RESOLUTION
RESOLUTION ACCEPTING MUROVEMENTS ON PORTIONS OF STREETS AND/OR
AVENUES AS LISTED BELOW:
WHEREAS, in conformance with the paving requirement provisions of Cit
ordinance 1331, the subdivider of Beverly Heights Addition, made arrangements
with West Texas Construction, Inc. for the construction of paving improvements
on certain streets dedicated in said subdivision under the provisions of said
ordinance prior to the recording of the subdivision plat of Beverly Heights
Addition including the following streets:
Avenue U (West curb and gutter only) from its intersection with a line 2.5 feet
South of the South Property Line of -the alley South of 69th Street to its
intersection with the center line of 66th Street, known and designated as
Unit Number N.S. 767.
Avenue W from its intersection with a line 15 feet North of the North Property
Line of 70th Street, to its intersection with a line 42.161 North of the South
Property.Line of 66th Street, known and designated as Unit Number N.S. 768,
67th Street from its intersection with a line 12 feet West of the East Property
Line of Avenue W to its intersection with a line 15 feet North of the North
Property Line of 68th Street, known and designated as Unit Number N.S. 769.
68th Street from its intersection with a line 12 feet West of the East Property
Line of Avenue W to its intersection with a line 11.38feet East of the West
Property Line of Avenue U, known and designated as Unit Number 770.
69th Street from its intersection with a line 12 feet West of the East Property
Line of Avenue W to its intersection with a line 11.36 feetEast of the West
Property Line of Avenue U, known and designated as Unit Number N.S. 771.
70th Street from its intersection with a line 10 feet East of the center line
of College Avenue to its intersection with a line 110 feet East of the East
Property Line of Avenue W, known and designated as Unit Number N.S. 778.
AND WHEREAS, the construction of the above improvements on the above-
mentioned streets was performed under the supervision of the City Engineer, and
said improvements have been completed and have been inspected and found to have
been constructed in accordance with City specifications and in accordance with
the provisions of City Ordinance 1331.
THEREFCRE, BE IT RESOLVED BY THE CITY OF LUBBOCK, TEXAS.
I.
That the improvements on said portions of the abovementioned streets
and the same are hereby accepted and the City Engineer be and he is hereby
authorized to direct the payment of the City's portion of the cost.
II.
11 This resolution shall take effect and be in force from and after its
passage.
PASSED AND APPROVED THIS 2219D DAY OF SEPTEMBER, 1960-
David C. Casey, Mayor
ATTEST-/) /1
Laventia Lowe, City iSecretary
APPROVED:
j n T. Hickerson, city Engineer
Fred -Q. Senter, Jr.,
CITY OF LUBBOCK
TEXAS
September 22, 1960
Honorable Mayor and City Commission
Lubbock, Texas
Gentlemen:
i have examined the paving improvements constructed by
West Texas Construction, ince, paving contractor, under their
contract with the subdividers of Beverly Heights Addition and
find the improvements on Avenue U, Avenue.W, 67th Street, 68th
Street, 69th Street and 70th Street$ as listed on the final estimate
sheet to have been completed in accordance with the plans and
specifications and recommend that you accept the improvements on
said streets and/or avenues, authorizing payment to the contractor
the amount shown on the attached consolidated final estimate sheet
as due them by the City of Lubbock.
Yours very truly,
ohn T. Hickerson
City Engineer
UANTITIES
CONSOLIDATED FML ISTII =
BEVERLY SEIMS ADDITION
Lots 1-119
Accepted September 22, 1960
S.Y. S.Y. L.F.
Unit Location S.Y. L.F. Alley Valley Corregatec
Paving C,& G Ret. Gutter Pipe Arch,
NS 767 W Ave.,U from 2.5' S. of the S.P,eL. 1110._16 54.79
of the alley S. of 69th St, to L of
66th St.
NS
768
Ave. W from 151 N. of the N.P;,,L. of 4523.16
2383.28
61.59 71.11
33,711.14
13,767.57
70th St. to 42.16' N. of the SoPL.
Curb & Gutter
@
1.44
19,825.30
of 66th St.
S.Y.
Alley Return
NS
769
67th St. from the E. Lip Line of 3902.49
2219.15
20.00
Valley Gutter
@
of Ave. W to 15' N. of the N,P.L.
1,495.25
68.00
L.F.
Corregated Pipe
of 68th St.
7.50
510.00
NS
770
68th Ste from the E.Lip Line of 4848.80
2598.01
34.76
$ 56,632.14
Ave. W to 11.38' E. of the W.P.L.
of Ave. U
NS
771
69th St. from the E. Lip Line of 5328.00
2995.77
20.83 34.76
Ave. W to 11.36' E. of the W.P.L.
of Ave. U
i
N5
778
70th Ste from E..Edge strip pave 4971.77
2461.20
60.88 158.42 68.00
@ College Ave. to 1101 E. of E.P.L.
Ave. W
TOTALS 230574.22
13,767.57
218.09 299.05 68.00
COST DISTRIBUTION
Unit &
Contract Property Owner
Sub -Unit Cost Cost
NS
767
1,872,58 10872.58
NS
768
10,563.54 10,563.54
NS
769
8,876.14 8,876.14
NS
770
10,848.72 10,848.72
NS
771
12,210.90 120210.90
NS
778
12,260.26 12,260.26
TOTAL $56,632.14 56,632.14
COST ESTIMATE
23,574.22
S.Y.
Paving
@
1.43
33,711.14
13,767.57
L.F.
Curb & Gutter
@
1.44
19,825.30
218.09
S.Y.
Alley Return
@
5.00
1,090.45
299.05
S.Y.
Valley Gutter
@
5.00
1,495.25
68.00
L.F.
Corregated Pipe
@
7.50
510.00
CONTRACT COST
$ 56,632.14