HomeMy WebLinkAboutResolution - 2021-R0213 - Amendment No.3 to Contract 15310 with Parkhill 6.22.2021Resolution No. 2021-R0213
Item No. 6.1.2
June 22, 2021
RESOLUTION
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LUBBOCK:
THAT the Mayor of the City of Lubbock is hereby authorized and directed to execute
for and on behalf of the City of Lubbock, Amendment No. 3 to Contract No. 15310 dated May
12, 2020, for construction administration and resident project representative services, and
closeout phase assistance and construction materials testing in connection with Taxiway M and
Taxiway J pavement rehabilitation at the Lubbock Preston Smith International Airport, by and
between the City of Lubbock and Parkhill Inc., of Lubbock, Texas, and related documents. Said
Amendment is attached hereto and incorporated in this resolution as if fully set forth herein and
shall be included in the minutes of the City Council.
Passed by the City Council on June 22, 2021
ATTEST:
0. dl., .
I " - i LZ6e3-e-- 0001�r
Rebec a arza, City Sec t
APPROVED AS TO CONTENT:
Kelly Campbell, A.A.E.
Director of Aviation
AS TO
DANIEL M. POPE, MA OR
First sistant City Attorney
ccdocs/RES.Amend#3 Agrmt Taxiway M and Taxiway J rehabilitation services
June 4, 2021
Resolution No. 2021-R0213
Parkhill
May 24, 2021
IN TRIPLICATE
Ms. Kelly Campbell, A.A.E., Director of Aviation
Lubbock Preston Smith International Airport
Administration Office, 2nd Floor
5401 North Martin Luther King, Jr. Blvd., Unit 389
Lubbock Texas 79403
Re: Amendment No. 3 b Agreement for Professional Services, Construction Administratlon, Resident
Project Representative (RPR) Services, Closeout Phase Assistance, and Construction Materials
Testing for LBB Taxiways M and J Pavement Rehabilitation
Dear Ms. Campbell:
As requested, we prepared Amendment No. 3 for Construction Administration, RPR services, Closeout Phase
assistance, and Subconsultant services for Construction Materials Testing on the LBB Taxiways M and J
Pavement Rehabilitation Project, specifically for Taxiway M (from Taxiway J to Taxiway F) and Taxiway J (from
Taxiway M to Taxiway R). Alternate 2 will also include oversight of concrete spall repair on Taxiway M south of
Taxiway R. Please refer to attached detailed fee sheets for an itemization of the scope of services.
Parkhill understands the Project scope to include:
1. Parkhill to provide Construction Administration Services as detailed on attached fee sheet. These
services reflect 100 calendar days to final Project completion. Services are proposed on an hourly rate
basis.
2. Parkhill to provide RPR services as detailed on attached fee sheet. RPR time reflects part-time over
100 calendar days to final completion and proposed on an hourly rate basis. Unused fee will not be
invoiced.
3. Parkhill will provide Closeout Phase services as detailed on attached fee sheet. These services include
record drawings only. A formal Project Final Report will not be prepared or submitted to FAA FAA post -
construction AGIS services are also excluded from the Parkhill scope. Services are proposed on a
lump sum basis.
4. Parkhill services include construction materials testing by partner firm, Pavetex Engineering, LLC.
Anticipated testing is as detailed in attached proposal. Construction materials testing is proposed on a
reimbursable basis and unused testing budget will not be invoiced.
Proposed Amendment 3 services are summarized as follows:
Task 5CON Hourly Rate Fee for Construction Phase Services (Parkhill) $ 36,200.00
Task ORPR Hourly Rate Fee for RPR Services (Parkhill) $ 47,500.00
Task 7CLO Lump Sum Fee for Closeout Phase Services (Parkhill) $ 5.100.00
Task 9SSC Reimbursable Services for Construction (Pavetex) $ 14,200.00
TOTAL AMENDMENT NO.3 $103,000.00
4222 85th WON Lubbock, Toxas 79423 808.473.2200 ParkhKoom
Ms. Kelly Campbell, A.A.E. Page 2 June 3, 2021
We propose to modify the agreement (Contract No.15310) between the City of Lubbock and Parkhill dated
May 12, 2020 and provide approved Task 7 services under provisions of Exhibit B - Payments to the Engineer,
Paragraph B4.01(Lump Sum Method) of the Contract as well as Tasks 5, 6, and 9 services under provisions of
Exhibit B — Payments to Engineer, Paragraph B4.01 (Hourly Rate Method) of Contract. Any necessary
additional services will be provided according to Exhibit B - Payments to the Engineer, Paragraph B4.02.
