HomeMy WebLinkAboutResolution - 2021-R0249 - Prevailing WagesResolution No. 2021-R0249
Item No. 6.4
July 27, 2021
RESOLUTION No. 2021 -R0249
WHEREAS, the City Council has heretofore established the general prevailing rate
of per diem wages for each craft or type of workmen or mechanics needed to execute public
works contracts for the City of Lubbock in accordance with the provisions of Texas
Government Code Chapter 2258; and
WHEREAS, such wage rates were established by Resolution No. 719 enacted
February 12, 1981, updated by Resolution No. 1590 enacted February 23, 1984, further
updated by Resolution No. 2502 enacted January 8, 1987, further updated by Resolution No.
5721 enacted March 14, 1996, amended by Resolution No. 6138 enacted December 16,
1998; and amended by Resolution No. 6262 enacted April 8, 1999; and amended by
Resolution No. 0483 enacted November 14, 2002; and amended by Resolution No. 2018-
R0028 enacted July 26, 2018; and
WHEREAS, such rates need to be updated at the present time in order to reflect the
current prevailing rate of per diem wages; NOW THEREFORE:
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the general prevailing rate of per diem wages for public works contracts shall
be as determined by the United States Department of Labor in accordance with the Davis -
Bacon Act (40 U.S.C. Section 276a et seq.), and its subsequent amendments.
Such wage rates are hereby found and declared to be the general prevailing rate of
per diem wages in all localities where public works are undertaken on behalf of the City of
Lubbock and such wage rates shall be included in all public works contracts as provided by
law.
Passed by the City Council on this 27th day of July , 2021.
DANIEL M. POPE, MAYOR
ATTEST:
Rebe ca Gana, City Secretaky
APPROVED AS TO CONTENT:
✓ 116=9
BIuBIu osch, Chief Pinancial Ofticer
APPROVED AS TO FORM:
Kelli Leisure, Assistant City Attorney
Res.PrevailingW ageltate2021
General Decision Number: TX20210280 07/02/2021
Superseded General Decision Number: TX20200280
State: Texas
Construction Type: Building
Counties: Crosby and Lubbock Counties in Texas.
BUILDING CONSTRUCTION PROJECTS (does not include
single family homes or apartments up to and including 4
stories).
Note: Under Executive Order (EO) 13658, an hourly
minimum wage of $10.95 for calendar year 2021 applies
to all contracts subject to the Davis -Bacon Act for which
the contract Is awarded (and any solicitation was issued)
on or after January 1, 2015. If this contract is covered by
the EO, the contractor must pay all workers in any
classification listed on this wage determination at least
$10.95 per hour (or the applicable wage rate listed on this
wage determination, if it is higher) for all hours spent
performing on the contract in calendar year 2021. If this
contract is covered by the EO and a
classification considered necessary for performance of
work on the contract does not appear on this wage
determination, the contractor must pay workers in that
classification at least the wage rate determined through
the conformance process set forth in 29 CFR 5.5(a)(1)(11)
(or the EO minimum wage rate, if it is higher than the
conformed wage rate). The EO minimum wage rate will be
adjusted annually. Please note that this EO applies to the
above -mentioned types of contracts entered into by the
federal government that are subject to the Davis -Bacon
Act itself, but it does not apply to contracts subject only to
the Davis -Bacon Related Acts, including those set forth at
29 CFR 5.1(a)(2)-(60). Additional information on
contractor requirements and worker protections under
the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/01/2021
1 07/02/2021
BOIL0074-003 01/01/2017
Rates Fringes
BOILERMAKER ...................... $ 28.00 22.35
CARP0665-00105/01/2017
Rates Fringes
CARPENTER ........................ $ 22.25 7.31
ELECO602-008 03/01/2020
Rates Fringes
ELECTRICIAN .................... ..$ 23.12 3%+10.75
ENG10178-005 06/01/2020
Rates Fringes
POWER EQUIPMENT OPERATOR
(1) Tower Crane ............. $ 32.85 13.10
(2) Cranes with Pile
Driving or Caisson
Attachment and Hydraulic
Crane 60 tons and above...$ 28.75 10.60
(3) Hydraulic cranes 59
Tons and under ............. .$ 32.35 13.10
IRON 0084-01106/01/2020
Rates Fringes
IRONWORKER, ORNAMENTAL ... $ 25.26 7.13
* IRON0263-003 06/01/2020
Rates Fringes
IRONWORKER, STRUCTURAL ........... $ 25.14 7.43
PLUM 0404-00109/01/20 20
Rates
Fringes
PLUMBER .......................... $ 26.05
8.81
---- -----------------------------------------------------------
SH EE0049-00104/01/2019
Rates Fringes
SHEET METAL WORKER (HVAC Duct
Installation Only) .............. .$ 21.73
14.94
----------------------------------------------------------------
SUTX2014-060 07/21/2014
Rates Fringes
BRICKLAYER ....................... $ 20.04
0.00
CEMENT MASON/CONCRETE FINISHER...$19.60
0.00
INSULATOR - MECHANICAL
(Duct, Pipe & Mechanical
System Insulation) .............. $19.77
7.13
IRONWORKER, REINFORCING ... $12.27
0.00
LABORER: Common or General.$12.35
0.00
LABORER: Mason Tender - Brick ... $11.36
0.00
LABORER: Mason Tender -
Cement/Concrete ..................$10.58
0.00
LABORER: Pipelayer..............$12.49
2.13
LABORER: Roof Tearoff .......... .$11.28
0.00
OPERATOR:
Backhoe/Excavator/Trackhoe .$14.25 0.00
OPERATOR: Bobcat/Skid
Steer/Skid Loader ............... $13.93 0.00
OPERATOR: Bulldozer.............$18.29 1.31
OPERATOR: Drill ................
