
START END
START END
6/00 6/00
IF-
F::�
$50,000
$0
$0_
$0
$0
ACCOUNT
I ACCOUNT �I
ACCOUNT ACCOUNT
ACCOUNT
PROF SVCS 8302
COMPLETION 6/00
TOTAL $50,000.00
SOURCE OF FUNDING
L-T-D REV 99-00 BUD 00-01
TOTAL FUTURE
AIRPORT CAPITAL PROJECTS FUND
50,000
50,000
[TOTAL
$50 000
$50 000
41
CITY OF LUBBOCK
REVISED FISCAL YEAR 1999-00
CAPITAL PROJECTS BUDGET
AIRPORT FACILITIES AND SYSTEM IMPROVEMENTS
LIFE TO
APPROVED
REVISED
TOTAL
PROJECT NAME
DATE
1999-00
1999-00
2000-01
2001-02
2002-03
2003-04
BUDGET
Mid Terminal Restrooms
$12,000
$0
$66,836
$0
$0
$0
$0
$78,836
CNN Installation
67,850
0
22,150
0
0
0
0
90,000
Build Roadway Impv at FAA
0
0
15,000
0
0
0
0
15,000
TOTAL PROJECTS BUDGET
$79,850
$0
$103,986
$0
$0
$0
$0
$183,836
SOURCE OF FUNDING
Airport Facilities & System Impr
$79,850
$0
$35,760
$0
$0
$0
$0
$115,610
Transfer from Airport Operations
0
0
68,226
0
0
0
0
68,226
TOTAL FUNDING
$79,850
$0
$103,986
$0
$0
$0
$0
$183.836
42
FUND: AIRPORT FACILITIES AND SYSTEM
IMPROVEMENTS CAPITAL PROJECTS
FUND PROJECT #: 254-9998
LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: MID -TERMINAL RESTROOMS
PROJECT DEPUTY DIRECTOR OF AVIATION
MANAGER:
PROJECT DESCRIPTION
THIS PROJECT WILL CREATE A RESTROOM FACILITY IN THE VICINITY OF GATE 6 IN THE TERMINAL BUILDING AT
LUBBOCK INTERNATIONAL AIRPORT.
ANNUAL OPERATING IMPACT
APPROXIMATELY $2,000 ANNUAL ADDITIONAL CUSTODIAL MAINTENANCE COSTS.
PROJECT SCHEDULING
DES10END
BID 2000END
ASTOART UISITION00
INSTARTLATIO
STARTIGhI
START
MYIOEND000
END
END000
3/99 5/99IF
7/00 =1
9/00$68,3944/01
IF
$9,442
$1,000
$0
$0
ACCOUNT -��
ACCOUNT �ACCOUNT ACCOUNTACCOUNT
PROF SVCS 8302
ADVRTSNG & PROM
SYS IMP -OTHER 9251
OMPLETION 4/01
TOTAL $78,836.00
SOURCE OF FUNDING
L-T-D REV 99-00 BUD 00-01
TOTAL FUTURE
AIRPORT FACILITIES & SYSTEM
IMPROVEMENTS FUND
12,000
66,836
12,000
66,836
OTAL
$12,000 $66 836
$78 836
43
i
FUND: AIRPORT FACILITIES AND SYSTEM FUND PROJECT #: 254-90069
IMPROVEMENTS CAPITAL PROJECTS LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: CNN INSTALLATION PROJECT DEPUTY DIRECTOR OF AVIATION
MANAGER:
PROJECT DESCRIPTION
INSTALLATION OF INTEGRATED SATELITE/CABLE TELEVISION SYSTEM TO BROADCAST CNN AIRPORT NETWORK IN
AIRPORT TERMINAL BUILDING. SYSTEM INCLUDES SEVEN TELEVISION MONITORS, SPEAKERS, SATELLITE
RECEIVER/DECODER, AUDIO CONTROLLER AND LOCAL COMMERCIAL INSERTION SYSTEM.
THIS PROJECT WILL ALSO FUND THE DESIGN AND CONSTRUCTION OF VENDING MACHINE KIOSKS. THE KIOSKS
WILL ENHANCE THE VISUAL IMAGE OF THE AIRPORT.
ANNUAL OPERATING IMPACT
MINIMAL IMPACT. EQUIPMENT WILL BE IN WARRANTY INITIALLY. BEYOND WARRANTY OUR TECHNICIANS WILL
SERVICE THE EQUIPMENT. WE HAVE THE RIGHT TO SELL LIMITED ADVERTISING WHICH WILL PRODUCE ADDITIONAL
REVENUE AND WILL HELP OFFSET ANY MAINTENANCE COSTS.