Compensation for Tasks 5, 6, 7, and 9 services shall not exceed the total rated without Owner's written
approval.
If the terms of this amendment are agreeable, please sign and return one copy of this amendment to our office.
We will take receipt of this signed letter as our notice to proceed with these services. We hook forward to working
with you in completing this Project. For anything further. please contact me at mhaberer@oarkhill.com or
806.473.3600.
Sincerely,
PARKHILL
By
Mark D. Haberer, PE, CM
Director of Aviation
MDWam/dg
Enclosures
Accepted by:
CITY OF LU BOCK
By
Daniel M. Pope, Mayor
Approved as to Content:
11, A., OIAIM dYlk
Kelly Campb6li, A.A.E.
Executive Director of Aviation
aoa fftwwn IN71i."M 2o¢,as.2 *c
Cc: Marta Alvarez, Director of Purchasing/Conbact Management
Mitch Satterwhite, First Assistant City Attorney
Parkhill
Project Fee and Budget Sheet
(Hourly/Billing Rates)
Toda 's Date:
May 20, 2021
Prepared By:
A)M
Principal:
MDH
Project Manager:
MDH
Project Name:
LBB Taxiways M and J Rehab
Project Number:
1271719.00
Task/Discipline:
5CON
Projected Start Date:
-
Fee(Revenue)Type:
Hourly Rate
Markup on Direct Expenses:
25.00%
Markup on Reimbursables:
15.00%
Fee Costs Summary
(Profit and Markhup Included In Total Fee)
Labor Cost: $35,614
Direct Consultants:
Direct Expenses:
Reimbursable Consultants:
Reimbursable Expenses: $490
Total Fee: $36.177
and Profit in tabor, Markup included in Duects and Reimbursables)
Labor: $3S,614
Directs:
Subtotal: $35,614
Reimburables: $563
Total Fee: $36,177
$36,200
Page i of 3
III
II
IIIIIIIII�III�IIIIIIIIIIIIIIIIIII
IIII�
I
I
I
I
n
I
RII
II
I
�IIII
I
I
III
II
II
IIIIIIIIIII
IIIINI
RI
IIIMIII
III
IIIIIII
II�II
IIII
II
I�INIIII
IIII
IIIBII
I
II�IIIINIII
III
IIIIII
I
IIIIII
Reimburable Expenses Project: LBS Taxiways M and J Rehab Project No:1271719
Ex uses NOT Included In lump sum fee. These are billed to client, including markup, if allowed.
