HomeMy WebLinkAboutResolution - 2021-R0430 - Amendment No. 6 Contract 15200 with RS&H, Inc - Airport 10.26.21Resolution No. 2021-RO430 Item No. 7.19 October 26, 2021 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock, a Sixth Amendment to that certain Professional Services Agreement dated May 12, 2020 by and between the City of Lubbock and RS&H, Inc., and related documents, in connection with a Security Systems Upgrade at Lubbock Preston Smith International Airport (LPSIA). Said Amendment is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on October 26, 2021 ATTEST: DANIEL M. POPE, MAYOR Rebe ca Garza, City Secre APPROVED AS TO CONTENT: Campbell, Director of Aviation TO FORM: Assistant City Attorney ccdocs/RES.Contract RS&H, Inc. September 22, 2021 Resolution No. 2021-R0430 Security Systems Upgrade September 9, 2021 City of Lubbock Texas Lubbock Preston Smith Int'I Airport LBB Contract No._ 1 S200.6 RS&H Project No. 223-1874-006 Prepared by RS&H lnc, at the direction of Lubbock Preston Smith International Airport RS01 SCOPE OF WORK I PROJECT DESCRIPTION The City of Lubbock (the Airport) has determined it desires to replace the existing access control system (ACS) and perform upgrades to the existing video management system (VMS) at Lubbock Preston Smith International Airport (LBB). This Work Plan describes the scope of services by RS&H, Inc., the Architect/Engineer (A/E) for the design/bid phase services associated with the Security Systems Upgrades project. This Work Plan includes anticipated Project Schedule and Project Proposal. The Project Schedule defines the durations of work that are the basis of the Work Plan and Project Proposal. The Project Proposal provides the basis of the estimate for the required compensation and defines the task efforts and deliverables required for the Project. The existing ACS is antiquated and not functioning properly. The Airport wishes to make improvements to the existing VMS. The ACS and VMS are not fully integrated. The work under this project will be to design a replacement ACS that is fully compatible with the VMS and to make improvements to the VMS. The following scope items will be included in the design: • The existing ACS will be replaced with a new system that is fully integrated with the existing VMS headend, including new identity management system, servers, computers, controllers, card reader interface modules, replacement card readers, credentials, software, and ancillary equipment. • The ACS will also integrate the existing gate intercom into the system. • The existing VMS will have software and hardware upgrades, including replacement of the Pelco network switch and nine (9) associated switches with new Ubiquiti network switches, update firmware on all newer switches, replacement of fiber media converters, provisions for the Contractor to scrub the current system architecture to maximize stability, replacement, or update of the directory server to manage the entire system, and add another recording archiver. Project Duration - The Project's schedule is defined in the accompanying Project Schedule. The actual schedule may vary significantly as the Project design progresses and the scope is further developed. Changes to the project schedule may require changes in the Consultant's efforts and require adjustments to the compensation indicated in this proposal. Lubbock Security Systems Upgrade T SCOPE OF WORK II PROJECT TASKS Below identified by Task is the anticipated work provided under this work order. TASK 1 PROJECT INITIATION AND INVESTIGATION PHASE Performance of this Task will confirm the general design parameters of scope, establish Airport expectations, review pertinent documentation, and complete a survey of existing conditions. Specific task breakdowns are as follows: Task 1.1 Project Kick -Off Meeting A virtual kickoff meeting will be