PROJECT SCHEDULING
DESIGN 10000
BID 20000
CONSTRUCTION 300001 ACQUISITION 40000
INSTALLATION 50000
START I END
START END
START END START END
START END
6/00 6/00
7/00
p00$36,3008/00
-
11/99$50,700 2/99
$2,000 IF7/00
$1,000
$0
ACCOUNT
ACCOUNTj ACCOUNT ACCOUNT �I ACCOUNT
PROF SVCS 8302
ADVRTSNG & PROM
SYS IMP -OTHER 9251
OTHER EQUIP 9226
OMPLETION 8/00
TOTAL $90,000.00
SOURCE OF FUNDING
L-T-D REV 99-00 BUD 00-01
TOTAL FUTURE
AIRPORT FACILITIES & SYS. IMPROVEMENT
67,850 22,150
90,000
[TOTAL
$67,850 $22 150
$90 000
44
FUND: AIRPORT FACILITIES AND SYSTEM FUND PROJECT #: 254-0000
IMPROVEMENTS CAPITAL PROJECTS LOCATION: LUBBOCK INTERNATIONAL AIRPORT
PROJECT: BUILD ROADWAY IMPROVEMENTS AT FAA PROJECT DEPUTY DIRECTOR OF AVIATION
HANGAR MANAGER:
PROJECT DESCRIPTION
THIS PROJECT WILL FUND THE DESIGN AND CONSTRUCTION OF A NEW FREIGHT DOCK, DRIVEWAY, AND PAVEMENT
OVERLAY AT TEH FAA HANGAR.
ANNUAL OPERATING IMPACT
MINIMAL IMPACT. NEW TENANT WILL PICK UP UTILITY COST AND SOME MAINTENANCE. RENT STREAM IS NEW
REVENUE FOR THE AIRPORT.
PROJECT SCHEDULING
DESIGN 10000
BID 20000
CONSTRUCTION 30000
ACQUISITION 40000
INSTALLATION 50000
START END
START END
START END
START END
START END
6/00 6/00
6/00 6/00
6/00$12
==:�F
$2,000
$1,000
0008/00
$0
$0
r ACCOGNTj
ACCOUNT ACCOUNT ACCOUNT-
ACCOUNT
PROF SVCS 8302
ADVRTSNG & PROM
OMPLETION 8/00
TOTAL $15.000.00
SOURCE OF FUNDING
L-T-D REV 99-00 BUD 00-01
TOTAL FUTURE
AIRPORT FACILITIES AND SYSTEM
IMPROVEMENTSFUND
15,000
15,000
0
OTAL
$15,000
$15.000
45
CITY OF LUBBOCK
REVISED FISCAL YEAR 1999-00
CAPITAL PROJECTS BUDGET
STORMWATER CAPITAL PROJECTS FUND
LIFE TO APP REVISED TOTAL
PROJECT NAME DATE 1999-00 1999-00 2000-01 2001-02 2002-03 2003-04 BUDGET
Stormwater Pumping Project $619,000 $0 $150,000 $0 $0 $0 $0 $769,000
TOTAL PROJECTS BUDGET $619,000 $0 $150,000 $0 $0 $0 $0 $769,000
SOURCE OF FUNDING
Stormwater Capital Projects Fd $619,000 $0 $150,000 $0 $0 $0 $0 $769,000
TOTAL FUNDING $619,000 $0 $150,000 $0 $0 $0 $0 $769,000
46
FUND: STORMWATER CAPITAL PROJECTS FUND PROJECT #: 293-90075
LOCATION: SOUTH LUBBOCK
PROJECT: STORM WATER PUMPING PROJECT PROJECT CHIEF WATER UTILITIES ENGINEER
MANAGER:
PROJECT DESCRIPTION
INSTALLATION OF APPROXIMATELY 24,300 FEET OF 12 INCH PIPE AND ACCESSORIES TO PUMP STORM WATER
FROM SIX PLAYA LAKES IN SOUTH LUBBOCK. PURCHASE OF 2 TRAILER MOUNTED, DIESEL DRIVEN PUMPS AND ONE
FLOATING, ELECTRICAL DRIVEN PUMP.
ANNUAL OPERATING IMPACT
VARIES DEPENDING UPON THE AMOUNT OF RAINFALL AND PUMPING REQUIREMENTS. ESTIMATED TO COST
$100,000 ANNUALLY TO OPERATE AND MAINTAIN.
PROJECT SCHEDULING
DESIGN 10000
BID 20000
ON 40000
lCONSTRUCTION 30000my
11
INSTALLATION 50000
START END
START END
START END END
START I END
11/99$62,0005/00IF
E
$0�
$707,000going
$0
$0
ACCOUNT � ACCOUNT ACCOUNT [— ACCOUNT
1 ACCOUNT
FULL-TIME SAL 8002
FULL-TIME SAL 8002
OFFC SUP 8107
TEMP EMP SAL 8081
OTHER OFFC SUP 8110
PROF SVCS 8302
PROF SVCS 8302
STREET SYS IMP 9240
STORM SEWER IMP
9243
LAND CAPITAL OUTLAY
9280
COMPLETION ongoing
TOTAL $769,000.00
SOURCE OF FUNDING
L-T-D REV 99-00 BUD 00-01
TOTAL FUTURE
TORMWATER CAPITAL PROJECTS FUND
619,000 150,000 0
769,000
OTAL
$619,000 $150,000 $0
$769,000
47