HomeMy WebLinkAboutResolution - 111055G - Paving Improvements - West Texas Contruction, Inc. - 17Th St, & Peoria Ave - 11/10/1955RESOLUTION
I I I Osts rq
RESOLUTION ACCEPTING INPROVEMTS ON PORTIONS OF STREETS, AND/OR
AVENTUES AS LISTED BELOW.
WHEREAS, the ,City of Lubbock passed resolutions September 22, 1955, and
October fit 1955, authorizing the construction of street improvements by West
Texas Construction., Incorporated, Paving Contractors, on portions of various
streets in said City 'including among others the following:
17th Street from its intersection with a line 20 feet West of the West Property
Line of Salem Avenue to its intersection with a line 105.4 feet West of the
West Property Line of Raleigh Avenue,_ known and designated as Unit Number 1780.
Peoria A4e=6 from its intersection with the North Property Line of 39th Street
to its intersection with a line 2.5 feet South of the South Property Line of
the Alley South of 38th Street., known and designated as Unit Number 1809.
AND WHEREAS, the improvements upon the said portions of the above—
mentioned streets have been inspected and found to have been constructed
according to the approved plans and specifications.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS:
I.
That the improvements on said portions of the abovementioned streets
bet and the same are hereby accepted and the City Engineer be and is hereby
authorized to direct the payment of the City's share on December 15, 1955•
II.
This resolution shall take effect and be in force after its passage.
PASSED AND APPROVED THIS 10TH DAY OF NOVEMBER, 1955•
Lower Ci&y Se
rson,
ug E:, Wilsbn., City Attorney
r-
CITY OF LUBBOCK
Honorable
Lubbock,
Text
Gentlemen:
TEXAS
November 10, 1955
Mayor and City Commission
Z have examined the paving improvements constructed by West Texas
Construction, Inc.,, paving contractors,, as authorized by resolutions
passed and approved September 22J. 1955, and October 6, 1955, and
find the improvements on streets known and designated as Units
No. 1780 and 1809 as listed on the attached final estimate sheet
to have been completed in accordance with plans and specifications
and recommend that you accept improvements on said streets, paying
the contractor the amount shown on the attached consolidated
estimate sheet on the due date shown on the abovementioned resolutions
as due him by the City of Lubbock.
JHS:jb
Very truly yours,
ohm T. Hi.ckerson
City Engineer
CCNSOLIDATED FILIAL EST114ATE
FOR UNIT. NOS. 1780 AND 1809; AUTHORIZED
SEPTEMBER 22, 1955 AND OCTOBER 60 1955,
RESPECTIVELY; ACCEPTED NOVEMM 100 1955
QUANTITIES
S.Y. S.Y. Subg. L. F. S. Y. Alley
Fnit No. Location Paying Prep. C. & G. Slab
.780 17th St.; Salem Ave. to Raleigh Ave.
.809 Peoria Ave.; Alley S. of 3 8th St. to
39th St.
21995,95 S.
Y.
Paving
275.95 S.
Y.
Paving
3,738.38 S.
Y.
Subgr. Prep.
1,488.28 L.
F.
Curb & Gutter
191.04 L.
F.
Curb & Gutter
2,995.95 3,409.36 1,488.28
275.95 329.02 191.04
31271.90 31738.38 1,679.32
COST ESTIMATES
1.15 = 6 31445.33
a 1.12 = 309.06
( .20 = 747.68
@ 1.50 = 2, 232. �,2
0 1.47 : 280.83
Contract Cost
5% Engineering
TOTAL COST
71015.32
350.76
7,366.08
Total City
City to Pay Contr.
Contract
Credit
nit No. Total Cost P. 0. Cost Cost
after Dec. 15, 195
Cost
Nj r. De
.780 6,677.61 6,208.93 468.68
150.70
6,359.63
317.5
.809 688.47 525.41 163.06
130.28
655.69
32.7
OTA.iS 7,366.08 .$ 6,734.34 631.74 $ 312.82 $ 7,015.32 6 350.7