Reimbursable Consultant Costs
S31 Structural Consultants
512 Mech/Elec Consultant
513 Environ/Civil Consultant
514 Architectural Consultant
515 Testing Consultant (Geotech, CMT, TAB, etc.)
516 Surveying Consultant
517 Interior Design Consultant
518 Other Consultant - Kitchen / food Consultants
518 Other Consultant - Acoustical Consultant
518 Other Consultant - AV / it Consultant
518 Other Consultant
S21 Travel
Motel
Days
Air Travel
Air fare @
Parking
Days @
Car Rental
Days @
Mileage
32 Miles @
522 Reproductions
Blackline / Color Plots
34" x 22"
36" x 24"
42" x 30
Other
Mounting foam Board
Printing:
Set Up Fee
8-1/2" x 11" B&W
8-1/2" x 11" Color
11" x 17" B&W
11" x 17" Color
Binding Cost
Laminating
Scan to file
Sum to CD/DVD
Scan Specs
Scan Drawings
S24 Telephone 5o
S25 Meals
S26 Field Supplies
S28 Postage 4
528 Posta e
530 Misc Reimbursable Ern
535 CADO
536 Field Equip Rental
S37 Interior Design Items
$39 License & Regulation l
543 NM Gross Recelot Tax
Task: 5CON Current fee: $36,177
Amount
Total
Men @ /Man -day
Men @ /Man
/Day a
/Day a
$0.560 @ 1S Trips = $268.80
$2.50 /Sht @
Sets a
$2.75 /Sht @
Sets =
Shts @
$3.25 /Sht @
Sets a
sf @
$0.55 /sf @
Sets a
Boards @
$10.00 /ea @
Originals @
$0.15 /Sht @
Submittals a
250 Originals @
$0.09 /Sht @
1 Sets a
$22.S0
100 Originals @
$0.55 /Sht @
1 Sets a
$55.00
50 Originals @
$0.18 /Sht @
1 Sets =
$9.00
2S Originals @
$1.05 /Sht @
1 Sets -
$26.25
Sets @
$2.00 /Set
s
Shts @
$2.00 /Sht
a
CO/OVO @
$13.S0 /each
Originals @
$0.15 /Sht
a
Originals @
$1.50 /Sht
a
Men
Page 3 of 3
5
Total
$269
$113
Parkhill
Project Fee and Budget Sheet
(Hourly/Bir ing Rates)
Today Date: May 29, 2021
Prepared By: AJM
Principal: MDH
Project Manager: MDH
Project Name: LBB Taxiways M and J Rehab
Project Number: 1271719.00
Task/Discipline: 6RPR
Projected Start Date: -
Fee (Revenue) Type: Hourly Rate
Markup on Direct Expenses: 15.00%
Markup on Reimbursables: 15.00%
Fee Costs Summary
(Profit and Markup Included in Total Fee)
Labor Cost: $45,360
Direct Consultants:
Direct Expenses:
Reimburable Consultants:
Reimbursable Expenses: $1,792
Fee Summary
(OH and Profit in Labor, Markup included in Directs and Reimbursabies)
Labor: $45,360
Directs:
Subtotal: $45,360
Reimburables: $2,061
Total Fee: $47,421 1 Total Fee: $47,421
----_. $47,500
Page 1 of 3
tic aaftd
mob m--
1
1
Reimburable Expenses Project: LBB Taxiways M and J Rehab
Project No:1271719
Task: 6RPR Current Fee:
$47,422
Expenses NOT included in lump sum fee. These are billed to client, Inckiding markup, if allowed.
Amount
Reimbursable: Consultant Costs
511 Structural Consultant
512 Mech/Elec Consultant
513 AIM
S14 Architectural Consultant
S15 Testing Consultant (Geotech, CMT, TAB, etc.)
516 Surveying Consultant
517 LOB Taxiways M and J Rehab
518 2271719
518 Other Consultant - Acoustical Consultant
S18 Other Consultant -AV/ IT Consultant
518 Other Consultant
Total Reimbursable Consultants
Reknbursable Expenses
521 Travel
Motel Oays @
Men @
/Man -day =
Air Travel Air Fare @
Men @
/Man =
Parking Days @
/Day
,
Car Rental Days @
/Day
=
Mileage 40 Miles @
$0.560
@ 80 Trips = $1,792.00
Subtotal
$1,792
522 Reproductions
Blackline / Color Plots
34" x 22"
Shts @
$2.50 /Sht @
Sets -
36" x 24"
Shts @
$2.75 /Sht @
Sets =
42" x 30
Shts @
$3.25 /Sht @
Sets a
Other
sf @
$0.55 /sf @
Sets =
Mounting foam Beard
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals @
$0.15 /Sht @
Submittals =
8-1/2" x IV B&W
Originals @
$0.09 AN @
Sets =
8-1/2" x 11" Color
Originals @
$O.SS /Sht @
Sets -
22" x 17" B&W
Originals @
SOAB /Sht @
Sets =
12" x 17" Color
Originals @
$1.05 /Sht @
Sets =
Binding Cost
Sets @
$2.00 /Set
:
Laminating
Shts @
$2.00 /Sht
Scan to file
Bum to CO/OVD
CD/DVD @
$13.50 /each
Scan Specs
Originals @
$0.15 /Sht
=
Scan Drawings
Originals @
$1.50 /Sht
=
Subtotal
523 Models/Renderings/Photos
