Loading...
HomeMy WebLinkAboutResolution - 2017-R0395 - Kimley-Horn And Associates - 10/26/2017Resolution No.2017-R0395 Item No.6.6 October 26,2017 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock,Amendment No.1to Contract No.13098 for engineering services related to 98th Street design and construction,by and between the City of Lubbock and Kimley-Horn and Associates,Inc.,of Lubbock, Texas, and related documents. Said Contract is attached hereto and incorporated in this Resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on October 26 ATTEST: Rebicca Garza, City Secretar APPROVED AS TO CONTENT: fPnSulin,P.E.,Director of Putjfic Works APPROVED AS TO FORM: "HIAjC Kelli Leisure,Assistant City Attorney RES.Amend 1 K.imley-Horn98thStreet 09.28.17 2017. DANIEL M.POPE,MAYOR Resolution No. 2017-RO395 Amendment 1 To Agreement Between The City of Lubbock, TX And Kimley-Horn and Associates, Inc. THIS IS THE FIRST AMENDMENT TO THE AGREEMENT dated and entered into the 15' day of December 2016 by and between the City of Lubbock ("City") and Kimley-Horn and Associates, Inc. ("Kimley-Horn"), a North Carolina Corporation, for providing engineering services for the design and construction of paving 98th Street between Upland Avenue to Milwaukee Avenue ("Project"). WITNESSETH: WHEREAS, the City desires to increase the scope of the work to be performed by Kimley-Horn on the Project. The new scope shall include: the design and construction documents for a 50-foot wide parallel drainage channel on the south side from Upland Avenue to Quincy Avenue, a 12-inch water line relocation, culverts beneath the Rochester Avenue and Quincy Avenue roadway connections to the south, and all associated hydraulic modeling and right-of-way coordination, survey, and document preparation. The details of work to be performed and associated additional fees are described in Attachment A and Attachment B respectively, attached to and incorporated herein. WHEREAS, all other portions of the original Agreement and previous Amendments, if any, shall remain in place and are not altered by this amendment. NOW, THEREFORE, the City and Kimley-Horn agree to the terms of this FIRST AMENDMENT: IN WITNESS HEREOF, the parties have executed this Agreement as of this 26th day of October 2017. CITY OF LU OCK �1� Y Daniel M. Pope, Mayor ATTEST: Is &Z Z , eb cca Garza, City Sec Amendment 1 — 98t' Street Paving Upland to Milwaukee AS L. Wg26FrapKIin, P.E., Director of Public Works APPROVED AS TO FORM: /Ylv�- kelli Leisure, Assistant City Attorney KIMLEY-HORN AND ASSOCIATES, INC. Y: od Swin E.,�Se ' - ice President Amendment 1 — 98' Street Paving Upland to Milwaukee 98th Street from Upland Avenue to Milwaukee Avenue Scope of Services - Attachment A Amendment #1 Project Understanding The original scope included "the design and construction documents for 98th Street from Upland Avenue to Milwaukee Avenue. 98'h Street will be improved from a 2-lane dirt roadway to a three -lane all-weather surface (asphalt and/or concrete)." This amendment adds new scope that was not included in the original agreement. New work includes: design and construction documents of a 50'-wide parallel drainage channel on the south side of 981h Street from Upland Avenue to Quincy Avenue, 12" water line relocation from Upland Avenue to Quincy Avenue, culverts beneath the Rochester Avenue and Quincy Avenue roadway connections to the south, and all associated additional hydraulic modeling, coordination for additional ROW and easements, survey and document preparation for same. The new scope added by this amendment is detailed below. Original scope items not mentioned remain unchanged and will be performed by the Engineer as per the original agreement: Design Project Management 1.3. Progress and Review Meetings: 1.3.1 Schedule, prepare for, attend, and document additional Progress and Review meetings; three (3) meetings 1.5. Modify and maintain project schedule, accounting for additional scope items, adjustments in task timeframes and milestone dates. 