HomeMy WebLinkAboutResolution - 071360M - Water/Sewer Improvements - Hemphill Contracting Co - Cherry Point Addition - 07/13/1960X �o
RESOLUTIM
A /,gy
Resolution accepting water and sewer system improvements for
Lots 178 thru 235, Cherry Point Addition.
WHEREAS, the developers of Lots 178 thru 235, Cherry Point Addition
have complied with the provisions of the City of Lubbock Code, Chapter 34,
Article 2, by providing the water and sewer improvements for said addition
in accordance with paragraph 61 of said Chapter 34, and,
WHEREAS, the total utility cost to the developer is 417,189.02
with the improvements constructed by Hemphill Contracting Company having a
value of $ 14,640.11 as determined by the unit prices established by said
Chapter 34, and 0 2,548.91 cash (engineering, wet tie-ins, paving repair,
difference in Pro Rata and actual cost) paid to the City with the developer
to receive a refund of 6 3,417.56 in accordance with Chapter 34 of the Code
of the City of Lubbock.
ME'`REAS, the construction of the said water and sewer improvements
was performed under the supervision of the City Engineer and said improvements
have been completed in accordance with the City of Lubbock's plans and specifi-
cations,
NGI THEREFORE BE IT RESOLVED BY THE CITY CM1ISSION OF THE CITY
CF LUBBOCK:
1. That the improvements be and the same are hereby accepted as
an integral part of the water and sewage system of the City
of Lubbock.
2. That refund of the refundable cost in the amount of � 3,417.56
be made in accordance with said Chapter 34.
3. This resolution shall take effect and be in force from and after
its passage.
PASSED AND APPROVED THIS 13th DAY OF July , 1960.
Atteste :
P"
Lave 'a Lowe, Ci Secretaty
Approved:
Q7_1C 4/�")xX jr
ty
Ar
Vaughn Ef Milson, City ,Attorney
David C. Casey, 15ayor