Loading...
HomeMy WebLinkAboutResolution - 2017-R0360 - Ace Pipe Cleaning - 10/12/2017Resolution No.2017-R0360 Item No.6.7 October 12,2017 RESOLUTION BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK: THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute for and on behalf of the City of Lubbock,Change Order No. 001 to that certain Contract No.13037 by and between the City of Lubbock and Ace Pipe Cleaning, Inc., for Canyon Lakes sanitary sewer interceptor rehabilitation phase 1A, and related documents. Said Change Order No.001 is attached hereto and incorporated in this resolution as if fully set forth herein and shall be included in the minutes of the City Council. Passed by the City Council on October 12,2017 . ATTEST: 'JL&#JLJL.JL Retjecca Garza,City Secre APPROVED AS TO/CONT l rector APPROVED AS TO FORM: IrfW Kqlli Leisure, Assistant City Attorney DANIEL M.POPE,MAYOR ccdocs/RES.ChgOrd#001 Contract I3037Contract-Canyon Lakes 09.15.2017 City of Lubbock Purchasing and Contract Management Change Order Contract No: 13037 Contractor: Ace Pipe Cleaning, Inc Change Order No, 001 Contract Title: Canyon Lakes Sanitary Sewer Interceptor Rehabilitation Phase 1A BID/RFP No. 17-13037-TF Project Number: 92318.9242.30000 1. "Change Order" means a written order to a Contractor executed by the Owner in accordance with the contract authorizing an addition to, deletion from, or adjustment or revision of the requirements of the contract documents, or an adjustment to the compensation payable to Contractor, or to the time for performance of the contract and completion of the Project, or a combination thereof, which does not alter the nature of the thing to be constructed and is an integral part of the project objective. Adjustments to "Estimated Quantities" to a line item in a Unit Price contract do not require a Change Order. All work that alters the nature of the thine to be constructed or that is not an integral part of the L1r� get t objective must be let out for public bid Description of change (alteration, deviation, addition, or deletion) caused by conditions encountered during construction not covered by the specifications and drawings of the project (attach additional pages ifnecessarv): The Work of this Project involves the cleaning and CCTV of certain sections of the Canyon Lakes Sanitary Sewer. Change Order 1 is a reconciliatory change order to resolve quantities and to indicate a completed contract. Refer to the attachment. 2. Where the Change Order is negotiated, the Change Order must be fully documented and itemized as to costs, including material quantities, material costs, taxes, insurance, employee benefits, other related costs, profit and overhead. Where certain unit prices are contained in the initial contract, no deviations are allowed in computing negotiated change order costs. ITEMIZED COSTS MUST BE FULLY DOCUMENTED AND ATTACHED TO THIS FORM ITEM DESCRIPTION AMOUNT A. ORIGINAL CONTRACT VALUE: $ 855,45800 B. AMOUNT OF THIS CHANGE ORDER: Council approval required ffover S25, 000 $t12s,1o1.09) COST CENTER: ACCOUNT: C. PERCENT OF CONTRACT VALUE THIS CHANGE ORDER (B/A): -14.7 % D. AMOUNT OF PREVIOUS CHANGE ORDERS: $ 0.00 E. TOTAL AMOUNT OF ALL CHANGE ORDERS (B+D): $ (126.101.os) F. PERCENT OF CONTRACT OF ALL CHANGE ORDERS (E/A): 25% increase -147 % or decrease G. NEW CONTRACT AMOUNT (A+E): $ 729,356.91 3. It is mutually agreed that the above dollar amount and the time extension, as applicable, as set forth in this Change Order constitutes full compensation to the Contractor for all costs, expenses and damages to the Contractor, whether direct, consequential or otherwise, in anyway incident to, or arising out of or resulting directly or indirectly; from the work performed or modified by the Contractor under this Change Order. 19rrrhasin and CnnUact b1c rra rmrut De r tent): r^—' LOl_: g//G /% v 08/15/2017 (1) CONTRACTOR fUC@ to (2) PROIEC ARCHITEC ' •NGINEER Date Approved a to Content: Secretary / Treasurer Ap r v 'd Form: Xv/,q5 -i 7 OWNER'S R ENTATIVE Xatel m I Y TTORNEY SEP jute 2017 (5) CAPITAL PROJECTS MANAGER Date (6) PURC G ND CONTRACT MANAGER [Datee an a Or over $25,000 require a Contract Cover Sheet and th ollowing signatures: CITY F L BBOCK ATTEST: 10/12/2017 /2017 (7) MAMR Date (8) CITY SECRETARY 4DateCouncil Date: October 12,2017 Agenda Item #: 6.7 Resolution #. 