1.6. Project Administration 1.6.1 Prepare additional monthly invoices and reports 1.6.2 Prepare additional project correspondence and process invoicing documents 1.8. Additional Coordination with sub -consultants (ROW, drainage, SUE) 1.9. Low cost alternatives sensitivity analysis 1.9.1 Prepare modified roadway plan limits, design profiles, drainage elements, earthwork quantities and all associated cost estimates to optimize design within original budget 2. Survey - No Change 3. Right -of -Way 3.6. Survey additional ROW, drainage, and slope easements (maximum 11 additional parcels) 4. Subsurface Utility Engineering (SUE) (by Subconsultant) 4.2. Utility investigations, both subsurface and above ground, will be prepared in accordance with ASCE C-1 38-02 and according to the Utility Quality Levels as described below. Utility Quality Levels are defined in cumulative order (least to greatest) as follows: 4.2.4 Quality Level A - Additional field work and coordination due to addition of the parallel channel City of Lubbock - 98th Street Paving from Upland to Milwaukee Page 1 of 3 Engineering Scope of Services - Amendment #1 October 10, 2017 5. Geotechnical - No Change 6. Franchise Utility Coordination (K-H) 6.1. Preliminary Design Coordination: 6.1.3 Franchise Conflicts Evaluation • Coordinate with design team regarding additional potential conflicts 6.2. Final Design Coordination: 6.2.1 Additional coordination due to drainage channel and Xcel substation 6.2.2 Additional coordination with SPEC related to their proposed future transmission lines 7. Drainage (by Subconsultant and K-H) 7.2. Modeling 7.2.5 Design of ultimate and interim conditions H&H modeling 7.3. Plan Production 7.3.3 Provide summary sheets showing necessary hydrologic and hydraulic calculations and assumptions for design and prospective fully developed roadway and additional calculations for the interim conditions. 7.3.5 Prepare two (2) additional Culvert Layout plan and profile sheets; one each for Rochester Avenue and Quincy Avenue 7.3.6 Provide additional culvert details to support the design intent for additional work 8. Roadway Design (K-H) 8.2. Prepare the roadway horizontal alignment between Upland Avenue and Milwaukee Avenue including the transition from '/z T2 section on the north side of 981h Street to a 2-lane section centered on the section line. 8.3. Prepare additional roadway typical sections for alternatives 8.5. Develop design cross-sections/Models 8.5.1 Develop multiple corridor models and cross sections for multiple interim alternatives and one (1) final alternative 8.6. Prepare additional roadway details to clarify intent of design 8.11. Prepare intersection layouts for Rochester Avenue and Quincy Avenue. 8.12. Prepare plans and details for concrete block retaining wall in select locations between Upland Avenue and Quincy Avenue 9. Bidding Phase - No Change 10. Construction Phase Services (Engineer of Record) - No Change 11. Water Line Design (K-H) - NEW TASK 11.1. Prepare water line relocation plans between Upland Avenue and Quincy Avenue • Prepare preliminary plan and profile sheets. Items to be included: Plan: 1. Control data 2. Existing / proposed right-of-way 3. Existing topography 4. Existing water line locations 5. Existing sanitary sewer line locations 6. Existing franchise utility locations (based upon SUE information) 7. Existing and proposed edges of pavement and curb 8. Proposed roadway centerline alignment 9. Proposed culvert locations 10. Proposed channel limits 11. Proposed 12" water line alignment 12. Proposed lateral water line connections/extensions 13. Proposed adjusted fire hydrant locations Profile: City of Lubbock - 98th Street Paving from Upland to Milwaukee Page 2 of 3 Engineering Scope of Services -Amendment #1 October 10, 2017 1. Existing ground profiles at the proposed centerline of 12" water line 2. Proposed 12" water line vertical profile 11.2. Prepare water line details 11.3. Technical Specifications • City standard specifications will be used for this project. Consultant will provide technical specifications for waterline -related components that are not part of the City specifications. 