HomeMy WebLinkAboutResolution - 042662J - Water/Sewer Improvements - Panhandle Construction Co - Tracy Heights Addition - 04/26/1962BESOLtTrION
Resolution accepting water and sewer system improvements for Lots 1
thru 92, Tracy Heights Addition,
WHEREAS, the developers of Lots 1 thru 92, Tracy Heights Addition
have complied with the provisions of the City of Lubbock Code, Chapter 34,
Article 2, by providing the water and sewer improvements for said addition in
accordance with paragraph 61 of said Chapter 34, and,
WHEREAS, the total utility cost to the developer is $31,762.72
with the improvements constructed by Panhandle Construction Company having a
value of $29,937.96 as determined by the unit prices established by said
Chapter 34, and $1,824.76 cash (engineering, wet tie-ins, paving repair,
difference in Pro Rata and actual cost) paid to the City with the developer to
receive a refund of $10,389.86 in accordance with Chapter 34 of the Code of the
City of Lubbock and a refund of deposit in the amount of $12.86 and,
WHEREAS, the construction of the said water and sewer improvements
was performed under the supervision of the City Engineer and said improvements
have been completed in accordance with the City of Lubbockts plans and
specifications,
LUBBOCK:
N06+T THEREFORE BE TT RESOLVED BY THE CITY COMISSION OF THE C11Y OF
1. That the improvements be and the same are hereby accepted as
an integral part of the water and sewage system of the City
of Lubbock.
2. That refund of the refundable cost in the amount of $10,389,86
be made in accordance with said Chapter 34.
3. That a refund of deposit be made in the amount of $12.86.
4. This resolution shall take effect and be in force from and
after its passage.
PASSED AND APPROVED THIS 26tTH DA APRIL, 1 2.
ack F. Strong, Mayor
Atte e
enia Lowe, Ci y Secretary
d:
T. Hickerson, City Engineer
App d:
Fred 0. Seater, Jr,, Ci orney