Shots @
/Shot
524 Telephone Calls @
/Call
525 Meals Days @
Men @
/Man -day
526 Field Supplies
$28 Postage Mailings @
/Mailing (Standard)
528 Postage Mailings @
/Maiing (Overnight)
530 Misc Reimbursable Exp
S32 Temporary Personnel
534 Office Supplies
535 CADD
536 Field Equip Rental
537 Interior Design Items
S39 license SiRegulation Fee
543 NM Gross Receipt Tax
S47 Computer Supplies
TotalRelmbrusable Expenses
$1,792
Page 3 of 3
Parkhill
Project Fee and Budget Sheet
(Hourly/BlBing Rates)
Today's Date: May 20, 2021
Prepared By:
A)M
Principal:
MDH
Project Manager:
MDH
Project Name:
LBB Taxiways M and J Rehab
Project Number:
1271719.00
Task/Discipline:
7CLO
Projected Start Date:
Fee (Revenue) Type: Lump Sum
Markup on Direct Expenses: 15.00%
Markup on Reimbursables: 15.00%
Fee Costs Summary
(Profit and Markup Included n Total Fee)
Labor Cost: $5,043
Direct Consultants:
Direct Expenses: $86
Reimburable Consultants:
Reimbursable Expenses:
Total Fee:
Fee Summary
IOH and Profit In labor, Markup included in Directs and Relmbursables)
Labor: $5,043
Directs: $99
Subtotal: $5,142
Reimburables:
Total Fee: $5,142
$5,100
Page 1 of 3
��III
I
II
I�I
�niuu
�
�u
Imo
011
�I�plll
!�
Direct Expenses Project: LBB Taxiways M and J Rehab Project No:1271719
Task. 7CLO Current Fee: $5,142
Ex enses included In lump sum fee. Not billed to client.
Direct Consultant Costs
Am
611 5/20/2021
612 Mech/Elec Consultant
613 AIM
614 Architectural Consultant
615 Testing Consultant (Geotech, CMT, TAB, etc.)
616 Surveying Consultant
617 Interior Des% n Consultant
618 Other Consultant - Kitchen / Food Consultant
618 Other Consultant • Acoustical Consultant
618 Other Consultant • AV/ IT Consultant
638 Other Consultant
Total Direct Consultants
Direct Expense Costs
621 Travel
Motel Days
Men @ /Man -day
AlrTravel Air Fare @
Men @ /Man
=
Parking Days @
/Day
=
Car Rental Days @
/Day
=
Mileage 30 Miles@
$0.585
@ 1 Trips
$17.55
622 Reproductions
Subtotal
Blackllne Prints
34" x 22"
Shts @
$2.50 /Sht @
Sets =
36" x 24"
Shts @
$2.75 /Sht @
Sets =
42" x 30
Shts @
$3.25 /Sht @
Sets =
Other
sf @
$0.55 /sf @
Sets =
Mounting Foam Board
Boards @
$10.00 /ea @
Printing:
Set Up Fee
Originals @
$0.15 /Sht @
Submittals =
8-1/2" x 11" B&W SO
Originals @
$0.09 /Sht @
1 Sets - $4.50
8-1/2" x 11" Color 50
Originals @
$O.55 /Sht @
1 Sets = $27.50
11" x 17" B&W 24
Originals @
$0.19 /Sht @
1 Sets - $4.32
11" x 17" Color 25
Originals @
$1.05 /Sht @
1 Sets = $26.25
Binding Cost
Sets @
$2.00 /Set
=
Laminating
Shts @
$2.00 /Sht
=
Scan to file
Burn to CO/DVD
CD/DVD @
$13.50 /each
-
Scan Specs
Originals @
$0.15 /Sht
-
Scan Drawings
Originals @
$1.50 /Sht
=
Subtotal
623 Models/RenderlShotss/Photos
5s @ Mot
624 Telephone 2 Calk @
$2.00 /Call
625 Meals Days @
Men @ /Man -day
626 Field Supplies
628 Postage 1 Mailings @
$2.00 /Mailing (Standard
628 Postage Mallin s @
/Mail( (Overnight)
629 Publications
630 Mkt Reimbursable Exn
635 CADD
& Regulation fee
643
Page 3 of 3
Parkhill
Project Fee and Budget Sheet
(Hourly/Billing Rates)
Today's Date: May 20, 2021
Prepared By: AIM
Principal: MDH
Project Manager: MDH
Project Name: LBB Taxiways M and J Rehab
Project Number: 1271719.00
Task/Discipline: 9SSC
Projected Start Date:
Fee (Revenue) Type: Hourly Rate
Markup on Direct Expenses: 25.00%
Markup on Reimbursables:
Fee Costs Summary
(Profit and Markup Included In Total Fee)
Labor Cost:
Direct Consultants:
Direct Expenses:
Reimburable Consultants: $12,356
Reimbursable Expenses:
Total Fee:
Summary
and Profit in Labor, Markup ncluded in Directs and Reimbursables)
Labor:
Directs:
Subtotal:
Reimburables: $14,209
Total Fee: $14,209
$14,200
Page 1 of 2
Reimbursable Expenses Project: LBB Taxiways M and 1 Rehab ProjectNo:1271719 Task: 9SS
Expenses NOT included in lump sum fee. These are billed to diem, including markup, if allowed.
