HomeMy WebLinkAboutResolution - 102760C - Water/Sewer Improvements - Hemphill Contracting Co - Bacon Heights Addition - 10/27/1960.Z
fl
q 61
j()EQt00 G
RESOLDTION
Resolution accepting water and sewer system improvements for Lots l
thru 80, Bacon Heights Addition.
WHEREAS, the developers of Lots 1 thru 80, Bacon Heights Addition
have complied with the provisions of the City of Lubbock Code, Chapter 34,
Article 2, by providing the water and sewer improvements for said addition in
accordance with paragraph 61 of said Chapter 34, and,
WHEREAS, the total utility cost to the developer is $28,546.61, with
the improvements constructed by Hemphill Contracting Company having a value of
$20,131.45 as determined by the unit prices,established by said Chapter 34, and
$1584.84 cash (engineering, wet tie-ins, paving repair, difference in Pro Rata
and actual cost) paid to the City with the developer to receive a refund of
$11,351.45 in accordance with Chapter 34 of the Code of the City of Lubbock.
WHEREAS, the construction of the said water and sewer improvements was
performed under the supervision of the City Engineer and said improvements have
been completed in accordance with the City of Lubbock's plans and specification
ILUBBOCR:
NOW THEREFORE BE IT RESOLVED BY THE CITY COMISSION OF THE CITY OF
1. That the improvements be and the same are hereby accepted as
an integral part of the water and sewage system of the City
of Lubbock.
2. That refund of the refundable cost in the amount of $11,351.45
be made in accordance with said Chapter 34.
3. This resolution shall take effect and be in force from and after
its passage.
PASSED AND APPROVED THIS 27th DAY OF _October , 1960.
i
David C. Ca$ey, Mayor
ttest d:
av is Lowe, Citq secretary 39.�
proved:Qrn�
hn T. Hickerson, City Engineer
pproved:
red 0. Senter, Jr., -9#,y At