RE S OLUT ION
RESOLUTION ACCEPTING IMPROVEMENTS ON A PORTION OF A]:1 ALLEY AS LISTED
BE LOW :
WHEREAS, the City of Lubbock passed a resolution on December 20,
1962 authorizing the construction of improvements by Frank Hodges Cement
Contractor on a portion of the following alley:
The East-West alley between Southeast Drive and East 28th Street from the
East Property Line of Juniper Avenue to the Southwest Property Line of
Southeast Drive, known and designated as Unit A-359.
AND WHEREAS, the improvements upon the said portion of the above-
mentioned alley have been inspected and found to have been constructed
according to the approved plans and specifications.
THEREFORE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portion of the abovementioned alley be
and the same are hereby accepted and the City Engineer be and he is hereby aut�or-
ized to direct the payment of the Cityrs share.
II.
This resolution shall take effect and be in force after its passage.
PASSED AND APPROVED THIS 24TH DAY OF JANUARY, 1963.
ack F. Strong, Mayor
�crm Aper ed
ATTEST:;'
;rity Attorney.
Lavenia Lowe, City Secretary
APPROVED:
n 1:,2fi ), /
ohn T. Hickerson, City Engineer
APP VED:
Fred 0. Senter, Jr., C Attorney
CITY OF LUBBOCK
TEXAS
January 24, 1963
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen;
I have examined the paving improvements constructed by
Frank Hodges Cement Contractor, paving contractor, as authorized
by a resolution passed on December 20, 1962 and find the improvements
on the East-West alley in Block 29, Dunbar Heights as listed on the
final estimate sheet to have been completed in accordance with the
plans and specifications and recommend that you accept the improvements
on said alley authorizing payment to the contractor the amount shown
on the attached consolidated final estimate sheet as due him by the
City of Lubbock.
Yours very truly,
/john T. Hickerson
City Engineer
CONSOLIDATED FIAL ESTMTE
GWO 2817
Accepted January 24, 1963
ZANTITIES
Unit & S.Y.
Sub -Unit Location Paving
A-359 The E -W alley between E. 28th and 664.83
Southeast Drive from the E.P.L. of
Juniper Ave. to the S.W. PL of
Southeast Drive
TOTAL 664.83
COST ESTIMATE
664.83 S.Y. Paving C $5.50 $ 3,656.57
CONTRACT COST $ 3,656.57
COST DISTRIBUTION
Property City
Unit & Contract Owner to
Sub -Unit Cost Cost Contractor
A-359 $ 3,656.57 $ 3,455.46 $ 201.11