2017-0 PUR-45 (Rev 12/2012) Lubbock Canyon Lakes Interceptor Rehabilitation - Phase 1A Reconciliatory Change Order k1 PAY ITEM QUA1.NTITY I UNITS DESCRIPTION OF ITEM UNIT TOTAL PRICE 02 7 I,h' Provide sediment removal of existing 24-inch diameter sanitary sewer (All Segments except Segments 9 & 10) $ 47.00 $ 314.90 TOTAL ADDITIONS 1 $ 314.90 SUBTRACTIONS 1, 2a 585 ( ) LF Provide sediment removal of existing 24-inch diameter sanitary sewer (Segments 9 & 10 only) $ 47.00 $ (27,512.39) 03 (22) LF Provide sediment removal of existing 30-inch diameter sanitary sewer $ 49.00 $ (1,078.00) 04 (1,362) LF Provide tubcrculation removal of existing 24-inch diameter sanitary sewer (Segments 9 & 10 only) $ 35.00 $ (47,670.00) 05 (28) LF Provide tuberculation removal of existing 30-inch diameter sanitary sewer $ 35.00 $ (980.00) 6a (1) F,A Attempted tubcrculation removal from existing 30-inch diameter sanitary sewer (Segment 1 $ 10,000.00 $ (10,000.00) Provide removal and disposal of all internal debris removed 07 (300) J'I'ONduring cleaning operations (All Segments except Segments 9 & $ 80.00 $ (24,000.00) 10) 7a (155) TON Provide removal and disposal of all internal debris removed during cleaning operations (Segments 9 & 10 only) $ 80.00 $ (12,400.00) Perform closed circuit television inspection of existing sanitary 08 (15) LF sewer (all depths, pipe materials, and pipe diameters) (All $ 2.00 $ (30.60) Se nents except Segments 9 & 10) Perform closed circuit television inspection of existing sanitary 8a (1,373) LF sewer (all depths, pipe materials, and pipe diameters) (Segments $ 2.00 $ (2,745.00) 9 & 10 only) TOTAL SUBTRACTIONS $ (126,415.99) TOTAL FOR CHANGE ORDER`NO..y Is (126,101.09) 11/29/2016 CERTIFICATE OF INTERESTED PARTIES FORM 1295 1of1 Complete Nos. 1- 4 and 6 if there are interested parties. Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. OFFICE USE ONLY CERTIFICATION OF FILING Certificate Number: 2017-267104 Date Filed: 09/29/2017 Date Acknowledged: 10/03/2017 1 Name of business entity filing form, and the city, state and country of the business entity's place of business. Ace Pipe Cleaning, Inc. Kansas City, MO United States 2 Name of governmental entity or state agency that is a party to the contract for which the form is being filed. City of Lubbock 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. 13037 Canyon Lakes Sanitary Sewer Interceptor Rehab Phase 1A 4 Name of Interested Party City, State, Country (place of business) Nature of interest (check applicable) Controlling I Intermediary 5 Check only if there is NO Interested Party. X 6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct. Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP / SEAL ABOVE Sworn to and subscribed before me, by the said this the day of 20 , to certify which, witness my hand and seal of office. Signature of officer administering oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.3337 CERTIFICATE OF INTERESTED PARTIES FORM 1295 1of1 Complete Nos. 1- 4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. CERTIFICATION OF FILING Certificate Number: 2017-267104 1 Name of business entity filing form, and the city, state and country of the business entity's place of business. Ace Pipe Cleaning, Inc. Kansas City, MO United States Date Filed: 09/29/2017 2 Name of governmental entity or state agency that is a party to the contract for which the form is being filed. City of Lubbock Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. 13037 Canyon Lakes Sanitary Sewer Interceptor Rehab Phase 1A 4 Name of Interested Party City, State, Country (place of business) Nature of interest (check applicable) Controlling I Intermediary 5 Check only if there is NO Interested Party. tra,rnrnrgryrry x 6 AFFIDAkN'I S ��.• '" "" •'�( I swear, or affirm, under penalty of perjury, that the above disclosure is true and correct. `(� 4aNOTA.RYpiL��a' - NOTARY SE SEAL t0 -. rt5365237 ;' r A �` agson Oo�oSO,Signature of authorized agent of Qeg City "�-�'Sn - �,.• S �� ` Secretary / Treasurer AFFIX NOTX�TAT�Ih�91a/lL ABOVE Sworn to and subscribed before me, by the said i'llll �GYiYI �1' °� this the day of 20 t-7 , to certify which, witness my hand and seal of office. Signature of off ic administering oath Printed name of officer administering oath Title of officer administering oath runny Nruviueu uy i exas ctrncs commission www.etrncs.state.tx.us Version V1.0.3337 AW--