Loading...
HomeMy WebLinkAboutResolution - 072254B - Street Improvements - Bobalet Heights - 22Nd Street, Vicksburg Avenue - 07/22/1954Z 2 " RESOLUTION RESOLUTION ACCEPTING IMPROVEM US ON PORTIONS OF STREETS, AND/OR AVENUES AS LISTED BELOW. WHEREAS, in conformance with the paving requirement provisions of City Ordinance 1331, the subdivider of replat of Lots 25, 38, 39, 40, 41, 42, 43 and part of 37 and 44 of Bobalet Heights, made arrangements for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said Ordinance prior to the recording of the subdivision plat of a portion of replat lots 25, 38, 39, 40, 41, 42, 43 and part of 37 and 44 Bobalet Heights, including the following streets and/or avenues: 22nd Street from its intersection with the East Property Line of Vicksburg Avenue to its intersection with the East Property Line of Bobalet Heights, known and designated as New Subdivision, Unit Number 48. Vicksburg Avenue from its intersection with the South Property Line of alley between 21st Street and 22nd Street to its intersection with the North Property Line of 24th Street, known and designated as New Subdivision, Unit Number 49. AND WHEREAS, the construction of the above improvements on the above— mentioned street was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in .accordance with city specifications and in accordance with the provisions of City Ordinance 1331, THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS I. That the improvements on said portions of the abovementioned street be, and the same are hereby accepted and the City Engineer be and is hereby authorized to direct payment of the City's portion. II. This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 22ND DAY OF , 954. .wt ATTEST Murrell R. ipr; M r Lave is Lowe, Ci Secretary APPROVED: ... f1v W. B. Holmes., .,City Engineer AP OVED: Vaughnn . Wilson, City Attorney 07 S 1-ff3 CONSOLIDATED ESMATE IM NkV SUBDIVISION UNITS 10. 4S AND 49 ACCEnED JULT 220 1954 ' S.Y. of Paving; a 't1.05 6l578.86 Unit No. Location S.Y. S.Y, L.P. S.Y. S.Y. L !'. of L.P. Paying lSubgr. C & 0 Alley Drainage Caro fn of alley paving C, x'3.25 a� 124.57 Slab Slab Drainage 538.00 269,0 L.F. of curb 3n channel @ $1.25 48 22nd Street Vicksburg to E. Contract cost 13,4.96.65 Line Bobalet Hts. X925.37 4028.99 1997.02 MX2m 134.5 269.0 49 Vicksburg Alley btvn 21st 22nd to 24th St, -2,14022-1.. 62 8 1,33 Total. 6, 265,58 7333.81 3171.64 36.33 134.50 269.0 COST ESTIMATE 6265.56 ' S.Y. of Paving; a 't1.05 6l578.86 7333.81 S.Y. of SubgraAe Prep. a $0.14 1,320,09 3171.64 L.P. of curb & Gutter 0 #1.45 4598.88 38.33 S.I. of alley paving C, x'3.25 a� 124.57 134* 50 ' 8 1'. of conc.slab in Ch;iQl 0 ( 4.00 538.00 269,0 L.F. of curb 3n channel @ $1.25 Contract cost 13,4.96.65 10% Engr, MX2m Total Cost 114,846.32 COST DLMIBUTION In -it, o. Total Cost, 48 90597.27 8,724.79 49 .1-20,22. .4m7_71i8: Totals $14,846.32 13,496.65 9W C,.2d 572.48 .. M.42 10349.67 kgdit ba, Perot. 872.48 m , i, 349.67 j 0722SI NEW SUBDIVISION Y AL PAVING GOSTS PROPERTY ROLL AeMpted 7 -:2 -*54 SUBDIVISION ftegWylsim ©t }art of 80bulat Hdahte ENG. W. O. , p Street or Avenue 22rA Street From 1iil bwCg to ITIL bdba.et to It& I Trait No. 48 Designation Rest St=`t Rate per foot = total. 1ax°012o owner cost S724M 492 total property 4*71 11� + t f .. PIVOT T IL Wit •� Y 1' 07Z254E) NEW SUBDIVISION PAVING COSTS PROPERTY ROLL racepw�1- 54 J SUBDIVISIOIT Ubalet ReightB MTG. Wo Oo Street or Avenue 4iakebwra From alley Booth of aOt St. -to—NFL 24th Street Unit No.--42- Designation o,4'Designation Res. Street (60-%) Hate per foot i total torcpo owner cost 477Z.86 ® $ 4.5M1945 total property R CITY OF LUBBOCK 07225�,j TEXAS July 22, 1954 Honorable Mayor and City Commission Lubbock, Texas Gentlemen: T have examined the paving improvements constructed by Kerr and Middleton under their contract with the Subdivider of Resubdivision of Bobalet Heights in accordance with Ordinance No. 1331 and find that the improvements on the street designated as New Subdivision Units No. 48 and /+9, as listed on the attached final estimate sheet, to have been completed in accordance with plans and specifications on said street, and recommend the payment to the contractor the amount shown on the attached consolidated final estimate sheet as being due hint from the City of Lubbock. Very truly W. B.tHs ODF: me City Engineer &*I..- Fx EMMET 1. . vfty 'raly .o I Ohm Otte