Reimbursable Consultant Costs
511 Structural Consultant
512 Mech/Elec Consultant
513 Environ/CMI Consultant
S14 Architectural Consultant
S1S Testing Consultant (Geotech, CMT, TAB, etc j Atlas Technical
516 Surveying Consultant
517 Interior Design Consultant
518 Other Consultant - Kitchen / Food Consultant
518 Other Consultant - Acoustical Consultant
518 Other Consultant - AV/ IT Consultant
518 Other Consultant
S21 Travel
Motel
Air Travel
Parking
Car Rental
Mileage
Days @
Air Fare @
Days @
Days @
M les @
$0.545
Men @
Men @
/Day
/Day
@
522 Reproductions
Blackline / Color Plots
34" x 22"
Shts @
Shts @
@
sf @
Boards @
Originals @
Originals @
Originals @
Originals @
Originals @
Sets @
Shts @
CO/OVD @
Originals @
61)
524 Telephone Cans
52S Meals naut
528
532 Tem rary Personnel
S34 Office Supplies
535 CADD
536 Field Equip Rental
537 Interior Design Items
539 License & ulatlon Fee
S43 NM Gross Recel�t Tax
S47 Cam outer5undles
$2.50 /Sht @
$2.75 /Sht @
$3.25 /Sht @
$0.55 /sf @
$10.00 /ea @
$0.15 /Sht @
$0.09 /Sht @
$0.55 /Sht @
$0.18 /Sht @
$1.05 /Sht @
$2.00 /set
$2.00 /Sht
513.50 /each
$0.15 /Sht
$1.50 /Sht
Shots
Page 2 of 2
Current Fee: $14,209
AmountSets
Consultants
/Man•day =
/Man a
a
Trips =
sl'[S =
Sets =
Sets =
Submittals
Sets =
Sets
Sets =
Sets =
May 21, 2021
Adam Multer
amulter@parkhill.com
Parkhill
4222 851' Street
Lubbock, Texas 79423
Re: LPSIA Taxiways M and J Rehabilitation
Lubbock, Texas
Dear Mr. Multer.
We greatly appreciate the opportunity to provide you with a fee proposal for the subject project. Please note that all testing
will be billed on an as -needed basis according to the fees shown.
We look forward to working with you on this project. If you have any questions or need any additional information, please
feel free to contact me.
Respectfully submitted,
Atlas Technical Consultants, LLC
1".4 //A"-
Cole Hutson, P.E.