held to establish the project design goals, objectives, methods, work schedule, and budget. RS&H will prepare a written summary of the meeting for distribution to all attendees. Task 1.2 Documentation Review RS&H will work with the Airport to collect and review all existing as -built data, including recent projects. The Consultant will identify missing data that will be required to build the base drawings and assemble into a drawing package. Task 1.3 Survey RS&H will conduct an on -site survey to collect data on the existing conditions needed to document the existing security systems. Task 1.4 Project Management and Discipline Coordination Consultant will oversee scheduling, resource allocation, monitoring, oversight, direction, and control for all aspects of the team's efforts including assembly and coordination of all documentation. Schedule, develop agenda, conduct review meetings, issue minutes, and monitor concurrence with stakeholders. TASK 2 DESIGN DEVELOPMENT - 60% CONSTRUCTION DOCUMENTS RS&H will produce a 60% design level of effort for review and comment by the Airport, including the following elements: • Design drawings • Draft technical specifications • Cost estimate Task 2.1 60% Design Drawings Based on consultation with airport staff and the kickoff meeting minutes, RS&H will develop the following 60% drawings and submit for review electronically: Lubbock Security Systems Upgrade w 2 SCOPE OF WORK • Reference sheet • Site plans • Perimeter gate plans • Demolition plans • Terminal layout plans • Enlarged plans • Block diagrams • Risers Task 2.2 60% Design Specifications RS&H will produce draft technical written specifications for Division 28 electronic security and associated Division 27 communications systems, raceway, and cabling for Owner review. Task 2.3 60% Engineers Opinion of Probably Construction Costs RS&H will produce an engineer's opinion of probable construction costs for the work. The opinion of probable construction cost represents the judgement of the estimators who have no control over the cost of labor, materials, or equipment, over the Contractor's methods of determining prices, or over competitive bidding, market or negotiating conditions. Accordingly, RS&H cannot and does not warrant or represent that bids or negotiated prices will not vary from the budget, funding or from any estimate or evaluation by RS&H. Task 2.4 Quality Control Review The Consultant shall conduct in-house quality control reviews of this design development document stage submittal. The review shall cover the design plans and technical specifications prior to submittal to the Airport. The Quality Control review will be performed as follows: IndeQendent OC Review — An independent Architect/Engineer not actively involved in the Project will review for readability, accuracy, appearance, and acceptability. Constructability Review — a comprehensive look at the Project to ensure alignment between plans and specifications, phasing impacts, potential conflicts, etc. Task 2.5 609/6 Design Review Meeting Prior to the review meeting, RS&H shall receive Owner review comments and respond in writing. RS&H will conduct a project review meeting via conference call with airport staff to review the 60% design documents, Owner -provided comments, and responses to comments. RS&H will provide a written summary of the meeting and distribute to all attendees. RS&H will incorporate all agreed upon changes into the documents as the design progresses into the next design phase. Task 2.6 Project Management Consultant will oversee scheduling, resource allocation, monitoring, oversight, direction, and control for all aspects of the team's efforts including assembly and coordination of all documentation. Lubbock Security Systems Upgrade ��� — 3 SCOPE Of WORK TASK 3 CONSTRUCTION DOCUMENTS 90% DESIGN RS&H will produce a 90% design level