11.4. Progress Design Review Submittal (-50%) • Submittal should include a snapshot of all developed designs and sheets such as: 1. Preliminary Plan and Profile sheets 2. Construction Cost Estimate 3. Draft Specifications 11.5. Final Design Plans Submittal • Submittal shall include the following: 1. Final design plans 2. Contract documents including the following: Technical specifications 3. Opinion of probable construction cost - End of Scope of Services — City of Lubbock — 98th Street Paving from Upland to Milwaukee Page 3 of 3 Engineering Scope of Services — Amendment 91 October 10, 2017 Kimley>»Horn Attachment B - Fee Schedule City of Lubbock RFQ #17-13098-SS 98th Street - Upland Avenue to Milwaukee Avenue Amendment #1 10/10/2017 Task No. Task Name (Lump Sum) Kimley-Horn Hugo Reed CMT RIOS Subtotal 1 Project Management $ 20,200.00 $ 2,600.00 $ $ $ 22,800.00 3 ROW/Land Owner Coord. $ - $ 18,500.00 $ $ $ 18,500.00 4 Subsurface Utility Engr. $ - $ - $ $ 5,900.00 $ 5,900.00 6 Franchise Utility Coord. $ 7,100.00 $ - $ $ - $ 7,100.00 7 Drainage Plan Prod/Analysis/Modeling $ 17,600.00 $ 3,300.00 $ $ $ 20,900.00 8 Roadway Design $ 53,900.00 $ 53,900.00 11 Water Line Design $ 33,600.00 $ - $ $ $ 33,600.00 Total Contract Fee $ 132,400.00 1 $ 24,400.00 $ 1 $ 5,900.00 1 $ 162,700.00 Kimley-Horn will perform the additional services in the above tasks for the total lump sum fee shown above, inclusive of expenses. Individual task amounts are informational only. Kimley-Horn reserves the right to reallocate amounts among tasks as necessary. All permitting, application and similar project fees will be paid directly by the Client. Lump Sum fees will be invoiced monthly based on the overall percentage of services performed. Payment will be due within 25 days of your receipt of the invoice and should include the invoice number and Kimley-Horn project number CERTIFICATE OF INTERESTED PARTIES FORM 1295 1 of 1 Complete Nos. 1 - 4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. CERTIFICATION OF FILING Certificate Number: 1 Name of business entity filing form, and the city, state and country of the business entity's place of business. 2017-270389 Kimley-Horn and Associates, Inc. Dallas, TX United States Date Filed: 10/10/2017 2 Name of governmental entity or state agency that is a party to the contract for which the form is being filed. City of Lubbock Date Acknowledged: 10/11/2017 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. 13098 98th Street Upland to Milwaukee Design 4 Name of Interested Party City, State, Country (place of business) Nature of interest (check applicable) Controlling I Intermediary Atz, John Dallas, TX United States X Peed, Brooks Dallas, TX United States X Schiller, Mike Dallas, TX United States X Wilson, Mark Dallas, TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct. Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP / SEAL ABOVE Sworn to and subscribed before me, by the said this the day of 20 , to certify which, witness my hand and seal of office. Signature of officer administering oath Printed narne of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.277 CERTIFICATE OF INTERESTED PARTIES FORM 1295 loft Complete Nos. 1 - 4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. CERTIFICATION OF FILING Certificate Number: t Name of business entity filing form, and the city, state and country of the business entity's place of business. 2017-270389 Kimley-Horn and Associates, Inc. Dallas, TX United States Date Filed: 10/10/20I 2 Name of governmental entity or state agency that is a party to the contract for which the form is being filed. City of Lubbock Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. 13098 98th Street Upland to Milwaukee Design 4 Nature of interest Name of Interested Party City, State, Country (place of business) (check applicable) Controlling I Intermediary Atz, John Dallas, TX United States X Peed, Brooks Dallas, TX United States X Schiller, Mike Dallas, TX United States X Wilson, Mark Dallas, TX United States X 5 Check only if there is NO Interested Party. ❑ 6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosyre-is true and correct. i MIRIAM CASTILLEJA .e Notary Public, State of Texas Comm. Expires 03.13.2021 OF-p` Signature of authorized agent of contracting busine s entity Notary ID 131041344 g g g ty AFFIX NOTARY STAMP / SEAL ABOVE Sworn to and subscribed before me, by the said W01 V \1 1� V V L this the _D++) day , of 20 {• l to certity which, witness my hand and seal of office. //- -'iri art �i a, wotkn+ m t Si§nature'of 6fficer administering oath Printed name of officer administering oath Title of officer -administering oath Forms provided by Texas Ethics Commission wwvr.ethics.state.tx.us Version V1.0.277