Loading...
HomeMy WebLinkAboutResolution - 092260J - Pavement Improvements - West Texas Construction Inc - Beverly Heights Addition - 09/22/1960r^ 09Z?ko �i RESOLUTION RESOLUTION ACCEPTING MUROVEMENTS ON PORTIONS OF STREETS AND/OR AVENUES AS LISTED BELOW: WHEREAS, in conformance with the paving requirement provisions of Cit ordinance 1331, the subdivider of Beverly Heights Addition, made arrangements with West Texas Construction, Inc. for the construction of paving improvements on certain streets dedicated in said subdivision under the provisions of said ordinance prior to the recording of the subdivision plat of Beverly Heights Addition including the following streets: Avenue U (West curb and gutter only) from its intersection with a line 2.5 feet South of the South Property Line of -the alley South of 69th Street to its intersection with the center line of 66th Street, known and designated as Unit Number N.S. 767. Avenue W from its intersection with a line 15 feet North of the North Property Line of 70th Street, to its intersection with a line 42.161 North of the South Property.Line of 66th Street, known and designated as Unit Number N.S. 768, 67th Street from its intersection with a line 12 feet West of the East Property Line of Avenue W to its intersection with a line 15 feet North of the North Property Line of 68th Street, known and designated as Unit Number N.S. 769. 68th Street from its intersection with a line 12 feet West of the East Property Line of Avenue W to its intersection with a line 11.38feet East of the West Property Line of Avenue U, known and designated as Unit Number 770. 69th Street from its intersection with a line 12 feet West of the East Property Line of Avenue W to its intersection with a line 11.36 feetEast of the West Property Line of Avenue U, known and designated as Unit Number N.S. 771. 70th Street from its intersection with a line 10 feet East of the center line of College Avenue to its intersection with a line 110 feet East of the East Property Line of Avenue W, known and designated as Unit Number N.S. 778. AND WHEREAS, the construction of the above improvements on the above- mentioned streets was performed under the supervision of the City Engineer, and said improvements have been completed and have been inspected and found to have been constructed in accordance with City specifications and in accordance with the provisions of City Ordinance 1331. THEREFCRE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS. I. That the improvements on said portions of the abovementioned streets and the same are hereby accepted and the City Engineer be and he is hereby authorized to direct the payment of the City's portion of the cost. II. 11 This resolution shall take effect and be in force from and after its passage. PASSED AND APPROVED THIS 2219D DAY OF SEPTEMBER, 1960- David C. Casey, Mayor ATTEST-/) /1 Laventia Lowe, City iSecretary APPROVED: j n T. Hickerson, city Engineer Fred -Q. Senter, Jr., CITY OF LUBBOCK TEXAS September 22, 1960 Honorable Mayor and City Commission Lubbock, Texas Gentlemen: i have examined the paving improvements constructed by West Texas Construction, ince, paving contractor, under their contract with the subdividers of Beverly Heights Addition and find the improvements on Avenue U, Avenue.W, 67th Street, 68th Street, 69th Street and 70th Street$ as listed on the final estimate sheet to have been completed in accordance with the plans and specifications and recommend that you accept the improvements on said streets and/or avenues, authorizing payment to the contractor the amount shown on the attached consolidated final estimate sheet as due them by the City of Lubbock. Yours very truly, ohn T. Hickerson City Engineer UANTITIES CONSOLIDATED FML ISTII = BEVERLY SEIMS ADDITION Lots 1-119 Accepted September 22, 1960 S.Y. S.Y. L.F. Unit Location S.Y. L.F. Alley Valley Corregatec Paving C,& G Ret. Gutter Pipe Arch, NS 767 W Ave.,U from 2.5' S. of the S.P,eL. 1110._16 54.79 of the alley S. of 69th St, to L of 66th St. NS 768 Ave. W from 151 N. of the N.P;,,L. of 4523.16 2383.28 61.59 71.11 33,711.14 13,767.57 70th St. to 42.16' N. of the SoPL. Curb & Gutter @ 1.44 19,825.30 of 66th St. S.Y. Alley Return NS 769 67th St. from the E. Lip Line of 3902.49 2219.15 20.00 Valley Gutter @ of Ave. W to 15' N. of the N,P.L. 1,495.25 68.00 L.F. Corregated Pipe of 68th St. 7.50 510.00 NS 770 68th Ste from the E.Lip Line of 4848.80 2598.01 34.76 $ 56,632.14 Ave. W to 11.38' E. of the W.P.L. of Ave. U NS 771 69th St. from the E. Lip Line of 5328.00 2995.77 20.83 34.76 Ave. W to 11.36' E. of the W.P.L. of Ave. U i N5 778 70th Ste from E..Edge strip pave 4971.77 2461.20 60.88 158.42 68.00 @ College Ave. to 1101 E. of E.P.L. Ave. W TOTALS 230574.22 13,767.57 218.09 299.05 68.00 COST DISTRIBUTION Unit & Contract Property Owner Sub -Unit Cost Cost NS 767 1,872,58 10872.58 NS 768 10,563.54 10,563.54 NS 769 8,876.14 8,876.14 NS 770 10,848.72 10,848.72 NS 771 12,210.90 120210.90 NS 778 12,260.26 12,260.26 TOTAL $56,632.14 56,632.14 COST ESTIMATE 23,574.22 S.Y. Paving @ 1.43 33,711.14 13,767.57 L.F. Curb & Gutter @ 1.44 19,825.30 218.09 S.Y. Alley Return @ 5.00 1,090.45 299.05 S.Y. Valley Gutter @ 5.00 1,495.25 68.00 L.F. Corregated Pipe @ 7.50 510.00 CONTRACT COST $ 56,632.14