General Manager
April 9, 2021
Atlas Technical Consultants
12804 County Road 2500
Lubbock TX 79404
Office (806) 771-7283
Fax (806) 771-7062
Date: May 21, 2021
Construction Materials Testing
Fee Schedule
T ■ �+
►
TECHNICAL CONSULTANTS
Laboratory Tests
Aggregates
Fee
Q
Extension
Dry Gradation
$
60.00
2
$
120.00
Washed Gradation
$
75.00
1
$
75.00
Magnesium Soundness
L.A. Abrasion
$
$
35000
325.00
3
2
$
$
1,050.00
650.00
Flat and Elongated
$
100.00
2
$
200.00
Decant
$
75.00
2
$
150.00
Deleterious
$
200.00
3
$
600.00
Fineness Modulus
$
70.00
1
$
70.00
Sand Equivalent
$
125.00
1
$
125.00
Field Testin •
Slum
$
25.00
18
$
450.00
Entrained Air
$
35.00
18
$
630.00
Temperature
$
5.00
18
$
90.00
Fresh Concrete Unit Weight
$
35.00
18
$
630.00
Making Beams ea 4 min Incld breaks
$
60.00
36
$
2,160.00
Technician / Engineering / Administrative
Technician Hourly Two hour minimum
pTechnician Overtime Hourly"
Administrative/Cledcal 1 hr minimum month)
$
$
$
59.00
69.00
59.00
40
40
4
$
$
$
2,360.00
2,760.00
236.00
Estimated Total
$
12,356.00
Field testing is billed in addition to Tech hourly rates
" Hourly rates apply portal to portal, between 8:00 am and 5:00 pm, Monday through Friday. Overtime
rates will be applied when services are provided outside of the before mentioned hours.
Client: City of Lubbock, Lubbock Preston Smith International Airport
Project: L88 Taxiways M and J Pavement Rehabilitation
Project Location: Lubbock, Texas
Agreement Date: May 24, 2021
Classification Hourly Rate
PROFESSIONAL LEVEL I
Architect
Civil Engineer
Electrical Engineer
Interior Designer
Landscape Architect
Mechanical Engineer
Structural Engineer
Surveyor
Other Professional
PROFESSIONAL LEVEL 11
Architect
Civil Engineer
Electrical Engineer
Interior Designer
Landscape Architect
Mechanical Engineer
Structural Engineer
Surveyor
Other Professional
PROFESSIONAL LEVELIII
Architect
Civil Engineer
Electrical Engineer
Interior Designer
Landscape Architect
Mechanical Engineer
Structural Engineer
Surveyor
Other Professional
PROFESSIONAL LEVEL IV
Architect
Cfvll Engineer
Electrical Engineer
Interior Designer
Landscape Architect
Mechanical Engineer
Structural Engineer
Surveyor
Other Professional
PROFESSIONAL LEVEL V
Architect
Civil Engineer
Electrical Engineer
Interior Designer
Landscape Architect
Mechanical Engineer
Structural Engineer
Surveyor
Other Professional
Parkhill
Hourly Rate Schedule
January 1, 2021 through December 31, 2021
Classification Hourly Rate
PROFESSIONAL LEVEL Vi
$113.00
Architect
$117.00
Civil Engineer
$120.00
Electrical Engineer
$107.00
Interior Designer
$107.00
Landscape Architect
$117.00
Mechanical Engineer
$112.00
Structural Engineer
$85.00
Surveyor
$105.00
Other Professional
PROFESSIONAL LEVEL VII
$122.00
Architect
$131.00
Civil Engineer
$135.00
Electrical Engineer
$113.00
Interior Designer
$113.00
Landscape Architect
$13S.00
Mechanical Engineer
$127.00
Structural Engineer
$95.00
Surveyor
$111.00
Other Professional
$138.00
$163.00
$158.00
$124.00
$134.00
$158.00
$156.00
$110.00
$122.00
$170.00
$190.00
$186.00
$13S.00
$145.00
$286.00
$191.00
$127.00
$144.00
$206.00
$229.00
$227.00
$163.00
$176.00
$227.00
$219.00
$150.00
$160.00
SUPPORT STAFF I
SUPPORT STAFF II
SUPPORT STAFF III
SUPPORT STAFF IV
SUPPORT STAFF V
SUPPORT STAFF VI
$229,00
$247.00
$257.00
$198.00
$213.00
$257.00
$236.00
$180.00
$194.00
$295.00
$295.00
$29S.00
$222.00
$295.00
$295.00
$295.00
$200.00
$295.00
$55.00
$65.00
$90.00
$96.00
$106.00
$115.00