of effort for review and comment by the Airport, including the following elements: • 90% construction document drawings • Technical specifications • Cost estimate Task 3.1 90% Design Drawings Based on results from the 60% design review meeting, RS&H will develop the following 90% drawings and submit for review electronically: • Updated 60% drawings • Cable interconnect diagrams • Schedules • Details Task 3.2 90% Design Specifications RS&H will produce updated technical written specifications for Division 28 electronic security and associated Division 27 communications systems, raceway, and cabling for Owner review. Task 3.3 90% Engineer's Opinion of Probable Construction Costs RS&H will update the engineer's opinion of probable construction costs for the work. The opinion of probable construction cost represents the judgement of the estimators who have no control over the cost of labor, materials, or equipment, over the Contractor's methods of determining prices, or over competitive bidding, market or negotiating conditions. Accordingly, RS&H cannot and does not warrant or represent that bids or negotiated prices will not vary from the budget, funding or from any estimate or evaluation by RS&H. Task 3.4 Quality Control Review The Consultant shall conduct in-house quality control reviews of this construction document stage submittal. The review shall cover the design plans and technical specifications prior to submittal to the Airport. The Quality Control review will be performed as follows: Independent QC Review— An independent Architect/Engineer not actively involved in the Project will review for readability, accuracy, appearance, and acceptability. f� Constructability Review —a comprehensive look at the Project to ensure alignment between plans and specifications, phasing impacts, potential conflicts, etc. Task 3.5 90% Design Review Meeting Prior to the review meeting, RS&H shall receive Owner review comments and respond in writing. RS&H will conduct a project review meeting via conference call with airport staff to review the 90% design documents, Owner -provided comments, and responses to comments. RS&H will Lubbock Security systems upgrade 4 SCOPE OF WORK provide a written summary of the meeting and distribute to all attendees. RS&H will incorporate all agreed upon changes into the documents as the design progresses into the next design phase. Task 3.6 Project Management Consultant will oversee scheduling, resource allocation, monitoring, oversight, direction, and control for all aspects of the team's efforts including assembly and coordination of all documentation. TASK 4 BID DOCUMENTS RS&H will update the 906/6 construction documents to produce a set of final bid documents suitable for providing to potential bidders, including the following elements: Final bid document drawings Final specifications Final cost estimate Task 4.1 Final Bid Documents Based on results from the 90% design review meeting, RS&H will update the 90°/0 construction document drawings to produce the final bid drawings. Task 4.2 Final Specifications RS&H will produce updated technical written specifications for Division 1 general, Division 28 electronic security and associated Division 27 communications systems, raceway, and cabling for bidding. Task 4.3 Final Engineer's Opinion of Probable Construction Costs RS&H will produce the final engineer's opinion of probable construction costs for the work. The opinion of probable construction cost represents the judgement of the estimators who have no control over the cost of labor, materials, or equipment, over the Contractor's methods of determining prices, or over competitive bidding, market or negotiating conditions. Accordingly, RS&H cannot and does not warrant or represent that bids or negotiated prices will not vary from the budget, funding or from any estimate or evaluation