HomeMy WebLinkAboutResolution - 110961G - Water/Sewer Improvements - Hemphill Contracting Co - Beverly Heights Addition - 11/09/19611A9'?&1 C"7
RESOLUTION
Resolution accepting water and sewer system improvements for Lots
120 thru 198, Beverly Heights Addition.
WHEREAS, the developers of bots 120 thru 198, Beverly Heights Additi
have complied with the provisions of the City of Lubbock Code, Chapter 34,
Article 2, by providing the water and sewer improvements for said addition in
accordance with paragraph 61 of said Chapter 34, and,
WHEREAS, the total utility cost to the developer is $21,918.15
with the improvements constructed by Hemphill Contracting Company having a val
of $15,411.19 as determined by the unit prices established by said Chapter 34,
and.$6,506.96 cash (engineering, wet tie-ins, paving repair, difference in
Pro Rata and actual cost) paid to the City with the developer to receive no
refund in accordance with Chapter 34 of the Code of the City of Lubbock.
WHEREAS, the construction of the said water and sewer improvements
was performed under the supervision of the City Engineer and said improvements
have been completed in accordance with the City of Lubbock*s plans and
specifications,
NOW THEREFORE BE * RESOLVED BY THE CITY COMMISSION OF THE CITY OF
LUBBOCK:
1. That the improvements be and the same are hereby accepted as
an integral part of the water and sewage system of the City
of Lubbock.
2. That no refund be made in accordance with said Chapter 34.
3. This resolution shall take effect and be in force from and after
its passage.
PASSED AND APPROVED THIS 9th DAY OF November ,1961.
Attest
_ lei
Lavi is Lowe, City ecretary
Approved:
T. Hickerson, C
Engineer
Approved:
Fred 0. Senter, Jre, Cit ttorney
V
David Co Casey, Mayor