.$16.22
0.34
OPERATOR: Forklift ............
..$14.83
0.00
OPERATOR: Grader/Blade ..........
$13.37
0.00
OPERATOR: Loader................$13.55
0.94
OPERATOR: Mechanic..............$17.52
3.33
OPERATOR: Paver (Asphalt,
Aggregate, and Concrete) .........
$ 16.03
0.00
OPERATOR: Roller................$12.70
0.00
PAINTER (Brush, Roller, and
Spray) .........................
$14.27
0.00
ROOFER ..........................
.$ 13.75
0.00
SHEET METALWORKER, Excludes
HVAC Duct Installation..........
$ 21.13
6.53
TILE FINISHER .................
$11.22
0.00
TILE SETTER ......................
$14.00
2.01
TRUCK DRIVER: Dump Truck
...... $12.39
1.18
TRUCK DRIVER: Flatbed Truck ... $19.65
8.57
TRUCK DRIVER: Semi -Trailer
Truck ..........................
$12.50
0.00
TRUCK DRIVER: Water Truck
----------------------------------------------------------------
....... $ 12.00
4.11
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
"General Decision Number: TX20210002 01/01/2021
Superseded General Decision Number: TX20200002
State: Texas
Construction Types: Heavy and Highway
Counties: Armstrong, Carson, Crosby, Ector, Irion,
Lubbock,
Midland, Potter, Randall, Taylor and Tom Green
Counties in Texas.
HEAVY & HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly
minimum wage of $10.95 for calendar year 2021 applies
to all contracts subject to the Davis -Bacon Act for which
the contract is awarded (and any solicitation was issued)
on or after January 1, 2015. If this contract is covered by
the EO, the contractor must pay all workers in any
classification listed on this wage determination at least
$10.95 per hour (or the applicable wage rate listed on
this wage determination, if it is higher) for all hours spent
performing on the contract in calendar year 2021. If this
contract is covered by the EO and a
classification considered necessary for performance of
work on the contract does not appear on this wage
determination, the contractor must pay workers in that
classification at least the wage rate determined through
the conformance process set forth in 29 CFR 5.5(a)(1)(ii)
(or the EO minimum wage rate, if it is higher than the
conformed wage rate). The EO minimum wage rate will
be adjusted annually. Please note that this EO applies to
the above -mentioned types of contracts entered into by
the federal government that are subject to the Davis -
Bacon Act itself, but it does not apply to contracts subject
only to the Davis -Bacon Related Acts, including those set
forth at 29 CFR 5.1(a)(2)-(60). Additional information on
contractor requirements and worker protections under
the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/01/2021
* SUTX2011-002 08/02/2011
Rates Fringes
CEMENT MASON/CONCRETE
FINISHER (Paving & Structures) ... $13.SS
ELECTRICIAN ...................... $ 20.96
FORM BUILDER/FORM SETTER
Paving & Curb ..............
.$12.36
Structures .................
.$13.52
LABORER
Asphalt Raker ........... ....$12.28
Flagger...................
.$ 9.30
Laborer, Common......
$10.30
Laborer, Utility ...........
$ 11.80
Work Zone Barricade
Servicer....................
$10.30
POWER EQUIPMENT OPERATOR:
Asphalt Distributer......
...$14.87
Asphalt Paving Machine
...... $13.40
Broom and Sweeper ...........
$ 11.21
Crane, Lattice Boom 80
Tons or Less ...............
.$16.82
Crawler Tractor Operator .... $13.96
Excavator, 50,000 Ibs or
less ........................
$13.46
Front End Loader Operator,
Over 3 CY...................
$12.77
Front End Loader, 3CY or
less .......................
$12.28
Loader/Backhoe............
$14.18
Mechanic ...................
$ 20.14
Milling Machine ............
.$15.54
Motor Grader, Rough ........
$16.15
Motor Grader, Fine..........
$17.49
Pavement Marking Machine .... $16.42
Reclaimer/Pulverizer.......
$12.85
Roller, Asphalt .............
$10.95
Roller, Other .............
$10.36
Scraper .....................
$10.61
Spreader Box ...............
$12.60
Servicer .........................
$13.98
Steel Worker (Reinforcing).
$13.50
TRUCK DRIVER
Lowboy -Float ...............
$14.46
Single Axle .................
$ 12.74
Single or Tandem Axle Dump..$11.33
Tandem Axle Tractor with
Semi ........................$12.49
---------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.