by RS&H. Task 4A Project Management and Project Coordination Consultant will oversee scheduling, resource allocation, monitoring, oversight, direction, and control for all aspects of the design team's efforts including assembly and coordination of all documentation. Lubbock Security Systems Upgrade SCOPE OF WORT[ TASK 5 BID AND AWARD SUPPORT SERVICES RS&H will assist the Airport with bidding and award support services after completion of the design as follows: Task 5.1 Pre -Proposal Conference RS&H will virtually attend a Pre -Proposal Conference conducted by the Airport, receive comments, and record minutes of the conference for distribution to the prospective contractors and other interested parties. Task 5.2 Addenda and Responses to Bidder Questions RS&H will prepare, and issue all required addenda to revise the project construction and contract documents prepared by RS&H to: (1) provide clarifications or (2) indicate approvals of substitutions. Task 5.3 Bid Analysis RS&H will evaluate the received bids for correctness, qualifications of the apparent low bidder, DBE participation goals, etc., and make recommendation of award based solely on the apparent qualified, low bidder. RS&H cannot and does not guarantee that bids will not vary from the opinion of probable construction cost estimate. Task 5.4 Project Management and Project Coordination Consultant will oversee scheduling, resource allocation, monitoring, oversight, direction, and control for all aspects of the design team's efforts including assembly and coordination of all documentation. TASK 6 CONSTRUCTION ADMINISTRATION SERVICES CA services will be provided by follow-on Work Order once the contract is awarded to the successful Bidder by the City. III PROPOSED PROJECT SCHEDULE The Project's schedule is anticipated as follows: RS&H Receives Executed Agreement Documentation Review and Survey Completion of 60% Design Owner Review Completion of 90% Design Owner Review Completion of Bid Documents City Approval Lubbock Security Systems Upgrade NTP 1 month after NTP 2 months additional 2 weeks additional 2 months additional 2 weeks additional 1 month additional 1 month additional (approx. pending City Processes) 6 SCOPE OF WORK Solicitation 1 month additional (approx. pending City Processes) Pre -Proposal Conference and Addenda 2 weeks additional (approx. pending City Processes) Receipt of Bids and Bid Analysis 2 weeks additional (after receipt of bids) total Project Schedule 10 months from NTP (approx. pending City Processes) The actual schedule may vary significantly as the design progresses. Changes to the project scope may require changes to the project schedule. Although that is not anticipated, if such changes occur and are significant, it may require an increase to the compensation indicated in the Project Proposal. The fee for all tasks presented in this proposal is indicated in attachment B. IV PROFESSIONAL SERVICES FEE AND FEE TYPE RS&H will provide the above referenced services for a Fixed Lump Sum Fee of $119,580 professional services. See Attachment B for a breakdown of costs. Should scope items/activities/efforts/durations be modified at the request of the Airport or need to be adjusted based on design/construction scheduling, the Consultant Team will need to modify the fee to accommodate the changes. Such changes will be compensated through an amendment (through Additional Services requested by the Consultant) to the Task Order or similar vehicle. Effort, fee, and schedule adjustments resulting from a change in scope will be assessed and approved by the Airport prior to the execution of the change. V ASSUMPTIONS AND EXCLUSIONS This scope is based on the following: 1. The Airport will provide existing as -built data, including recent projects. 2. No major design revisions after the 90% submission. 3. Permitting is not included. 