Loading...
HomeMy WebLinkAboutResolution - 111055G - Paving Improvements - West Texas Contruction, Inc. - 17Th St, & Peoria Ave - 11/10/1955RESOLUTION I I I Osts rq RESOLUTION ACCEPTING INPROVEMTS ON PORTIONS OF STREETS, AND/OR AVENTUES AS LISTED BELOW. WHEREAS, the ,City of Lubbock passed resolutions September 22, 1955, and October fit 1955, authorizing the construction of street improvements by West Texas Construction., Incorporated, Paving Contractors, on portions of various streets in said City 'including among others the following: 17th Street from its intersection with a line 20 feet West of the West Property Line of Salem Avenue to its intersection with a line 105.4 feet West of the West Property Line of Raleigh Avenue,_ known and designated as Unit Number 1780. Peoria A4e=6 from its intersection with the North Property Line of 39th Street to its intersection with a line 2.5 feet South of the South Property Line of the Alley South of 38th Street., known and designated as Unit Number 1809. AND WHEREAS, the improvements upon the said portions of the above— mentioned streets have been inspected and found to have been constructed according to the approved plans and specifications. THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS: I. That the improvements on said portions of the abovementioned streets bet and the same are hereby accepted and the City Engineer be and is hereby authorized to direct the payment of the City's share on December 15, 1955• II. This resolution shall take effect and be in force after its passage. PASSED AND APPROVED THIS 10TH DAY OF NOVEMBER, 1955• Lower Ci&y Se rson, ug E:, Wilsbn., City Attorney r- CITY OF LUBBOCK Honorable Lubbock, Text Gentlemen: TEXAS November 10, 1955 Mayor and City Commission Z have examined the paving improvements constructed by West Texas Construction, Inc.,, paving contractors,, as authorized by resolutions passed and approved September 22J. 1955, and October 6, 1955, and find the improvements on streets known and designated as Units No. 1780 and 1809 as listed on the attached final estimate sheet to have been completed in accordance with plans and specifications and recommend that you accept improvements on said streets, paying the contractor the amount shown on the attached consolidated estimate sheet on the due date shown on the abovementioned resolutions as due him by the City of Lubbock. JHS:jb Very truly yours, ohm T. Hi.ckerson City Engineer CCNSOLIDATED FILIAL EST114ATE FOR UNIT. NOS. 1780 AND 1809; AUTHORIZED SEPTEMBER 22, 1955 AND OCTOBER 60 1955, RESPECTIVELY; ACCEPTED NOVEMM 100 1955 QUANTITIES S.Y. S.Y. Subg. L. F. S. Y. Alley Fnit No. Location Paying Prep. C. & G. Slab .780 17th St.; Salem Ave. to Raleigh Ave. .809 Peoria Ave.; Alley S. of 3 8th St. to 39th St. 21995,95 S. Y. Paving 275.95 S. Y. Paving 3,738.38 S. Y. Subgr. Prep. 1,488.28 L. F. Curb & Gutter 191.04 L. F. Curb & Gutter 2,995.95 3,409.36 1,488.28 275.95 329.02 191.04 31271.90 31738.38 1,679.32 COST ESTIMATES 1.15 = 6 31445.33 a 1.12 = 309.06 ( .20 = 747.68 @ 1.50 = 2, 232. �,2 0 1.47 : 280.83 Contract Cost 5% Engineering TOTAL COST 71015.32 350.76 7,366.08 Total City City to Pay Contr. Contract Credit nit No. Total Cost P. 0. Cost Cost after Dec. 15, 195 Cost Nj r. De .780 6,677.61 6,208.93 468.68 150.70 6,359.63 317.5 .809 688.47 525.41 163.06 130.28 655.69 32.7 OTA.iS 7,366.08 .$ 6,734.34 631.74 $ 312.82 $ 7,015.32 6 350.7