HomeMy WebLinkAboutResolution - 060955H - Paving Improvements - West Texas Contruction, Inc. - SD Of Highland Place - 06/09/19551 i I
RESOLUTION
RESOLUTION ACCEPTING IMPROVEMENTS ON PORTIONS OF STREETS, AND/OR AVENUES
AS LISTED BEL(W.
• WHEREAS, in conformance with the paving requirement provisions of City
Ordinance 1331, the subdivider of Highland Place Lots 1 through 11, Block 9,
Lots 13 through 24, Block 8, made arrangements with West Texas Construction,
Incorporated for the construction of paving improvements on certain streets
dedicated in said subdivision under the provisions of said Ordinance prior
to the recording of the subdivisionplat of a portion of Highland Place,
including the following streets and/or avenues:
38th Street from its intersection with the East Property Line of Nashville
Avenue to its intersection with the East Gutter Line of Orlando Avenue, known
and designated as New Subdivision Unit Number 58.
AND UTEREAS, the construction of the above improvements on the above—_
mentioned streets and/or avenues was performed under the supervision of the
City Engineer, and said improvements have been completed and have been inspec
and found to have been constructed in accordance with city specifications and
in accordance with the provisions of City Ordinance 1331s
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS
I.
That the improvements on said portions of the abovementioned streets and/
avenues be, and the same are hereby accepted, and the City Engineer be and is
hereby authorized to direct payment of the City's portion.
II.
This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 9TH DAY OF JUNE, 1955,
ATTEST: rre 1 R. pp
i
LaV,6nia Lowe,. ity Seferetary
APPROVED:
1W. B. Holmes,
APPROVED:
Vaughn E. Wilson,, City Attorney
- � A. 0(00q 14
CITY OF LUBBOCK
TEXAS
June 9, 1955
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
Z have examined the paving improvements constructed by West Texas
Construction, incorporated under their contract with the Subdivider of
Highland Place Addition, Lots 1 through ll, Block 9, and Lots 13 through
24, Block 8, in accordance with Subdivision Regulation Ordinance Number
1331 and find that the improvements on the street designated flew Sub—
division Unit Number 58, as listed on the attached final estimate sheet,
to have been completed in accordance with plans and specifications on
said street'. and recommend the payment to the contractor the amount shown on
the attaheed consolidated final estimate sheet as being due him from
the City of Lubbock.
Very truly yours,
of
W. B. Holmes
Director of Public Works
EVP:jb
CONSOLIDATED FINAL ESTIMATE FOR HIGHLAND PLACE
ADDITION PAVING UNIT ABUTTING LOTS 1 THRU 11,
BLOCK 9, AND LOTS 13 THRU 24, BLOCK 8
Improvements Constructed by West Texas Construction, Incorporated
SUIS= OF QUANTITIES
N -S S.Y. of S.Y. of L.F. of S.Y. Concre S.Y. CC
Unit No. Location Paving SulDg. Prep Curb & Alley Slab Valley
Gutter Gutter
N—S 58 38th from EGL Orlando Ave. to EPL 3,.678.67 ->4,258.69 1,695.47 109.06
Nashville Ave.
Total 32678.67 42258.69 10695.47
109.06
COST DISTRIBUTION
Total Estimated Highland Place City to Total Contract Credit
N -S Unit No. Cost Subd. Cost Contractor Cost Ener. Dep
N -S 58
$8,600.50 $6,44.72
$8,600.50 $6,442.72
COST ESTIMATE
$4375.92 $70818.64 $781.86
$1,375.92 47,818.64 x`781.86
39678.67 S.E. Paving (Sur. & Base) @ $1.12 =
4,258.69 S.Y. Subgrade Prep. @ $0.20
1,695.47 L.F. Curb & Gutter @ $1.47 =
109.06 S.Y. Conc. Valley Gutter ® $3.25 =
Total Contract Cost
10% Engr.
Total Estimated Cost
$ 4,120.11
851.74
2,492.34
4.45
7x818,64
781.86
$ 8,600.50