4. Services not explicitly defined in this scope of work are not included. Lubbock Security systems Upgrade DocuSign Envelope ID. 4F6686B2.84Dg-4488•9405-7COE74ES2C28 CITY OF l OCK Daniel M. Pope Mayor T. Re rza City Secretary APPROVED AS TO CONTENT. CAMA!iyrt� Kelly Campbell Executive Director of Aviation Lubbock HwWr Roof /mprown"nts SCOPE OF WORK RS W 4,,,..�c...4. dk,...�,c.� �ew"D ANU Amanda J. aKrongley Vice President RS&H SECURITY SYSTEMS UPGRADES PROJECT PROPOSAL 15200.6 PROJECT STAGE - DESIGN AND BID PHASE TASKS SCOPE r TASK TITLE Task 1.0 Pro eet Initiation and Investigation Phase Task 1.1 Pr l e Meat T 1.2 mentatlon Ravis-w hspet Onk"l or.,ten 1 ftim Nam., MMOr Er1a111Mr 3 16 anal—, 1 6 T9CMkkn eal WlMWF A l kAW's 2 TOTAL 7 7 ,; a Task 1.4 Pr et Man ement 1 32 8 2 2 8 34 1 TOTAL 2 0 49 12 RATE 5387.62 $244.07 SW2.851 3178.66 108.96 $216.00 $8918 TOTAL D RECT LABOR 735 S 3 17 868 8 7S4 3 1248 $ 28 608 OTHER DIRECT WoN14ALARY COSTS S ECIILTY S ONSUL TOTAL SPECIALTY SUSCONSULT N S VE to AiAars Car L Per Dian No. of P s Map 31lim Times TOTAL TRAVEL' 2 2 200 195 6 95 A 73 Mi1as @ 30.50 TOTAL OD 's i Task 2.0 00% Design Phase ask .1 W%osslon Drawin s Task 2.2 Oran Teehn cal S e Gallons 48 4 8 1 20 24 5 8 10 Task 2 Cost Estimate Task .4 a tL Con 18 4 4 4 8 2 8 2 T k 2.S 307.Oas n RavI Msatl T"RZ-flFrojectlillanapment HOURS RATE 2 0 48 3302 85 62 178.66 24 3108.96 SWI 62 3244.87 9 5216.00 1 389 t6 155 TOTAL DIRECT LABORS 735 iIS 14 837 3 11077 3 2 615 S 1944, 3 892 3 31 SW OTHER DIRECT NON -SALARY COSTS ar QWGS iPA E REPRODUCTION #SETS o29 50 R rtfeatkms TOTAL REPRODUCTION 100 1 9 P A ELNERY N PCKGS 0 PCKGS and ions $25.00 55.00 TOTAL POSTAOEIOELIV RY TRAVEL Oas' vi Reew as' L VEL RP le s 1 Arfare 31100 1.1 Cer am Loda 31 Per 0iem 80 No of Times MILEAGE Milsop es a Saw TOTAL OOC's Lubbock Hangar Roof Improvements Pill oraNer e..ia SCOPE / TASK TITLE oir.«en N'".o.. Milli? a"a" T.eankM. sat wnp.r r,N. TOTAL Task 3.0 90% Design Phase a 3.190%Oas n Dn a as 3.2 TechMea ata as Coat estimate 16 0 4 4 12 2 4 621 4 TalkLlI Con4ot as .9 90% OH n Ravlaw Moel 4 1 4 as Pt set ona man 2 8 10 TOTAL R 2 0 50 12 3 104 RATE:Sr36,-762. 44.87 2.85 M17. s10898 3216.00 16 TOTAL OIRECT LABOR 735 s 14 537 S 8933 S 1 308 s 848 635 S 28 OTHER DIRECT N Y COSTS N DWGS #PAGES REP TION 98 s0A0 IISETS Ot ' s 100 R iwau%— TOTAL REPRODUCTION 2pp 2 SM 0 23 TA P /DE E N P S N P KGS and �eofions2 TOTAL POSTAGEID ELIVERY_ 2 360 SPECIALTY UBCONSULTANTS Poor Review " s0 TOTAL SPECIALTY SUBCONSULTANTS so T VEL Avlare Car L Per Dian No of Deskirt Review Mes' Voye—#D 11365 $130 Tsnos 1 11 tap 1 GO T AURA EL " Mies Q $0 50 TOTAL ODC's Task 4.0 Bid Documents Taskil.11FIn 9Id Document Drawings32 Task 4.2 FMaI c18callons Task 4.3 FkW Cost Estimate 12 6 2 2 4 4 18 Took 4A Project an menl 2 8 10 TOTAL N RS 2 0 34 36 4 0 7y RATE 5367.62 $244.87 $302.85 3178.68 108.96 $218.00 58916 TOTAL DIRECT LABOR 735 S S 70297 6 432 S 436 S 357 S 18,256 OTHER 0 CT SALARY COSTS REPR UUCTION N DWGS #PAGES IL a R�200 TOTAL REPRODUCTION 10.98 30.10 WTS 100 2 2 $126 S40 PO EL RY NPC S 0PCKGS .00 TOTAL POSTAGEIDELIVERY C UBCONS L ANTS Peer eviow TOTAL SPECIALTY SUBCONSULTANTS TRAVEL are Car LPoor Diem NO. of uEmkw Review with ' 1.100 sp sire 49 so t s0 T T L MILEAGE= TOTAL ODC's 0Mibs Lubbock Hangar Roof improvements 10 SCOPE 1TASK Tf1t E /wl et PraJM onr..ti tt.mt.r ornaw. t.Ner c.a�wr cnarmt. i«�nkl.n sat ttNMW warn A..r. TOTAL Task 5.0 Bid and Award Support Services Tat 5. • al C kre TM;52 Addends and R• onus is OWder t ant Tak S.3 Bld Is 8 a 2 2 2 TUN 5.4 Pr t Manasoment 8 2 367.62 0 $244.87 22 1 2 TOTAL HOURS RATE 5302.65 S17a.665108.86 r 56918 TOTAL DIRECT LABOR S 735 S 8653 S 2.501 S 8 178 S 10.078 TRAVEL Arfare di Car L ParDlem No. of d N sp a 1 51.100 1 4130 1 $60 Tmtt TOTALTRAVEL 0 Vul 6 SO TOTAL 0 't t ZZE . 4 I S•L AtP9Ub1 MI'V i Lubbock Hangar Roo/ Improvements II